This document contains questions and answers related to solicitation number W50S6K20B0004 from the Department of the Army National Guard for repairs to energy management and control systems and water meters at Eielson Air Force Base in Alaska. Key details include requirements to replace existing water meters and install new meters according to provided diagrams, conduct surveys for lead-based paint and asbestos in specific buildings, develop environmental protection and hazardous waste plans, address potential contaminated soil discovery procedures, and immediately report any spills of any quantity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

W50S6K20B0004

Repair EMCS and Meters, Eielson Air Force Base, AK

14 Aug 2020

1. A Water Meter Piping Diagram is shown on sheet M-001. Please furnish a condensate meter piping diagram

Response: This project contains a mixture of replacing existing water meters and installing new water meters where ones do not currently exist. If replacing an existing meter, the intent is for a one-for-one change out without modification of the surrounding piping, except as needed to support the meter installation. New water meter installs should be in accordance with the water meter piping diagram on sheet M-001.

Condensate meters will follow the same diagram and logic as the water meters.

2. Q. We installed the following meter in Building 3180 in 2013 under Contract W91ZRU-10-D-0015-003, Project FTQW08-2912: Badger Recordall Model 120 disc meter with ER420 totalizer.

2A Q: Perhaps this meter just needs a new totalizer or output signal?

R. - B1171 and B3225 have 3” water meters. This can be confirmed by the contractor during the pre-bid site visit. The intent is to install the same style/specified water meters which are being used for the 16-2602 project.

R. B3180 does have a newer meter from that more recent remodel. We are fine with this staying in service (therefore excluding it from 20-2004). The contractor will be responsible for incorporating it into the new DDC under the primary 16- 2602 project.

3. Q Specification Section 01 11 00, Summary of Work, paragraphs 1.1 and 1.6 discuss “Salvage Plan” and “Salvage of Materials and Equipment.” The specifications do not include Division 02 specifications which normally detail the requirements of existing conditions remediation and salvage. Would the Government provide a list of locations and items to include in the salvage plan?

R There are no known items that will require salvage.

4. Q In Specification Section 01 33 00, paragraph 1.6.1., the contractor is to use the submittal register provided by the Government. After award, will the Government provide the submittal register in MS Word or Excel format?

R The submittal register will be provided in Excel format.

5. Q Is an AF Form 103, BCE Work Clearance Request form (dig permit) required to be processed if options are awarded?

R An AF103 will be required regardless of whether the options are awarded (i.e. an AF103 will be required for the base bid).

6. Q Specification 01 35 26, Government Safety Requirements appears to be the standard USACE spec. Is a standard lift plan required as a submittal for the components utilized in the features of work for this contract?

R A standard lift plan submittal will be required.

7. Q Specification Section 01 50 00: Is a contractor office required to have conference room area for weekly meetings, or can these be held in a Government facility?

R. A Government facility (B3225) can be utilized.

8 Q. Specification Section 01 50 00 discusses road closures and temporary traffic provisions. Is West Loop able to be closed for the portion required to install the underground crossing?

R. At this time, it is anticipated that a closure of West Loop will be allowable.

However, the final call on road closure locations, dates, times, and durations will be subject to approval by the 354FW, as they own that road.

9. Q Specification Section 01 50 00 states backflow preventers are utilized in temporary facility application, but does not state how or where this occurs. Is the application of the temporary backflow preventers for re-routing facility water supply while new water meters are installed and tested? Does this apply to all facilities receiving new water meters per Drawing M-001?

R. Temporary backflow preventers will only be required if an existing backflow must be bypassed in order to perform water meter work. This is not expected but the language was included due to the potential for unforeseen conditions.

10. Q Specification section 22 00 00 identifies backflow prevention devices, please confirm this spec applies to the single, new device to be installed in Bldg 3130, per Drawing M-112. Is this correct?

R This is the correct understanding.

11. Q Division 03 and 32 specifications related to concrete work are not included in the solicitation. CLIN 0003, Option, includes underground work to connect Buildings 3127 and 3128. A road crossing is involved that currently has concrete curb and gutter. Approximately 6 – 8 LF each side of street requires demolition.

As part of the process would new sections of concrete curb and gutter be required and if so, what would be the specification for this?

R Repair of curb and gutter would be required. A specification for can be provided according to UFGS 32 16 19.

12. Q If the curb and gutter is demolished, can it be disposed of on base at the Spruce Lake site?

R It will be at the discretion of 354 CES Natural Resources whether they will accept the material for on base disposal. It will be the responsibility of the contractor to perform this coordination. If Natural Resources does not accept the material, then it will need to be hauled off base. Please note that all excavations are occurring in areas of no known contamination, therefore the generic Sampling and Analysis Plan applies.

13. Q Would demolished asphalt be disposed of on Eielson AFB, or hauled off-base?

R Hauled off base.

14. Q: Drawing M-003 does not indicate one or two at the 90-deg turns, but the narrative seems to contradict the drawing.

A: One handhole will be required as shown on M-003 and detail 2/M-001.

SECTION 01 57 19

1.3 SUBMITTALS

SD-01 Preconstruction Submittals: Employee Training Records

15. Q: What specific environmental training records are required?

A: Contractor employees shall be properly trained (with training documentation) in hazardous waste disposal procedures. Hazardous Waste

Training will be offered biweekly October-April and weekly May-September, held on Mondays from 1000-1130 in the Second Floor Conference Room (Rm 208) of the 354th CES Building 2258. Date and location subject to change. No training on Federal Holidays. Please RSVP to ensure a seat and confirm date/location has not changed. It is the responsibility of the Contractor to coordinate with the Program Manager, Ariane Glover, (907-377-1659) to attend training prior to the start of field work.

Additionally, all contractors working on the installation are required to take the Environmental Management System (EMS) General Awareness Training (Course EMS100AFIT00004) offered on TEACH (7 min duration). Training can be accessed electronically at the following site: https://usaf.learningbuilder.com.

Training certificates will be required as a submittal and be provided to the EMS Coordinator via email at glover.ariane@us.af.mil prior to receiving the Environmental Element signature on the AF Form 103, "Work Clearance Request."

The Environmental office will not sign the Contractor's Work Clearance

Request (AF Form 103) if the Contractor has not attended the hazardous and solid waste training and EMS training.

SD-06 Test Reports

16. Q: Solid waste management report is the only one listed. Are there other environmental tests required?

A: The Contractor shall subject a representative sample of each type of hazardous waste (or potentially Hazardous Waste)generated to the applicable laboratory test to make an appropriated waste determination at the point of generation (in accordance with 40 CFR 262.11) such as the Toxic Characteristic Leaching Procedure (TLCP) and pH testing, as needed.

Sampling and testing for appropriate metals, and volatile and semi-volatile chemicals shall be performed by an independent, EPA approved test laboratory that is regularly engaged in the sampling and testing of hazardous materials and waste. Provide the test results to Eielson’s Hazardous Waste Facility before transferring the waste to the facility. Refer to the Waste Disposal and Borrow Pit Worksheet for additional hazardous waste handling requirements.

17. Q: Are there records of previous LBP or Asbestos contamination for any of these facilities?

A: The proposed project involves renovating or repairing an old structure. The contractor must contact Insulation Shop (CEO/CEOII) by phone (907-377-5133) or by email (charles.herbert@us.af.mil, james.walsh.23@us.af.mil) prior to the work to obtain more details and to inspect the old site records for asbestos. If asbestos is discovered, an asbestos plan will be required and must include the following:

1. All asbestos waste disposal records shall be signed by CEO/CEOII prior to removal of such waste from the base. A copy of the completed manifest (signed by the receiving landfill) shall be submitted to CEO/CEOII and CES/CEIE.

2. The contractor shall follow Section 2.1.13, below, of the Eielson AFB Asbestos Management and Operations Plan (AMOP). A copy of the AMOP may be obtained from 354 CES/CEIEC.

3. The Contractor is:

a. Responsible for identifying asbestos containing material (ACM) prior to conducting maintenance, abatement, renovation, or demolition activities.

b. Responsible for making proper notification and providing copies to CES/CEIEC and CEO/CEOII.

c. Prior to final approval of job completion, a copy of asbestos removal procedures, amounts removed, type of product removed, location of removal actions and residual product left in place be provided to CEO/CEOII Insulation Shop, Tel# 907-377-5133 or via email to charles.herbert@us.af.mil or to andrew.broome@us.af.mil. This is required for updates to the facility asbestos register maintained by the Insulation Shop in accordance with 40 CFR 763, AFI32- 1052 and AFOSH 161-21.

Due to the age of the following facilities: B3127 (1954) and B3180 (1956), lead based paint may be present, therefore, a lead-based paint survey will be required for the above listed facilities, if disturbing painted surfaces in areas not previously sampled.

Survey and sampling is the responsibility of the proponent. Note that previous sampling at B3180 showed lead present above regulatory limits in wall tiles. Please contact the Toxics Program Manager for previous sampling results and locations surveyed. No records exist for previous sampling at B3127.

Please use appropriate PPE and follow disposal requirements, as needed. If disposing of surfaces with paint coatings, a TCLP lead sample (using Method 1311 in SW-846) will be required. Any results greater than or equal to 5 ppm must be handled and disposed of as hazardous waste. Note that an exemption exists for scrap metal recycling for metal exhibiting a characteristic waste. Scrap metal not recycled in accordance with the regulations is not excluded under 40 CFR 261.4(a)(13) or exempt under 261.6(a)(3)(ii).

Based on the age of the following facilities, no known lead based paint concerns:

B1168 (1998), B1171 (1997), B1172 (1995), B1173 (1995), B1174 (1990), B1176 (1990), B1180 (2011), B3128 (1991), B3129 (1995), B3130 (1992), B3131 (1991), B3132 (1994), B3133 (1994), B3225 (1998), B32251 (2009), and B3345 (2000).

1.6 ENVIRONMENTAL PROTECTION PLAN

18. Q: This project may not require excavation or impact other environmental aspects. Do we still need to address all these items in the EPP?

A: The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. The Contractor shall address each topic at a level of detail commensurate with the environmental issue and required construction task(s). The Contractor shall include environmental issues associated with the specific project. After submittal and review of the Environmental Protection Plan, the Contractor shall meet with the Contracting Officer and the 168 CES Environmental Manager for the purpose of discussing the implementation of the Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's environmental plans. The Environmental Protection Plan shall be current and maintained onsite by the Contractor.

The ENVIRONMENTAL PROTECTION PLAN (EPP) shall include, but is not limited to, the listed items. Respond to all listed items. If an item is not applicable to project work, then give a short explanation of why it is not. Include discussions of any other environmental issues germane to the work, even if a particular topic may not appear in the list.

Ensure that Name(s) and contact information of person(s) within the Contractor's organization who is (are) responsible for ensuring adherence to the Environmental Protection Plan, and Name(s) and qualifications of person(s) responsible for manifesting hazardous waste, and asbestos and lead-based paint (LBP) to be removed from the site, if applicable.

1.6.9.6 Compliant Materials

19. Q: Do we need to provide SDSs for all materials including items such as wd- 40?

A: A hazardous material is any substance defined by OSHA as a hazardous substance requiring a SDS. Hazardous materials that need to be reported include but are not limited to chemicals, paints, thinners, sealing compounds, strippers, glues, solvents, all petroleum products including oils, hydraulic fluids, and fuels stored on-site (fuels in vehicles are exempt), pesticides, adhesives, acids, flammables, corrosives, oxidizers, compressed gases (such as but not limited to oxygen, acetylene, propane, flammable and non-flammable gases), all aerosols, and all materials containing hazardous substances.

The Contractor shall request authorization for all proposed hazardous materials to be used by completing the Contractor Hazardous Materials Usage Tracking Form, Appendix C, for each hazardous material and shall submit a copy of the SDS for each item to the Contracting Officer (CO) prior to bringing the items on the installation. The Contractor shall submit to the CO the information for each item not less than 30 calendar days prior to bringing the items on the installation to ensure the HAZMAT Program Manager has adequate time to review the HAZMAT inventory.

The inventory shall include a table identifying the material, initial quantity, quantity used, unit of issue, manufacturer, and product code. This table must be updated and submitted quarterly during the project, unless additional quantities/materials are added, at which time the Contractor has seven days to provide the additional information and safety data sheet (SDS). At project completion, submit an updated inventory indicating quantities used, and disposed.

A Hazardous Materials Usage Tracking Form will be provided.

Any hazardous materials transported on site shall have an SDS and a copy must be delivered to the Contracting Officer, the Hazardous Materials Program Manager at Bldg 2258, (377-5209), and 168 CES, Base Civil Engineer.

All usable hazardous material shall be removed from the site by the Contractor at project completion unless other provisions within the contract direct otherwise.

3.7.3.2 Hazardous Waste Disposal

20. Q: Will the base accept any hazardous waste at the installation accumulation point?

A: All hazardous waste will be transported off Base, coordinated with the base Hazardous Waste Facility, providing sample results, waste profiles, manifest, and other associated disposal documentation as required. No hazardous waste will be accepted for disposal on Base, with the exception of used aerosol cans for puncturing and scrap metal recycling. All associated costs for disposal are the responsibility of the Contractor.

The Contractor shall call 377-1668 to coordinate removal of hazardous waste a minimum of 10 days prior to transporting the waste off base. All sampling results, waste profiles, and hazardous and/or non-hazardous waste manifests must be included for review 10 days prior to waste removal.

All hazardous and non-hazardous waste manifests must be signed by a designated Eielson POC in accordance with Eielson's current Waste Manifest Delegation of Authority Letter. Please contact the Hazardous Waste Facility at 377-1668 for signature. Copies of all manifests must be provided to 354 CES/CEIEC, Hazardous Waste Facility Manager.

Questions regarding disposal of hazardous waste should be directed to

354 CES/CEIEC, 377-1659.

3.11 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED

SOIL OR HAZARDOUS WASTES

21. Q: Does this project have the potential to encounter contaminated soils?

A: At this time, there are no known areas of contamination in the project footprint.

However, inadvertent discovery is possible. The project will operate under the

ENVIRONMENTAL WORK PLAN FOR PROJECTS WITH NO KNOWN

CONTAMINATION (rev June 4, 2019) also known as the Generic SAP. In the event that excavation exposes previously unknown contamination, regardless of size of excavation, digging will cease and a Site Specific Environmental work plan will be developed as outlined in the Generic SAP. The Contractor shall comply with all terms of the Generic SAP for field screening, sampling, stockpiling, and reporting.

Any discovery of potentially contaminated soils or water (odors, free product, sheen, staining, field screening readings >20 ppm), not previously documented by the Base, shall be reported immediately to 911. Eielson AFB Reporting Procedures Guidance shall be followed.

354 CES/CEIEC shall make all required agency spill reporting notifications.

Suspect soil must be tested to determine if it contains any contaminants prior to relocating it.

Testing and disposal of soil shall follow Alaska Department of Environmental Conservation 18 AAC 75 (Oil and Other Hazardous Substances Pollution Control).

If test results determine “other than clean”, the material shall be transported to a permitted Subtitle C facility for hazardous waste or a permitted Subtitle D facility for nonhazardous waste, in accordance with state and federal regulations.

NOTE: UNDER NO CIRCUMSTANCES shall soil, clean or contaminated, from

Eielson AFB be delivered to or donated to off-base sources (other than an appropriate landfill or remediation processing center based on the contaminants identified) for use.

3.7.4 Releases/Spills of Oil and Hazardous Substances

3.7.4.1 Response and Notifications

22. Q: Is there a minimum discharge below which reporting is not required?

A: NO. All spills of any quantity must be reported.

Spills should be reported by calling 911 and asking for Eielson dispatch which will connect to the EAFB Fire Department. 354 CES/CEIEC shall make all required agency spill reporting notifications.

Spill reporting is required for spills to any surface, including inside buildings, to sewers, and to surface water bodies. The operator shall have sufficient spill response supplies readily available on vehicles and/or at the site to contain any spillage. The Contractor shall take appropriate actions to correct the spill’s cause and prevent future occurrences.

The Contractor shall be responsible for all costs and labor required for sampling and analysis, response, containment, clean up, and disposal. The site of the spill shall be documented using latitude and longitude in the Eielson AFB approved digital GIS format. Contractors shall submit an Alaska Department of Environmental Conservation (ADEC) “Transport, Treatment, & Disposal Form for Contaminated Media” to the Tanks & Spills Program Manager for submission to ADEC. The form is available online at https://dec.alaska.gov/spar/csp/guidance_forms/csguidance.htm. ADEC approval shall be secured prior to transport of any contaminated material (e.g. soil, water, absorbents) generated by cleanup of a spill or previously unknown historic contaminated site off-base. A copy of the approval to transport shall be submitted to the Eielson project manager prior to transport off-base. No material shall be removed from the site nor backfill begun without approval from the 354 CES/CEIEC. Copies of the weight and/or acceptance tickets shall be submitted to the Eielson project manager within 5 business days of delivery or receipt by Contractor. Copies of the certificate of thermal incineration or disposal and confirmatory samples shall be submitted to the Eielson project manager within 5 business days of delivery or receipt by Contractor.

All petroleum spills shall be cleaned up using absorbent materials. Spills caused by the Contractor shall be the Contractor’s responsibility to containerize and dispose of the contaminated absorbent material. No contaminated absorbents may be transported off-base without an ADEC approval, secured through the Tanks & Spills Program Manager (907-377-2937). A waste manifest, signed by a designated Air Force POC, will be required for waste transported off the installation. Please coordinate with the base Hazardous Waste Facility (907-377-1668) 10 days prior to transport.

23. Q. Since we were not able to inspect the meter installation sites, perhaps you can send photos of each existing meter installation, noting the sizes of existing piping?

A. This opportunity was presented at the SITE VISIT on 5 Aug. All attendees were asked if there was anything specific to look they would like to look at. No parties requested photographs of the meter installation sites.