This document contains questions and responses related to a solicitation for the construction of a zirconia alumina blast media room. Key details include that the solicitation requires the construction of a new blast room for abrasive blasting using zirconia alumina media. A site visit is scheduled for December 21, 2022 and interested parties must RSVP by December 19. Proposals are due by December 27, 2022. The scope of work involves constructing the blast room, installing dust collection and HVAC systems, providing air connections and monitoring makeup air. The government will provide utilities within 30 feet of the work site but no hot or chilled water. 2D as-built drawings are required upon completion. The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground.

View the file

Other files

File Type Posted
Amendment Document 2.pdf PDF
Questions and Answers Document 1 1E Blast Room.docx DOCX document
Attachment 1 Drawings.pdf PDF
Amendment Document.pdf PDF
Solicitation W25G1V23R0007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Qs to Government BIDDER QUESTIONS Solicitation: W25G1V23R0007 Customer: DoD/Department of The Army

No.Page(s)Section(s)Sub-sectionDiscussionQuestionResponse
11SF 1449Block 10Acquisition TypeBlock #10, "Unrestricted Acquisition," is checked. Is this applicable to this solicitation? If not, what is the acquisition type?Yes
23SF 1449, AddendumProposal Submission InstructionsPROPOSALS AS WELL AS ALL REQUIRED SUPPORTING DOCUMENTATION MUST BE SUBMITTED ELECTRONICALLY AS A .PDF FILE and email to kristen.zigmont.civ.civ@army.mil and labeled with the RFP number and Volume number.Is the Price File to be Submitted as a PDF or Excel File?PDF
334Statement of WorkSecurity ClearancesPerformance of work will require access to classified information or equipment IAW the DD Form 254, Contract Security Classification Specification, provided as an attachment. Contractor shall comply with FAR 52.204-2, Security Requirements.Is a security clearance required for this effort and if yes, at what level?Not Applicable for this Contract
478,79FAR ClausesClauses Incorporated by full text52.219-4 Notice of Price Evaluation Preference For HUBZone Small Business Concerns (OCT 2022)Is FAR 52.219-4 an evaluation preference/factor for this solicitation?Small Business is being considered for this
521Implementation PlanSection 3.7.6The Vendor will submit a written implementation plan for review and acceptance by the TYAD CCB. This plan will include, but is not limited to, detailed information of all IT equipment, components, software, firmware, and data to be delivered to TYADWhen is the written implementation plan due?Prior to commencement of installation
629Contingency Operations Plan14.0 SECURITY REQUIREMENTS FOR THE CONTRACTORThe Contractor shall prepare and submit a Contingency Operations Plan to the Government.When is the Contingency Operations Plan due?Prior to commencement of installation
7N/AStatement of WorkN/AN/ADefine the site management requirements? Is it 1 Superintendent and 1 QC manager? Resume requirements? IS CQM required? Please provide criteria for Site management acceptance?At least one on-site Supervisor by the Contractor is required for all aspects of the project
8N/APhotosN/AN/APlease provide photos of entire existing floor? Specifically where existing floor goes below FFE?Not available
9N/APhotosN/AN/APlease provide photos of electrical panels/feedersNot available
10N/APhotosN/AN/APlease provide photos of existing blast room and all ancillary componentsNot available
11N/AStatement of WorkN/AN/APlease supply list of equipment that is to remain onsite (Equipment that is not part of the bid package but is part of the systems required operating components). Statement of work defines operating pressures but does not state to replace air compressors or supplied air system specifically, nor does it define specs for these units? Are these units GFE?Compressed air and breathing air will be supplied by the Government.
12N/AStatement of WorkN/AN/ASOW does not define how many tool ports/Supplied air ports are to be supplied inside of the blast room? Contractor assumes 1 for Supplied air and 1 for Tool air.The blast room shall be designed and constructed with two (2) breathing air and process connection points on the booth.
1310Statement of Work2.3Conditioned make-up airPlease provide the conditioning requirements (temp ranges, etc.) for the specified "temperature controlled makeup air".Only temperature control is required, Desired temperature control is in the range of 67-72 degrees Fahrenheit.
149Statement of WorkSection 1.4 and site walkUtilities (compressed air, power, etc.)Contractor understands from the solicitation and field walk that the government shall provide needed utilities, including compressed air, power, etc. Request that the government provide a detailed description of how the tie-ins to these utilities will be accomplished, locations in relation to the new blast room, and contractor associated responsibilities.
Also, please confirm whether hot and/or chilled water are included in the provided utilities. The above details would apply to these utilities as well if so.Utilities will be furnished by the Government within 30 feet of the work site. No hot or chilled water will be provided.
1512Statement of Work2.28Fire suppression systemA carbon dioxide fire suppression system is specified. This style system has risks associated with operation in an enclosed personnel occupied space if breathing air is not utilized properly. Is this specific system required or would it be preferred that contractor make a recommendation for a more appropriate system and provide in the quotation?A carbon dioxide fire suppression system is required that meets UFC (United Facility Criteria) and NFPA standards.
1610Statement of Work2.3HVAC system locationIs there a chosen location for placement of the HVAC system, including the specified "energy recovery system"? If so, please provide photos.The energy recovery requirement is rescinded. A potential location for the HVAC system is the roof above the reclaimer.
1711Statement of Work2.7Energy Recovery SystemPlease provide additional detail for "energy recovery system". Contractor's understanding is that this system is desired to utilize the ventilated air, after it has passed through the dust collection system, for heat recovery to the makeup air without contaminating the supply/makeup air. Please confirm if this is true, and if so, whether the entire HVAC system should/could be located near the dust collection system.The energy recovery requirement is rescinded.
1810Statement of Work2.3Dust collection sized for additional existing equipmentContractor understands from the SOW that the new dust collection system shall be oversized by 12,000 cfm to accommodate existing additional equipment. Will it be in the contractor's scope to make ductwork tie-ins to the referenced additional equipment. If so, can information for these require tie-ins be provided?There will be one tie in of the existing maniflod from the additional equipment to the new ductwork
1912Statement of Work2.18Dust collection system explosion requirementsThe SOW calls for "explosion relief panel", yet there are no other NFPA items called for an no cost value listed. Are any other explosion controls required?Additional explosion controls are required as may stated in OSHA, NFPA and other regulations listed in the SOW.
2012Statement of Work2.2Dust collection filtration requirementsSOW does not call for HEPA filtration and is exhausting to atmosphere, yet the spec does call for "99.999% efficient to a particle size of 0.5 micron". No known media except HEPA can meet that requirement. Is HEPA required? Please confirm.Any technology, including HEPA filtration, can be used to meet this requirement.
2112Statement of Work2.18scale weighing systemSOW calls for "scale weighing system shall be incorporated to indicate the amount of dust in the dust collection barrels or drums." In order to include, contractor will require additional information such as: weight of material being collected, maximum weight required, etc.Each scale for each drum shall have at least a 1500 pound capacity.
2210Statement of Work2.3Makeup air monitoringPlease confirm that make-up air must be "monitored for combustible gases, carbon monoxide and carbon dioxide", as the SOW calls for, even though the system will utilize 100% fresh air as required by the SOW.Yes, as make-up air may be further heated or cooled before returning to the building.
2312Statement of Work2.23Precision media control valvesThe specified media, zirconia alumina, is a very aggressive media. Contractor believes this is understood based on the requirements included in the SOW. However, the precision media control valves are understood to be a computerized valve specifically designed to control the media flow with specialized gears. The contractor believes this aggressive media will destroy this expensive piece of equipment. Typical for this media would be a tungsten grit valve. Please provide confirmation.Provide a valve appropriate for the application
2413Statement of Work2.3Air Connection pointsPlease clarify if there is to be 2 connection points total or 2 connections for breathing air and 2 for Process air connections? Also please provide connection sizes and photos of connection lines/supply units?There shall be two connection points/outlets for both in the booth for convenience of the blaster to connect closer to the work being blasted. Size is to be appropriate for the proposed design
2510Statement of Work2.3Air Conditioning unitPlease provide photo of location of Makeup AC unit for conditioned air and or detail drawings?Location to be proposed by the bidder. A suggested location is the roof above the new reclaimer.
2612Statement of Work2.29Fire SuppressionPlease confirm that system is not to be sprinkled? Please confirm that pull stations at both man exit doors are to be supplied. What is the distance to the nearest pull station to either man exit door?The system design is to meet the regulations stated in the SOW.
2710Statement of Work2.3Makeup air monitoringDoes the gov want the makeup air to be heated/temperature and humidity controlled (IE Cooled) or just heated?Temperature controlled; desired temperature range of 67-72 degrees Fahrenheit
289Statement of Work1.4Government SupplyPlease provide technical data, cut sheets or locations for government Supplied air system, Air Compressors and Electrical breakers and feeders?The Government will provide the utilites in the amount the proposed system rtequires.
299Statement of Work1.8"Contractor shall furnish

to the COR a computer-aided design and drafting (CADD) as-build drawing of the SYSTEM inside the building. The drawing shall be furnished in PDF format; in .dwg format; and in

hardcopy, 22”x34” paper size, in triplicate."Please confirm this requirement is for 2D CADD as builts and not 3D CADD Renderings?2D
3010Statement of Work2.3"The dust collection system shall be oversized by 12,000 cubic feet per minute to accommodate existing additional equipment. The ducts from the existing additional equipment shall be connected to the SYSTEM. No loads, except ducts, shall be placed on or supported by the building structure. All such loads shall be floor supported independent of the building’s structural members"Please confirm the count of "Existing additional equipment", photos, existing duct sizes and distance to would be main Dust collection system?The manifold duct for the existing additional equipment is directly connected to the duct of the current blast booth. The same single point connection can be made to the duct of the new system.