Enclosure 2 - Cost Template _31 March 2025.xlsx

XLSX spreadsheet 247 KB Posted

Attached to
Enhanced Contested Logistics Software Prototype Development
Solicitation number
W50RAJ-25-CL-RFPP
Issued by

About this file

This document is a detailed Cost Template Excel file for a federal contract opportunity from the U.S. Army's Rapid Capabilities and Critical Technologies Office (RCCTO). The template is designed for a competitive Request for Prototype Proposals (RFPP) for Enhanced Contested Logistics Software Prototype Development, with the intent to award one or more Other Transaction Agreements for Prototype (OTAP). The comprehensive cost template includes multiple worksheets covering labor hours, labor costs, travel expenses, and optional data rights across base years and option periods, with placeholders for prime and subcontractor details.

The template provides a structured approach for offerors to submit cost proposals, with specific instructions such as maintaining spreadsheet links, ensuring timeframe alignment with the RFPP, and renaming subcontractor tabs appropriately. Notably, only U.S. companies with the capability to process and store Controlled Unclassified Information (CUI) are eligible to submit proposals. The cost template breaks down potential costs into labor categories, travel, other direct costs (ODCs), and optional data rights, allowing detailed financial planning across base years and potential option periods, though in this instance the specific numeric values are not populated.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 2 - Introduction

PRIME OFFEROR:XYZ, Inc.
SUB OFFEROR (IF APPLICABLE):XYZ, Inc.
PROPOSAL NO.:XXX
PROPOSAL PART:Enclosure 2 - COST/PRICE

Cost/Price Proposal General Rules:

1. The spreadsheets in this excel file may contain links. Do not delete any tables in the spreadsheets to avoid breaking the links.

2. It is the contractors responsibility to ensure the periods and timeframes included in this cost/price proposal match with specific timeframes identified in subject TORP.

3. Rename the applicable subcontractor tab to identify the subcontractor company name proposed.

4. Do not protect cells. Do not encrypt or password protect the files. Do not use hardcode numbers, show all formulas.

5. Follow any instructions provided in the appropriate spreadsheet.

subject RFPP.

Enclosure 2A - Total Summary

PRIME OFFEROR:XYZ, Inc.
SUB OFFEROR (IF APPLICABLE):XYZ, Inc.
PROPOSAL NO.:XXX
PROPOSAL PART:Enclosure 2 - COST/PRICE
TOTAL COST SUMMARY
PERFORMANCE PERIODBASE YEAR 1BASE YEAR 2BASE YEAR 3OPTION 1OPTION 2TOTAL
Labor Hours000000
Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fixed Fee/Profit on Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ODC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Enclosure 2B - Labor Hours

PRIME OFFEROR:XYZ, Inc.
SUB OFFEROR (IF APPLICABLE):XYZ, Inc.
PROPOSAL NO.:XXX
PROPOSAL PART:Enclosure 2 - COST/PRICE
FFP - TOTAL TEAM LABOR HOUR SUMMARY
TEAM MEMBERBase Year 1Base Year 2Base Year 3Option 1 PeriodOption 2 PeriodTotal Base and Option Hours% of Total Hours
Prime Offeror Name000000ERROR:#DIV/0!
Sub 1 Name000000ERROR:#DIV/0!
Sub 2 Name000000ERROR:#DIV/0!
Sub 3 Name000000ERROR:#DIV/0!
Sub 4 Name000000ERROR:#DIV/0!
Total Team Labor Hours000000ERROR:#DIV/0!
TOTAL LABOR CATEGORY/HOUR SUMMARY
LABOR CATEGORYBase Year 1Base Year 2Base Year 3Option 1 PeriodOption 2 PeriodTotal Base and Option Hours% of Total Hours
Labor Category Title 1*000000ERROR:#DIV/0!
Labor Category Title 2*000000ERROR:#DIV/0!
Labor Category Title 3*000000ERROR:#DIV/0!
Labor Category Title 4*000000ERROR:#DIV/0!
Labor Category Title 5*000000ERROR:#DIV/0!
Etc.000000ERROR:#DIV/0!
Total Hours All Labor Categories000000ERROR:#DIV/0!
BASE YEAR 1 (MM/DD/YR - MM/DD/YR)
(Prime Offeror Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Prime Name) Hours0
(Sub 1 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 1 Name) Hours0
(Sub 2 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 2 Name) Hours0
(Sub 3 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 3 Name) Hours0
(Sub 4 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 4 Name) Hours0
TOTAL FFP BASE YEAR 1 HOURS0
BASE YEAR 2 (MM/DD/YR - MM/DD/YR)
(Prime Offeror Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Prime Name) Hours0
(Sub 1 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
0
Total (Sub 1 Name) Hours0
(Major Sub 2 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 2 Name) Hours0
(Sub 3 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
0
Total (Sub 3 Name) Hours0
(Sub 4 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 4 Name) Hours0
TOTAL FFP BASE YEAR 2 HOURS0
BASE YEAR 3 (MM/DD/YR - MM/DD/YR)
(Prime Offeror Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Prime Name) Hours0
(Sub 1 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 1 Name) Hours0
(Major Sub 2 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 2 Name) Hours0
(Sub 3 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 3 Name) Hours0
(Sub 4 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 4 Name) Hours0
TOTAL FFP BASE YEAR 3 HOURS0
OPTION 1 (MM/DD/YR - MM/DD/YR)
(Prime Offeror Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Prime Name) Hours0
(Sub 1 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 1 Name) Hours0
(Major Sub 2 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 2 Name) Hours0
(Sub 3 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 3 Name) Hours0
(Sub 4 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 4 Name) Hours0
TOTAL FFP OPTION 1 HOURS0
OPTION 2 (MM/DD/YR - MM/DD/YR)
(Prime Offeror Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Prime Name) Hours0
(Sub 1 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 1 Name) Hours0
(Major Sub 2 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 2 Name) Hours0
(Sub 3 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 3 Name) Hours0
(Sub 4 Name)Site LocationTotal Hrs
Labor Category Title 1*0
Labor Category Title 2*0
Labor Category Title 3*0
Labor Category Title 4*0
Labor Category Title 5*0
Etc.0
Total (Sub 4 Name) Hours0
TOTAL FFP OPTION 2 HOURS0

Enclosure 2B - Labor Costs

PRIME OFFEROR:XYZ, Inc.
SUB OFFEROR (IF APPLICABLE):XYZ, Inc.
PROPOSAL NO.:XXX
PROPOSAL PART:Enclosure 2 - COST/PRICE
FFP - TOTAL TEAM LABOR SUMMARY
TEAM MEMBERLabor HoursEstimated CostFixed FeeTotal FFP
Prime Offeror Name0$ - 0$ - 0$ - 0
Sub 1 Name0$ - 0$ - 0$ - 0
Sub 2 Name0$ - 0$ - 0$ - 0
Sub 3 Name0$ - 0$ - 0$ - 0
Sub 4 Name0$ - 0$ - 0$ - 0
Total Team Labor Costs0$ - 0$ - 0$ - 0
FFP - TOTAL LABOR BREAKOUT
PERFORMANCE PERIODLabor HoursEstimated CostFixed FeeTotal FFP
Base Year 1 Labor0$ - 0$ - 0$ - 0
Base Year 2 Labor0$ - 0$ - 0$ - 0
Base Year 3 Labor0$ - 0$ - 0$ - 0
Option 10$ - 0$ - 0$ - 0
Option 20$ - 0$ - 0$ - 0
Total Task Order0$ - 0$ - 0$ - 0
BASE YEAR 1 LABOR
(Prime Offeror Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(PRIME NAME) FFP - TOTAL BASE YEAR 10$ - 0$ - 0$ - 0
(Sub 1 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 1 NAME) FFP - TOTAL BASE YEAR 10$ - 0$ - 0$ - 0
(Sub 2 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 2 NAME) FFP - TOTAL BASE YEAR 10$ - 0$ - 0$ - 0
(Sub 3 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 3 NAME) FFP - TOTAL BASE YEAR 10$ - 0$ - 0$ - 0
(Sub 4 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 4 NAME) FFP - TOTAL BASE YEAR 10$ - 0$ - 0$ - 0
BASE YEAR 2 LABOR
(Prime Offeror Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(PRIME NAME) FFP - TOTAL BASE YEAR 20$ - 0$ - 0$ - 0
(Sub 1 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 1 NAME) FFP - TOTAL BASE YEAR 20$ - 0$ - 0$ - 0
(Sub 2 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 2 NAME) FFP - TOTAL BASE YEAR 20$ - 0$ - 0$ - 0
(Sub 3 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 3 NAME) FFP - TOTAL BASE YEAR 20$ - 0$ - 0$ - 0
(Sub 4 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 4 NAME) FFP - TOTAL BASE YEAR 20$ - 0$ - 0$ - 0
BASE YEAR 3 LABOR
(Prime Offeror Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(PRIME NAME) FFP - TOTAL BASE YEAR 30$ - 0$ - 0$ - 0
(Sub 1 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 1 NAME) FFP - TOTAL BASE YEAR 30$ - 0$ - 0$ - 0
(SUB 2 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 2 NAME) FFP - TOTAL BASE YEAR 30$ - 0$ - 0$ - 0
(Sub 3 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 3 NAME) FFP - TOTAL BASE YEAR 30$ - 0$ - 0$ - 0
(Sub 4 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 4 NAME) FFP - TOTAL BASE YEAR 30$ - 0$ - 0$ - 0
OPTION 1
(Prime Offeror Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(PRIME NAME) FFP - OPTION 10$ - 0$ - 0$ - 0
(Sub 1 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 1 NAME) FFP - OPTION 10$ - 0$ - 0$ - 0
(Sub 2 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 2 NAME) FFP - OPTION 10$ - 0$ - 0$ - 0
(Sub 3 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 3 NAME) FFP - OPTION 10$ - 0$ - 0$ - 0
(Sub 4 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 4 NAME) FFP - OPTION 10$ - 0$ - 0$ - 0
FFP - OPTION 2
(Prime Offeror Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(PRIME NAME) FFP - TOTAL OPTION 20$ - 0$ - 0$ - 0
(Sub 1 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 1 NAME) FFP - TOTAL OPTION 20$ - 0$ - 0$ - 0
(Sub 2 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 2 NAME) FFP - TOTAL OPTION 20$ - 0$ - 0$ - 0
(Sub 3 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 3 NAME) FFP - TOTAL OPTION 20$ - 0$ - 0$ - 0
(Sub 4 Name)Site LocationLabor RatesLabor HoursEstimated CostFixed FeeTotal FFP
MM/DD/YR thru MM/DD/YREst. CostFixed FeeFFP
Labor Category Title 1*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 2*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 3*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 4*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Labor Category Title 5*0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
Etc.0$ - 0$ - 0$ - 00$ - 0$ - 0$ - 0
(SUB 4 NAME) FFP - TOTAL OPTION 20$ - 0$ - 0$ - 0

Enclosure 2C - Travel and ODCs

PRIME OFFEROR:XYZ, Inc.
SUB OFFEROR (IF APPLICABLE):XYZ, Inc.
PROPOSAL NO.:XXX
PROPOSAL PART:Enclosure 2 - COST/PRICE
FFP - TOTAL TRAVEL COST BREAKOUT
PERFORMANCE PERIODDirect Travel Cost*Burden 1 Rate (specify burden type, e.g. Mat'l Hdlg)Burden 1 CostBurden 2 Rate (specify burden type, if applicable, e.g. G&A on Mat'l Hdlg)Burden 2 CostTotal Travel Cost
Base Year 1$ - 00.00%$ - 00.00%$ - 0$ - 0
Base Year 2$ - 00.00%$ - 00.00%$ - 0$ - 0
Base Year 3$ - 00.00%$ - 00.00%$ - 0$ - 0
Option 1$ - 00.00%$ - 00.00%$ - 0$ - 0
Option 2$ - 00.00%$ - 00.00%$ - 0$ - 0
FFP - TOTAL TRAVEL COSTS$ - 0$ - 0$ - 0$ - 0
FFP - TOTAL ODC BREAKOUT
PERFORMANCE PERIODDirect ODC Amount*Burden 1 Rate (specify burden type, e.g. Mat'l Hdlg)Burden 1 CostBurden 2 Rate (specify burden type, if applicable, e.g. G&A on Mat'l Hdlg)Burden 2 CostTotal ODC Cost
Base Year 1$ - 00.00%$ - 00.00%$ - 0$ - 0
Base Year 2$ - 00.00%$ - 00.00%$ - 0$ - 0
Base Year 3$ - 00.00%$ - 00.00%$ - 0$ - 0
Option 1$ - 00.00%$ - 00.00%$ - 0$ - 0
Option 2$ - 00.00%$ - 00.00%$ - 0$ - 0
FFP - TOTAL ODC$ - 0$ - 0$ - 0$ - 0

*If direct travel cost and/or ODC amounts are based on other than the RFPP specified factors (Sections X and X of the RFPP), the basis of estimate (BOE) and associated calculations for the proposed amounts must be provided below.

BASIS OF ESTIMATE - TRAVEL

BASIS OF ESTIMATE - ODC

Enclosure 2D - Optional DR

PRIME OFFEROR:XYZ, Inc.
SUB OFFEROR (IF APPLICABLE):XYZ, Inc.
TORP NO.:XXX
PROPOSAL PART:Enclosure 2 - COST/PRICE
OPTIONAL DATA RIGHTS
OPTIONAL DATA RIGHTSBase Year 1Base Year 2Base Year 3Option 1Option 2Total Data Rights
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
INSTRUCTIONS
Prime contract offerors may (but are not required to) propose optional prices for additional data rights to permit the Government to use, modify, reproduce, release, perform, display or disclose the resulting technical data and computer software for Government purposes (as defined in DFARS 252.227-7013(a)(12) and 252.227-7014(a)(11)). Any option(s) proposed in this subpart shall be on a FFP basis and shall clearly identify all terms and conditions thereto.

File details come from the government source that posted it. Updated .