A019 - Critical Characteristics

PDF 674 KB Posted

Attached to
M31 FIN RFP W15QKN-19-R-0015
Solicitation number
W15QKN-19-R-0015
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) outlining requirements for a Critical Characteristics Control Plan (CCCP), Critical Plans of Action (CPOA), and critical defect reporting for the production of M31 fins for 120mm mortar cartridges. The contractor must establish and maintain a product-specific CCCP in accordance with the specified standard and submit it 180 days prior to First Article approval or the start of production if First Article is not required. The CCCP and any optional CPOA must be updated and resubmitted every six months after Government approval. Critical defect reporting must also be conducted in accordance with the standard identified. Revisions to the CCCP must be resubmitted within 10 days of receipt of Government comments. The related solicitation is for the M31 fin for 120mm mortar cartridges and was issued by the Department of the Army Materiel Command Contracting Command Picatinny Arsenal as solicitation number W15QKN-19-R-0015.

CDRL A019

View the file

Other files

File Type Posted
M31_Fin_Amendment_03_Questions_&_Answers_W15QKN-19-R-0015_QUESTIONS_SUBMISSION_2.docx DOCX document
W15QKN19R0015-0001.pdf PDF
Attachment_0012_-_120MM_M31_TAIL_FIN_AMENDMENT_0001_Q&A_SUBMISSION_1.docx DOCX document
Attachment_0010_-_ECP_R18Q2010_120MM_M31_Tail_FIN-Rev_1.pdf PDF
Attachment_0009_Certificate_of_Destruction.doc DOC document
A016 - IMS and Plan PDF
Attachment_0004_-_FORM_3002_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
A015 - End of Contract Report PDF
A001 - ECP - PDF
A004 - Material Certification - PDF
A006 - MSE AIE - PDF
A020 - OPSEC PDF
Attachment_0008_-_Contract_Quality_Assurance_Requirements_(Final).docx DOCX document
120MM_M31_TAIL_FIN_RFP_W15QKN-19-R-0015_FINAL.pdf PDF
A002 - RFV - PDF
A007 - FSAR - PDF
A011 - ADC PDF
Attachment_0006_PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
Exhibit A - CONTRACT DATA REQUIREMENTS LIST DD1423 —
Attachment_0011_-_Additional_Solicitations_and_Contract_Requirements.docx DOCX document
A012 - Delayed Delivery Status Reporting PDF
A003 - NOR - PDF
A017 - Meeting Minutes Report - PDF
A014 - Monthly Status Letter Report PDF
A013 - Accident Incident Report PDF
Attachment_0005_-_SF_LLL.PDF PDF
A010 - PCCI - PDF
Attachment_0010_-_ECP_R18Q2010_120MM_M31_Tail_FIN.pdf PDF
Attachment_0002_-_US_Government_NDA.pdf PDF
Attachment_0007_-_DD_FORM_2345.pdf PDF
A008 - Annual QMS Audits PDF
A018 - Hazardous Waste Report PDF
Attachment_0001_-_Section_B_120MM_M31_Tail_Fin_Assembly_Master_CLIN_Matrix.xlsx XLSX spreadsheet
A009 - Process Maps PDF
A005 - FAT and LAT - PDF
Attachment_0003_-_AMSTA_1350_FORM.PDF PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED Page____of____

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP _______ TM _______ OTHER ____________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT REQ’D 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13.13. DATE OF SUBSEQUENT SUBMISSION

Draft Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1 DATA ITEM NO: A019
2 TITLE OF DATA ITEM: Critical Characteristics
3 SUBTITLE: CCCP, CPOA, and Critical Defect Reporting
5 CONTRACT REFERENCE: C.4.2
6 REQUIRING OFFICE: RDAR-EIQ-MC
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: D
10 FREQUENCY: As Required
12 DATE OF FIRST SUBMISSION: See Block 16
11 AS OF DATE: As Required
13 DATE OF SUBSEQUENT SUBMISSION: See Block 16
a ADDRESSEERow1: RDAR-EIQ-MC
DraftRow1: 1
RegRow1: 1
ReproRow1:
a ADDRESSEERow2: RDAR-MEA-P
DraftRow2: 1
RegRow2: 1
ReproRow2:
a ADDRESSEERow3: RDAR-EIQ-PE
DraftRow3: 1
RegRow3: 1
ReproRow3:
a ADDRESSEERow4: SFAE-AMO-CAS
DraftRow4: 1
RegRow4: 1
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL: 4
Reg15 TOTAL: 4
Repro15 TOTAL:
H DATE: 28 Mar 2018
J DATE: 28 Mar 2018
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP: X
TM:
OTHER:
D SYSTEMITEM: M31 Fin for 120MM Mortar Cartridges
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
Remarks: The contractor shall establish, document and maintain a product specific, Critical Characteristics Control Plan(CCCP) in accordance with DI-MGMT-81986. The contractor shall submit 180 days prior to First Article, or production if First Article is not applicable. Government will respond within 45 days of receipt of CCCP and any required revisions. Unless otherwise stated, contractor shall submit revisions within 10 days of receipt of Government response.

A Critical Plans Of Action (CPOA) is optional, but if done, should be in accordance with DI-MGMT-81996. At a minimum the CCCP/CPOA must be updated and submitted every 6 months after approval. The CCCP and CPOA are separate documents and maintained as such.

Critical Defect Reporting shall be performed in accordance with DI-SAFT-80970A.

BLOCK 13: Unless otherwise specified, if CCCP changes after initial Government approval, Contractor shall resubmit revised plan for Government approval.

BLOCK 14: Submit electronically. E-mail addresses for the listed offices will be provided at Contract/Post award.

2018-03-28T07:39:02-0400
CHAMBERS.DARRIN.S.1367772740
2018-03-28T07:38:53-0400
CHAMBERS.DARRIN.S.1367772740
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: See Block 16

File details come from the government source that posted it. Updated .