A015 - End of Contract Report
PDF 675 KB Posted
- Attached to
- M31 FIN RFP W15QKN-19-R-0015
- Solicitation number
- W15QKN-19-R-0015
About this file
This document is a Contract Data Requirements List (CDRL) outlining the requirements for an End of Contract Report to be delivered under Solicitation Number W15QKN-19-R-0015 issued by the Department of the Army Materiel Command Contracting Command Picatinny Arsenal. The CDRL requires a final report at the end of the contract covering M31 Fin for 120MM Mortar Cartridges. The report must include a title page with item nomenclature, contract number and reporting dates; security markings; table of contents; summaries of work accomplished including results; a description of all work referencing related progress reports; a listing of any test equipment designed; and conclusions, recommendations and appendices. The report is to be submitted electronically to the listed offices.
CDRL A015
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED Page____of____
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _______ TM _______ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT REQ’D 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13.13. DATE OF SUBSEQUENT SUBMISSION
Draft Final
Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
| 1 DATA ITEM NO: A015 |
| 2 TITLE OF DATA ITEM: End of Contract Report |
| 3 SUBTITLE: |
| 5 CONTRACT REFERENCE: C.9.5 |
| 6 REQUIRING OFFICE: SFAE-AMO-CAS |
| 7 DD 250 REQ: LT |
| 9 DIST STATEMENT REQD: D |
| 10 FREQUENCY: As Required |
| 12 DATE OF FIRST SUBMISSION: As Required |
| 11 AS OF DATE: As Required |
| 13 DATE OF SUBSEQUENT SUBMISSION: As Required |
| a ADDRESSEERow1: ACC-NJ-CA |
| DraftRow1: 1 |
| RegRow1: 1 |
| ReproRow1: |
| a ADDRESSEERow2: RDAR-MEA-P |
| DraftRow2: 1 |
| RegRow2: 1 |
| ReproRow2: |
| a ADDRESSEERow3: RDAR-EIQ-PE |
| DraftRow3: 1 |
| RegRow3: 1 |
| ReproRow3: |
| a ADDRESSEERow4: Government QAR |
| DraftRow4: 1 |
| RegRow4: 1 |
| ReproRow4: |
| a ADDRESSEERow5: SFAE-AMO-CAS |
| DraftRow5: 1 |
| RegRow5: 1 |
| ReproRow5: |
| a ADDRESSEERow6: RDAR-EIQ-MC |
| DraftRow6: 1 |
| RegRow6: 1 |
| ReproRow6: |
| a ADDRESSEERow7: |
| DraftRow7: |
| RegRow7: |
| ReproRow7: |
| a ADDRESSEERow8: |
| DraftRow8: |
| RegRow8: |
| ReproRow8: |
| a ADDRESSEERow9: |
| DraftRow9: |
| RegRow9: |
| ReproRow9: |
| a ADDRESSEERow10: |
| DraftRow10: |
| RegRow10: |
| ReproRow10: |
| a ADDRESSEERow11: |
| DraftRow11: |
| RegRow11: |
| ReproRow11: |
| a ADDRESSEERow12: |
| DraftRow12: |
| RegRow12: |
| ReproRow12: |
| a ADDRESSEERow13: |
| DraftRow13: |
| RegRow13: |
| ReproRow13: |
| a ADDRESSEERow14: |
| DraftRow14: |
| RegRow14: |
| ReproRow14: |
| a ADDRESSEERow15: |
| DraftRow15: |
| RegRow15: |
| ReproRow15: |
| a ADDRESSEERow16: |
| DraftRow16: |
| RegRow16: |
| ReproRow16: |
| a ADDRESSEERow17: |
| DraftRow17: |
| RegRow17: |
| ReproRow17: |
| a ADDRESSEERow18: |
| DraftRow18: |
| RegRow18: |
| ReproRow18: |
| a ADDRESSEERow19: |
| DraftRow19: |
| RegRow19: |
| ReproRow19: |
| a ADDRESSEERow20: |
| DraftRow20: |
| RegRow20: |
| ReproRow20: |
| a ADDRESSEERow21: |
| DraftRow21: |
| RegRow21: |
| ReproRow21: |
| a ADDRESSEERow22: |
| DraftRow22: |
| RegRow22: |
| ReproRow22: |
| a ADDRESSEERow23: |
| DraftRow23: |
| RegRow23: |
| ReproRow23: |
| a ADDRESSEERow24: |
| DraftRow24: |
| RegRow24: |
| ReproRow24: |
| a ADDRESSEERow25: |
| DraftRow25: |
| RegRow25: |
| ReproRow25: |
| a ADDRESSEERow26: |
| DraftRow26: |
| RegRow26: |
| ReproRow26: |
| Draft15 TOTAL: 6 |
| Reg15 TOTAL: 6 |
| Repro15 TOTAL: |
| H DATE: 28 Mar 2018 |
| J DATE: 28 Mar 2018 |
| A CONTRACT LINE ITEM NO: |
| B EXHIBIT: |
| TDP: X |
| TM: |
| OTHER: |
| D SYSTEMITEM: M31 Fin for 120MM Mortar Cartridges |
| E CONTRACTPR NO: |
| F CONTRACTOR: |
| Pg: |
| Remarks: The report shall be prepared in contractor’s format and contain the following: |
1. Title page listing the Type of Report (i.e. Final, Initial, etc), Item Nomenclature, Contract Number, and Dates of the Reporting Period.
2.Security classification and distribution limitation markings shall be included on all pages.
3. Table on Contents.
4. Brief summary of all work accomplished, to include both negative and positive results. All information shall be referenced to the appropriate Progress Report, or section of the Final Report, where the subject is discussed in detail.
5. The body of the report shall describe all work accomplished, including as applicable, theoretical studies, experimental work mechanical design, theory of operation, test procedures, test results, and those drawings, charts, graphs, illustrations, or other material needed to clarify the presentation.
6. When test equipment has been designed and constructed for use on this contract,a listing of all such equipment is to be included. This listing shall include all related drawings and associated lists. It shall be referenced in the report and included as an appendix.
7. Conclusions, recommendations, and proposals.
8. Appendixes for any necessary tables, references, photographs, charts, and illustrations.
BLOCK 14: Submit electronically. E-mail addresses for the listed offices will be provided at Contract/Post award.
| 2018-03-28T07:36:10-0400 | |
| CHAMBERS.DARRIN.S.1367772740 |
| 2018-03-28T07:35:48-0400 | |
| CHAMBERS.DARRIN.S.1367772740 |
| 8 APP CODE: |
| 4 AUTHORITY Data Acquisition Document No: N/A |
File details come from the government source that posted it. Updated .