VMD machine installation Aug 22 2018.pdf

PDF 1 MB Posted

Attached to
Vacuum Microwave Dehydrator (VMD) Model: nutraREV-Test-2450-10 Federal contract opportunity
Solicitation number
SPE30021Q0001
Issued by
Defense Logistics Agency Troop Support Subsistence

View the file

Other files for this federal contract opportunity

Other files attached to Vacuum Microwave Dehydrator (VMD) Model: nutraREV-Test-2450-10, newest first.
File Type Posted
200825-USA-10kW-Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 kW nutraREV dryer Machine 71

Project: US Army Natick Soldier Systems Center

August 3 2018

Confidential Proprietary

10 kW nutraREV-3-Test unit

EnWave Operations and Quality Engineering

Confidential Proprietary

Description: Possible equipment distribution.

Drawing units: NA.

View: Isometric view / footprint.

Proprietary

Description: Possible equipment distribution.

Drawing units: Inches.

View: Top view / footprint.

Proprietary

Description: Possible equipment distribution.

Drawing units: Inches.

View: Front view / footprint.

Proprietary

Description: Possible equipment distribution.

Drawing units: Inches.

View: Side view / footprint.

Proprietary

Description: Drying drum detail.

Drawing units: Inches.

View: Selected views.

3 drying drums provided with the nutraREV basket system.

Material: Food grade polypropylene.

Proprietary

Description: Drying tray detail.

Drawing units: Inches.

View: Selected views.

10 units provided with the Ferris wheel tray-handling system.

Material: Food grade polypropylene.

Proprietary

The following photos show the REV dryer that will be received once the crates are removed.

Main chamber

Magnetrons

Electric Cabinet Pump Skid

Proprietary

Utility Requirements Specification

Electric power

• Single connection point procured by the US Army:

208V/60Hz/3phase/100A.

• The connection of the electrical cabinet to the electrical mains of the installation facility is out of EnWave’s scope of work (not procured by EnWave). The US Army should provide a professional electrician to perform this connection.

• The main circuit breaker where the electrical connection needs to be done is in the electrical cabinet. As shown in the picture.

Ground

3 wires

Proprietary

Utility Requirements Specification

Cooling water from your chiller

• Single connection point procured by the US Army: 5°C to

15°C. Minimum required flow rate: 50 LPM. Minimum pressure: 3 bar (45 psi).

• If sufficient cooling water supply is not available at the installation facilities. This requirement can be covered with a chiller which cooling capacity is larger than 6 Refrigeration Tons (indoor air cooled chiller). Please notice that this chiller is not provided by EnWave Corporation.

• The connection of the pump skid to your chiller at the installation facility is out of EnWave’s scope of work (not procured by EnWave). The US Army should provide a technician to perform this connection.

• The connection supplied with the REV pump skid is 1” NPT female. The US Army needs to provide the necessary fittings and piping/hoses to interface the supply and return lines of their chiller or cooling water supply to the 1” NPT female fittings provided with the pump skid (supply and return lines).

The pump skid fittings are shown in the photographs.

Supply from your chiller

Return from your chiller

Proprietary

Utility Requirements Specification

Compressed air

• Single connection point procured by the US Army: Filtered dry air: 1CFM @ 90 psi.

• The compressed air supply needs to be connected to the compressed air tube supply connection provided with the pump skid. This compressed air tube connection is a 1/4” OD plastic tubing. The US Army needs to provide a push in connection and the materials necessary to interface this 1/4” OD plastic tubing with their compressed air supply.

This connection is out of EnWave’s scope of work (not procured by EnWave).

1/4” OD push in fitting commonly used (it is not mandatory to use this specific type of fitting as long as the fitting chosen properly interfaces the 1/4” OD tubing provided with the pump skid.

Compressed air tube in the pump skid that needs to be connected to the compressed air supply (1/4” OD plastic tubing at the right).

Proprietary

Utility Requirements Specification

Internet connection

• Single connection point procured by the US Army: Hard wired

Internet connection (5, 5e, 6, 6a).

• The US Army needs to procure the connection of the electrical cabinet to their IT infrastructure.

• The Ethernet receiver is located in the electrical cabinet as shown in the photograph.

Ethernet connection

Proprietary

Tentative Installation Procedure

Traditionally, the installation/commissioning process of the REV dryer takes 3 to 4 days. Please find below an estimate of the expected schedule and required materials:

• Day 1 (and maybe day 2): Our filed engineer works with your team on the installation of the REV dryer. During day 1 and day 2 the US Army needs to provide the following resources:

• Your electrician should be available during day 1 to connect the REV dryer to the mains of your plant.

• Your technician should be available to connect the pump skid of the REV dryer to your cooling water supply, and the compressed air supply.

• Your IT personnel should be available to connect the REV dryer to your Internet infrastructure.

• One technical assistant should be available during days 1 and 2 to help our engineer. The assistant should have access to a basic mechanical/electrical toolkit. We recommend that the person assisting our engineer during installation is the person that will oversee service and maintenance for the dryer (maintenance personnel).

• A +5,000 lb. forklift, gantry or lifting table.

• A +5,000 lb. pallet jack.

• Day 2: Our field engineer and our process scientist will test the functionalities of the REV dryer to confirm that everything is operating according to specifications. If the testing of the machine results ideal, our process scientist could start training your team on day 2.

• Day 3 (and if necessary day 4): Our process scientist trains your team and confirms commissioning of the REV dryer.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13

File details come from the government source that posted it. Updated .