VSSB252001 Repair Roof Building 235 Drawing Set Summary
This is a technical drawing set for the Iowa Department of Public Defense's roof replacement project at Building 235 of the 185th Air Refueling Wing located at Sioux Gateway Airport in Sioux City, Iowa. The project encompasses roof replacement across three roof areas (A, B, and C) totaling approximately 12,163 square feet. The scope of work requires contractors to remove the existing 60 mil EPDM roofing membrane, flashing, and two layers of 2-inch rigid insulation board, then install two layers of 2.6-inch rigid insulation (R-30) and a new 90 mil EPDM roofing membrane system. Additional work includes removal of specified equipment with utility disconnection and capping, installation of new flashing for all roof penetrations, installation of new gutter systems with concrete splash pads matching existing specifications, and installation of roof walk pads. The mandatory site visit is scheduled for June 3, 2026, at 10:00 AM, and all bids must be submitted by June 17, 2026, via the IMPACS site. A bidders' conference will be held to address questions and clarify requirements prior to the submission deadline. Contractors must field verify all quantities and measurements prior to bidding and comply with all applicable state and federal codes, standards, and regulations.
The project requires contractors to protect all existing roof equipment and facility property during construction, with any damage to be repaired at the contractor's expense. Contractors must also return the removed Elektror L138 siren to the contracting entity once disconnected and relocated from the roof. The contract will be competitively awarded based on technical qualifications, cost competitiveness, and demonstrated experience with similar commercial roofing projects, with pricing submitted as part of the proposal. The project is subject to prevailing wage requirements applicable to state projects, and funding is sourced through the Department of Public Defense's capital improvement budget. The contract term and completion timeframe will be established upon award and notice to proceed. The project may be set aside for small businesses or disadvantaged business enterprises in accordance with Iowa procurement regulations. The issuing officer is Philip Payton, reachable at 515-975-6211 or philip.payton@dpd.iowa.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VSSB252001 SOW 4-29-2026.pdf | ||
| 1392044-event.pdf | ||
| 00 43 16 - Supplement D - TSB Form.pdf | ||
| VSSB252001 AF66 Material Submittal Register.pdf | ||
| VSSB252001 Form of Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
COVER SHEET 1 OF 3
ROOF DETAIL SHEET
EXISTING/DEMO PLAN 2 OF 3
GENERAL NOTES
1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH
LATEST CODES, STANDARDS AND SPECIFICATIONS
UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES
AND MEASUREMENTS PRIOR TO PROJECT BID.
3. PROTECT EXISTING ROOF EQUIPMENT AND THE
FACILITY DURING REPAIR WORK ANY DAMAGE TO THE
EQUIPMENT OR FACILITY CAUSED BY THE
CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT
THE CONTRACTOR'S EXPENSE.
4. CONSTRUCTION OPERATIONS TO REMOVE EXISTING
EQUIPMENT REQUIRES ANY OTHER ITEMS ECT., TO BE
REMOVED THEY SHALL BE REPLACED TO THEIR
ORIGINAL CONDITION.
SHEET INDEX
BASE MAP
IOWA
SIOUX GATEWAY AIRPORT
NEBRASKA
WOODBURY CO.
IOWA
T88N
T87N
T86N
T91N
T90N
T89N
R
W
R
W
R
W
R
W
R
W
R
W
SIOUX
CITY
SIOUX GATEWAY
AIRPORT
RIVER
MISSOURI
VICINITY MAP
LOCATION IN STATE
IOWA AIR NATIONAL GUARD 185TH ARW
PROJECT NO: VSSB252001
CRS REPAIR ROOF B235
PLYMOUTH CO.
IOWA
VSSB252001
COVER SHEET
185ARW IOWA AIR NATIONAL GUARD
SIOUX GATEWAY AIRPORT
SIOUX CITY, IOWA
DRAWN BY: SHEET:
NONESCALE: LAST UPDATE: PROJECT NO.
BDB DATE:
TITLE:
C .F.R
FAC
ILITY
2ND MECH DR.
LIFT
TAX
IW
AY "A"
B
AT AVE.
HEADQUARTERS AVE.
STATION
239 264
M A
C A
R T H
U R
S T
H A
R B
O R
D R
TDY
PARKING
12240 11240
W ash Rack
PARKING
ARMY GUARD COMPLEX
POWELL
P E
R
IM
E T E
R R
D
POL COMPLEX
PAINT FACILITY
TO MUNITIONS
PERIMETER RD.
OIQ LOC 31
HALSEY
GATE
UP
RAM
P
DOW
N
DOCK
DN
H A
LS
EY
S
T
286 TDY
DN
H A
R B
O R
D R
P O
L R
O A
D
PERIM
ETER R
D.
PERIMETER RD.
TARP
SHED
TARPSHED
(A)
(B)
3631 3630
SL
SL
S O
U T H
B R
ID
G
E D
R
T A
X
IW
A Y
M
5' 7'
7'
POL FUEL TRUCK ACCESS
AIRPORT GATE
15240
BROWN AVE.
TA
XIW
AY
"B
SULLY DITCH
SULLY DITCH
H A
R B
O R
D
IT
C H
H A
R B
O R
D
IT
C H
H A
R B
O R
D
IT
C H
GLIDE SLOPE BLDG
US MAIL
SERVIC
E RD
RF-84F F-84
A-7 F-16
T-33A
F-100
MALSR BLDG
P A
IN
T B
O O
T H
A C
C E
S S
ALPH
A
BRAVO
GOLF
M
IK
E
T A
X
IW
A Y "A
TAX
IW
AY "A"
ALPH
A
PERDUE
TAXIWAY "G"
MAIN
GATE
CRS REPAIR ROOF B235
16 APR 2026
24 FEB 2026
Acaddata/SC/235/Projects/roof replacement project 2026.dwg
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
T- HANGARS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING/DEMO PLAN
185ARW IOWA AIR NATIONAL GUARD
SIOUX GATEWAY AIRPORT
SIOUX CITY, IOWA
DRAWN BY:
16 APR 2026
SHEET:
NONESCALE: LAST UPDATE:
BDB DATE: 24 FEB 2026
TITLE:
Acaddata/SC/235/Projects/roof replacement project 2026.dwg
A
21'-6" 59' 40'-4"
B C 100'-8"
ROOF (A) 2,164 S.F.
ROOF (B) 5,939 S.F.
ROOF (C) 4,060 S.F.
TOTAL 12,163 S.F.
(1.) REMOVE EXISTING 60 MIL EPDM ROOFING MEMBRANE, ALL FLASHING AND 2 LAYERS 2" RIGID INSULATION BOARD FROM ROOF AREAS (A,B & C), AND GUTTER SYSTEMS. DISPOSE OFF BASE.
FOLLOW ALL STATE AND FEDERAL REGULATIONS.
NOTES:
(4.) PROTECT ALL PROPERTY TO INCLUDE CONDUITS ATTACHED TO ROOF DECK DURING
THE REMOVAL AND REINSTALL PROCESS.
(5.) INSTALL 2 LAYERS 2.6" RIGID INSULATION (R-30) FULLY ATTACHED/ ADHERED TO METAL DECK
AND FULLY ADHERED 90 MIL EPDM ROOFING MEMBRANE SYSTEM. COMPLETE ALL
NECESSARY MODIFICATIONS FOR INSULATION AND MEMBRANE UPGRADE.
SEE SHEET (3) FOR EXISTING ROOF DETAILS.
(2.) REMOVE EXISTING EQUIPMENT IDENTIFIED ON THE DRAWING. FILL OPENINGS
WITH METAL DECKING. METAL DECK SHALL LAP ALL SIDES OF OPENING 6". ATTACH NEW
DECK TO EXISTING WITH SCREWS OR WELD.
EQUIPMENT TO BE REMOVED
(3.) DISCONNECT AND OR CAP ALL UTILITIES FOR THE EQUIPMENT TO BE REMOVED.
ELECTRICAL DISCONNECTED AT THE PANEL. GAS LINE CAPPED AS FAR BACK ON THE
SERVICE LINE AS POSSIBLE NOT TO DISCONNECT ANY OTHER SERVICE USED.
VSSB252001
PROJECT NO.
CRS REPAIR ROOF B235
(6.) INSTALL ALL FLASHING REQUIRED FOR ALL ROOF PENETRATIONS AND ROOF EDGES.
(7.) INSTALL NEW GUTTER SYSTEMS WITH CONCRETE SPLASH PADS. MATCH EXISTING GUTTER
SYSTEM SIZE AND LAYOUT. MATCH EXISTING SPLASH PAD SIZES AS CLOSE AS POSSIBLE.
APPROXIMATE SF.
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
S2S3
DOWN SPOUT/SPLASH PAD (8) TYP.
120'-10"
(8.) ELEKTROR L138 SIREN MUST BE RETURNED TO CE ONCE REMOVED.
ELEKTROR L138 SIREN
HVAC UNIT WILL BE RELOCATED TO GROUND PRIOR TO ROOF PROJECT
UPGRADE CURB TO 4'x4'
UPGRADE CURB TO 4'x4'
WALK PADS TO BE ADDED
(9.) INSTALL WALK PADS IN ACCORDANCE TO DRAWING AND BEST PRACTICE.
SECTION DETAIL
ROOF (A,B & C) EDGES
MEMBRANE FLASHING
EXISTING FLASHING
NEW MEMBRANE FLASHING
NEW MEMBRANE ROOFING
EXISTING FLASHING
NEW RIGID ROOF
INSULATION
SECTION DETAIL
ROOF (A & C)
NEW CONCRETE SPLASH PAN
(8) DOWN SPOUT LOCATIONS
MATCH EXISTING PAN SIZE
MEMBRANE ROOFING SYSTEM
2 LAYERS 2" RIGID INSULATION
ROOF DETAILS SHEET
185ARW IOWA AIR NATIONAL GUARD
SIOUX GATEWAY AIRPORT
SIOUX CITY, IOWA
DRAWN BY:
16 APR 2026
SHEET:
NONESCALE: LAST UPDATE:
BDB DATE: 24 FEB 2026
TITLE:
Acaddata/SC/235/Projects/roof replacement project 2026.dwg VSSB252001
PROJECT NO.
CRS REPAIR ROOF B235
MEMBRANE ROOFING SYSTEM
2 LAYERS 2" RIGID INSULATION
MEMBRANE FLASHING
METAL FLASHING
METAL GUTTER
METAL DOWN SPOUT
MEMBRANE ROOFING SYSTEM
2 LAYERS 2" RIGID INSULATION
MEMBRANE FLASHING
METAL FLASHING
METAL GUTTER
METAL DOWN SPOUT
MEMBRANE ROOFING SYSTEM
2 LAYERS 2" RIGID INSULATION
MEMBRANE FLASHING
METAL FLASHING
METAL GUTTER
METAL DOWN SPOUT
MEMBRANE ROOFING SYSTEM
2 LAYERS 2" RIGID INSULATION
MEMBRANE FLASHING
METAL FLASHING
SHT 2
SHT 2
4SECTION DETAIL
ROOF (C) SHT 2
3SECTION DETAIL
ROOF (A) SHT 2
1 SECTION DETAIL
ROOF (B) SHT 2
SECTION DETAIL
SHT 2
6SECTION DETAIL
ROOF (A) SHT 2
ROOF (C)
METAL GUTTER
| 235-roof replacement project 2026_CoverSheet |
| Sheets and Views |
| Model |
| 235-roof replacement project 2026_sheet2 |
| Sheets and Views |
| Model |
| 235-roof replacement project 2026_sheet3 |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .