Attachment_0002_-_Quality_Assurance_Surveillance_Plan_(QASP).pdf
PDF 19 KB Posted
- Solicitation number
- W15QKN16R0022
About this file
Attachment 0002 - Quality Assurance Surveillance Plan (QASP)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EWI_-_Redacted_JA_(5-4-16).pdf | ||
| W15QKN16R0022-0001.pdf | ||
| Exhibit_A_-_CDRLs.pdf | ||
| Attachment_0002_-_Quality_Assurance_Surveillance_Plan_(QASP).pdf | ||
| Attachment_0001_-_Labor_Categories.xlsx | XLSX spreadsheet | |
| W15QKN-16-R-0022.pdf | ||
| Exhibit_A_-_CDRLs.pdf | ||
| W15QKN-16-R-0022.pdf | ||
| Attachment_0001_-_Labor_Categories.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENTS SUMMARY/QUALITY ASSURANCE SURVEILLANCE
PLAN (PRS/QASP)
Performance Requirement IAW Section
Performance Measure
Performance Standard
Acceptable Performance
Level
(APL)
Method of
Surveillance
Compliance (Exceeded, Met or Partially
Met The contractor shall provide field support during pre-campaign and campaign operations
Completeness
Quality
Timeliness
The installations/ reinstallations will be performed expeditiously.
The Engineers and technical staff will ensure that the calibrations, repairs maintenance, troubleshooting, modifications, installations/reinstallations are complete
*TBD on a Task Order Basis
COR/COTR
Review
Repair service calls
Timeliness Repairs are made in a timely manner; customers are informed of expected repair time of within 24 hours of repair time.
*TBD on a Task Order Basis
The contractor shall provide process support
Quality
Timeliness
Completeness
Process and Mechanical Engineering support during operations will be performed expeditiously to minimize downtime. The engineers and technical staff will ensure that maintenance, repair, troubleshooting/diagnosis, redesign, and software modification are complete.
*TBD on a Task Order Basis shall provide permitting support
Quality
Completeness
The Engineers and technical staff will ensure that modification and upgrade of the incinerator compliance program is complete. Complete permitting reports prepared and submitted as required by NJDEP
*TBD on a Task Order Basis
Supply critical parts and materials
The critical parts and material must be supplied in a timely manner so as to
*TBD on a Task Order Basis not interfere with the current operations
Submit maintenance, installation, support, and repair reports
Completeness
Upon satisfactory completion of maintenance, installation, repair and support efforts the contractor will supply monthly invoice detailing the work done, hours expended and equipment purchased; this will also include the balance of remaining monies left on the contract.
Report shall be submitted electronically and contain no errors.
*TBD on a Task Order Basis will submit safety reports as required
The contractor will submit safety incident/accident reports immediately after any major accident or incident as describe in Section 7.3
Report shall be submitted electronically and contain no errors.
*TBD on a Task Order Basis
*TBD on a Task Order Basis
File details come from the government source that posted it. Updated .