AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Cost Plus Fixed Fee
0005 2018NOV26
W15QKN
ARMY CONTRACTING COMMAND - NJ
PICATINNY ARSENAL, NJ 07806-5000
JOHN SCOTT
EMAIL: JOHN.C.SCOTT158.CIV@MAIL.MIL
W15QKN-19-R-0014
2018OCT25
X
X 2019JAN02 04:00pm
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 12
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JOHN SCOTT
Buyer Office Symbol/Telephone Number: ACC-NJ-MC/(973)724-9061
Type of Contract 1: Cost Plus Fixed Fee
Type of Contract 2: Firm Fixed Price
Kind of Contract: Research and Development Contracts
*** End of Narrative A0000 ***
1. The purpose of Amendment 0005 to W15QKN-19-R-0014 is as follows:
a. Extend the date for receipt of proposals FROM: 10 December 2018 TO: 02 January 2019.
b. Extend the date for submittal of the Past Performance Questionnaires and Past Performance POC Lists in section L, FROM: "within 30 calendar days of the release of the RFP", TO: "No Later Than 17 December 2018."
2. All other terms and conditions remain unchanged.
*** END OF NARRATIVE A0007 ***
2 12
W15QKN-19-R-0014
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 PROPOSAL SUBMISSION:
L.1.1 Introduction: This section contains general proposal submissions instructions as well as specific proposal requirements for the
40mm HV XM1176.
L.1.2 General: The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the Request for Proposal (RFP). The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
L.2. PROPOSAL INSTRUCTIONS:
L.2.1 General:
L.2.1.1 Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the
Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
L.2.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.
L.2.1.3 Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the
Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
L.2.1.4 Alternate Proposals: Alternate proposals will not be accepted.
L.2.1.5 Proposals shall be valid for 9 months from the date require for submission.
L.2.2 All questions concerning this procurement, either technical or contractual must be submitted in writing to the Contracting
Officer. No direct discussion between the technical representative and a prospective Offeror will be conducted. Questions shall be sent to the following point of contact, and proposals shall be submitted to the following point of contact:
Mr. Jason Melofchik
Army Contracting Command New Jersey
ACC-NJ- MC, Bldg. 10
ATTN: Telephone: (973)724-2575
Picatinny Arsenal, NJ 07806-5000
E-mail: jason.h.melofchik.civ@mail.mil
Please note that electronic e-mail proposal submissions will not be accepted.
L.2.3 The proposal shall consist of the following:
L.2.3.1 Each proposal shall be submitted in the English Language and consist of and include all of the following:
a. One (1) signed and completed paper copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the Pricing Matrices in Section B, any fill-ins required, such as Contract Data Requirements List: DD Form 1423 with Blocks 17 and 18 completed if required, and
Certifications and Representations in Section K. Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A. The proposal must also include computation for the use of Government-Owned Production and Research Property, if applicable.
b. Original and three (3) paper copies and five (5) electronic CD copies of the proposal volumes, as reflected in D.3., shall be compiled using the Microsoft Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, and formatted for an MS Windows compatible computer. The Price Factor shall be contained on a separate CD from non-price Factors. Price breakdown, when applicable, will include MS Excel spreadsheets with formulae intact. Process flows may be delivered in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with the
Offerors Name and the Solicitation Number. Alternatively, files may be provided in Portable Document Format (.pdf).
3 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all
Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the 40mm HV XM1176 solicitation, all
Offerors must submit Reps/Certs data into the System for Award Management (S.A.M.) at https://www.sam.gov/ and provide one (1) hard copy and one (1) electronic copy (on a separate CD from the volumes above) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal
L.2.3.2 Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR
52.219-9, Alternate II. This plan shall be incorporated into any resultant contract in reference to the RFP.
L.3. FORMAT FOR PROPOSALS
L.3.1 The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor.
Volume I: Technical Factor (Maximum of 100 pages)*
Volume II: Data Rights Factor (No page limit)
Volume III: Price Factor (No page limit)
Volume IV: Past Performance Factor (Maximum of 25 pages)
Volume V: Small Business Participation Factor (Maximum of 25 pages)
Volume VI: Solicitation, Offer and Award Documents, Certifications/Representations, and Small Business Subcontracting Plan (No page limit)
*Note-Volume I page limit does not include resumes
L.3.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:
Margins Top, Bottom, Left, Right - 1
From Edge Header, Footer 0.5
Page Size, Width 8.5
Page Size, Height 11
L.3.3 Length:
L.3.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, Factory floor layouts, etc. may be used, with each fold counted as one additional page. The font used shall not be less than 10 pitch.
L.3.3.2 Price Volume. The Offerors Price Matrix and any documentation that is based on or includes mathematical calculations (e.g., calculations for rental value of government property in the Offerors possession, calculations where there is the appearance of unbalanced pricing, etc.) shall be submitted in electronic, executable format utilizing Microsoft Excel. Any additional information necessary to explain the proposed pricing that does not contain mathematical calculations may be submitted in Adobe, Microsoft Word or
Microsoft Excel format.
L.3.3.3 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring
Contracting Officer (PCO) no later than 15 days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.
L.3.3.4 The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal.
Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Section M of the
RFP.
L.3.3.5 File Packaging:
All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their
4 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
native format, i.e. doc, xls, ppt, etc. *Please note Self extracting .exe files will not be accepted.*
L.4 SPECIFIC PROPOSAL INSTRUCTIONS:
Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross-referenced to both the applicable Statement of Work (SOW) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable SOW paragraph by placing the appropriate SOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the SOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to the 40mm HV XM1176 Cartridge except for the area of Past Performance. In the response to the Request for Proposal, the
Offeror must address the following Factors and Subfactors:
L.4.1 FACTOR 1: TECHNICAL
L.4.1.1 SUBFACTOR 1: Fuze and Programming Unit Design
a. Compatibility: At a minimum, the Offeror shall provide the following:
Engineering drawings for the retrofitted cartridge detailing key envelope dimensions including all dimensions necessary to verify compliance with cartridge Interface Control Drawing (13072800).
Engineering drawings of the Programming Unit detailing key envelope dimensions including all dimensions necessary to verify compliance with Interface Control Drawing, Programming Unit, Hardware (13073870).
Detail descriptions, data, and analysis showing how the XM1176 system design conforms to Interface Control Document, Programming Unit, Electronic (13073960).
Information (analysis, discussion, and plans) supporting that the Offerors system design will be capable of conforming to the Interface
Control Drawing (13072800) for the XM1176 cartridge, Interface Control Drawing, Programming Unit, Hardware (13073870), and Interface
Control Document, Programming Unit, Electronic (13073960).
b. Operational Environment. At a minimum, the Offeror shall provide the following:
Evidence including but not limited to test data that illustrates that the Offerors system will maintain PD functionality in the absence of a programming message.
Evidence including but not limited to test data that illustrates that the Offerors cartridge maintains Airburst (AB) functionality when exposed to Electromagnetic Environmental Effects (E3) in accordance with the Performance Specification requirements.
Information (analysis, discussion, tests results, and plans) supporting that the Offerors design will be capable of remaining operational after exposure to various operational environments including temperature extremes and E3in accordance with the Performance
Specification requirements
c. Fuze Modes: At a minimum, the Offeror shall provide the following:
Evidence including but not limited to test data and analysis that illustrates the Offerors system reliability for each functional mode
(Airburst and Point Detonation) in accordance with the Performance Specification.
Evidence including but not limited to test data that illustrates that the Offerors fuze functions in Point Detonation (PD) mode in accordance with the Performance Specification requirements including, but not limited to Graze Impact test data.
Information (analysis, discussion, tests results, and plans) supporting that the Offerors fuze design will be capable of complying with
Army fuze standards including but not limited to those of MIL-STD-1316 and MIL-STD-331 and in accordance with the Performance
Specification requirements.
d. Material Effects: At a minimum, the Offeror shall provide the following:
Information (analysis, discussion, and tests results) supporting that the Offerors design will be capable of penetrating mild steel and rolled homogeneous armor (RHA) targets in accordance with the Performance Specification.
e. Spare Parts Packages: At a minimum, the Offeror shall provide the following:
Information (analysis, discussion, and tests results) supporting that the Offerors spare parts packages will be capable of sustaining
5 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Programming Units for each quantity range listed for LRIP 1, LRIP 2 and FRP.
L.4.1.2 SUBFACTOR 2: Producibility
a. Fuze retrofit process: At a minimum, the Offeror shall provide the following:
Information (analysis, discussion, and plans) supporting the Offerors proposed fuze retrofit process including but not limited to expected scrap rate, process throughput, and inspections.
b. Production process: At a minimum, the Offeror shall provide the following:
A description of the production processes (including process maps), and the steps required for manufacture (including tooling), assembly, inspection, marking, packaging, and testing, as well as the sequence of operations for all assemblies, subassemblies, and parts to produce the XM1176 cartridge and programming unit.
c. Plan for delivery of 40mm HV XM1176 cartridges and programming units.
d. Key performance characteristics and processes: At a minimum, the Offeror shall provide the following:
The Offerors plan for identification, inspection, and prevention and control of key performance characteristics and processes (those characteristics and related processes that could result in loss of performance, test failures, or reduced reliability) and the approach to identify the source of variation, and improve and control the processes.
L.4.1.3 SUBFACTOR 3: Program Management
a. Program Plan /Integrated Master Plan (IMP), Integrated Master Schedule (IMS), Statement of Work (SOW), and Contract Work Breakdown
Structure (CWBS): At a minimum, the Offeror shall provide the following:
i. The Offeror shall supply an IMP that includes the following:
The plan that the Offeror intends to use to execute the program, and control technical and schedule risk.
Description of the required levels of engineering, hardware, and resources, including events, accomplishments, and criteria to ensure its EMD and Production program meets key Government milestones including PDR, CDR, PRR, all Government test events, and FATs and LATs occurring during LRIP1, LRIP2, and PY1.
ii.The Offeror shall supply an IMS that includes the following:
A master multi-layered schedule, which incorporates all the IMP events, accomplishments, and criteria to ensure its EMD and Production program meets key Government milestones including PDR, CDR, PRR, all Government test events, and FATs and LATs occurring during LRIP1, LRIP2, and PY1.
Offeror shall furnish an analysis describing how the proposed schedule is supportable and achievable considering contract requirements, downtime, and delays.
Description of the production and delivery schedule as well as the detailed tasks, durations, dependencies, and sequencing of all actions, resources, and integration needed to design and produce 40mm HV XM1176 system up through production.
Description of the programs critical path through Full-Rate Production including major/key subcontractor and suppliers schedules.
b. Key Personnel and Organization Structure: At a minimum, the Offeror shall provide the following:
i. Resumes of the Offerors key personnel working the program showing the requisite disciplines, experience, expertise to successfully design and build demonstration hardware, and execute subsequent options successfully to support the IMP and IMS.
ii. An organizational chart that defines/displays the roles and responsibilities of the key personnel and team as a whole.
L.5. FACTOR 2: DATA RIGHTS
L.5.1 The Offeror shall submit a proposal that clearly outlines all terms and conditions required to acquire sufficient rights in any restricted technical data or computer software. The proposal shall clearly identify any costs to the Government, including any minimum quantity required to be purchased by the Government (if applicable), as well as the timeframe to acquire those rights and any additional limitations imposed.
L.5.2 Any proposal from an Offeror with restricted intellectual property who chooses not to offer sufficient rights in technical data or
6 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
computer software will still be evaluated in accordance with the color/adjectival ratings. However, to the extent known at the time an offer is submitted to the Government, the Offeror is still required to identify the technical data or computer software that the Offeror
(including its potential subcontractors or suppliers) asserts should be furnished to the Government with restricted use, release, or disclosure. Offerors shall submitt data rights assertions using the "Data Rights Assertions Table" section J Attachment 0002.
L.5.3 Due to Government timeframe requirements, as well as to create a level playing field for Data Rights proposal evaluations, the
Government desires all additional rights to be received no later than the award of Option 3 (LRIP2).
L.5.4 The Government desires no less than Government Purpose Rights to all of the technical data and computer software developed and/or delivered under this contract, or specifically negotiated license rights that are substantially similar to Government Purpose Rights.
However, at a minimum, the Government desires no less than Government Purpose Rights to the XM1176 fuze, the software in the Programmer
Unit, and the communication protocol between the PU and the round along with all required chipsets. The Government anticipates incorporating the proposed terms and conditions, or any resultant license, into the contract at the time of award. As such, the proposal shall clearly identify all terms and conditions necessary for a binding agreement. The Government recommends that the proposal focus on a lump sum fee, a minimum units to be purchased, or an alternate/hybrid approach to acquire sufficient rights. Although a royalty can be proposed, given the complexities of administering and tracking such a royalty, the Government does not prefer this approach. If proposing a lump sum fee, the Offeror shall clearly specify what portion of the proposed lump sum is associated with recuping development costs and what portion is associated with potential future income, for each separate item of data or software for which limited or restricted rights is claimed. Further, regardless of the approach taken, the Offeror shall provide a detailed description of the methodology or rationale used in determining the value of the limited or restricted items of data or software.
L.6 FACTOR 3: PRICE
L.6.1 The Offeror shall submit a cost plus fixed fee pricing for each priced EMD CLIN (Base contract and Option 1) and a Not-to-Exceed
(NTE) firm fixed unit price for each priced Production CLIN to support LRIP1, LRIP2, and FRP of the 40mm HV XM1176 System (Cartridge and
Programming Unit). CLINs that contain quantity ranges require unit prices for all range quantities. Submission of data in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, is a requirement for the contract but shall be Not Separately Priced. The
Offeror is required to complete blocks 17 & 18 on each DD 1423 form. The completed DD 1423 forms shall be included in the proposal submission. If an Offeror fails to propose prices for all CLINs and quantities/quantity ranges, the Government may reject the offer.
The proposed price for production CLINS shall be inclusive of all fabricating, testing, inspection, packaging, delivery of the solicited item and disposal of legacy fuzes. Each Offeror must propose a firm-fixed-price for First Article Test CLINS for all years. Failure to provide a price for FAT may result in the offer not being considered for award.
L.6.2 Offerors shall provide a separate detailed proposal broken out by element of cost by Offeror fiscal year for each CPFF CLIN unit price and total price. The Offerors proposals shall contain sufficient cost documentation for analysis and evaluation of the proposed costs in accordance with FAR 15.403-5(b)(2). All cost proposals and supporting schedules shall be submitted in Microsoft Excel format and MUST HAVE THE FORMULAS INTACT AND FUNCTIONING. The cost proposals for each CLIN shall contain the following:
a. A detailed proposal including elements of cost such as direct labor broken out by labor category, labor rates and labor hours with labor rate computations, indirect rates and rate computations, material costs, subcontract costs, Other Direct Costs (ODCs), fee and fee computations, cost of money factors and computations, etc.
b. A consolidated, priced bill of materials which shall include part numbers, part description, quantity, unit price, and extended amount in Microsoft Excel format with formulas intact. Overage/scrap/attrition, if proposed, shall be addressed including basis for the proposed rate. The bill of materials shall identify the basis of estimate for each part number. Supporting documentation (quotations, purchase orders, commercial pricing, etc.) shall be provided for bill of material items with a unit price of $500 and greater. The source of proposed escalation shall be identified and supporting documentation shall be provided which allows for verification of the proposed escalation. The rationale for the indices used and the method of rate application shall be explained.
c. A schedule of proposed direct labor and indirect rates shall be provided. The schedule shall display the rates by type, function, and contractor fiscal year. The Offeror shall identify the basis for all proposed rates [i.e., Forward Pricing Rate Agreements (FPRA), Forward Pricing Rate Proposal (FPRP), budgetary rates, etc.] and shall provide documentation supporting their proposed direct and indirect rates. The Offeror/subcontractor(s) shall provide copies of their current (within the last twelve months) FPRA or FPRP submission for direct and indirect rates, and/or Provisional Billing Rates approval letter for current indirect rates. For rates
(current and/or out-year) based on budgetary data or a FPRP, in order to perform a cost realism analysis, the Offeror/subcontractor(s) shall provide current payroll records to support their hourly labor rates and a detailed breakout of the proposed Offeror/subcontractor indirect rates (including pool of expenses and allocation base broken out by program/project). The source of proposed labor escalation shall be identified along with supporting documentation verifying the proposed escalation. The rationale for the indices used and the method of rate application shall be explained.
d. A matrix of subcontract costs including rationale for any adjustments to subcontractor proposals.
e. A summary table of ODCs which shall include description, quantity, unit price and extended amount in Microsoft Excel format with formulas intact. Supporting documentation (e.g. quotations, purchase orders, commercial pricing, etc.) shall be provided for ODC items
7 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
with a unit price of $500 and greater. The source of proposed escalation shall be identified and supporting documentation shall be provided verifying the proposed escalation. The rationale for the indices used and the method of rate application shall be explained.
f. The same data delineated above shall be provided for each major subcontractor. A major subcontractor is defined as a subcontractor whose combined proposed amount for all CPFF CLINs is 10% or more of the prime contractors proposed CPFF price. Detailed rationale and supporting calculations shall be provided if the Offeror proposed a different amount than that quoted by the subcontractor. The prime contractor must provide the following information on all subcontractors: name; mailing address; point of contact; phone number; fax number; and e-mail address. If subcontractors will not provide their proprietary cost data (i.e. rates, etc.) to the prime contractor, a general outline of subcontractor proposal costs/prices is required which should correlate with detailed proposed costs/prices the
Government will receive directly from the subcontractor. Instruct the subcontractor that it must furnish all detailed information directly to the Government by the solicitation closing date.
g. Basis of Estimates (BOEs) including task descriptions, and rationale, labor categories and hours, material and ODCs with appropriate
CLIN/CWBS reference.
h. Since this acquisition includes cost-reimbursable effort, pursuant to FAR 16.301-3(a)(3), the contractors accounting system must be deemed adequate for determining cost applicable to the contract. Therefore, Offerors shall provide documentation supporting the
Governments determination that their accounting system has been deemed adequate.
D.6.3 In accordance with FAR 45.202(a), the Government shall consider any potentially unfair competitive advantage that may result from an Offeror using Government property. To eliminate the competitive advantage, a rental equivalent evaluation factor shall be added to each offer which is predicated on the use of Government property in the Offerors or the Offerors subcontractors(s) possession. Offerors shall propose the per unit rental value of such Government property for each CLIN/quantity range in accordance with FAR 52.245-9, Use and Charges. Refer to solicitation instructions titled Use and Rental of Government Property in Section L for submission instructions.
L.6.4 Unbalanced Pricing - Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The greatest risks associated with unbalanced pricing occur when (a) Startup work, mobilization, first articles, or first article testing are separate line items; (b) Base quantities and option quantities are separate line items; or (c) The evaluated price is the aggregate of estimated quantities to be ordered under separate line items of an indefinite-delivery contract. Offerors shall provide documentation, including data, calculations and supporting rationale, for any apparent unbalanced pricing which will be used to determine if the proposed prices are balanced.
L.7. FACTOR 4: PAST PERFORMANCE
L.7.1 Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offerors existing plant capability and demonstrate satisfaction of customer requirements.
L.7.2 Offerors shall submit a list of all recent Government contracts (prime and major subcontracts) in performance or awarded to the offeror and any of its major subcontractors proposed for this effort within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries occurred or were scheduled to occur within the past three years, which are relevant to the efforts required by this solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. Since the Government may not necessarily interview all of the sources provided by the
Offerors, it is incumbent upon the Offeror to explain the relevance of the data provided. The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of providing thorough and complete past performance information remains with the Offerors. Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the Government. This part shall be organized into the following sections:
(1) Section 1 Contract Descriptions. This section shall include the following information in the following format:
(a) Contractor/Subcontractor place of performance, Commercial and Government Entity (CAGE) Code and Data Universal Numbering System
(DUNS) Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, telephone and fax numbers).
(b) Government contracting activity, current address, Procuring Contracting Officer's name, e-mail address, telephone, and fax numbers.
(c) Governments technical representative/COR, and current e-mail address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.
(e) Government contract administration activity's Pre-Award Monitor's name and current e-mail address, telephone, and fax numbers.
8 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements also include
Delivery Order Numbers.
(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc. In the case of
Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc).
(h) Awarded price/cost.
(i) Final or projected final price/cost.
(j) Original delivery schedule, including dates of start and completion of work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 describing the objectives achieved and detailing how the effort is relevant to the requirements of the solicitation.
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for
Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure Notices or
Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors delivered product.
(3) Section 3 Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Offerors corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government SOW subparagraph number. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 25% of the total proposed price.
(4) Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees.
However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.
(5) Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be completed and submitted (APPENDIX D). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the
Government contracting activity and technical representative responsible for the past/current contract. The POC's shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer No Later Than 17
December 2018, to jason.h.melofchik.civ@mail.mil. The Offeror shall also e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list No Later Than 17 December 2018. The POC List shall be submitted in
Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number; Government Agency;
POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail Address; Date E-Mailed to POC (month/day).
(6) Offerors are cautioned that the Government may use data obtained from other sources. Since the Government may not necessarily interview all of the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of the data provided.
L.8. FACTOR 5: SMALL BUSINESS PARTICIPATION
L.8.1 The Small Business Participation Factor Volume is comprised of a single chapter.
Offerors are responsible for including sufficient detail to permit a complete evaluation. Any information provided as part of the Small
Business Participation Factor Volume may be used to correlate the evaluation of the other proposal volumes.
L.8.2 This provision applies to every Offeror (U.S. and non-U.S.), regardless of size status or locations of working facilities or headquarters. For proposal preparation purposes, the Offeror's Small Business Participation proposals shall be consistent with any subcontracting references/identification contained elsewhere in any other Factor Volume. Percentages are calculated using proposed total contract price as the denominator and include first-tier subcontractors only. For the purpose of evaluating Small Business
Participation, the total contract price is determined by adding the total of all priced CLINs included in Section B. For Options 2, 3, and 4 the maximum quantity of the highest range multiplied by the highest ranges unit price should be used to determine the price of the
CLIN. Offerors shall also explain their rationale as to why the percentage of SB participation being utilized for this effort is
9 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
appropriate for their company. Offerors shall describe their approach and efforts undertaken to utilize small businesses (SB). SB targets will be incorporated into any resulting prime contract and contractors will be required to report SB participation.
L.8.3 All Offerors, including Offerors who are themselves U.S. small business concerns based on the NAICS code assigned to this requirement, are to identify the extent to which U.S. small business concerns will be utilized as first-tier subcontractors in the performance of this proposed contract. U.S. small business concerns are defined (1) in FAR 19.001 and (2) by the criteria and size standards in FAR 19.102 for the applicable NAICS code. U.S. small business concerns include small businesses (SBs), small disadvantaged businesses (SDBs), woman-owned small businesses (WOSBs), HUBZone small businesses (HUBZone SBs), veteran-owned small businesses (VOSBs), and service disabled veteran-owned small businesses (SDVOSBs).
L.8.4 If the Offeror (to include any U.S. small business concerns who are proposing as part of a joint venture or teaming arrangement) is itself a U.S. small business concern, the Offeror's own participation as a SB, SDB, WOSB, HUBZone SB, VOSB, or SDVOSB will also be considered small business participation for the purpose of this evaluation. In this event, the extent of the Offeror participation as a
U.S. small business concern shall be detailed in the same manner as subcontracts to first-tier U.S. small business concerns.
L.8.5 Small Business Amounts: All Offerors shall address anticipated U.S. small business concern participation and subcontracting based on the total contract dollars proposed by the Offeror.
L.8.6 The Offeror shall provide information for small business participation and subcontracting in a table format in accordance with the following example:
SMALL BUSINESS PARTICIPATION TABLE (IN MILLIONS)
| Business Category | $ Cost All Contracts | % of SB Participation | Cost Total SubK |
| Contract Total Price | $43.00 | | |
| SB | $10.34 | 24.00% | $10.34 of $43.00 |
| SDB | $2.86 | 6.65% | $2.86 of $43.00 |
| SDB | $2.36 | 5.50% | $2.36 of $43.00 |
| WOSB | $1.55 | 3.60% | $1.55 of $43.00 |
| HUBZone SB | $1.08 | 2.50% | $1.08 of $43.00 |
| VOSB | $1.55 | 3.60% | $1.55 of $43.00 |
| SDVOSB | $1.46 | 3.40% | $1.46 of $43.00 |
L.8.7 Guidance for filling in the above "Small Business Participation" Table:
(a) Include first-tier subcontractors only. Note that members of a joint venture may be considered the Offeror or the first tier subcontractors, depending on the legal form of the joint venture as defined in its agreement document.
(b) If the Offeror is a U.S. small business concern, detail the extent of the Offeror participation as a U.S. small business concern in the same manner as subcontracts to first tier U.S. small business concerns.
(c) Percentages should be rounded to the nearest tenth of a percent.
L.8.8 Additional Guidance for particular Business Categories:
(a) For "Contract Total Price": Include the Offeror's proposed Total Contract Price on this line.
(b) For SB: Include U.S. small business concerns from all categories (i.e. SB, SDB, WOSB, HUBZone SB, VOSB and SDVOSB) in the dollars and percentage on this line. The SDB, WOSB, HUBZone SB, VOSB and SDVOSB are subcategories of SB and the dollars in each of these may not add to match the total dollars in the SB line due to the following: In some cases the same dollars may be reported in more than one block (i.e., a $10,000 subcontract to a Woman-Owned Small Business that is also a Service-Disabled Veteran-Owned Small Business should be entered on four rows: $10,000 under SB, $10,000 under WOSB, $10,000 under VOSB and $10,000 under SDVOSB). Be sure that the dollars are counted in the SB line only once and not four times (e.g. $40,000 representing the same firm participating at $10,000 in differing categories). Note that the SB percentage is not simply a total of the percentages of each SB subcategory and must be calculated separately as shown in the chart.
(c) For HUBZone SB: Include only "SBA certified" HubZone SBs. Note that this is different from some of the state HUB certifications.
L.8.9 Small Business List: All Offerors shall provide the names and CAGE codes of small business concerns (including the Offeror if a small business concern) who would participate in accomplishing the proposed contract; the small business classification of each U.S.
small business concern (i.e. SB, SDB, WOSB, HUBZone SB, VOSB and SDVOSB); a short description of the specific services to be provided by each small business concern; and the estimated total dollars for each service or product.
10 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. This data shall be provided in a table format in accordance with the following example:
| Name of SB Concern | Cage Code | Location | SB Class | Description of Supplies or Services | Total $ (in Millions) |
| ABC Co. | 123XX | City, USA | SB | Wire | $0.50 |
| DEF Co. | XX123 | City, USA | SB | Plating | $0.75 |
| GHI, Inc. | DD123 | City, USA | SB, WOSB, VOSB | Circuit Cards | $1.20 |
b. If a small business does not have a CAGE code, insert the word "None" in the table above. Note that during the evaluation, the
Government may request that the Offeror submit a letter from the small business affirming the information provided in your proposal.
c. For SB Classifications(s), list all SB classifications that apply to each concern in the table above.
L.8.10 If the Offeror IS NOT a U.S. small business concern and must submit a Small Business Subcontracting Plan under the RFP in accordance with FAR 52.219-9, the Small Business Subcontracting Plan shall be consistent with the Offeror's Small Business Participation proposal information provided in response to D.10.6 (recognizing that the Small Business Subcontracting Plan percentages will be different in that the percentage calculation denominator is total subcontracting amount as opposed to this Small Business Participation
Factor where the percentage calculation denominator is the Offeror's proposed Contract Target Price).
L.8.11 Compliance with FAR 52.219-9.
L.8.11.1 Offerors which are both: (a) other than U.S. small business concerns (as defined by the NAICS code applicable to the RFP), and
(b) have had prior contracts requiring the submission of a Small Business Subcontracting Plan in accordance with FAR 52.219-9 are to:
Provide a description of their performance in complying with the requirements of FAR 52.219-9, including documentation of both their goals and their accomplishment of the goals established under subcontracting plans of prior contracts performed over the past twelve
(12) months (from date of solicitation issuance). This documentation shall include Individual Subcontracting Reports (ISRs/DD Form 294s) which list both goals and accomplishments against individual or master plans. If over the last twelve (12) months from the date of RFP release, the Offeror reported accomplishments against commercial or comprehensive subcontracting plans in lieu of individual or master plans, the Offeror shall submit the plans to document the goals and the Summary Subcontract Reports (SSRs/DD Form 295s) to document the accomplishments. (Note: if the Offeror has not performed a contract over the past twelve (12) months, which included FAR 52.219-9, the
Offeror shall so state).
L.8.12 Offerors which have had prior contracts requiring a Small Business Subcontracting Plan IAW FAR 52.219-9 and provide the information requested above shall not respond to D.8.14 below.
L.8.13 If the reporting entity listed on a subcontracting report is different from the name of the proposing prime, provide an explanation of the legal relationship between the other entity and the proposing prime and a description of how the other entity's small business accomplishments reported are applicable to the current proposal. This explanation should include Business Name, CAGE Code and
DUNS number of the other entity and the proposing prime.
L.8.14 Approach to meeting FAR 52.219-8. Offerors which are either U.S. small business concerns, or other than U.S. small business concerns (as defined by the NAICS code applicable to the RFP) having had no prior contracts requiring a Small Business Subcontracting
Plan in accordance with FAR 52.219-9 shall substantiate their proposed approach to meeting the requirement of FAR 52.219-8.
Substantiation may include providing:
(a) A description of the Offeror's performance, over the past twelve (12) months (from date of solicitation issuance), in complying with the requirements of FAR 52.219-8 (Note: if the Offeror has not performed a contract over the past twelve (12) months (from date of solicitation issuance), which included FAR 52.219-8, the Offeror shall so state);
(b) A description and available documentation of any methods or techniques used to promote small business participation;
(c) Any listings of U.S. small business concerns who are subcontracting candidates;
(d) Internal procedures used to monitor small business participation during contract performance; and/or
(e) Any other information substantiating that the Offeror will satisfy the requirements of FAR 52.219-8.
L.9 SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS
L.9.1 Each Offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the solicitation. An authorized official of the firm shall sign the SF 33 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.