Mechanical Details: NY058-Mechanical (tank) Details M518-Plans
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
SUPPLY AIR DUCT ------_J
COIL PIPING
CSEE DETAIL 7 /M515>-~
B
A v_ FLEX CONNECTION v WITH RECTANGULAR
DUCT CSEE NOTE 2l
HOT WATER
REHEAT COIL
Ii' --
1------HWS--.-"""---~
~1--~•---HWR------~
""11F.f.o,;:::_ -""-"'-""-'lillr
EXTERNAL INSULATION -----<-~I ~-~·!'~_:
PROVIDE ACCESS PANEL
IN BOTTOM OF VAV UNIT
UPSTREAM OF THE HOT
WATER REHEAT COIL.
IF NOT INTERNALLY LINED I ACTUATOR
NOTES:
I [====-.i-'.jll::;!: ___ CONTROLLER
1. SUPPORT AIR TERMINAL
UNIT. AT BOTH ENDS WITH I
MINIMUM 2" WIDE 22 GA MIN 3 X I
GAL V HANGER STRAPS DUCT DIAi
2. FOR ROUND OR OVAL DUCT I
CONNECTION, USE FLEX DUCT. I
USE FLEX DUCT CONNECTION
WITH RECTANGULAR DUCT. ________ ,
SUPPLY DUCT
c= --
DAMPER
BOX FLOW
METERING
STATION
INSULATION AS
REQUIRED
---,~<EXTERNAL SHOWN>
c
•••SAFETY
D
SEAL ALL PENETRATIONS WITH
3M POLYSULFIDE CAULK
PROVIDE CROUSE-HINDS
GUP215 4x4 WEATHER
AND EXPLOSION PROOF
CAST ALUMINUM JUNCTION
BOX WITH 6 HUBS FOR
ELECTRIC GAUGE STICK------,
3,{ RIGID CONU IT
WITH PVC COATED
FROM MONITOR WELL--.---
PROVIDE SEALING
FITTING AND SEALING
COMPOUND KIT __ _/"
PROVIDE FOS & FOR
TO TANK CONNECTIONS
FOS AND FOR IN FRP SECONDARY
CONTAINMENT SLEEVE-----~I
P A Y S • • •
E F
PROVIDE CROUSE-HINDS
GUP215 4x4 WEATHER AND
EXPLOSION PROOF CAST
ALUMINUM JUNCTION BOX
WITH 6 HUBS FDR LEAK
DETECTION SENSOR
~l~~~~---- 3,{ RIGID CONDUIT
':: WI TH PVC COATED
CW.P. FITTINGl
------FUEL OIL TANK
BY OTHERS
i----CONTAINMENT TANK BY
TANK MANUFACTURER
GRADE
1 SINGLE DUCT VAV BOX WITH HOT WATER REHEAT COIL 2 FUEL OIL TANK SUMP DETAIL
M51 8 NO SCALE
TO NC
CHILLER ~ E CHR ---r---{)---;---~CHR FROM SYSTEM
PUMP
PIPING TO TANl\,-----+-------r
SHALL BE FULL SIZE
A--+----AUTOMATIC AIR VENT
NO
SHUT-OFF VALVE----
INTERNAL BAFFLE PLATE---+---t
BUFFER TANK --------1
4 " CON CR E TE BAS E-----.l<:'.::::=::::::::~
2" DRAIN VALVE -
---EXTEND TO NEAREST
FLOOR DRAIN
4 BUFFER TANK PIPING DETAIL
M518 NO SCALE
COOLING
COIL
INVERTED TRAP/
/EXPANSION VALVE
SUCTION
1 SPLIT SYSTEM DX PIPING DETAIL
M518 NO SCALE
M518 NO SCALE
ROOF
VERIFY HEIGHT
AS REQUIRED
WITH ALL
APPLICABLE
CODES.
,,,-- ROUND TOP
1-- METALBESTOS VENT OR
AS REQUIRED BY
EQUIPMENT MANUFACTURER
STORM COLLAR
ADJUSTABLE TALL
CONE ROOF FLASHING.
CSEE ARCHITECTURAL)
SUPPORT PLATE
SEE ARCHITECTUR
FOR ROOF FLASHING
\_SHEET METAL THIMBLE
SEAL WEATHER TIGHT TO
ROOF CONSTRUCTION.
5 FLUE VENT THRU ROOF DETAIL
M518 NO SCALE
HIGH CAPACITY AUTOMATIC AIR VENT------ ,-_~FILL VALVE
MAKE CONNECTION TO BOTTOM OF PIPE
TO CI RC ULA TI NG PUMP--~--1----+--d
PRESSURE GAUGE -----C2'
A
/. - FROM GLYCOL
MAKE-UP
11---~--FROM
BOILER/HEAT
EXCHANGER
AIR SEPARATOR
'+---AUTOMATIC A IR VENT
r--ttt=;::::::::t:__---1--u N I ON
DIAPHRAGM ------i
EXPANSION TANK 1-------1
4" CONCRETE BASE---.-~-~_,
H--SHUT-OFF VALVE
----DRAIN VAL VE -
EXTEND TO NEAREST
FLOOR DRAIN
a EXPANSION TANK PIPING DETAIL
M518 NO SCALE
•••SUPPORT VALUE ENGINEERING IT PAYS•••
G H
~--PLENUM BEHIND
LOUVER
PLENUM TD EXTEND
~~N~~~~~ D~OUVER ""' ------------------ PLENUM TO EXTEND 1 1,2'
BELOW LOUVER CONNECTION
t
M518
1 " DRAIN L I NE
CONNECTION
SECTION VIEW
\, /i----PITCH BOTTOM OF PLENUM
TO DRAIN CONNECTION
PITCH DRAIN LINE TO / ',,
1...C__.J--.-!::::'1....---NEAREST FLOOR DRAIN
PLAN VIEW I
LOUVER PLENUM DRAIN DETAIL
NO SCALE
-----FOS --I--,,-- FUSIBLE LINK
VACUUM BREAKER
t
UNION
B-1- T
BURNER ,
B-4-T
BURNER
B-5-T
BURNER
a::
GATE VALVE
ALL FUEL OIL
PIPING TO BE 7'4"
~- PRESSURE GUAGE
~- BACK PRESSURE
VALVE
~ RELIEF VAL VE
'--'----L-FOR .. I OUT TO TANK
r---'.,-l--;-----~<:7--V1---!>i<l---"'--Fos ~ IN FROM TANK
"" ~ CHECK VAL VE
""~ STAINER - DUPLEX
FOP-2-T FOP-1-T BASKET TYPE
SEE DETAIL
8/M514
M518
~- VACUUM GAUGE
FUEL OIL PIPING DETAIL
NO SCALE
18" MIN. BETI-IEEN-___,
TOP OF 5LEEVE
AND eRADE
,--SOD
~--4" TOP SOIL AND 4" CLAY
""1\!!'-----BACKFILL
~---FILTER FABRIC BELOW CLAY
i"~m:======PEA ROCK ,}- FRP SECONDARY
CONTAINMENT SLEEVE
'----FOS AND FOR IN SECONDARY
CONTAINMENT SLEEVE
~--5" MINIMUM PEA ROCK
SURROUNDING SLEEVE
FUEL OIL PIPING TRENCH DETAIL
NO SCALE
m US Army Corps of Engineers Louisville Distric t
"' z
" > w
"' 0.
w r z
"' " "' w m m o a " a N •
• u u z ~ <C c: .!:
iii' 2' i=
- • 0
C N ID '-
0 0 a:
w f-zu w a:
u <( "' en a:
w ::::> 0 a: z w - ;;: en w
WIW
a: . z a: a: I <( a: w w a:
f- "' 0 _J <( C\J I ' ;;: en
.. u GO wo a <C "' 0.
en _J f w
_J u -z I u w
Cl
LL.
Cl ,.._
"' I Cl a:
u
I z
M518
AS AWARDED