SOW Attachment 1 - Site Plans.pdf
PDF 2 MB Posted
- Attached to
- Repair 176WG Lactation Rooms
- Solicitation number
- W50S6L22B0004
About this file
This solicitation seeks proposals for repair of lactation rooms at various facilities within the 176th Wing of the Alaska Air National Guard. The scope of work includes modifying existing spaces to create new lactation rooms and modifying surrounding areas at five locations. It involves base bid items to repair rooms at buildings 17441, 16456, 15455, and 16430 along with optional items to repair rooms at buildings 7252 and 16468. Proposed work must meet standards for acoustic insulation, ventilation, plumbing, lighting and other requirements. The total contract value is estimated between $250,000 to $500,000. Interested parties must be registered in SAM and have a CAGE code to respond. The NAICS code is 236220 and it is anticipated to be a total small business set-aside. The response deadline is June 29th, 2022 and work must be complete within 180 days of notice to proceed.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FXSB220239, Repair Lactation Rooms, Various Facilities – 30 March 2022 SOW Attachment 1. Site Plan
For Reference Only
All Lactation rooms shall model after lactation room shown in Attachment 2. The lactation rooms built shall be similar in appearance as Attachment 2 (for example: similar lighting, layout, colors used, flooring, sink location, accessories). Goal is to provide a quality calming atmosphere for nursing mothers.
1. All Lactation rooms shall have:
a. STC-45 rated door assembly
b. “Lactation Room” or “Nursing Mother” signage on door.
c. Deadbolt that indicates “Occupied/Vacant”
d. Sound dampening gypsum board
e. If ceiling is a suspended system, acoustic blanket shall be installed to dampen noise. Install blanket to allow access above each ceiling tile.
f. Vanity/countertop with single sink (hot and cold water)
g. One duplex outlet above and below countertop
h. One additional outlet place in location conducive to chair/table placement, where mother using breast pump can plug it in, place it on table, and pump.
i. Air supply and return
j. Light switch w/occupancy sensor
k. Wall mounted coat hanger (4 hooks minimum)
l. Full length mirror mounted on door, inside lactation room
m. Tilt mirror at sink
n. If enough room, provide recessed drop-down diaper changing station – coordinate with COR if not providing
o. Wall mounted soap dispenser
p. Recessed wall napkin dispenser and trash can unit
q. If required by code/regulation, provide fire strobes/alarms
r. Adequate fire suppression coverage
s. Tile flooring
2. Contractor shall modify areas as necessary (demo/construct/modify) to ensure finished usable products both in modified areas affected by lactation room construction and lactation rooms.
a. Contractor shall provide/modify lighting to provide dedicated lighting and control system(s) in modified areas affected by lactation room construction.
b. Contractor shall provide/modify HVAC return/supply and fire suppression to provide proper air return/supply coverage and proper fire suppression coverage in modified areas affected by lactation room construction.
c. Contractor shall repair walls, ceilings, flooring, other damages in modified areas affected by lactation room construction. Finish/paint to match surrounding finishes.
3. Contractor to review facility drawings and verify all information pertinent to this project. This includes but is not limited to validating wall-types, HVAC, electrical, flooring, plumbing. All documentation provided shall be field verified since drawings may be outdated. Drawings can be viewed at 7252 Gibson Avenue, JBER.
4. Site plans provided below are provided to contractor to give idea of what is being requested. Plans are not providing final dimensions – contractor to propose final dimensions ensuring all codes are met.
For Reference Only
BASE BID
O&T BLDG. 17441
Remove Lockers, repair/finish surrounding area. If lockers are one unit, remove unit and replace with single wide, double stacked lockers with access facing North (toward existing bench).
Relocate accessories to new modified bathroom
Figure 1. Women’s First Floor Restroom – current layout
Figure 2. Proposed layout
Lactation Room
Bench
Bench
For Reference Only
HANGAR 12 BLDG. 16456
1. Contractor shall relocate lockers per end-user’s guidance.
2. Contractor shall demo wall shown in red (Figure 4.) to allow adequate walkway space between the new lactation room and the bathroom stalls. Not all demo required is shown.
3. Contractor to determine final size of lactation room to ensure adequate walkway space is met.
Figure 3. Women’s Restroom – current layout
Red line = demo (not all demo required is shown)
Green = New
Figure 4. Proposed Lactation Room Layout (in green)
For Reference Only
HANGAR 10 BLDG. 15455
West bay, men’s/women’s bathroom
1. Contractor to determine best engineering solution for new single sink. Lighting/outlet(s) shall be relocated if required, and the necessary bathroom accessories that were provided at the double sink (soap dispenser, napkin dispenser, etc.)
2. Contractor to determine size of lactation room to ensure adequate walkway space in both restrooms.
Figure 5. Men’s and Women’s Restroom – current layout
Figure 6. Proposed Lactation Room Layout
For Reference Only
HANGAR 11 BLDG. 16430
East bay, 3rd Floor
1. Contractor to modify rooms 306/307 (shown in Figure 7.), to provide functioning lactation room and office that is minimum 120SF (shown in Figure 8.)
Figure 7. 3rd Floor – Current Layout
Figure 8. 3rd Floor – Proposed Lactation Room/Office Modification
For Reference Only
OPTIONAL BID ITEM 1. CES BLDG. 7252
1. Contractor shall modify closet (room 112A) to create lactation room.
2. Expecting closet to have water supply and drain lines in area since closet used to be kitchen with operating sink.
OPTIONAL BID ITEM 2. AMC BLDG. 16468
1st floor, Women’s Restroom
Figure 9. Women’s Restroom – Current layout
Figure 10. Proposed layout
File details come from the government source that posted it. Updated .