Enclosure 2_Cost Price Workbook.xlsx

XLSX spreadsheet 197 KB Posted

Attached to
Enhanced Contested Logistics Software Prototype Development
Solicitation number
W50RAJ-25-CL-RFPP
Issued by

About this file

This document is a comprehensive Cost Price Workbook Excel template for a federal contract proposal, designed to help offerors systematically document and break down their cost proposal across multiple tasks and years. The template provides detailed sections for capturing direct labor costs, fringe benefits, overhead, subcontractors, consultants, other direct costs, material handling, and general and administrative expenses for five distinct tasks (Tasks 1a, 1b, 2, 3, 4, and 5), with provisions for base year and optional year pricing.

The workbook is specifically linked to Solicitation Number W50RAJ-25-CL-RFPP for the U.S. Army's Rapid Capabilities and Critical Technologies Office (RCCTO), seeking an Enhanced Contested Logistics Software Prototype Development. The solicitation is a competitive Request for Prototype Proposals (RFPP) using an Other Transaction Agreement for Prototype (OTAP), restricted to U.S. companies capable of processing and storing Controlled Unclassified Information (CUI). The cost proposal template requires detailed documentation of labor categories, rates, escalation, indirect rates, and material costs, with instructions for offerors to provide supporting documentation for all proposed expenses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Cost Proposal

GENERAL INFORMATION

The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of cost proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed costs; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.

Cost by Task: In addition to providing summary by period of performance (base and any options), the contractor is also responsible for providing a breakdown of cost for each task identified in the statement of work. The sum of all cost by task worksheets MUST equal the total cost summary.

Options: If proposing options, they must be separately priced and separate worksheets or tables should be provided for each option. Any proposed options that are not fully priced out, will not be included in any resulting award.

SUMMARY

Below is a summary of the proposed cost. This chart will automatically fill in as the Offeror completes the "Total Cost Summary" tab.

Total Direct Labor Costs$0
Total Fringe Benefit Costs$0
Total Labor Overhead Costs$0
Total Subcontract Costs$0
Total Consultant Costs$0
Total Other Direct Costs$0
Total Material Handling Costs$0
Total G&A Costs$0
Subtotal Costs$0
Total Cost of Money$0
Total Estimated Cost$0
Profit$0
Total Price$0
SAMPLE FORMAT ONLY. DOLLARS MAY NOT COMPUTE CORRECTLY IN THIS SAMPLE.
THE PERCENTAGES FPR THE FRINGE BENEFIT, OVERHEAD G&A MUST BE YOUR COMPANY APPROVED OR CALCULATED RATES AS RECOMMENDED BY YOUR CPA OR DCMA/DCAA
THE TABS BELOW MUST BE DELETED IF NOT USED. ARE FIGURES IN THE TABS ARE FOR ILLUSTRATION PURPOSES ONLY. YOUR COMPANY FIGURES MUST BE USED.

Total Cost Summary

Cost Proposal - Firm Fixed Price (FFP)
Prime Offeror Name:

sample labory categories/use actual company labor categories and rates Task1a (CY19) Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Task1b (CYXX) Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Task 2 (CY19) Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Task 3 (CY19) Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Task 4 (CYXX) Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Task 5 (CYXX) Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
Direct Labor (DL) (Note 1)09/19 to 12/19

Wade Wargo: Note:

The months during the base period of performance that these rates apply

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/XX to 12/XX

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/XX to 12/XX

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/XX to 12/XX Wade Wargo: Note:

The months during the base period of performance that these rates apply

4-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts AdminExample, The$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
QA1 - QA Engineer$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
TA1 - Administrator 1- 0$0- 0$0
TA2 - Administrator 2$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
TDS -Designer/Draftsperson$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
TDS2 - Product Support Administrator$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
TG1 - Programmer 1$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
TG2 - Programmer 2$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
EN1 - Engineer 1$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
EN2 - Engineer 2$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
EN3 - Engineer 3$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
TSA - Subcontract Administrator$0- 0$0- 0$0- 0$0- 0$0- 0$00$0.00
0$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0$0$0$0$0$0$0
Insert line(s) & title(s) for any other F/B rates$0$0$0$0$0$0$0
Total Fringe Benefit Costs$0$0$0$0$0$0$0
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0$0$0$0$0$0$0$0$0$0$0
Mfg Overhead$0$0$0$0$0$0$0
Insert line(s) & title(s) for any other O/H rates$0$0$0$0$0$0$0
Total Labor Overhead Costs$0$0$0$0$0$0$0
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01$0$0$0$0$0$0$0
Insert line(s) for any additional Subcontractors/Interorganizational$0$0$0$0$0$0$0
Total Subcontract Costs$0$0$0$0$0$0$0
Consultants
Consultant Name - #01$0$0$0$0$0$0$0
Insert line(s) for any additional Consultants$0$0$0$0$0$0$0
Total Consultant Costs$0$0$0$0$0$0$0
Other Direct Costs
Materials/SuppliesTab: Materials-Supplies$0$0$0$0$0$0$0
EquipmentNot Applicable$0$0$0$0$0$0$0
TravelNot Applicable$0$0$0$0$0$0$0
Insert line(s) for any other types of ODCsNot Applicable$0$0$0$0$0$0$0
Total Other Direct Costs$0$0$0$0$0$0$0
Material Handling (M/H O/H) (If Applicable)
Insert M/H O/H rate title$0$0$0$0$0$0$0$0$0$0$0$0$0
Insert line(s) & title(s) for any other M/H O/H rates$0$0$0$0$0$0$0
Total Material Handling Costs$0$0$0$0$0$0$0
General and Administrative (G&A) (If Applicable)XXX%
Insert G&A rate title$0$0$0$0$0$0$0$0$0$0$0$0$0
Insert line(s) & title(s) for any other G&A rates$0$0$0$0$0$0$0
Total G&A Costs$0$0$0$0$0$0$0
Subtotal Costs$0$0$0$0$0$0$0
Facilities Cost of Money (COM) (If Applicable)
Eng COM rate$0$0$0$0$0$0$0$0$0$0$0$0$0
Mfg COM rate$0$0$0$0$0$0$0
Material COM rate$0$0$0$0$0$0$0
G&A COM rate$0$0$0$0$0$0$0
Insert line(s) & title(s) for any other COM rates$0$0$0$0$0$0$0
Total Cost of Money$0$0$0$0$0$0$0
Total Estimated Cost$0$0$0$0$0$0$0
Profit$0$0$0$0$0$0$0$0$0$0$05.000%$0$0
Total Price$0$0$0$0$0$0$0
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Escalation and Indirect Rate Worksheet

Task 1a

Task 1a - XXX (SOW XXX)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL)CY19

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY20

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY21

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY16

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY17

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/20 to 12/20

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/21 to 9/21

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

4-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts AdminExample, The$0.00$0.00$0.00$0.00$0.00$0.000$0.00
QA1 - QA Engineer$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TA1 - Administrator 1$0.00
TA2 - Administrator 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS -Designer/Draftsperson$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS2 - Product Support Administrator$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG1 - Programmer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG2 - Programmer 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN1 - Engineer 1New Hire$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN2 - Engineer 2$0.00$0.00$0.000$0.00
EN3 - Engineer 3$0.00$0.00$0.000$0.00
TSA - Subcontract Administrator$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg Overhead$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/Suppliessee Sheet "Task 1a Matls"$0.00
EquipmentNot Applicable$0.00
TravelNot Applicable$0.00
ShippingNot Applicable$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (Not Applicable)
Insert M/H O/H rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (Not Applicable)
Insert G&A rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (Not Applicable)
Eng COM rateNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg COM rate$0$0.00$0$0.00$0$0.00$0.00
Material COM rate$0$0.00$0$0.00$0$0.00$0.00
G&A COM rate$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Tab Titled "Escalation & Indirect Rates"

Task 1b

Task 1b - XXXX (SOW XXX)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY19

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY20

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY21

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY16

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY17

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/20 to 12/20

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/21 to 9/21

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

25-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts Admin$0.00$0.00$0.00$0.00$0.00$0.000$0.00
QA1 - QA Engineer$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TA1 - Administrator 1$0.00
TA2 - Administrator 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS -Designer/Draftsperson$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS2 - Product Support Administrator$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG1 - Programmer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG2 - Programmer 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN1 - Engineer 1New Hire$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN2 - Engineer 2$0.00$0.00$0.000$0.00
EN3 - Engineer 3$0.00$0.00$0.000$0.00
TSA - Subcontract Administrator$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg Overhead$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/Suppliessee Sheet "Task 1b Matls"$0.00
EquipmentNot Applicable$0.00
TravelNot Applicable$0.00
ShippingNot Applicable$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (Not Applicable)
Insert M/H O/H rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (Not Applicable)
Insert G&A rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (Not Applicable)
Eng COM rateNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg COM rate$0$0.00$0$0.00$0$0.00$0.00
Material COM rate$0$0.00$0$0.00$0$0.00$0.00
G&A COM rate$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Tab Titled "Escalation & Indirect Rates"

Task 2

Task 2 - XXX (SOW XXX)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY19

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY20

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY21

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY16

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY17

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/20 to 12/20

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/21 to 9/21

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/16 to 12/16

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/17 to 08/17

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

4-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts Admin$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
QA1 - QA Engineer$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
TA1 - Administrator 1$0.000$0.00
TA2 - Administrator 2$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
TDS -Designer/Draftsperson$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
TDS2 - Product Support Administrator$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
TG1 - Programmer 1$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
TG2 - Programmer 2$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
EN1 - Engineer 1$0.00$0.00$0.000$0.00$0.000$0.00$0.00$0.000$0.00
EN2 - Engineer 2$0.00$0.00$0.000$0.00
EN3 - Engineer 3$0.00$0.00$0.000$0.00
TSA - Subcontract Administrator$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0.00$0.00$0.0050.070%$0.0050.070%$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0.00$0$0.00$0$0.00$0165.450%$0.00$0165.450%$0.00$0$0.00$0.00
Mfg Overhead$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/Suppliessee Sheet "Task 2 Matls"$0.00
EquipmentNot Applicable$0.00
TravelNot Applicable$0.00
ShippingNot Applicable$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (Not Applicable)
Insert M/H O/H rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (Not Applicable)
Insert G&A rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (Not Applicable)
Eng COM rateNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg COM rate$0$0.00$0$0.00$0$0.00$0.00
Material COM rate$0$0.00$0$0.00$0$0.00$0.00
G&A COM rate$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit$0$0.00$0$0.00$0$0.00$08.000%$0.00$08.000%$0.00$0$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Tab Titled "Escalation & Indirect Rates"

Task 3

Task 3 - XXX (SOW XXX)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY19

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY20

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY21

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 12 or 13 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/20 to 12/20

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/21 to 9/21

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

25-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts Admin$0.00$0.00$0.00$0.00$0.00$0.000$0.00
QA1 - QA Engineer$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TA1 - Administrator 1$0.000$0.00
TA2 - Administrator 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS -Designer/Draftsperson$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS2 - Product Support Administrator$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG1 - Programmer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG2 - Programmer 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN1 - Engineer 1New Hire$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN2 - Engineer 2$0.00$0.00$0.000$0.00
EN3 - Engineer 3$0.00$0.00$0.000$0.00
TSA - Subcontract Administrator$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg Overhead$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/Suppliessee Sheet "Task 3 Matls"$0.00
EquipmentNot Applicable$0.00
TravelNot Applicable$0.00
ShippingNot Applicable$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (Not Applicable)
Insert M/H O/H rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (Not Applicable)
Insert G&A rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (Not Applicable)
Eng COM rateNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg COM rate$0$0.00$0$0.00$0$0.00$0.00
Material COM rate$0$0.00$0$0.00$0$0.00$0.00
G&A COM rate$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Tab Titled "Escalation & Indirect Rates"

Task 4

Task 4 - N/A(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY19

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY20

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY21

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 12 or 13 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/20 to 12/20

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/21 to 9/21

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

25-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts Admin$0.00$0.00$0.00$0.00$0.00$0.000$0.00
QA1 - QA Engineer$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TA1 - Administrator 1$0.00$0.00$0.000$0.00
TA2 - Administrator 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS -Designer/Draftsperson$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS2 - Product Support Administrator$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG1 - Programmer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG2 - Programmer 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN1 - Engineer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN2 - Engineer 2$0.00$0.00$0.000$0.00
EN3 - Engineer 3$0.00$0.00$0.000$0.00
TSA - Subcontract Administrator$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg Overhead$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/Suppliessee Sheet "Task 4 Matls"$0.00
EquipmentNot Applicable$0.00
TravelNot Applicable$0.00
ShippingNot Applicable$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (Not Applicable)
Insert M/H O/H rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (Not Applicable)
Insert G&A rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (Not Applicable)
Eng COM rateNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg COM rate$0$0.00$0$0.00$0$0.00$0.00
Material COM rate$0$0.00$0$0.00$0$0.00$0.00
G&A COM rate$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Tab Titled "Escalation & Indirect Rates"

Task 5

Task 5 - N/A(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY19

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY20

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY21

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 12 or 13 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year CY/FY 13 or 14 Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
09/19 to 12/19

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/20 to 12/20

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year 01/21 to 9/21

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

25-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
CON - Contracts Admin$0.00$0.00$0.00$0.00$0.00$0.000$0.00
QA1 - QA Engineer$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TA1 - Administrator 1$0.00
TA2 - Administrator 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS -Designer/Draftsperson$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TDS2 - Product Support Administrator$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG1 - Programmer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
TG2 - Programmer 2$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN1 - Engineer 1$0.00$0.00$0.00$0.00$0.00$0.000$0.00
EN2 - Engineer 2$0.00$0.00$0.000$0.00
EN3 - Engineer 3$0.00$0.00$0.000$0.00
TSA - Subcontract Administrator$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (NOTE 2)
Fringe Benefits$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (NOTE 2)
Eng Overhead$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg Overhead$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Not Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/Suppliessee Sheet "Task 5 Matls"$0.00
EquipmentNot Applicable$0.00
TravelNot Applicable$0.00
ShippingNot Applicable$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (Not Applicable)
Insert M/H O/H rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (Not Applicable)
Insert G&A rate titleNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (Not Applicable)
Eng COM rateNot Applicable$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Mfg COM rate$0$0.00$0$0.00$0$0.00$0.00
Material COM rate$0$0.00$0$0.00$0$0.00$0.00
G&A COM rate$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM ratesNot Applicable$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category. Include any supporting documentation for basis of current labor rates.
Note 2: See Tab Titled "Escalation & Indirect Rates"

Task 1a Matls Item Part Description Material Type Material Unit Cost Number of Test Units Total Material Cost Est. Material Weight & Size Custom Analytical Engineering: Raw material size obtained from drawings, diameter rounded up in quarter inch increments and approximately 1 inch added to part length for machining purposes

Material Cost BOE
Example Thing XYZ
1Description- 0Quote from
1Description- 0Quote from
1Description- 0Quote from
1Description- 0Quote from
1Description- 0Quote from
2Description- 0Quote from
3Description- 0Quote from
5- 0Quote from
6- 0Quote from
1- 0Quote from
7- 0Quote from
Subtotal Materials$0- 0

Item Part Description Material Type Material Unit Cost Number of Test Units Total Material Cost Est. Material Weight & Size Custom Analytical Engineering: Raw material size obtained from drawings, diameter rounded up in quarter inch increments and approximately 1 inch added to part length for machining purposes Material Cost BOE

11- 0Quote from
21- 0Quote from
31- 0Quote from
Subtotal Materials$0- 0

Item Part Description Material Type Material Unit Cost Number of Test Units Total Material Cost Est. Material Weight & Size Custom Analytical Engineering: Raw material size obtained from drawings, diameter rounded up in quarter inch increments and approximately 1 inch added to part length for machining purposes Material Cost BOE

11- 0Quote from
21- 0Quote from
31- 0Quote from
Subtotal Materials$0- 0

Item Part Description Material Type Material Unit Cost Number of Test Units Total Material Cost Est. Material Weight & Size Custom Analytical Engineering: Raw material size obtained from drawings, diameter…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .