- On-Call Roof Repair
- Solicitation number
- W25G1V-18-R-0007
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_02_Wage_Determination.pdf | ||
| Attachment_01_REV,_Q&A.pdf | ||
| Question_and_Answers.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25G1V70790JM3
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
As a result of this Amendment 0003, the follow ing changes are hereby incorporated into solicitation W25G1V-18-R-0007:
1. Reference Section K, provision 52.222-33 Notice of Requirement for Project Labor Agreement. Provision has been removed from this solicitation
2. As a result of this Amendment, Attachment 01 REV, Questions and Answ ers, is hereby incorporated into this solicitation. Attachment can be found at FBO.GOV w ebsite.
3. Reference Section B., Roof Repair Price Schedule. Item forty-nine (49) has been added. Item tw enty-one (21) has been revised.
4. Reference Section H.2 (e), Rate of Wages - Contracting Officer Notice. Additional language and current Wage Determination (Attachment
02) incorporated into this solicitation.
All other terms remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W25G1V-18-R-0007
X 9B. DATED (SEE ITEM 11)
16-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Apr-2018
CODE
ACC-APG DIVISION E
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
W25G1V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W25G1V-18-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
SECTION B
ROOF REPAIR PRICE SCHEDULE
**Unit costs must include, at a minimum, material, overhead and profit. Regular and emergency labor rates are priced separately. Emergency labor rates WILL NOT be included in evaluation process**
ITEM DESCRIPTION UNIT OF
MEASURE
UNIT
PRICE
BASE YEAR
UNIT
PRICE
OPT YR 1
UNIT
PRICE
OPT YR 2
UNIT
PRICE
OPT YR 3
UNIT
PRICE
OPT YR 4
01 METAL DECKING 20
ga TYPE B
SQUARE FOOT
02 ½” PT PLYWOOD SHEET
03 ½” CDX PLYWOOD SHEET
04 4X4 PT WOOD
SUPPORT BLOCKING
LINEAR FOOT
05 2” ROOF ISO BOARD SQUARE FOOT
06 6” COVER TAPE LINEAR FOOT
07 12” COVER TAPE LINEAR FOOT
08 3” SEAM TAPE LINEAR FOOT
09 .060 EPDM SQUARE FOOT
10 TERMINATION BAR LINEAR FOOT
11 EDGING 24 ga Kynar LINEAR FOOT
12 LAP SEALANT TUBE
13 SPLICE ADHESIVE GALLON
14 PRIMER GALLON
15 BONDING ADHESIVE GALLON
16 EPDM CLEANER GALLON
17 12” UNCURED
FLASHING
LINEAR FOOT
18 MASTIC WATER
CUTOFF
TUBE
19 RETROFIT DRAIN EACH
20 SEALEX LOW SLOPE
ROOF SEALER
2 GALLON
CONTINUE NEXT PG
21 STAINLESS STEEL
COPING CAP BASED
20” GIRTH 26 GAUGE
LINEAR FOOT
22 CERTAINTEED CT/AR
LANDMARK SHINGLES
SQUARE
23 LANDMARK HIP
RIDGE
LINEAR FOOT
24 30# ROOF FELT ROLL
25 KARNAK FLASHING
CEMENT
GALLON
26 STEP FLASHING LINEAR FOOT
27 12” ALUMINUM
FLASHING
LINEAR FOOT
28 6” ALUM FASCIA .024 LINEAR FOOT
29 10” ALUM FASCIA
.024
LINEAR FOOT
30 12” VINYL SOFFIT PC
31 5” ALUM “K” GUTTER LINEAR FOOT
32 2”X3” ALUM
DOWNSPOUT
LINEAR FOOT
33 6” PAINTED
GALVANIZED GUTTER
LINEAR FOOT
34 3”X5” PAINTED
GALVANIZED
DOWNSPOUT
LINEAR FOOT
35 4” PVC PIPE FOR
DOWNSPOUTS
LINEAR FOOT
36 SILICONE CAULKING TUBE
37 MASONRY CAULK TUBE
CONTINUE LIST ON
NEXT PAGE
38 ACRYMAX FULL
REINFORCED
ELASTOMERIC
COATING SYSTEM (3
COATS)
SQUARE FOOT
LABOR &
MATERIAL
39 ECOLASTIC TREMKO GALLON
40 BERGER RTCLSM
POLYCARBONATE
SNOW GUARDS
EACH
41 SNOW GUARD
BONDING ADHESIVE
TUBE
42 BERGER F‐RAIL SNOW
RETENTION SYSTEM
LINEAR FOOT
43 SKY TRACK LIFT HOUR
44 SCISSORS LIFT HOUR
45 REGULAR HOUR
FOREMAN REPAIRS
HOUR
46 REGULAR HOUR
LABORER REPAIRS
HOUR
47 EMERGENCY HOUR
FOREMAN REPAIRS
48 EMERGENCY
LABORER REPAIRS
HOUR
49 PETERSON SNAP‐
CLAD .040
ALUMINUM 12”
WIDTH METAL PANEL
SQUARE FOOT
*NOTE: PAYMENT WILL BE MADE FOR ACTUAL QUANTITIES USED AT THE UNIT PRICE
SPECIFIED IN AWARD. ANY ITEMS REQUIRED THAT ARE NOT PRICED ABOVE WILL BE
SUBMITTED IN WRITING TO THE COR AND WILL BE USED UPON AGREEMENT OF PRICING
BETWEEN THE GOVERNMENT AND CONTRACTOR.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SECTION H
H.1 DEPOT REGULATIONS - CONTRACTING OFFICER'S NOTICE
While within the confines of Tobyhanna Army Depot, Contractor employees will adhere to and be governed by all rules, regulations, policies, procedures and directives issued by the Commanding Officer, Tobyhanna Army Depot, and said employees will be required to conduct themselves in the same manner required of Government employees.
H.2 RATE OF WAGES - CONTRACTING OFFICER NOTICE
(a) The minimum wages paid to laborers and mechanics on this project, as determined by the Secretary of Labor to be prevailing for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the pertinent locality, are as set forth below. (This clause is inoperative if the contract is in the amount of $2,000 or less).
(b) Any class of laborers and mechanics, including apprentices and trainees, not listed below employed on this contract shall be reclassified conformably to the schedule set out below by mutual agreement between the Contractor and class of labor concerned, subject to the prior approval of the Contracting Officer, and to the following criteria being satisfied:
(i) The work to be performed by the classification requested is not performed by a classification in the wage determination;
(ii) The classification is utilized in the area by the construction industry;
(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
In the event that a listed classification in fact performs the work of the missing classification, then that listed classification wage rate shall be used for the laborers or mechanics performing the said work. Information regarding whether a listed classification is documented as performing the work of the missing classification is available from the union in cases where the listed rate for the candidate classification was obtained from a union; or the information is available from DOL if the listed rate of the candidate classification is based upon a DOL survey. A classification rate can be determined as being from a DOL survey or from a union rate by the identifier above the classification: if the identifier shows the first few letters of the classification (e.g., carpenters may show “carp”, plumbers may show “plum”), the rate is a union rate; if, however, the identifiers starts with “SU”, the rate is based on a DOL survey. All identifiers starting with “SU” are non-union rates. Questions regarding whether a classification with a rate based upon a survey (i.e., non-union) is documented as doing the work of the missing classification may be posed to DOL at the regional office at
(215) 861-5830.
(c) For purposes of a conformance, in the event the interested parties cannot agree on the proper classification or reclassification of a particular class of laborers and mechanics to be used, the questions, accompanied by the recommendation of the Contracting Officer, shall be referred to the Department of Labor for final determination.
NAME OF CLASSIFICATION OF LABORERS AND MECHANICS - BUILDING
Decision Number/Date – PA180122 and any amendments thereto which are listed below.
Modification Number Publication Date 03 04/13/2018
(d)(1) A Contractor may employ apprentices on Government Construction projects. The Contractor, prior to using apprentices on the contract work must submit to the Contracting Officer written evidence of registration of such employees in a program which has been accepted either by the Bureau of Apprenticeship and Training (BAT), U.S. Department of Labor, or by a state apprenticeship and training agency approved and recognized by BAT. Trainees may be employed only under programs approved by BAT. The Contractor also shall be required to submit written evidence of apprentice to journey-man and trainee to journeyman ratios and wage rates including fringe benefit payments established for his program in the project area. Upon receipt of such submission, the Contracting Officer shall accept these ratios and rates for the purposes of determining the Contractor's compliance with the Davis-Bacon Act clause.
(2) Whenever a contractor has classified employees as apprentices or trainees without complying with the foregoing requirements, the classification shall be rejected, and the Contractor shall be required to pay such employees at the rates applicable to the classification of the work they actually performed.
(e) Contracting agencies may unilaterally extend the term of a contract in contracts that contain options. Inclusion of current wage determination is required at time option is exercised.
H.3 HAZARDOUS MATERIAL - CONTRACTING OFFICER'S NOTICE
This contract may involve the delivery of hazardous materials as defined by the latest version of Appendix A, Federal Standard 313. FAR 52.223-3, Hazardous Material Identification And Material Safety Data (JAN 1997) and DFAR 252.223-7001, Hazard Warning Labels (DEC 1991), is included in full text. The attached DOL Form OSHA174 (or other approved DOL Form similar to OSHA20) must be submitted by the apparently successful Offeror prior to award of the contract or delivery of material.
H.4 PROGRESS PAYMENT REQUESTS
In accordance with the terms of the contract clause entitled Prompt Payment For Construction Contracts (FAR 52.232-27, SEP 2005) the following information and documentation is required to be included in any proper invoice for payment. Omission of information or documentation from the following list does not alleviate the Contractor's responsibility to submit that information or documentation with its payment invoice if submission is required elsewhere in this contract.
(a) Updated Progress Schedule as required by FAR clause 52.236-15, Schedules For Construction Contracts (APR 1984).
(b) Certified payroll records as required by FAR Clause 52.222-8, Payrolls And Basic Records (FEB 1988).
(c) As required by FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts (SEP 2002):
(1) Contractor Certification (Subparagraph (c))
(2) A listing of the total value of each subcontract
(3) A listing of the amount included for work performed by each subcontractor and amounts previously paid to each subcontractor.
PLEASE NOTE: For Final Payment Only - A release of all claims against the Government arising by virtue of the contract.
H.5 WORK AREA RESTRICTIONS - CONTRACTING OFFICER'S NOTICE
Contractor employees are restricted to the immediate area of the job site and not permitted access to any area adjacent to said job site without expressed written permission of the Contracting Officer.
H.6 PROTECTION OF OPENINGS - CONTRACTING OFFICER'S NOTICE
1. During the periods of inclement or cold weather, and at the end of each work day, the contractor shall provide a secure temporary enclosure to seal all openings being worked on.
2. Security of the building/area will not be downgraded during non-working time.
H.7 RESERVED
H.8 COORDINATION - CONTRACTING OFFICER'S NOTICE
a. All work shall be scheduled so as to provide minimum interference with depot operations. The Contractor shall coordinate the schedule with the Contracting Officer, prior to commencement of work.
b. Working hours shall be between 0730 and 1600 hours, Monday through Friday, (excluding Federal Holidays and the day after Thanksgiving if deemed a Federal Holiday) unless prior approval has been received from the Contracting Officer.
c. Successful bidder(s) shall within five (5) days after commencement of work submit a written, practicable construction schedule to the Contracting Officer for written approval.
d. If the work requires tapping into existing electrical, sewerage, water, storm, air lines, alarms, etc., this maneuver shall not interfere with Depot operations. Interruptions shall occur during a weekend or during other than regular working hours and shall be coordinated with the Contracting Officer's Representative. When a situation such as this arises, the contractor shall notify the COR, in writing, at least seven (7) days in advance of the occurrence, describing the circumstances and requesting approval. (In the event of conflict between this paragraph and the Technical Specifications, the latter shall govern).
H.9 APPROVALS - CONTRACTING OFFICER'S NOTICE
All reference to approvals as may be required throughout the specifications, attachment I, Technical Specifications shall be deemed to mean the written approval of the Contracting Officer. All requests for approval shall be made in writing to the Contracting Officer.
H.10 FAR 52.236-12 CLEANING UP (APR 1984)
The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
(End of clause)
CONTRACTING OFFICER'S NOTICE:
1. Debris and Rubbish: Remove debris and rubbish from the site as soon as practicable. Do not allow to accumulate in buildings or on site. (However, see paragraph 3. below concerning cardboard waste.) Also remove debris from excavations.
2. Debris Control: Remove and transport debris, to an approved disposal site, in a manner as to prevent spillage on streets or adjacent areas.
3. Disposal of Debris:
a. Removal of debris and rubbish shall be the responsibility of the Contractor. The Contractor shall dispose of all materials, except as noted b. below, outside the limits of the Government Controlled Property at a site approved by local and state authorities.
COMPLIANCE WITH THE MONROE COUNTY SOLID WASTE MANAGEMENT
ORDINANCE/PLAN IS REQUIRED FOR THE HAULING AND DISPOSAL OF
CONSTRUCTION/ DEMOLITION WASTE. FOR ALL OTHER WASTE, COMPLIANCE
MAY BE REQUIRED. CONTRACTORS ARE RESPONSIBLE FOR CONTACTING
THE MONROE COUNTY MUNICIPAL WASTE MANAGEMENT AUTHORITY TO
DETERMINE SPECIFIC COMPLIANCE RESPONSIBILITIES AND REQUIREMENTS.
MONROE COUNTY MUNICIPAL WASTE MANAGEMENT AUTHORITY CAN BE
REACHED AT 570-421-7301. PLEASE NOTE, THE USE OF TRANSFER FACILITIES
FROM THE MONROE COUNTY CONTRACTED FACILITIES LIST IS NOT ALLOWED
FOR TOBYHANNA ARMY DEPOT PROJECTS.
b. CONTRACTORS ARE ENCOURAGED AND SPECIFICALLY REQUESTED TO
DISPOSE OF CARDBOARD DEBRIS WITHIN THE CONFINES OF THE
GOVERNMENT CONTROLLED PROPERTY AT ANY OF THE DEPOT'S READILY
ACCESSIBLE CARDBOARD BALER LOCATIONS. IF A BALER IS NOT LOCATED
NEAR THE JOB SITE, CARDBOARD DEBRIS MAY BE NEATLY STACKED AT THE
JOB SITE FOR SUBSEQUENT PICK-UP BY GOVERNMENT PERSONNEL. ALL
CARDBOARD DEBRIS DISPOSAL ARRANGEMENTS MUST BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. The Contracting Officer shall be notified, in writing, of the location of the selected disposal site.
5. A final cleanup is required at end of the project to include dust, debris, smudges, stains, marks of any kind, spills, dirt, construction material, all waste, rags, etc.
Vacuuming and wet mop will be required for projects within structures that have finished areas.
H.11 FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES
(APR 1984)
(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.
(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
(End of clause)
CONTRACTING OFFICER'S NOTICE: There will be no charge for any utilities required for this contract. Bidder/Offeror shall not include any costs for securing such utilities in his bid price.
H.12 SECURITY INSPECTION
By submission of a bid/offer under this solicitation, the Contractor acknowledges and agrees that all vehicles operated by the contractor and commercial vendors and subcontractors will be inspected by Depot Security personnel prior to entering or departing the controlled area of Tobyhanna Army Depot.
H.13 RESERVED:
H.14 INSURANCE REQUIREMENTS
Reference the clause FAR 52.228-5 Insurance – Work On A Government Installation (JAN 1997) and pursuant to FAR 28.307-2 the following insurance requirements apply.
The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
(a) WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY. Contractors are required to comply with applicable Federal and State worker’s compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy , except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker’s compensation to be written by private carriers.
(b) GENERAL LIABILITY. Bodily injury liability insurance coverage written on the comprehensive form of the policy of at least $500,000 per occurrence is required.
Property damage liability insurance is not required unless otherwise specified.
( c ) AUTOMOBILE LIABILITY. Automobile liability insurance written on the comprehensive form of policy is required. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
H. 15 CONSTRUCTION DRAWINGS
Reference the clause FAR 52.236-21 I included by reference in Section I.
a. Shop drawings should be submitted directly to the Contracting Officer’s Representative (COR).
b. In the event the contractor desires that more than one approved set be returned (See FAR 52.236-21(g)), the contractor shall submit additional copies for approval and request these additional copies be returned to the contractor.
c. Four sets of shop drawings shall be submitted at the completion of the work indicating minor changes or revisions made with the knowledge and consent of the COR to previously approved shop drawing submittals. If no changes or revisions have been made, this resubmittal is not required.
d. When changes and revisions have been made to the contract drawings, one clean marked-up set of these drawings shall be submitted upon completion of the work, indicating these changes and revisions.
H.16 TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND
VISITOR RESTRICTIONS
Depot Access:
A background check and approval from Tobyhanna Army Depot (TYAD) Security Branch is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied. The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access to include warranty services. The TYAD point of contact (POC) will provide ELTY Form 648-C, “Request Access to Tobyhanna Army Depot” to the contractor/vendor at least ten days prior to the expected visit date for completion. The contractor/vendor shall return the completed ELTY Form 648-C to the TYAD POC in a timely manner so the same may be submitted to Security for processing no later than seven days prior to the visit. All of the required fields on the form shall be complete and accurate by the contractor/vendor for timely processing. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. See “Access and General Protection/Security Policy and Procedures”.
Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Security Branch. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. Submit the completed ELTY Forms 648-C form(s) to the COR or POC.
H.17 CONTRACTOR VEHICLES, TRAILERS AND EQUIPMENT
All contractor owned, rented or leased vehicles, trailers, and/or equipment for use on site shall be identified with the contractor’s company name, job site description, point of contact and phone number where the contractor can be reached 24 hours a day. The contractor shall ensure all referenced items are to be checked for proper operation, leaks, etc. prior to delivery to Tobyhanna Army Depot. The contractor shall coordinate with the Contracting Officer’s Representative or assigned Government point of contact prior to leaving any of the referenced items unattended at the site.
H.18 USE OF POWER EQUIPMENT USING FOSSIL FUEL
Contractors are prohibited from using diesel or gasoline powered equipment in an enclosed environment that is populated at the time the equipment is to be used unless coordinated and approved by the COR and the Safety Office. Alternate power such as propane or electricity is acceptable for use in populated areas. If the Government has required that the pertinent work be performed during times when the enclosed area is unpopulated, the COR must coordinate with the Safety Office for specific approval of both the use of the diesel/gasoline powered equipment and the schedule of the work for the Contractor to use the diesel or gasoline powered equipment. Under those circumstances which unequivocally preclude use of alternate power, and diesel or gasoline powered equipment must be used, the COR must coordinate with the Safety Office for approval of such use.
END SECTION H
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
The following have been deleted:
52.222-33 Notice of Requirement for Project labor Agreement MAY 2010
(End of Summary of Changes)