Question and Answer dated 05-11-2020.docx
DOCX document 12 KB Posted
- Attached to
- Standoff Activated Volcano Obstacle Federal contract opportunity
- Solicitation number
- W15QKN20Q0031
About this file
This document contains a question and answer exchange regarding inspection requirements for a federal contract opportunity to produce Standoff Activated Volcano Obstacle plastic parts. The opportunity is a small business set-aside solicitation issued by the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal. The solicitation seeks quotes to manufacture, inspect, and deliver plastic parts in accordance with government technical data packages and contract requirements. The response clarifies that the solicitation does not include a Physical Configuration Audit clause requiring 100% inspection of features for a sample of parts. Rather, the Quality Assurance Provisions call out characteristics that will be examined for every part manufactured in accordance with Military Standard verification levels.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0018 Questions and Answer regarding inspection.docx | DOCX document | |
| W15QKN20Q0031_0003.pdf | ||
| W15QKN20Q0031_0002.pdf | ||
| W15QKN20Q0031 Amendment 0001.pdf | ||
| Questions and Answers dated 04 May 2020.docx | DOCX document | |
| Attachment 0003 Section J Attachment - Contract Quality Requirements.docx | DOCX document | |
| Attachment 0001 CDRL_A001- PARTS_MATERIALS AND PROCESS SELECTION LIST.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| DD_2345_FORM.pdf | ||
| Attachment 0002 CDRL_A002- CERTIFICATION_DATA REPORT.pdf | ||
| Attachment 0005 - US_Government_NDA.doc | DOC document | |
| W15QKN20Q0031.pdf | ||
| Attachment 0004 - CERTIFICATE_OF_DESTRUCTION.DOC | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question: QAPs with major dimensions were provided, which was very helpful thank you. However in our experience, with new tools both the USG and contractor usually additionally require 100% inspection on ~3 parts per tool to fully define the tool and parts produced from it. This is not required for this program? Just 24 majors (28 incl material) comprises the entirety of the inspection required across 4 large highly featured assembly of parts?
Additional 100% inspection of 3 parts per tool is recommended for the development success of the program.
Answer: This contact does not include a Physical Configuration Audit (PCA) clause. That would be our process where a small sample of parts would be 100% inspected against all features of the drawing. What we did call out are the characteristics listed in the QAP. These callouts are attached to MIL-STD-1916 Verification Levels which dictate that 1 in every X parts will have this feature examined. Because we are buying such a small quantity of parts this factor becomes 1 in every 1 part will have this feature examined. This means that we have 100% of parts for this order being examined for each major and minor characteristic. We are examining every part, but not every feature of every drawing.