VSSB252001 AF66 Material Submittal Register.pdf

PDF 83 KB Posted

Attached to
Repair Roof Building 235
Solicitation number
VSSB252001
Issued by
Scott County, Iowa

About this file

This is a Material Submittal Schedule for a roof replacement project (VSSB252001) managed by the Iowa Department of Public Defense for Building 235 at the 185th Air Refueling Wing in Sioux City, Iowa. The schedule identifies 16 line items requiring contractor submission, including construction schedules, personnel appointments, training certifications, insurance documentation, bonds, and product specifications for roofing materials such as EPDM 90 MIL roofing, insulation, adhesives, and metal termination components. Most submittals are required within 10 days of Notice to Proceed (NTP), with certain closeout and waste management documentation due within 60 days of NTP. The schedule also requires hazardous material usage forms, waste reduction reports, recovered materials documentation, and warranty submittals. Contractors must provide shop drawings, samples, color selections, manufacturer recommendations, warranties, product data, and operating instructions for specified materials. A mandatory site visit was scheduled for June 3rd at 10:00 AM, with a bidders' conference to be held prior to the June 17, 2026 bid submission deadline. Bids must be submitted via the IMPACS site in lump sum format with the required form of bid.

The project requires all roofing work to comply with prevailing wage requirements applicable to state projects and current building codes and specifications. No specific incumbent vendor or award value range is identified in the available documentation. Funding is sourced through the Department of Public Defense's capital improvement budget. The contract may be set aside for small businesses or disadvantaged business enterprises in accordance with Iowa procurement regulations. Award will be made to the most qualified and cost-competitive bidder meeting all technical and compliance requirements. The issuing officer is Philip Payton of the Iowa Department of Public Defense, reachable at 515-975-6211 or philip.payton@dpd.iowa.gov.

View the file

Other files

File Type Posted
VSSB252001 SOW 4-29-2026.pdf PDF
1392044-event.pdf PDF
00 43 16 - Supplement D - TSB Form.pdf PDF
VSSB252001 Form of Bid.pdf PDF
VSSB252001 Repair Roof Building 235 Drawing Set.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS PROJECT No:

VSSB252001

TO BE COMPLETED BY PROJECT ENGINEER

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

D O

C U

M

EN

TS

R

EP

O R

TS

C

ER

TS

. O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N S

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

C

AT

AL

O

G /P

R O

D U

C T

D

AT

A

O

PE

R

AT

IN

G

/M

AI

N T.

IN

ST

R U

C

TI

O N

S

Te ch ni ca l D at a

SC

H

ED

U

LE

S

AS

-B

U

IL

T R

EC

O

R D

D R

W G

S/

SP

EC

S

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP APPROVED DIS-

APPROVED

CONTRACT

FOR RE-

SUBMITTAL

FINAL

APPROVAL REMARKS

1 Construction Schedule X NTP+10 2 Site Superintendent Appointment Letter X NTP+10 3 AT Level 1 Training X NTP+10 4 Insurance Documentation X NTP+10 5 Bonds X Prior to NTP 6 Insulation X X NTP+10 7 EPDM 90 MIL Roofing X X NTP+10 8 Adhesive for Membrane X X NTP+10 9 Metal Termination Bars/Battons X X NTP+10 10 Sheet Metal Traim X X NTP+10

HAZARDOUS MATERIAL USAGE & CONTROLS-

FORM X

NTP+10

CONST. WASTE MANAGEMENT & DISPOSAL -

Waste Reduction Report X

NTP+60

13 RECOVERED MATERIALS REPORTING FORM X NTP+60

CLOSEOUT PROCEDURES - Contractor's Punchlist X NTP+60

CLOSEOUT PROCEDURES - Closeout Submittals X

NTP+60

CLOSEOUT PROCEDURES - Warranty Submittals X NTP+60

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT

NO.

PROJECT TITLE - Repair Roof B235

AF-Form-66