This is a Questions and Answers document for solicitation W15QKN-26-Q-A139, issued July 20, 2026, addressing industry inquiries submitted during the solicitation phase for CSS99155 HVAC Replacement at the SSG Isadore S. Jachman United States Army Reserve Center in Owings Mills, Maryland. Key clarifications include confirmation that this is a new requirement with no incumbent contractor, that field-mounted and provided controls are required for fan coil units rather than factory-provided BACnet controls, and that existing control wiring may be reused while communication wire must be replaced with BACnet-compatible wire. The contractor bears responsibility for all wiring reused and new installations to ensure operational and functional capabilities. The project is strictly replace-in-kind with no design responsibility assigned to the contractor, though all HVAC and control components must result in a fully operational system following 99th EBCS Standards and modern industry practices. The Air Handling Unit specifications were provided per SOW section 11.3.3, and the 99th BAS Points and Alarms documentation will be provided separately. The superintendent may serve as Quality Control manager and site safety health officer. The response deadline was extended from July 23, 2026 to July 27, 2026 at 10:00 AM EDT.
The purpose of this document is to provide answers to questions submitted by industry during the solicitation phase.
Q1. Is this a brand new requirement? If not, is/was there an incumbent performing services
A1. This is a new requirement.
Q2. 1.
During the site visit held on Thursday, July 16, 2026, access to the roof wasn’t available to look at the air handling unit on the roof due to the representative not having the key. Are additional visits available prior to the bid deadline? If not can photos of the unit including interior sections, nameplate information, control panels, etc. be provided?
A2. AHU Specs have been provided per 11.3.3. Additional information/photos not available at this time.
Q3. 2.
Please confirm that field mounted and provided controls for the fan coil units are required or if factory provided BACnet compatible controls are acceptable.
A3. Field Mounted and provided controls are required.
Q4. The SOW (11.5.11.7) referenced points lists “99th BAS Points & Alarms” Sheet required for the control system. Can you please provide that documentation?
A4. Yes, This document will be provided.
Q5. Can existing wiring be reused as necessary or does all new wiring need to be provided and installed for the control system and its components?
A5. Exisiting control wire can be reused between equipment and controls. Communication wire shall be replaced with BACnet compatible wire for communication to the BMS. Contractor shall be responsible for all wiring reused and new for operational and functional capabilities.
Q6. Please confirm that the superintendent can serve as QC manager and site safety health officer.
A6. Yes.
Q7. Please confirm that the contractor does not have any design responsibility and this project is strictly a replace in kind project.
A7. The contractor does not have any design responsibility, but shall ensure all HVAC and Control components result in a fully operational and functional system that requires no human intervention. All Logic and sequences shall follow 99th EBCS Standards and modern industry practices.
Q8. The SOW references Paint and Finishes specification; however, we do not see any of the work in the scope of work. Can you please clarify what painting and finishes work is part of this project?
A8. 11.4.9.2.(2) Surface repairs detail patch/sand/paint tasks required upon demo of the existing LON Network.
Q9. Please provide the building’s automation contractor contact information including point of contact, Company name, phone number and email address.
A9. 99th Does not have access to this information at this time.
Q10. Can the due date for the solicitation be extended?
A10. Yes, the solicitation response date has been extended from Thursday, 23 July 2026 by 10:00AM EDT to Monday, 27 July 2026 by 10:00AM EDT.