M72 LAW RFP W15QKN20R0022 AMD 0004 - FINAL.PDF

PDF 17 KB Posted

Attached to
M72 Light Assault Weapon (LAW) Variants and Shoulder Launched Munitions (SLM) Components
Solicitation number
W15QKN-20-R-0022
Issued by

About this file

This document summarizes an amendment to a solicitation for the manufacturing, testing, and delivery of M72 Light Assault Weapon variants and components for Shoulder Launched Munitions training systems.

The amendment extends the proposal due date from October 22, 2020 to November 12, 2020 at 4:00pm EST. It also changes the delivery schedule for Ordering Period 1, reducing the time for First Article Testing completion from 548 days to 365 days after delivery order award. Initial production lot delivery is changed from within 1,004 days after order receipt or 456 days after FAT approval, whichever is later, to within 545 days after order receipt or 180 days after FAT approval, whichever is later. The U.S. Army Contracting Command - New Jersey will fulfill this requirement through a sole source, firm fixed price IDIQ contract with Nammo Defense Systems over five years for the specified components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0004 2020OCT22

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

LAURA BURGOS-MAGIDSON

EMAIL: LAURA.E.BURGOS-MAGIDSON.CIV@MAIL.MIL

W15QKN-20-R-0022

2020JUL31

X

X 2020NOV12 04:00pm

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 5

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: LAURA BURGOS-MAGIDSON

Buyer Office Symbol/Telephone Number: CCNJ-ET/(973)724-4769

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0004 to Solicitation W15QKN-20-R-0022 is as follows:

1. Extend the proposal due date from 22 October 2020 at 4:00pm EST to 12 November 2020 at 4:00pm EST.

2. Change the Delivery Schedule contained within FAR 52.211-8 -- Time of Delivery for Ordering Period 1. As a result, completion of the

First Article Test is hereby changed from 548 days after Delivery Order award to 365 days after Delivery Order award. Additionally, the delivery of the initial production lot for the M72A7, M72A8, M72A9, and M72A10 is hereby changed from "within 1,004 days after receipt of order or within 456 days after First Article Test approval, whichever is later to within 545 days after receipt of order or within

180 days after First Article Test approval, whichever is later."

*** END OF NARRATIVE A0005 ***

2 5

W15QKN-20-R-0022

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

F-1 CHANGED 52.211-8 TIME OF DELIVERY (JUN 1997) -- ALTERNATE III (APR 1984) APR/1984

(a) The Government requires delivery to be made according to the following schedule:

M72-SERIES LIGHT ASSAULT WEAPON (LAW) AND ITS VARIANTS REQUIRED DELIVERY SCHEDULE:__________________________________________________________________________________

Delivery Dates to be determined upon each individual Delivery Order.

**The following is a notional Government delivery schedule**____________________________________________________________

For Ordering Period 1:______________________

Physical Configuration Audit (PCA):___________________________________

PCA shall be completed 60 days prior to First Article Testing (FAT) so that the Government may participate.

First Article Test (FAT):_________________________

FAT to be completed 365 Days after Delivery Order Award.

Actual delivery schedule will be determined under the individual Delivery Orders. However, the Government anticipates deliveries under the first Delivery Order to commence 180 days after FAT approval (545 days after Delivery Order award). Estimated rates are as follows:

M72A7:______

M72A7 LAW (HA29) with delivery of the initial production lot (up to 3,200 rounds) within 545 days after receipt of order or within 180 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

545 days of issuance of Delivery Order.

M72A7 (HA29) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A7 (HA29) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A8:______

M72A8 LAW (HB26) with delivery of the initial production lot (up to 3,200 rounds) within 545 days after receipt of order or within 180 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

545 days of issuance of Delivery Order.

M72A8 (HB26) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A8 (HB26) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A9:______

M72A9 (HA48) with delivery of the initial production lot (up to 3,200 rounds) within 545 days after receipt of order or within 180 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

545 days of issuance of Delivery Order.

M72A9 (HA48) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A9 (HA48) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A10:_______

M72A10 LAW (HB25) with delivery of the initial production lot (up to 3,200 rounds) within 545 days after receipt of order or within 180 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

545 days of issuance of Delivery Order.

M72A10 (HB25) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A10 (HB25) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

3 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M72AS Trainer Launcher:_______________________

M72AS Trainer Launcher with a maximum production rate of 500 units per year.

M72AS Trainer Launcher FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72AS Trainer Launcher PCA with a maximum production rate of 1 unit per year.

M72AS FFE Trainer Launcher:___________________________

M72AS FFE Trainer Launcher with a maximum production rate of 500 units per year.

M72AS FFE Trainer Launcher FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72AS FFE Trainer Launcher PCA with a maximum production rate of 1 unit per year.

M72AS 21MM Trainer Rocket:__________________________

M72AS 21MM Trainer Rocket (HA21) with delivery of the initial production lot (up to 25,000 rounds) within 10 months after receipt of order or within 10 months after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 2 months of the previous delivered lot under a single delivery order.

M72AS 21MM Trainer Rocket (HA21) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

Components for SLM Training Systems:____________________________________

Components for SLM Training Systems with delivery of the initial production lot (up to 500 units) within 456 days after receipt of order.

For Ordering Periods 2 through 5:_________________________________

Physical Configuration Audit (PCA):___________________________________

PCA shall be completed 60 days prior to First Article Testing (FAT) so that the Government may participate.

First Article Test (FAT):_________________________

FAT to be completed 548 Days after Delivery Order Award.

Actual delivery schedule will be determined under the individual Delivery Orders. However, the Government anticipates deliveries under the first Delivery Order to commence 456 days after FAT approval (1,004 days after Delivery Order award). Estimated rates are as follows:

M72A7:______

M72A7 LAW (HA29) with delivery of the initial production lot (up to 3,200 rounds) within 1,004 days after receipt of order or within 456 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

456 days of issuance of Delivery Order.

M72A7 (HA29) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A7 (HA29) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A8:______

M72A8 LAW (HB26) with delivery of the initial production lot (up to 3,200 rounds) within 1,004 days after receipt of order or within 456 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

456 days of issuance of Delivery Order.

M72A8 (HB26) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A8 (HB26) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A9:______

M72A9 (HA48) with delivery of the initial production lot (up to 3,200 rounds) within 1,004 days after receipt of order or within 456 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within

456 days of issuance of Delivery Order.

4 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M72A9 (HA48) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A9 (HA48) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A10:_______

M72A10 LAW (HB25) with delivery of the initial production lot (up to 3,200 rounds) within 1,004 days after receipt of order or within

456 days after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 90 days of the previous delivered lot under a single delivery order. If no First Article Test is required, delivery of initial production lot shall be within 456 days of issuance of Delivery Order.

M72A10 (HB25) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72A10 (HB25) PCA with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72AS Trainer Launcher:_______________________

M72AS Trainer Launcher with a maximum production rate of 500 units per year.

M72AS Trainer Launcher FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72AS Trainer Launcher PCA with a maximum production rate of 1 unit per year.

M72AS FFE Trainer Launcher:___________________________

M72AS FFE Trainer Launcher with a maximum production rate of 500 units per year.

M72AS FFE Trainer Launcher FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

M72AS FFE Trainer Launcher PCA with a maximum production rate of 1 unit per year.

M72AS 21MM Trainer Rocket:__________________________

M72AS 21MM Trainer Rocket (HA21) with delivery of the initial production lot (up to 25,000 rounds) within 10 months after receipt of order or within 10 months after First Article Test approval, whichever is later. Each second or additional lot to be delivered within 2 months of the previous delivered lot under a single delivery order.

M72AS 21MM Trainer Rocket (HA21) FAT with a minimum of 1 unit per year with a maximum production rate of 1 unit per year.

Components for SLM Training Systems:____________________________________

Components for SLM Training Systems with delivery of the initial production lot (up to 500 units) within 456 days after receipt of order.

The Government will evaluate equally, in regard to time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

(End of Clause)

5 5

SECTION A
SECTION F

File details come from the government source that posted it. Updated .