Mechanical Details: NY058-Mechanical (tank) Details M518-Plans

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

SUPPLY AIR DUCT ------_J

COIL PIPING

CSEE DETAIL 7 /M515>-~

B

A v_ FLEX CONNECTION v WITH RECTANGULAR

DUCT CSEE NOTE 2l

HOT WATER

REHEAT COIL

Ii' --

1------HWS--.-"""---~

~1--~•---HWR------~

""11F.f.o,;:::_ -""-"'-""-'lillr

EXTERNAL INSULATION -----<-~I ~-~·!'~_:

PROVIDE ACCESS PANEL

IN BOTTOM OF VAV UNIT

UPSTREAM OF THE HOT

WATER REHEAT COIL.

IF NOT INTERNALLY LINED I ACTUATOR

NOTES:

I [====-.i-'.jll::;!: ___ CONTROLLER

1. SUPPORT AIR TERMINAL

UNIT. AT BOTH ENDS WITH I

MINIMUM 2" WIDE 22 GA MIN 3 X I

GAL V HANGER STRAPS DUCT DIAi

2. FOR ROUND OR OVAL DUCT I

CONNECTION, USE FLEX DUCT. I

USE FLEX DUCT CONNECTION

WITH RECTANGULAR DUCT. ________ ,

SUPPLY DUCT

c= --

DAMPER

BOX FLOW

METERING

STATION

INSULATION AS

REQUIRED

---,~<EXTERNAL SHOWN>

c

•••SAFETY

D

SEAL ALL PENETRATIONS WITH

3M POLYSULFIDE CAULK

PROVIDE CROUSE-HINDS

GUP215 4x4 WEATHER

AND EXPLOSION PROOF

CAST ALUMINUM JUNCTION

BOX WITH 6 HUBS FOR

ELECTRIC GAUGE STICK------,

3,{ RIGID CONU IT

WITH PVC COATED

FROM MONITOR WELL--.---

PROVIDE SEALING

FITTING AND SEALING

COMPOUND KIT __ _/"

PROVIDE FOS & FOR

TO TANK CONNECTIONS

FOS AND FOR IN FRP SECONDARY

CONTAINMENT SLEEVE-----~I

P A Y S • • •

E F

PROVIDE CROUSE-HINDS

GUP215 4x4 WEATHER AND

EXPLOSION PROOF CAST

ALUMINUM JUNCTION BOX

WITH 6 HUBS FDR LEAK

DETECTION SENSOR

~l~~~~---- 3,{ RIGID CONDUIT

':: WI TH PVC COATED

CW.P. FITTINGl

------FUEL OIL TANK

BY OTHERS

i----CONTAINMENT TANK BY

TANK MANUFACTURER

GRADE

1 SINGLE DUCT VAV BOX WITH HOT WATER REHEAT COIL 2 FUEL OIL TANK SUMP DETAIL

M51 8 NO SCALE

TO NC

CHILLER ~ E CHR ---r---{)---;---~CHR FROM SYSTEM

PUMP

PIPING TO TANl\,-----+-------r

SHALL BE FULL SIZE

A--+----AUTOMATIC AIR VENT

NO

SHUT-OFF VALVE----

INTERNAL BAFFLE PLATE---+---t

BUFFER TANK --------1

4 " CON CR E TE BAS E-----.l<:'.::::=::::::::~

2" DRAIN VALVE -

---EXTEND TO NEAREST

FLOOR DRAIN

4 BUFFER TANK PIPING DETAIL

M518 NO SCALE

COOLING

COIL

INVERTED TRAP/

/EXPANSION VALVE

SUCTION

1 SPLIT SYSTEM DX PIPING DETAIL

M518 NO SCALE

M518 NO SCALE

ROOF

VERIFY HEIGHT

AS REQUIRED

WITH ALL

APPLICABLE

CODES.

,,,-- ROUND TOP

1-- METALBESTOS VENT OR

AS REQUIRED BY

EQUIPMENT MANUFACTURER

STORM COLLAR

ADJUSTABLE TALL

CONE ROOF FLASHING.

CSEE ARCHITECTURAL)

SUPPORT PLATE

SEE ARCHITECTUR

FOR ROOF FLASHING

\_SHEET METAL THIMBLE

SEAL WEATHER TIGHT TO

ROOF CONSTRUCTION.

5 FLUE VENT THRU ROOF DETAIL

M518 NO SCALE

HIGH CAPACITY AUTOMATIC AIR VENT------ ,-_~FILL VALVE

MAKE CONNECTION TO BOTTOM OF PIPE

TO CI RC ULA TI NG PUMP--~--1----+--d

PRESSURE GAUGE -----C2'

A

/. - FROM GLYCOL

MAKE-UP

11---~--FROM

BOILER/HEAT

EXCHANGER

AIR SEPARATOR

'+---AUTOMATIC A IR VENT

r--ttt=;::::::::t:__---1--u N I ON

DIAPHRAGM ------i

EXPANSION TANK 1-------1

4" CONCRETE BASE---.-~-~_,

H--SHUT-OFF VALVE

----DRAIN VAL VE -

EXTEND TO NEAREST

FLOOR DRAIN

a EXPANSION TANK PIPING DETAIL

M518 NO SCALE

•••SUPPORT VALUE ENGINEERING IT PAYS•••

G H

~--PLENUM BEHIND

LOUVER

PLENUM TD EXTEND

~~N~~~~~ D~OUVER ""' ------------------ PLENUM TO EXTEND 1 1,2'

BELOW LOUVER CONNECTION

t

M518

1 " DRAIN L I NE

CONNECTION

SECTION VIEW

\, /i----PITCH BOTTOM OF PLENUM

TO DRAIN CONNECTION

PITCH DRAIN LINE TO / ',,

1...C__.J--.-!::::'1....---NEAREST FLOOR DRAIN

PLAN VIEW I

LOUVER PLENUM DRAIN DETAIL

NO SCALE

-----FOS --I--,,-- FUSIBLE LINK

VACUUM BREAKER

t

UNION

B-1- T

BURNER ,

B-4-T

BURNER

B-5-T

BURNER

a::

GATE VALVE

ALL FUEL OIL

PIPING TO BE 7'4"

~- PRESSURE GUAGE

~- BACK PRESSURE

VALVE

~ RELIEF VAL VE

'--'----L-FOR .. I OUT TO TANK

r---'.,-l--;-----~<:7--V1---!>i<l---"'--Fos ~ IN FROM TANK

"" ~ CHECK VAL VE

""~ STAINER - DUPLEX

FOP-2-T FOP-1-T BASKET TYPE

SEE DETAIL

8/M514

M518

~- VACUUM GAUGE

FUEL OIL PIPING DETAIL

NO SCALE

18" MIN. BETI-IEEN-___,

TOP OF 5LEEVE

AND eRADE

,--SOD

~--4" TOP SOIL AND 4" CLAY

""1\!!'-----BACKFILL

~---FILTER FABRIC BELOW CLAY

i"~m:======PEA ROCK ,}- FRP SECONDARY

CONTAINMENT SLEEVE

'----FOS AND FOR IN SECONDARY

CONTAINMENT SLEEVE

~--5" MINIMUM PEA ROCK

SURROUNDING SLEEVE

FUEL OIL PIPING TRENCH DETAIL

NO SCALE

m US Army Corps of Engineers Louisville Distric t

"' z

" > w

"' 0.

w r z

"' " "' w m m o a " a N •

• u u z ~ <C c: .!:

iii' 2' i=

- • 0

C N ID '-

0 0 a:

w f-zu w a:

u <( "' en a:

w ::::> 0 a: z w - ;;: en w

WIW

a: . z a: a: I <( a: w w a:

f- "' 0 _J <( C\J I ' ;;: en

.. u GO wo a <C "' 0.

en _J f w

_J u -z I u w

Cl

LL.

Cl ,.._

"' I Cl a:

u

I z

M518

AS AWARDED

0 ..,.

I u

I Cl

I a:

"' -Cl

File details come from the government source that posted it.