ExA_CONTRACT_DATA_REQUIREMENTS_LIST.pdf
PDF 663 KB Posted
- Attached to
- AMENDMENT Guided Missiles Life Cycle Contractor Support Federal contract opportunity
- Solicitation number
- W31P4Q14R0187
About this file
CRDL
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A05_FIRST_TO_FIGHT_UNITS.pdf | ||
| A07_DEPLOYMENT_FIELDING_PLAN.pdf | ||
| A12_JAVELIN_MAINTENANCE_SIGNIFICANT_ITEMS.pdf | ||
| A10_GOVERNMENT_FURNISHED_PROPERTY.pdf | ||
| A13_JAVELIN_ARMY_AUTHORIZED_STOCKAGE_LIST.pdf | ||
| A04_TRAINING_COURSE_EQUIPMENT_LIST_.pdf | ||
| A02_DD254_AND_OPSEC_COVER.pdf | ||
| A09_JAVELIN_SECURITY_CLASSIFICATION_GUIDE.pdf | ||
| A06_DOCUMENT_SUMMARY_LIST.pdf | ||
| A08_MAINTENANCE_CONCEPT_CHART.pdf | ||
| A03_JAVELIN_FIELDING_SCHEDULE.pdf | ||
| A11_REPRESENTATIVE_LIST_OF_FTT_IS_ _SS.pdf | ||
| A01_STATEMENT_OF_WORK.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-MSLS-CWS-L-SS
Att 1, Para C-15.2 Att 1, Para D-22.0 Att 1, Para E-9.0
Att 1, Para I-16.0
SFAE-MSLS-CWS-L-SS
Block 9: A. Distribution Statement C. Distribution Authorized to U.S.
Government Agencies and their contractors; Administrative and Operational Use; 14 Aug 14. Requests for this document shall be referred to PEO, Missiles and Space, CCWS Project Office, ATTN:
SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898.
31 Jan 2017.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17 Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Preservation and Packing Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-PACK-80120C Attachment 1, Para A-13.1 Attachment 1, Para I-1.11.1
AMSAM-MMC-LS-DP INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ASREQ SEE BLOCK 16 b. COPIES
SECT. B
8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
N/A N/A SEE BLOCK 16
Reg
Repro
16. REMARKS:
Block 9: A. Distribution Statement B: Distribution Authorized to U.S. Government Agencies Only; Administrative and Operational Use, 14 Aug 14. Other requests for these documents shall be referred to U.S. Army Aviation and Missile Command, ATTN: AMSAM-MMC-LS-DP, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12, and 13: Contractor shall submit NLT 60 days after contractor initiated change.
Block 14: Data shall be submitted electronically via Javelin Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and steven.w.potts4.civ@mail.mil.
SEE BLOCK 16 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90 mailto:tracey.smith@us.army.mil mailto:otto.hsu@us.army.mil mailto:steven.potts@us.army.mil
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17 Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Special Packaging Instructions (SPI)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-PACK-80121C Attachment 1, Para A-13.1 Attachment 1, Para I-1.11.1
SFAE-MSLS-CWS-L INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES
SECT. B
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
N/A N/A SEE BLOCK 16
Block 9: A. Distribution Statement D. Distribution authorized to DoD and DoD Contractors Only; Administrative or Operational Use; 14 Aug 14. Other requests for this document shall be referred to PEO, Missiles and Space, CCWS Project Office, ATTN: SFAE-MSLS-CWS-E-J, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12 & 13: Contractor shall submit NLT 60 days after contractor initiated change.
Block 14: Data shall be submitted electronically via Javelin Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17 Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80368A Attachment 1, Para A-1.0 Attachment 1, Para F-4.0 Attachment 1, Para I-1.1
SFAE-MSLS-CWS-L-SS INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT MTHLY 45 DAC b. COPIES
SECT. B
8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
N/A N/A 30 DAEOM
Block 9: A. Distribution Statement B: Distribution authorized to U.S. Government Agencies Only; Administrative and Operational Use, 14 Aug 14. Other requests for these documents shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Block 10: Data shall be submitted 30 day after end of month when activity occurs.
Block 14: Data shall be submitted electronically via Javelin Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17 Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Government Furnished Material (GFM) Consumption Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80438B Attachment 1, Para A-8.0 SFAE-MSLS-CWS-L INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ANNLY 12 MACA b. COPIES
SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A ANNLY
Block 8: Government approval/disapproval 30 days after receipt.
Contractor to resubmit 30 days after receipt of Government comments.
Block 9: A. Distribution Statement C: Distribution Authorized to US Government Agencies and Their Contractors;
Administrative and Operational Use, 14 Aug 14. Other requests for these documents shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Block 14: Data shall be submitted electronically via Javelin Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and
SFAE-MSLS-CWS-L 0
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Technical Report – Study/Services JAVTRAK Data Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80508B Attachment 1, Para A-2.1 Attachment 1, Para A-2.3
SFAE-MSL-CWS-E-J INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT QTRLY 30 DACA b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
N/A N/A AS REQ Reg Repro
16. REMARKS:
Block 9: A. Distribution Statement C. Distribution authorized to U.S. Government Agencies and their Contractors; Administrative and Operational Use; 14 Aug 14. Other requests for this document shall be referred to the PEO, Missiles and Space, ATTN: SFAE-MSL-CWS-E-J, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Block 14: Data shall be submitted electronically via Javelin Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
Data shall be delivered in Microsoft Office formation (Access).
SFAE-MSL-CWS-E-J 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Technical Report – Study/Services Allocated Baseline Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80508B Attachment 1, Para A-10.5 Attachment 1, Para I-1.2.1 Attachment 1, Para I-1.2.3 Attachment 1, Para I-1.8.5
SFAE-MSL-CWS-E-J INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT SEE BLK 16 SEE BLK 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A N/A SEE BLK 16 Reg Repro
16. REMARKS:
Block 9: A. Distribution Statement C. Distribution authorized to U.S. Government Agencies and their Contractors; Administrative and Operational Use; 14 Aug 14. Other requests for this document shall be referred to the PEO, Missiles and Space, ATTN: SFAE-MSL-CWS-E-J, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12, & 13: As generated by the contractor.
Block 14: Data shall be submitted electronically via Javelin Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
Data shall be delivered in Microsoft Office formation (Access).
SFAE-MSL-CWS-E-J 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A008 Engineering Change Proposal (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-CMAN-80639C Attachment 1, Para A-10.4 Attachment 1, Para I-1.8.4
SFAE-MSLS-CWS-E-CM INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 8: (Class I only). Government approval/disapproval 30 days after receipt. Contractor to resubmit 30 days after receipt of Government comments. Class IIs are for information only.
Block 9: A. Distribution Statement D. Distribution Authorized to DOD and DOD Contractors Only; Administrative or Operational Use; 14 Aug
14. Other requests for this document shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-E-CM, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12 and 13: ECP's & VECP's - Submit NLT 5 days after preparation. Generated to maintain baseline documents current.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
SFAE-MSLS-CWS-E-CM 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A009 Request for Deviation (RFD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-CMAN-80640C Attachment 1, Para A-10.4 Attachment 1, Para I-1.8.4
SFAE-MSLS-CWS-E-CM INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 8: Government approval/disapproval within 30 days after receipt. Contractor to resubmit 15 days after receipt of Government comments.
Block 9: A. Distribution Statement D. Distribution Authorized to DOD and DOD Contractors Only; Administrative or Operational Use; 14 Aug 14. Other requests for this document shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS- CWS-E-CM, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12, & 13: As generated by the contractor.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
SFAE-MSLS-CWS-E-CM 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A010 Notice of Revision (NOR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-CMAN-80642C Attachment 1, Para A-10.4 Attachment, Para 1-1.8.4
SFAE-MSLS-CWS-E-CM INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 8: Government approval/disapproval within 30 days after receipt. Contractor to resubmit 15 days after receipt of Government comments.
Block 9: Distribution Statement and Export Control Act Warning Statement shall be that of the document being revised.
Blocks 10, 12, & 13: Submit with DI-CMAN-80639C. No separate submission required.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
SFAE-MSLS-CWS-E-CM 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A011 Performance and Cost Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-FNCL-80912 Attachment 1, Para I-1.3 SFAE-MSLS-CWS-B INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT QTRLY SEE BLK 16 b. COPIES SECT. B
8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
N/A N/A SEE BLK 16 Reg Repro
16. REMARKS:
Block 9: A. Distribution Statement B. Distribution authorized to U.S. Government Agencies Only; Administrative and Operational Use; 14 Aug 14. Other requests for this document shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-B, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 12 & 13: Actuals only will be submitted. Subsequent reports due on quarterly cycle and shall be submitted by 28 days after end of quarter.
Block 14: Hard copy shall be mailed to: PEO, Missiles and Space, CCWS Project Office, SFAE-MSLS-CWS-B (ATTN: Joel Ditto) Redstone Arsenal, AL 35898. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
SFAE-MSLS-CWS-B 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS)
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A012 Revisions to Existing Government Documents Technical Manual Updates
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-80925 Attachment 1, Para A-13.2 Attachment 1, Para I-1.11.2
SFAE-MSLS-CWS-L-SS INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ANNLY 12 MACA b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A ANNLY Reg Repro
16. REMARKS:
Block 8: Government approval/disapproval 45 days after receipt.
Contractor to resubmit 30 days after receipt of Government comments.
Block 9: A. Distribution Statement C: Distribution Authorized to US Government Agencies and Their Contractors;
Administrative and Operational Use, 14 Aug 14. Other requests for these documents shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil, steven.w.potts4.civ@mail.mil, steven.w.potts4.civ@mail.mil, autumn.a.knoth-jez.civ@mail.mil and joseph.l.baker74.ctr@mail.mil.
SFAE-MSLS-CWS-L-SS 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90 mailto:tracey.smith@us.army.mil mailto:otto.hsu@us.army.mil mailto:steven.potts@us.army.mil mailto:steven.w.potts4.civ@mail.mil mailto:autumn.a.knoth-jez.civ@mail.mil mailto:joseph.l.baker74.ctr@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A013 Performance Oriented Packaging Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-PACK-81059A Attachment 1, Para A-13.1 Attachment 1, Para I-1.11.1
AMSAM-MMC-LS-MD INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT AS REQ SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 9. A. Distribution Statement B. Distribution Authorized to U.S. Government Agencies Only. Test and Evaluation Purposes Only; 14 Aug 14. Other requests for these documents shall be referred to U.S. Army Aviation and Missile Command, ATTN:
AMSAM-MMC-LS-MD, Redstone Arsenal, Al 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12 & 13: Submit 15 days after completion of each test.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and steven.w.potts4.civ@mail.mil.
AMSAM-MMC-LS-MD 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90 mailto:tracey.smith@us.army.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A014 Maintenance Support Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ILSS-81225 Attachment 1, Para I-2.0 SFAE-MSLS-CWS-L-SS INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION IN
LT AS REQ 30 DAC b. COPIES SECT. B
8. APP CODE F 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A N/A R/ASR Reg Repro
16. REMARKS:
Block 9: A. Distribution Statement F: Further dissemination on as directed by DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898, or higher authority. This determination was made on 14 Aug 14.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12, and 13: Submit updated data NLT 30 days after creation.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and steven.w.potts4.civ@mail.mil.
Contractor format acceptable.
SFAE-MSLS-CWS-L-SS 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90 mailto:tracey.smith@us.army.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A015 Equipment Inventory Records Inventory Audit
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ILSS-81251 Attachment 1, Para I-1.7 SFAE-MSLS-CWS-L-SS INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION IN
LT ANNLY 60 DAC b. COPIES SECT. B
8. APP CODE F 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A N/A R/ASR Reg Repro
16. REMARKS:
Block 9:
A. Distribution Statement F: Further dissemination on as directed by DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898, or higher authority. This determination was made on 14 Aug 14.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and steven.w.potts4.civ@mail.mil.
Contractor format acceptable.
This submittal applies to FMS contracts of 1 year or more.
SFAE-MSLS-CWS-L-SS 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90 mailto:tracey.smith@us.army.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A016 Configuration Status Accounting Information
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-CMAN-81253A Attachment 1, Para A-10.3 SFAE-MSLS-CWS-E-J INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 8: Government approval/disapproval 30 days after receipt. If disapproved the contractor shall resubmit within 15 days after receipt of Government comments.
Block 9: Distribution Statement B. Distribution authorized to U.S.
Government Agencies only, Proprietary Information and Critical Technology; 14 Aug 14; Other requests for this document shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-E-J, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12 & 13: “As-Built” record data shall be provided with or before the first shipment of configuration items. An indentured drawing and specification listing shall also be provided. The indentured listing shall be revised showing change in serial number effectivity before or with each physical shipment of configuration item.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
Data shall be delivered using Microsoft Office Excel.
SFAE-MSLS-CWS-E-J 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A017 Contract Work Breakdown Structure (CWBS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81334D Attachment 1, Para A-4.0 Attachment 1, Para I-1.4
SFAE-MSLS-CWS-B INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 8: Government approval/disapproval 30 days after receipt of the preliminary submission. Contractor shall incorporate any revisions within 15 days after receipt and resubmit.
Block 9: A. Distribution Statement A. Approved for public release, 14 Aug 14. Other requests for these documents shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS), SFAE-MSLS-CWS-B, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12, & 13: Preliminary CWBS due 30 DACA. This submittal is due 60 days after DCARC creation of mapping matrix. Submission shall include extension of the CWBS down to the level at which tasks will be assigned, budgeted, and performed. A one time WBS dictionary shall be submitted with the initial CWBS. Subsequent changes to the WBS shall be submitted within 30 days after they occur.
Block 14: Submissions to DCARC must be sent through their web site (http://dcarc.pae.ods.mil/). Email notification shall be sent to tracey.s.smith.civ@mail.mil and otto.hsu.civ@mail.mil.
SFAE-MSLS-CWS-B
DCARC
0 0 1
15. TOTAL 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
0 0 1 http://dcarc.pae.ods.mil/
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
JAVELIN LIFE CYCLE CONTRACTOR
SUPPORT (LCCS) FY 16-17
Raytheon/Lockheed Martin Javelin Joint Venture
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A018 Training Program Structure Document
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-81521B Attachment 1, Para F-10.1 and F-10.2
SFAE-MSLS-CWS-L-SS INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT SEE BLOCK 16 SEE BLOCK 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A SEE BLOCK 16 Reg Repro
16. REMARKS:
Block 8: Government approval/comments due 30 days after receipt of submission. Contractor to resubmit 30 days after receipt of Government comments.
Block 9: A. Distribution Statement C. Distribution Authorized to U.S. Government Agencies and their Contractors.
Administrative and Operational Use; 14 Aug 14. Other request for this document shall be referred to DA, PEO, Missiles and Space, Close Combat Weapon Systems (CCWS) Project Office, ATTN: SFAE-MSLS-CWS-L-SS, Redstone Arsenal, AL 35898.
B. Export Control Act Warning – Required WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. SEC 2751, et seq.), or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25, DTD 6 Nov 84.
Blocks 10, 12 & 13: Draft submission due 60 days after incorporation of contractor initiated change into hardware or software. Final submission due 60 days prior to course start date.
Block 14: Data shall be submitted electronically via Joint Venture External SharePoint. Email notification shall be sent to tracey.s.smith.civ@mail.mil, otto.hsu.civ@mail.mil and steven.w.potts4.civ@mail.mil.
All slides and transparencies are to be provided in MS PowerPoint format.
SFAE-MSLS-CWS-L-SS 1 0 1
15. TOTAL 1 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
mailto:tracey.smith@us.army.mil
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .