This document is an Engineering Change Proposal (ECP) for the M31 fin specification for 120mm mortar cartridges. The ECP proposes updating the fin specification MIL-DTL-71037A to include specifications for acceptance inspection equipment and automated verification of hydrostatic and eddy current test stamps. The Configuration Control Board recommends approval of the ECP to reference the additional inspection specifications and utilize new automated acceptance inspection technologies. The Department of the Army Materiel Command Contracting Command Picatinny Arsenal is soliciting offers for the M31 FIN under solicitation number W15QKN-19-R-0015. The ECP and solicitation involve 120mm mortar cartridges and fins to be procured by the Department of the Army.

SECTION J - ATTACHMENT 0010 - ECP R18Q2010

View the file

Other files

File Type Posted
M31_Fin_Amendment_03_Questions_&_Answers_W15QKN-19-R-0015_QUESTIONS_SUBMISSION_2.docx DOCX document
W15QKN19R0015-0001.pdf PDF
Attachment_0012_-_120MM_M31_TAIL_FIN_AMENDMENT_0001_Q&A_SUBMISSION_1.docx DOCX document
Attachment_0010_-_ECP_R18Q2010_120MM_M31_Tail_FIN-Rev_1.pdf PDF
Attachment_0009_Certificate_of_Destruction.doc DOC document
A016 - IMS and Plan PDF
Attachment_0004_-_FORM_3002_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
A015 - End of Contract Report PDF
A001 - ECP - PDF
A004 - Material Certification - PDF
A006 - MSE AIE - PDF
A020 - OPSEC PDF
Attachment_0008_-_Contract_Quality_Assurance_Requirements_(Final).docx DOCX document
120MM_M31_TAIL_FIN_RFP_W15QKN-19-R-0015_FINAL.pdf PDF
A002 - RFV - PDF
A007 - FSAR - PDF
A011 - ADC PDF
Attachment_0006_PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
A019 - Critical Characteristics PDF
Exhibit A - CONTRACT DATA REQUIREMENTS LIST DD1423 —
Attachment_0011_-_Additional_Solicitations_and_Contract_Requirements.docx DOCX document
A012 - Delayed Delivery Status Reporting PDF
A003 - NOR - PDF
A017 - Meeting Minutes Report - PDF
A014 - Monthly Status Letter Report PDF
A013 - Accident Incident Report PDF
Attachment_0005_-_SF_LLL.PDF PDF
A010 - PCCI - PDF
Attachment_0002_-_US_Government_NDA.pdf PDF
Attachment_0007_-_DD_FORM_2345.pdf PDF
A008 - Annual QMS Audits PDF
A018 - Hazardous Waste Report PDF
Attachment_0001_-_Section_B_120MM_M31_Tail_Fin_Assembly_Master_CLIN_Matrix.xlsx XLSX spreadsheet
A009 - Process Maps PDF
A005 - FAT and LAT - PDF
Attachment_0003_-_AMSTA_1350_FORM.PDF PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND

ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER

PICATINNY ARSENAL, NEW JERSEY 07806-5000

Printed on Recycled Paper

RDAR-EIS-CL 12 April 2018

MEMORANDUM FOR: Office of the Project Manager, Combat Ammunition Systems, SFAE-AMO-CAS, Picatinny Arsenal, NJ 07806-5000

SUBJECT: Transmittal of ARDEC Configuration Control Board (CCB) for Request for Engineering Change Action (ECA) R18Q2010

1. The attached ARDEC Form 390-R-E, Control No. R18Q2010, containing comments and a Recommendation of the RDECOM-ARDEC (RI) Level II CCB for subject ECA is forwarded to your office for final disposition. Please email completed and signed action to robin.e.perry.civ@mail.mil for final distribution.

2. The point of contact is Mr. Thomas C. Peter, ARDEC, RDAR-MEM-M, 973-724-2304, email: thomas.c.peter2.civ@mail.mil

Encl

CAD Division/PM-CAS Engineering Change Actions

CONCURRENCE SHEET

ECP VECP VEP RFV NUMBER:

HE 60MM Cartridge Fuze Other Components

FRPC 81 MM Projectile Fins

Smoke 120 MM Packaging Shell Body

Illumination 105 MM Prop Charge Propellant

155 MM Ignition Cartridge Energetic

TITLE:

CONCUR

NON-CONCUR

Configuration Management: Vinod Kapoor NOT APPLICABLE

Project Officer:

CONCUR

NON-CONCUR

NOT APPLICABLE

Project Officer:

CONCUR

NON-CONCUR

NOT APPLICABLE

Project Officer:

CONCUR

NON-CONCUR

NOT APPLICABLE

Project Officer:

CONCUR

NON-CONCUR

NOT APPLICABLE

Branch Chief:

CONCUR

NON-CONCUR

NOT APPLICABLE

Associate for Programs, Plans, and Integration William Kuhnle

CONCUR

NON-CONCUR

NOT APPLICABLE

M31

✔ R18Q2010

120mm M31 Fin Specification Changes

KAPOOR.VINOD.1228875

David Richmond

RICHMOND.DAVID.A.1282

257072

Reinaldo Martinez

MARTINEZ.REINALDO.1239

630584

KUHNLE.WILLIAM.G.12

28820896

Page _ of _

DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only; Administrative or Operational Use and Contractor Performance Evaluation; 27 July 2017. Other requests for this document shall be referred to SFAE-AMO-CAS, B-162 north, Picatinny Arsenal, NJ 07806-5000.

CONFIGURATION CONTROL BOARD DIRECTIVE (CCBD) 1. PAN:

R18Q2010

2a. MODEL/TYPE:

M31 Fin

2b. SYSTEM NAME:

120 mm Mortar cartridges

3. PART

NUMBER:

MIL-DTL-7103 7

4. CCB NAME:

120mm M31 Fin Specification Changes

5. CCB

LEVEL:

I

II

Other

6. CCB DATE:

04/10/18

7. ORIGINATOR NAME:

Mary Baird

8. ORIGINATOR RGANIZATION:

RDAR-EIQ-MC

9. ORIGINATOR ECP/RFV NO.: 10. ORIGINATOR DATE:

03/27/18 *2

11. TYPE OF ACTION:

ECP

RFV

VECP

OTHER _________

SYNOPSIS OF CHANGE:

The 120mm M3I fin assembly specification, MIL-DTL-71037A, will be updated to include specifications MIL-A-48078A and MIL-A-70625A. In addition, new Automated Acceptance Inspection Equipment (AAIE) requirements for automated verification of the presence of the hydrostatic and eddy current test stamps will be added to the fin specification.

Need for Variance:

The addition of specifications MIL-A-48078 and MIL-A-70625 to specification MIL-DTL-71037A will provide a reference for additional details on AIE and new AAIE requirements. This requirement will utilize the new available technologies (i.e. Vision systems, etc.), which will allow for a more efficient method of inspection to inspect the presence of the hydrostatic and eddy current test stamps on the products under production.

13. CCB RECOMMENDATION ON ACTION W/RATIONALE (INCLUDE ANY MODIFICATIONS ON ACTION AS SUBMITTED):

APPROVE DISAPPROVE APPROVE AS MODIFIED WITHDRAWN REPLACED BY REV. OTHER

CCB recommends approval of ECP R18Q2010 as presented

*2: CMO received the action on 3/27/18

14. POSITION ON CCB (BLOCK 13) RECOMMENDATION:*1: two changes were made after few members concurred. This was done based on comments from Vinny Kapoor and Nicole Horzepa-Jasikoff. The changes were approved by QA, QA branch Chief, Charles D’amato, V. Kapoor and Nicole HJ. For details, please see supporting documents. This action is considered as an original action (not revised) since the submitter and Branch Chief signed the ECP on 4-12-18, after CCB member’s comments were incorporated.

14a.

FUNCTION

14b.

OFFICE SYMBOL

14c.

EMAIL ADDRESS

14d. CONCUR 14e.

SIGNATUREYES NO REMARKS

Producibility-M31 APO RDAR-MEM-P See attached emails

QA RDAR-EIQ-MC See attached emails

QA RDAR-EIQ-MC See attached emails

USMC PMM-116 See attached emails

Quality Assurance RDAR-EIQ-PE See attached emails

Smoke Engineer RDAR-MEM-M See attached emails

APO-Illum RDAR-MEM-M See attached emails

APO-Smoke RDAR-MEM-M See attached emails

PM-CMC RDAR-EIS-CL See attached emails

APO-120mm HE RDAR-MEM-M See attached emails

Supervisory Gen Engr RDAR-EIQ-SE See attached emails

QA RDAR-EIQ-MC See attached emails

PQM RDAR-EIQ-PE See attached emails

Logistics RDAR-EIL-LM See attached emails

APO-FRPC RDAR-MEM-M See attached emails

PCO ACC-NJ-CA See attached emails

Product Assurance RDAR-EIQ-MG See attached emails

Mortars-SME RDAR-MEM-M See attached emails

DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only; Administrative or Operational Use and Contractor Performance Evaluation; 27 July 2017. Other requests for this document shall be referred to SFAE-AMO-CAS, B-162 north, Picatinny Arsenal, NJ 07806-5000.

CONFIGURATION CONTROL BOARD DIRECTIVE (CCBD) 1. PAN:

R18Q2010

15. ACTION CLASS: 16a. RECURRING RFV?

NO YES

17. COST IMPACT:

NONE –see 13h

DECREASE(PARA 13h)

INCREASE(PARA 13h)

18. PROGRAM MANAGER:

ECP

MAJOR

MINOR

ADMIN

RFV

CRITICAL

MAJOR

MINOR

PM-CAS

PM-CCS

PM-SW

PM-TAS

PM-MAS

PM-

MORTAR

PM-HBCT

OTHER_____

TACOM

PEO-STRI

NAVY

PALADIN

16b. ECP REQD AS A

RESULT OF RFV?

NO YES

19. CCB CHAIR RECOMMENDATION: 20a. CCB CHAIR:

Andrew D Smith RDAR-EIS-CL, ActgCh, Large Caliber Systems Branch

PRINTED/TYPED NAME, OFFICE SYMBOL AND SIGNATURE

20b. DATE (DD-MON-YYYY)

APPROVE

DISAPPROVE

OTHER

APPROVE AS

MODIFIED

WITHDRAWN

REPLACED BY REV:

20c. TELEPHONE 309-782-4581

21. DECISION RECOMMENDATION ON ACTION: 22a. CONFIGURATION CHANGE AUTHORITY (CCA):

William Kuhnle Associate for Programs, Plans, and Integration

PRINTED/TYPED NAME, OFFICE SYMBOL AND SIGNATURE

22b. DATE (DD-MON-YYYY)

APPROVE

DISAPPROVE

OTHER

APPROVE AS

MODIFIED

WITHDRAWN

REPLACED BY

REV.:

22c. TELEPHONE

(973) 724-3415

SMITH.ANDREW

.D.1251904479

KUHNLE.WILLIA

M.G.1228820896✔

13 Apr 2018

19-APR-2018

DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only; Administrative or Operational Use and Contractor Performance Evaluation; 27 July 2017. Other requests for this document shall be referred to SFAE-AMO-CAS, B-162 north, Picatinny Arsenal, NJ 07806-5000.

CONFIGURATION CONTROL BOARD DIRECTIVE (CCBD) 1. PAN:

R18Q2010

(CONTINUED FROM BLOCK 13. ON PREVIOUS PAGE)

13a. CCB RECOMMENDATION ON ACTION W/RATIONALE AND MODIFICATIONS:

This additional space is not needed

b. QUALITY ASSURANCE REQUIREMENT CHANGES NEEDED/INCLUDED: No

c. TECHNICAL MANUALS (TMs) OR DEPOT MAINT WORK REQ (DMWR) AFFECTED: No

d. OTHER SYSTEMS AFFECTED: No

e. FINANCIAL REQUIREMENTS: $ 0 EXPLAIN: see 13h

f. SCHEDULE IMPACT: none if approved in a reasonable time

g. CONTRACTS AND SOLICITATIONS AFFECTED: Future production

h. IMPLEMENTATION INSTRUCTIONS:

RFV – PROCURING ACTIVITY SHALL NOTIFY THE CONTRACTOR OF THE DISPOSITION OF THIS RFV. IF APPROVED, COST

CONCESSION WILL BE OBTAINED AS FOLLOWS:

NO COST CONCESSION COST CONCESSION OF $. +/- QA %

RATIONALE

ECP/VECP:

FUTURE: ECP SHALL BE INCORPORATED INTO THE TECHNICAL DATA FOR FUTURE CONTRACTS ONLY (NO EXISTING CONTRACTS

IMPACTED).

OPTIONAL: PROCURING ACTIVITY SHALL OFFER THIS ECP TO CONTRACTS LISTED IN 13g ABOVE. CONTRACTOR MAY CHOOSE TO

IMPLEMENT AT THEIR OPTION, PROVIDED THERE IS NO ADDITIONAL COST TO THE GOVERNMENT.

MANDATORY: PROCURING ACTIVITY SHALL IMPLEMENT ECP INTO CONTRACTS/SOLICITATIONS LISTED IN 13g ABOVE. (NOTE: COST

INFORMATION BELOW IS PROVIDED AS A GUIDE TO CONTRACTING OFFICER. FINAL COST TO BE DETERMINED BY NEGOTIATION

BETWEEN THE CONTRACTING OFFICER AND CONTRACTOR.)

NO COST ADJUSTMENT COST ADJUSTMENT $ +/- %

RATIONALE: Current manufacturer already meets this ECP/NOR requirement and it will not be added to their contract. As for our M31 New Solicitation that is in-progress, we have this requirement as exceptions (to the certified TDP) in the M31 New Solicitation. Therefore, no cost impact present or going forward.

i. ORGANIZATION RESPONSIBLE FOR DOCUMENT UPDATE (FILL IN FOR APPROVED ECP, VECP ONLY) (LIST EACH DOC # ONCE)

DOCUMENT#

(E.G. 12993884)

NOR #

(E.G. 001, 002)

DOCUMENT MAINTAINER DOCUMENT TYPE

ARDEC OTHER GOVT

ORG (SPECIFY)

CONTRACTOR

(SPECIFY)

DR-DRAWING

QS-QUAL DOC

MS-MIL SPEC

PD- PACK DATA

EL-ENG LIST

LS-LOCAL SPEC

3D-3D SOLID MODEL

PL- PARTS LIST

OT-OTHER

PDM LRED QESA DR PD QS PL MS LS OT 3D

MIL-DTL-7103 7 1 of 1 X

R18Q2010

KUHNLE.WILLIAM.G.1228820896

Digitally signed by

KUHNLE.WILLIAM.G.1228820

896 19-APR-2018