Q&A_RFP_W15QKN-17-R-0024_dated_20_APR_2017.docx

DOCX document 14 KB Posted

Attached to
60mm and 81mm Body Tubes and Tail Cones
Solicitation number
W15QKN-17-R-0024
Issued by

About this file

Q&A Dated 20 April 2017

View the file

Other files

File Type Posted
Q&A_RFP_W15QKN-17-R-0024_dated_08_May_2017.docx DOCX document
A015_DD1423_Delay_of_Delivery_Report_Revised_02_May_2017.docx DOCX document
A018__DD1423_Failure_Analysis_and_CAR_revised_02_May_2017.docx DOCX document
A004__DD1423_DID_-_PCA_Revised_02_May_2017.docx DOCX document
W15QKN17R0024-0002.pdf PDF
Q&A_RFP_W15QKN-17-R-0024_dated_03_May_2017.docx DOCX document
Attachment_0009_-_Technical_Data_Package_(TDP)_20-APR-2017.docx DOCX document
Attachment_0008_CONTRACT_C_REQUIREMENTS_20-APR-17.pdf PDF
Solicitation_W15QKN17R0024_AMD_0001.pdf PDF
Q&A_RFP_W15QKN-17-R-0024_dated_21_APR_2017.docx DOCX document
Q&A_RFP_W15QKN-17-R-0024.docx DOCX document
Attachment_0010_-_Price_Matrix_(revised).xlsx XLSX spreadsheet
Attachment_0010_-_Price_Matrix_(revised).xlsx XLSX spreadsheet
W15QKN-17-R-0024__Solicitation.pdf PDF
Exhibit_A_-_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRLS)_A001-A021.pdf PDF
Attachment_0001_-_DD2345_-_FORM_MILITARY_CRITICAL_TECHNICAL_DATA_AGREEMENT.pdf PDF
Attachment_0008_-_Contract_C_Requirements.pdf PDF
Attachment_0005_-_SF-LLL_DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
Attachment_0003_-_AMSTA-AR_1350_TECHNICAL_DATA_REQUEST_QUESTIONAIRE.pdf PDF
Attachment_0009_-_Technical_Data_Package_(TDP).docx DOCX document
Attachment_0004_-_Form_3002_CLEARANCE_OF_TECHNICAL_INFORMATION.pdf PDF
Attachment_0002_-_US_GOVERNMENT_NON-DISCLOSURE_AGREEMENT.docx DOCX document
Attachment_0007_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
Attachment_0006_-_PAST_PERFORMANCE_QUESTIONAIRE.docx DOCX document
Attachment_0010_-_Price_Matrix.xlsx XLSX spreadsheet
Attachment_0002_-_US_GOVERNMENT_NON-DISCLOSURE_AGREEMENT.docx DOCX document
Attachment_0007_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
Attachment_0001_-_DD2345_-_FORM_MILITARY_CRITICAL_TECHNICAL_DATA_AGREEMENT.pdf PDF
Attachment_0002_-_US_GOVERNMENT_NON-_DISCLOSURE_AGREEMENT.doc DOC document
Attachment_0010_-_Price_Matrix.xlsx XLSX spreadsheet
W15QKN-17-R-0024__Solicitation.pdf PDF
Attachment_0006_-_PAST_PERFORMANCE_QUESTIONAIRE.docx DOCX document
Exhibit_A_-_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRLS)_A001-A021.pdf PDF
Attachment_0009_-_Technical_Data_Package_(TDP).docx DOCX document
Attachment_0005_-_SF-LLL_DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
Attachment_0003_-_AMSTA-AR_1350_TECHNICAL_DATA_REQUEST_QUESTIONAIRE.pdf PDF
Attachment_0008_-_Contract_C_Requirements.pdf PDF
Attachment_0004_-_Form_3002_CLEARANCE_OF_TECHNICAL_INFORMATION.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

RFP W15QKN-17-R-0024

60/81mm Body Tube and Tail Cone Assemblies

Question 1: Print 9345348 Rev. N in note 4 states all surfaces must be painted except press fit surface, ends, and threads as shown. Is it the Government’s intent to have the ID of the part painted?

RESPONSE: The ID of the M721/M767 Body Tube Assembly should not be painted. Drawing 9345348 is missing the word "EXTERIOR" between "ALL" and "SURFACES" in Line 3 of Note 4. An amendment to the solicitation is forthcoming.

Question 2: MIL-DTL-32285 W Amendment 1 Section 3.2.6.1 was added that references a pull test which has been deleted from the print in 2011. Is it the Government’s intent to reincorporate the test?

ORIGINAL RESPONSE PROVIDED TO INDUSTRY ON 14 April 2017: The USG does not plan to reincorporate the pull test requirement, which was removed in an earlier drawing revision. The inclusion of any reference to pull testing in MIL-DTL-32285 w/AMD1 is an error that will be corrected in a future specification revision. An amendment to the solicitation is forthcoming.

CORRECTION: The pull test requirement is not being removed from the TDP. The pull test will be required during FAT in accordance with MIL-DTL-32285 w/Amendment 1. The pull test note will be added back to the drawing for clarity.

Question 3: Does the Solicitation only include machining of the components, and light assembly, or will we be handling the M776 Fuze & M27 Fin as well?

RESPONSE: This solicitation does not involve the machining or assembly of the M776 fuze or M27 fin. Drawing 9345348 contains the requirements, including the necessary subassemblies, for the M721/M767 Body Tube Assembly. Drawing 12982769 contains the requirements, including the necessary subassemblies, for the M721/M767 Tail Cone Assembly.

Question 4. In reference to solicitation W15QKN-17-R-0024 drawing # 12982769, M721/M767 TAILCONE ASSEMBLY, note #1 calls out the dimensions of the bolt but does not call out a material. What is the material?

RESPONSE: The hex head screw requirements, including material, on drawing 12982769 were updated. Please see 'Engineering Exceptions' on the 'Contract C Requirements' form for PRON P16C16 for the most up to date requirements. Please note that the hex head screw requirements are located in Note 2 of drawing 12982769, not Note 1.