VSU J_453 Invitation to Bid.pdf

PDF 110 KB Posted

Attached to
J-453-BID Partial Renovation, Education Center
Solicitation number
PE-47200-RFQ-2026-000000128
Issued by
Lee County, Georgia

About this file

This is an Invitation to Bid issued by the Board of Regents of the University System of Georgia for the partial renovation of the Education Center at Valdosta State University (VSU) in Valdosta, Georgia, identified as BOR Project No. J-453. Sealed bids must be physically delivered to the VSU Physical Plant Office Conference Room at 2903 N. Ashley Street, Valdosta, Georgia by 2:00 PM EST on June 11, 2026. A mandatory pre-bid conference will be held on Wednesday, May 20, 2026, at 10:00 AM at the VSU Physical Plant Office Training Room at the same address. Bidding documents in electronic PDF format are available upon request from the Design Professional contacts Gene Dunwody, Jr. and Spud Fordham of Dunwody/Beeland Architects, Inc. (gdunwodyjr@dunwodybeeland.com, sfordham@dunwodybeelancd.com, 478.742.5321). Bids will be publicly opened and announced at the time and place noted above. The contract will be awarded on a lump sum basis to the responsive and responsible bidder providing the lowest bid within budget.

The Owner requires each bid be accompanied by a Bid Bond equal to not less than five percent of the total bid amount, with both performance and payment bonds required at 100 percent of the Contract Sum prior to contract execution. Bids may not be withdrawn for sixty days after opening, except in accordance with Georgia law. The Owner reserves the right to reject all bids, waive technicalities and informalities, and reject any bid exceeding budget. In evaluating bidder responsibility, the Owner will consider whether bidders are debarred or excluded from contracting, have been terminated for cause on prior public works contracts, can demonstrate a Current Ratio of 1.0 or higher, have an Experience Modification Rate not exceeding an average of 1.2 over three years, and have successfully completed similar public works projects on time and within cost and quality standards. If all responsive and responsible bids exceed budget, the Owner may supplement the budget or negotiate with the lowest responsive and responsible bidder to modify the project scope to achieve cost compliance.

View the file

Other files

File Type Posted
BOR VSU J_453 Bid Requirements.docx DOCX document
J_453 Addendum 1 052926.pdf PDF
VSU J_453 BID Sign In Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

The Owner will receive sealed bids from Contractors in the VSU Physical Plant Office, Conference Room, 2903 N. Ashley Street, Valdosta, Georgia 31602. Bids must be physically on the table in the Bid Room by 2:00 PM EST o’clock, at the time legally prevailing in Valdosta, Georgia, on June 11, 2026, for the construction of BOR Project No. J-453 Partial Renovation, Education Center, located above in Valdosta, Georgia. At the time and place noted above, the bids will be publicly opened and announced.

Bidding Documents may be obtained by general contract bidders in electronic format (PDF) upon request to the Design Professional. A plan holder's list is available upon request by subcontractors.

Contact: Gene Dunwody, Jr. and/or Spud Fordham Dunwody/Beeland Architects, Inc.

gdunwodyjr@dunwodybeeland.com and/or sfordham@dunwodybeelancd.com 478.742.5321

Bidders are cautioned that the acquisition of Bidding Documents through any source other than as described above is not advisable.

Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid.

There will be a pre-bid conference held on Wednesday. May 20, 2026, at 10:00 am at VSU Physical Plant Office, Training Room, 2903 N. Ashley Street, Valdosta, GA 31602. Attendance at this conference is MANDATORY for any contractor intending to bid on this project. Others may attend if they so desire.

Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of opening, except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of the contract.

The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget.

In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following:

• Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;

• Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract;

• Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher;

• Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an

Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and

• Whether the bidder’s past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder’s contract obligations.

In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.

BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA

BY: J . FRANK SMITH VICE CHANCELLOR FOR REAL ESTATE & FACILITIES

[Remainder of Page Intentionally Left Blank] mailto:gdunwodyjr@dunwodybeeland.com mailto:sfordham@dunwodybeelancd.com

INVITATION TO BID

File details come from the government source that posted it. Updated .