Solicitation W31P4Q-15-R-0138

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W31P4Q-15-R-0138 X

2016MAR1605:00am

DOA2

SEE SCHEDULE

W31P4Q

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

CORALYNN H. WOODS

(256)955-3024

CCAM-SM-C

CORALYNN.H.WOODS.CIV@MAIL.MIL

1 30

X 1

X 3 X 6

X 7 X 8 X 9

X 10

X 12

X 15

X 20

X 21

X 27

X 30

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: CORALYNN H. WOODS

Buyer Office Symbol/Telephone Number: CCAM-SM-C/(256)955-3024

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

FMS REQUIREMENT

*** End of Narrative A0000 ***

A-1. The Army Contracting Command-Redstone hereby issues this Request for Proposal for the procurement of the Chaparral Azimuth Position

Sensor in accordance with Attachment 001, Statement of Work(SOW),on a Firm Fixed Price(FFP),basis in support of Foreign Military

Sales(FMS)customers. This requirement is contingent upon the availability of funds.

A-2. The complete requirement for procuring twenty(22)twenty-two, Chaparral Azimuth Position Sensors of which(2)two will be for destrucitve purposes and must pass First Article Testing and(20)twenty shall be deliverable units. The contractor shall build the

Azimuth Position Sensor In Accordance With (IAW)the SOW(enclosed with the requirements package), Army Part Number(APN)13678625. The

Chaparral Azimuth Position Sensors as described herein shall consist of instructions provided on drawing, MIS-16052E, as listed in the

Statement of Work.

A-3. Award will be made to a single offeror whose offer responds to all items included in Attachment 001, Statement of Work. Failure to provide any item shall render the offer non-responsive or may cause the offeror's proposal to be rejected.

A-4. The Government will select for award the proposal that provides the Lowest Price, Technically Acceptable (LPTA) and other factors considered. The Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore,an

Offeror's proposal should contain the offeror's best terms from a technical and price standpoint. The Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary.

A-5. As described in all nine(9)Contract Data Requirements List(A001, A002 ,A003,A004,A005,A006,A007,A008,A009). This acquisition contains an Export Control Warning, technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751

ET SEQ)or the Export

Administration Act of 1979(Title 50, U.S.C.,APP 2401) Executive Order 121470. This information cannot be released outside the United

States without prior approval from the Government.

A-6. The full solicitation package is attached(drawings,specifications and other technical data). Any questions should be via email to coralynn.h.woods.civ@mail.mil, or malissa.h.blake.civ@mail.mil.

A-7. Offers shall be submitted in accordance with FAR 52.215-1.Contractors should email offer to coralynn.h.woods.civ@mail.mil,No

Later Than (NLT) 1700 (5:00 PM) Central Standard Time on 16 March 2016.

*** END OF NARRATIVE A0001 ***

2 30

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0100 API MWO Kits

NSN: MANP-00-001-0016

0100AA FIRST ARTICLE TESTING 2 EA $ $ _____________________ ______________ __________________

COMMODITY NAME: API MWO Kits

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: J56DSF7013 PRON AMD: 02

AMS CD: VFB001

FMS COUNTRY/CASE: EG/VFB

QUANTITY: 2

(End of narrative B001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 30

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 BEGP4N40909001 KA2VFB L KEGP00 2

PROJ CD BRK BLK PT _______ __________

KEG002

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 2 29-JUN-2017

FOB POINT: Origin

SHIP TO:

(KEG002) NEW YORK FORWARDING SERVICES

7465 CANDLEWOOD ROAD SUITE M

HANOVER MD 21076-3183

MARK FOR: EGYPTIAN MINISTRY OF DEFENSE

ARMAMENT AND AMMUNITION DEPT

WORKSHOP NR 60

NASR CITY CAIRO EGYPT

0200 AZIMUTH POSITION

NSN: MANP-00-001-0016

3 30

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0200AA CY 16 ORDERING PERIOD 20 EA $ $ _____________________ ______________ __________________

COMMODITY NAME: AZIMUTH POSITION

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: J55DSH4413 PRON AMD: 07

AMS CD: VFB002

FMS COUNTRY/CASE: EG/VFB

P/N: 13678625

NSN:

THE CONTRACTOR SHALL PROVIDE CHAPARRAL AZIMUTH

POSITION SENSOR IN ACCORDANCE WITH THE STATEMENT OF

WORK, ATTACHMENT 001. THE TOTAL QUANTITY OF TWENTY

TWO(22), TWO(2) OF THE TOTAL QUANTITY WILL BE USED

FOR DESTRUCTIVE, FIRST ARTICLE TESTING, THE REMAINING

TWENTY(20) WILL BE DELIVERABLE.

FOB POINT: ORIGIN

(End of narrative B001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

002 BEGP4N32289002 KA2YFB L KEGP00 2

PROJ CD BRK BLK PT _______ __________

KEG002

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 20 24-JUN-2017

FOB POINT: Origin

SHIP TO:

(KEG002) NEW YORK FORWARDING SERVICES

7465 CANDLEWOOD ROAD SUITE M

HANOVER MD 21076-3183

MARK FOR: EGYPTIAN MINISTRY OF DEFENSE

ARMAMENT AND AMMUNITION DEPT

WORKSHOP NR 60

NASR CITY CAIRO EGYPT

0300 CONTRACT DATA REQUIRMENTS LIST ______________________________

4 30

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

THE CONTRACTOR SHALL PROVIDE AND DELIVER DATA ITEMS

A001 THROUGH A009, IN ACCORDANCE WITH CONTRACT DATA

REQUIREMENTS LIST (CDRLs), DD FORM 1423-2, EXHIBIT A.

A001 - IAW DI-NDTI-80566A

A002 - IAW DI-NDTI-80809B

A003 - IAW DI-SESS-80639

A004 - IAW DI-CMAN-80529/T

A005 - IAW DI-ADMN-80925

A006 - IAW DI-MGMT-80269

A007 - IAW DI-MISC-81398C

A008 - IAW DI-MISC-81397C

A009 - IAW DI-MGMT-8O368A

(End of narrative B001)

5 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

*** END OF NARRATIVE C0002 ***

W31P4Q-15-R-0138

*** END OF NARRATIVE C0001 ***

6 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

D-1 52.208-4701 WOOD PACKING MATERIALS REQUIREMENTS JUL/2007

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and ouside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD

HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(End of Clause)

D-2 52.247-4700 BAR CODE MARKINGS MAY/2014

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

(End of Clause)

7 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.209-4705 FIRST ARTICLE - INSPECTION AND ACCEPTANCE JUN/1997

The Government shall perform Contract Quality Assurance at origin; however, test and evaluation, final inspection, acceptance, and approval shall be at destination. The first article submitted for testing under this contract shall meet such performance requirements and material, dimensional, heat treat, surface finish and functional requirements as set forth in the drawings, supplementary quality assurance provisions and specifications. The Government will perform such chemical, physical functional and environmental tests as necessary to determine that the requirements of the applicable specifications and drawings have been met.

8 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

9 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

-1-

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

-2-

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC -3-

Issue By DoDAAC -4-

Admin DoDAAC -5-

Inspect By DoDAAC -6-

Ship To Code -7-

Ship From Code -8-

Mark For Code -9-

Service Approver (DoDAAC) -10-

Service Acceptor (DoDAAC) -11-

Accept at Other DoDAAC -12-

LPO DoDAAC -13-

DCAA Auditor DoDAAC -14-

Other DoDAAC(s) -15-

10 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

-16-

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

-17-

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

11 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

H-1 52.243-4000 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, MAR/2011

REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations

(RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format. _______

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government

Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II

ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using

RDMR Form 523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office

(CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense

Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;

interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

12 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice"

(SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer __________

(ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution. ____________

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft _______________________

Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website (http://www.redstone.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm) by clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.

b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the

ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, _______________________________ the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a ___________________________________________________ different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or _____________________ execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

13 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(End of clause)

14 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-1 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS OCT/2015

I-2 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE JUL/2013

I-3 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2015

I-4 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

I-5 52.211-5 MATERIAL REQUIREMENTS AUG/2000

I-6 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008

I-7 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS OCT/2010

I-8 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB) JUL/2005

OTHER THAN PENSIONS

I-9 52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES FEB/2016

I-10 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING MAY/2014

$15,000

I-11 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015

I-12 52.222-26 EQUAL OPPORTUNITY APR/2015

I-13 52.222-50 COMBATING TRAFFICKING IN PERSONS MAR/2015

I-14 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG/2011

I-15 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008

I-16 52.232-1 PAYMENTS APR/1984

I-17 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002

I-18 52.232-11 EXTRAS APR/1984

I-19 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984

I-20 52.232-25 PROMPT PAYMENT JUL/2013

I-21 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013

I-22 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013

I-23 52.233-1 DISPUTES MAY/2014

I-24 52.233-3 PROTEST AFTER AWARD AUG/1996

I-25 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004

I-26 52.243-1 CHANGES--FIXED PRICE AUG/1987

I-27 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS DEC/2015

I-28 52.253-1 COMPUTER GENERATED FORMS JAN/1991

I-29 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

I-30 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

I-31 252.204-7000 DISCLOSURE OF INFORMATION AUG/2013

I-32 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992

I-33 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT FEB/2014

I-34 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING DEC/2015

I-35 252.204-7015 DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT CONTRACTORS FEB/2014

I-36 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013

I-37 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014

I-38 252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL COMPUTER FEB/2014

SOFTWARE DOCUMENTATION

I-39 252.227-7015 TECHNICAL DATA--COMMERCIAL ITEMS FEB/2014

I-40 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION JAN/2011

I-41 252.227-7019 VALIDATION OF ASSERTED RESTRICTIONS--COMPUTER SOFTWARE SEP/2011

I-42 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED MAY/2013

INFORMATION MARKED WITH RESTRICTIVE LEGENDS

I-43 252.227-7027 DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE APR/1988

I-44 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000

I-45 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA JUN/2013

I-46 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991

I-47 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS JUN/2012

15 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-48 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

I-49 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991

I-50 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS JUN/2013

I-51 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT MAR/2008

I-52 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC APR/2014

I-53 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING SEP/1989

(a) The Contractor shall test -1- unit(s) of Lot/Item -2- as specified in this contract. At least -3- calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within -4- calendar days from the date of this contract to -5- marked

First Article Test Report: Contract No. ___, Lot/Item No. ___. Within -6- calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the

Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of Clause)

I-54 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS DEC/2014

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

I-55 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES OCT/1997

16 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting

Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall --

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractors ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each

Contractor ownership change.

(c) The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).

(End of Clause)

I-56 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION JUL/2013

(a) Definitions. As used in this clause--

"Long-term contract" means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

"Small business concern" means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part

121 and the size standard in paragraph (c) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at

17 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

http://www.sba.gov/content/table-small-business-size-standards

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award

Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ______________ assigned to contract number ________________________. [Contractor to sign and date and insert authorized signer's name and title].

(End of clause)

I-57 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES JUL/2014

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of

Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

I-58 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB/1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address:

http://www.acq.osd.mil/dpap/dars/far.html or http://www.acq.osd.mil/dpap/dars/index.htm or http://farsite.hill.af.mil/VFAFARa.HTM

(End of Clause)

I-59 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES APR/1984

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any DoD FAR SUPPLEMENT (48 CFR 2) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.

(End of Clause)

18 30

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

I-60 252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS NOV/2005

(a) Definition. SPI process, as used in this clause, means a management or manufacturing process that has been accepted previously by the Department of Defense under the Single Process Initiative (SPI) for use in lieu of a specific military or Federal specification or standard at specific facilities. Under SPI, these processes are reviewed and accepted by a Management Council, which includes representatives of the Contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and the military departments.

(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and standards cited in the solicitation. A listing of SPI processes accepted at specific facilities is available via the Internet at http://guidebook.dcma.mil/20/guidebook_process.htm (paragraph 4.2).

(c) An offeror proposing to use an SPI process in lieu of military or Federal specifications or standards cited in the solicitation shall

(1) Identify the specific military or Federal specification or standard for which the SPI process has been accepted;

(2) Identify each facility at which the offeror proposes to use the specific SPI process in lieu of military or Federal specifications or standards cited in the solicitation;

(3) Identify the contract line items, subline items, components, or elements affected by the SPI process; and

(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the

Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.

(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:

(Offeror insert information for each SPI process)

SPI Process: _______________________________

Facility: ________________________________

Military or Federal Specification or Standard: ________________________________

Affected Contract Line Item Number, Subline Item Number, Component, or Element: ______________________________

(e) If a…