SIGNED_W31P4Q15R0163-0001.pdf
PDF 21 KB Posted
- Attached to
- Chaparral Missile Class V Components
- Solicitation number
- W31P4Q15R0163
About this file
Amendment 0001
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2016APR05
W31P4Q
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
DAVID C WEBB
EMAIL: DAVID.C.WEBB8.CIV@MAIL.MIL
W31P4Q-15-R-0163
2016MAR24
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 8
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DAVID C WEBB
Buyer Office Symbol/Telephone Number: CCAM-SM-C/(256)842-7685
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
FMS REQUIREMENT
*** End of Narrative A0000 ***
A-1. The issuance of this Amendment (0001) is to respond to questions regarding solicitation (W31P4Q-15-R-0163) by industry and to post additional attachments to the FedBizOps annoucement.
A-2. The following questions were posed by Industry to the Government regarding the solicitation and they are as follows:
Question 1: Should the Statement of Work read "The contractor shall manufacture and present for acceptance three units of Lot Item
0001AA (Thermal Battery) cannot be overhauled and must be provided as a manufactured item?
Answer to #1: Product Verification Audit (PVA) does not apply. There will be no change to the SOW. FAR Clause 52.209.4723 titled, _____________________________________________________________________________________________________________________
"PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK," is hereby deleted in its entirety from the solicitation.______________________________________________________________________________________________________________
Question 2: Should the request for waiver be submitted prior to proposal submittal or with the proposal?
Answer to #2: Yes, First Article Test waiver requests should be presented BEFORE the proposal is submitted. _____________________________________________________________________________________________
Question 3: L-29 provides direction to price with and without first article testing. Section B does not appear to facilitate providing two separate prices (production quantity with first article and production quantity without first article tests)?
Answer to #3: ACC-RSA requests that each contractor submit prices for both production quantity with First Article Tests and ______________________________________________________________________________________________________________ production quantity without First Article Tests for all SLIN(s) 0001AA - 0004AA. Since the contracting office cannot insert a second______________________________________________________________________________________________________________________________________ line below the top line of each SLIN, please insert a second line if your business is going to use the SF33 documents as part of your______________________________________________________________________________________________________________________________________ proposal.___________
In addition, FAR Clause 52.209-4701 titled, "AWARD INFORMATION WHEN GOVERNMENT TESTING OF FIRST ARTICLE IS REQUIRED," located at L-30 is_________________________________________________________________________________________________________________________________________ hereby deleted in its entirety since ACC-RSA is requesting separate pricing for First Article Testing and Without First Article Testing________________________________________________________________________________________________________________________________________ for SLIN(s) 0001AA - 0004AA.____________________________
Question 4: Are there are any page limitations on the three factors being evaluated (technical, past performance, price)?
Answer to #4: 50 pages is the limit for each factor being evaluated. ______________________________________________________
A-3. Although these attachments are stated in the solicitation, they were not incorporated in the announcement on FedBizOps. They are hereby added to the announcement and can be viewed at FedBizOps. The following attachments are:
1. Document Summary List (Attachment 0002 to RFP W31P4Q-15-R-0163)
2. DD 254 Security Classification (Attachment 0003 to RFP W31P4Q-15-R-0163)
*** END OF NARRATIVE A0002 ***
2 8
W31P4Q-15-R-0163 0001
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 MK70/PS149 THERMAL BATTERY
NSN: 6130-00-001-0017
0001AA MK70/PS149 THERMAL BATTERY - 11743216 450 EA $ $ _____________________________________ ______________ __________________
COMMODITY NAME: MK70/PS149 THERMAL BATTERY
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: J55DSH3013 PRON AMD: 02
FMS COUNTRY/CASE: TW/ZBD
THE ARMY PART NUMBER (APN) FOR THIS SLIN IS 11743216.
(End of narrative B001)
Attention:
Submit one price that includes First Article Testing and one price for that does not include the First
Article Testing.
Directions on completing this pricing section.
The top line of each SLIN will be the price with the
First Article Test and the second line is for pricing without the First Article Test.
If the contractor is utilizing the solicitation
(SF33) as part of their proposal, please insert a line below the first line of this SLIN. Otherwise, please state clearly on your proposal regarding the pricing for First Article Testing.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
ATTN: JMMC-AOS
1 C TREE RD.
MCALESTER, OKLAHOMA 74501
MARK FOR:
TAIWAN CHAPARRAL FMS PROGRAM
DO NOT PICK UP IN FIELD SERVICE STOCK
POC: KURT KING
COMM: (916) 420-6889
DSN: 956-6889
3 8
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
0002AA M121 ROCKET MOTOR - 13007205 466 EA $ $ ____________________________ ______________ __________________
COMMODITY NAME: ROCKET MOTOR
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: J55DSG6913 PRON AMD: 01
AMS CD: ZBD004
FMS COUNTRY/CASE: TW/ZBD
THE ARMY PART NUMBER (APN) FOR THIS SLIN IS 13007205.
(End of narrative B001)
Attention:
Submit one price that includes First Article Testing and one price for that does not include the First
Article Testing.
Directions on completing this pricing section.
The top line of each SLIN will be the price with the
First Article Test and the second line is for pricing without the First Article Test.
If the contractor is utilizing the solicitation
(SF33) as part of their proposal, please insert a line below the first line of this SLIN. Otherwise, please state clearly on your proposal regarding the pricing for First Article Testing.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
CONTRACTOR IS TO SUBMIT A NOTICE OF AVAILABILITY
(NOA) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW).
(End of narrative F001)
0003AA M145 SAFETY & ARMING DEVICE - 10234569 150 EA $ $ ______________________________________ ______________ __________________
COMMODITY NAME: SAFETY AND ARMING DEVICE
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: J55DSG6413 PRON AMD: 01
4 8
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
AMS CD: ZBD004
FMS COUNTRY/CASE: TW/ZBD
THE ARMY PART NUMBER (APN) FOR THIS SLIN IS 10234569.
(End of narrative B001)
Attention:
Submit one price that includes First Article Testing and one price for that does not include the First
Article Testing.
Directions on completing this pricing section.
The top line of each SLIN will be the price with the
First Article Test and the second line is for pricing without the First Article Test.
If the contractor is utilizing the solicitation
(SF33) as part of their proposal, please insert a line below the first line of this SLIN. Otherwise, please state clearly on your proposal regarding the pricing for First Article Testing.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
CONTRACTOR IS TO SUBMIT A NOTICE OF AVAILABILITY
(NOA) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW).
(End of narrative F001)
0004AA M250 WARHEADS - 9256709 248 EA $ $ _______________________ ______________ __________________
COMMODITY NAME: WARHEAD,GUIDED MISS
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: J55DSG6513 PRON AMD: 01
AMS CD: ZBD004
FMS COUNTRY/CASE: TW/ZBD
THE ARMY PART NUMBER (APN) FOR THIS SLIN IS 9256709.
(End of narrative B001)
Attention:
Submit one price that includes First Article Testing and one price for that does not include the First
5 8
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Article Testing.
Directions on completing this pricing section.
The top line of each SLIN will be the price with the
First Article Test and the second line is for pricing without the First Article Test.
If the contractor is utilizing the solicitation
(SF33) as part of their proposal, please insert a line below the first line of this SLIN. Otherwise, please state clearly on your proposal regarding the pricing for First Article Testing.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
CONTRACTOR IS TO SUBMIT A NOTICE OF AVAILABILITY
(NOA) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW).
(End of narrative F001)
0005 CONTRACT DATA REQUIREMENT LIST (CDRL) _____________________________________
DELIVERY SHALL BE IN ACCORDANCE WITH DD FORM 1423 AT
EXHIBIT A.
(End of narrative F001)
6 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 DELETED 52.209-4723 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK DEC/2006
7 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
L-1 DELETED 52.209-4701 AWARD INFORMATION WHEN GOVERNMENT TESTING OF FIRST ARTICLE IS JUN/1997
REQUIRED
8 8
| SECTION A |
| SECTION B |
| SECTION E |
| SECTION L |
File details come from the government source that posted it. Updated .