This document is a Contract Data Requirements List (CDRL) outlining requirements for an Integrated Master Schedule and Plan to be delivered under Solicitation Number W15QKN-19-R-0015 for M31 Fin for 120MM Mortar Cartridges. The contractor must submit a Summary Master Schedule and Intermediate Schedules within 45 days of award, with the Summary Master Schedule providing a top-level integrated roll up of key tasks and milestones at the summary Contract Work Breakdown Structure level. Intermediate Schedules must include key tasks and milestones at varying detail levels, integrated as roll ups of detailed schedules. Unless otherwise specified, any changes to the Integrated Master Schedule after initial submission require resubmitting the revised plan to the Government within 10 days. Distribution is to various Army offices electronically via email addresses to be provided after award.

CDRL A016

View the file

Other files

File Type Posted
M31_Fin_Amendment_03_Questions_&_Answers_W15QKN-19-R-0015_QUESTIONS_SUBMISSION_2.docx DOCX document
W15QKN19R0015-0001.pdf PDF
Attachment_0012_-_120MM_M31_TAIL_FIN_AMENDMENT_0001_Q&A_SUBMISSION_1.docx DOCX document
Attachment_0010_-_ECP_R18Q2010_120MM_M31_Tail_FIN-Rev_1.pdf PDF
Attachment_0009_Certificate_of_Destruction.doc DOC document
Attachment_0004_-_FORM_3002_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
A015 - End of Contract Report PDF
A001 - ECP - PDF
A004 - Material Certification - PDF
A006 - MSE AIE - PDF
A020 - OPSEC PDF
Attachment_0008_-_Contract_Quality_Assurance_Requirements_(Final).docx DOCX document
120MM_M31_TAIL_FIN_RFP_W15QKN-19-R-0015_FINAL.pdf PDF
A002 - RFV - PDF
A007 - FSAR - PDF
A011 - ADC PDF
Attachment_0006_PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
A019 - Critical Characteristics PDF
Exhibit A - CONTRACT DATA REQUIREMENTS LIST DD1423 —
Attachment_0011_-_Additional_Solicitations_and_Contract_Requirements.docx DOCX document
A012 - Delayed Delivery Status Reporting PDF
A003 - NOR - PDF
A017 - Meeting Minutes Report - PDF
A014 - Monthly Status Letter Report PDF
A013 - Accident Incident Report PDF
Attachment_0005_-_SF_LLL.PDF PDF
A010 - PCCI - PDF
Attachment_0010_-_ECP_R18Q2010_120MM_M31_Tail_FIN.pdf PDF
Attachment_0002_-_US_Government_NDA.pdf PDF
Attachment_0007_-_DD_FORM_2345.pdf PDF
A008 - Annual QMS Audits PDF
A018 - Hazardous Waste Report PDF
Attachment_0001_-_Section_B_120MM_M31_Tail_Fin_Assembly_Master_CLIN_Matrix.xlsx XLSX spreadsheet
A009 - Process Maps PDF
A005 - FAT and LAT - PDF
Attachment_0003_-_AMSTA_1350_FORM.PDF PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED Page____of____

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP _______ TM _______ OTHER ____________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT REQ’D 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13.13. DATE OF SUBSEQUENT SUBMISSION

Draft Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1 DATA ITEM NO: A016
2 TITLE OF DATA ITEM: Integrated Master Schedule and Plan
3 SUBTITLE:
5 CONTRACT REFERENCE: C.10.2
6 REQUIRING OFFICE: RDAR-MEA-P
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: D
10 FREQUENCY: As Required
12 DATE OF FIRST SUBMISSION: As Required
11 AS OF DATE: As Required
13 DATE OF SUBSEQUENT SUBMISSION: See Block 16
a ADDRESSEERow1: ACC-NJ-CA
DraftRow1: 1
RegRow1: 1
ReproRow1:
a ADDRESSEERow2: RDAR-MEA-P
DraftRow2: 1
RegRow2: 1
ReproRow2:
a ADDRESSEERow3: RDAR-EIQ-PE
DraftRow3: 1
RegRow3: 1
ReproRow3:
a ADDRESSEERow4: Government QAR
DraftRow4: 1
RegRow4: 1
ReproRow4:
a ADDRESSEERow5: SFAE-AMO-CAS
DraftRow5: 1
RegRow5: 1
ReproRow5:
a ADDRESSEERow6: RDAR-EIQ-MC
DraftRow6: 1
RegRow6: 1
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL: 6
Reg15 TOTAL: 6
Repro15 TOTAL:
H DATE: 28 Mar 2018
J DATE: 28 Mar 2018
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP: X
TM:
OTHER:
D SYSTEMITEM: M31 Fin for 120MM Mortar Cartridges
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
Remarks: Contractor’s format is acceptable.

Contractor shall submit the Summary Master Schedule and Intermediate Schedules per guidance below. Due 45 days after Post Award.

Summary Master Schedule. A top-level schedule of key tasks/activities and milestones at the summary level of the CWBS and IMP (if applicable). It shall be an integrated roll up of the intermediate and detailed schedules (vertical integration).

Intermediate Schedules. Mid-level contract schedules that include key tasks/activities and milestones and all associated accomplishments in the summary master schedule, traceable to the CWBS element or IMP event as necessary to display work effort at the intermediate level of summarization.

There may be several intermediate schedules that depict varying levels of detail. They shall be integrated roll ups of the detailed schedules (vertical integration).

BLOCK 13: Unless otherwise specified, if the IMS changes after initial submission, Contractor shall resubmit revised plan to the Government within 10 days.

BLOCK 14: Submit electronically. E-mail addresses for the listed offices will be provided at Contract/Post award.

2018-03-28T07:37:14-0400
CHAMBERS.DARRIN.S.1367772740
2018-03-28T07:37:04-0400
CHAMBERS.DARRIN.S.1367772740
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: N/A