A006 - MSE AIE -
PDF 674 KB Posted
- Attached to
- M31 FIN RFP W15QKN-19-R-0015
- Solicitation number
- W15QKN-19-R-0015
About this file
This document is a Contract Data Requirements List (CDRL) outlining measurement and inspection equipment requirements for an Army Materiel Command contract to manufacture M31 fin cartridges. The CDRL requires documentation of all Acceptance Inspection Equipment (AIE) and Automated AIE used to test that the cartridges meet specifications. The documentation must be submitted at least 180 days before First Article Testing or upon contract award if FAT is waived, with the Army providing a response within 60 days. Revisions are due within 10 days of Army feedback. AIE designs must be approved prior to FAT, and all AIE must be available at FAT. Fourteen copies of documentation should be emailed to several Army offices.
CDRL A006
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED Page____of____
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _______ TM _______ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT REQ’D 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13.13. DATE OF SUBSEQUENT SUBMISSION
Draft Final
Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
| 1 DATA ITEM NO: A006 |
| 2 TITLE OF DATA ITEM: MEASUREMENT SYSTEM EVALUATION (MSE) |
| 3 SUBTITLE: Acceptance Inspection Equipment (AIE) |
| 5 CONTRACT REFERENCE: C.5.3 |
| 6 REQUIRING OFFICE: RDAR-EIQ-MC |
| 7 DD 250 REQ: LT |
| 9 DIST STATEMENT REQD: D |
| 10 FREQUENCY: As Required |
| 12 DATE OF FIRST SUBMISSION: See Block 16 |
| 11 AS OF DATE: As Required |
| 13 DATE OF SUBSEQUENT SUBMISSION: See Block 16 |
| a ADDRESSEERow1: RDAR-EIQ-MC |
| DraftRow1: 1 |
| RegRow1: 1 |
| ReproRow1: |
| a ADDRESSEERow2: RDAR-MEA-P |
| DraftRow2: 1 |
| RegRow2: 1 |
| ReproRow2: |
| a ADDRESSEERow3: RDAR-EIQ-PE |
| DraftRow3: 1 |
| RegRow3: 1 |
| ReproRow3: |
| a ADDRESSEERow4: SFAE-AMO-CAS |
| DraftRow4: 1 |
| RegRow4: 1 |
| ReproRow4: |
| a ADDRESSEERow5: |
| DraftRow5: |
| RegRow5: |
| ReproRow5: |
| a ADDRESSEERow6: |
| DraftRow6: |
| RegRow6: |
| ReproRow6: |
| a ADDRESSEERow7: |
| DraftRow7: |
| RegRow7: |
| ReproRow7: |
| a ADDRESSEERow8: |
| DraftRow8: |
| RegRow8: |
| ReproRow8: |
| a ADDRESSEERow9: |
| DraftRow9: |
| RegRow9: |
| ReproRow9: |
| a ADDRESSEERow10: |
| DraftRow10: |
| RegRow10: |
| ReproRow10: |
| a ADDRESSEERow11: |
| DraftRow11: |
| RegRow11: |
| ReproRow11: |
| a ADDRESSEERow12: |
| DraftRow12: |
| RegRow12: |
| ReproRow12: |
| a ADDRESSEERow13: |
| DraftRow13: |
| RegRow13: |
| ReproRow13: |
| a ADDRESSEERow14: |
| DraftRow14: |
| RegRow14: |
| ReproRow14: |
| a ADDRESSEERow15: |
| DraftRow15: |
| RegRow15: |
| ReproRow15: |
| a ADDRESSEERow16: |
| DraftRow16: |
| RegRow16: |
| ReproRow16: |
| a ADDRESSEERow17: |
| DraftRow17: |
| RegRow17: |
| ReproRow17: |
| a ADDRESSEERow18: |
| DraftRow18: |
| RegRow18: |
| ReproRow18: |
| a ADDRESSEERow19: |
| DraftRow19: |
| RegRow19: |
| ReproRow19: |
| a ADDRESSEERow20: |
| DraftRow20: |
| RegRow20: |
| ReproRow20: |
| a ADDRESSEERow21: |
| DraftRow21: |
| RegRow21: |
| ReproRow21: |
| a ADDRESSEERow22: |
| DraftRow22: |
| RegRow22: |
| ReproRow22: |
| a ADDRESSEERow23: |
| DraftRow23: |
| RegRow23: |
| ReproRow23: |
| a ADDRESSEERow24: |
| DraftRow24: |
| RegRow24: |
| ReproRow24: |
| a ADDRESSEERow25: |
| DraftRow25: |
| RegRow25: |
| ReproRow25: |
| a ADDRESSEERow26: |
| DraftRow26: |
| RegRow26: |
| ReproRow26: |
| Draft15 TOTAL: 4 |
| Reg15 TOTAL: 4 |
| Repro15 TOTAL: |
| H DATE: 28 Mar 2018 |
| J DATE: 28 Mar 2018 |
| A CONTRACT LINE ITEM NO: |
| B EXHIBIT: |
| TDP: X |
| TM: |
| OTHER: |
| D SYSTEMITEM: M31 Fin for 120MM Mortar Cartridges |
| E CONTRACTPR NO: |
| F CONTRACTOR: |
| Pg: |
| Remarks: The Measurement and Inspection Equipment System Design documentation for Acceptance of Product describes the Acceptance Inspection Equipment (AIE), Automated AIE (AAIE), and various measurement systems, used to meet the inspection and test requirements to deliver units and other end products that conform to contract, specification, QAP and drawing requirements. This documentation is used to evaluate the acceptability of these designs to meet contract requirements. |
Submit at least 180 days prior to FAT, or production if FAT is waived. The government will respond within 60 days of receipt. Revisions are to be submitted within 10 days of government response. If documentation was approved on prior contract and no changes were made, submit only evidence of prior approval.
Note: Incomplete submission is considered delinquent
BLOCK 5: Applicable to all AIE designs that are used to perform examination and test in accordance with the item specifications. All AIE designs shall be approved prior to the First Article submission. All AIE shall be available for use at FAT.
BLOCK 14: Submit electronically. E-mail addresses for the listed offices will be provided at Contract/Post award.
| 2018-03-28T07:29:21-0400 | |
| CHAMBERS.DARRIN.S.1367772740 |
| 2018-03-28T07:29:07-0400 | |
| CHAMBERS.DARRIN.S.1367772740 |
| 8 APP CODE: |
| 4 AUTHORITY Data Acquisition Document No: DI-QCIC-81960 |
File details come from the government source that posted it. Updated .