Q&A_3.docx
DOCX document 13 KB Posted
- Attached to
- Well Repairs at Fort Devens Federal contract opportunity
- Solicitation number
- W15QKN17R1054
About this file
Additional Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A4.docx | DOCX document | |
| amendment_0006.pdf | ||
| 7701-3351_Observed_Fire_Trainer_Facility_-_Building_4322.pdf | ||
| Floor_Plan.pdf | ||
| Updated_SOW.pdf | ||
| Drawings_2.pdf | ||
| Layout.pdf | ||
| Drawings_1.pdf | ||
| Amendment_0005_.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| amendment_0004.docx | DOCX document | |
| amendment_0003.pdf | ||
| Q&A.docx | DOCX document | |
| W15QKN-17-R-1054_0002.pdf | ||
| W15QKN-17-R-1054_0001.pdf | ||
| 04_DEP_Corrective_20161230_SOW_Attach_02_NON-CE-14-5D024_Sanitary_Survey.pdf | ||
| 04_DEP_Corrective_20161230_SOW_Attach_01_South_Post_Map_for_MA_DEP.pdf | ||
| 04_DEP_Corrective_20161230_SOW_Attach_03_NON-CE-14-5D566.pdf | ||
| SOW.pdf | ||
| W15QKN-17-R-1054.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Is there only the one dry well at the Water point / FAC-11 site?
a. Yes, that is our intent to have one dry well for both chlorine analyzers.
2. For the water point well pit, how much plumbing to remove to install the chlorine analyzer?
a. Our intent would be to minimize the amount that gets removed as part of the process for installing the chlorine analyzer.
3. Are there exact locations for the dry wells?
a. No, there are not exact locations identified yet, but we would be willing to take recommendations on potential siting locations.