This is an Excel spreadsheet containing requirements attachments for HbA1c testing services across nine VA medical facilities in VISN 4. The document includes detailed specifications for test volumes, instrument requirements, facility locations, and pricing templates.
The attachments outline annual test volumes ranging from 11,000 to 40,000 tests per facility, totaling 244,530 tests annually across all sites with a projected 1% increase per year. Each facility requires one primary analyzer with 35 tests per hour minimum throughput, no backup analyzer, quality control testing twice daily, and 8x5 service coverage. All facilities require Data Innovations interface management with primary instrument interfacing. Delivery locations span Pennsylvania and Delaware, with varying hours of operation (some 24/7, others business hours only). The pricing templates include spaces for contractors to provide BPA pricing and FSS pricing across a base year and four option years, though no actual pricing is filled in.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24425Q0165_2.docx | DOCX document | |
| 36C24425Q0165.docx | DOCX document | |
| 36C24425Q0165 LineItems.xlsx | XLSX spreadsheet | |
| SCLA Philadelphia.pdf | ||
| SCLA Allegany.pdf | ||
| SCLA Lebanon.pdf | ||
| SCLA Erie.pdf | ||
| SCLA Wilkes Barre.pdf | ||
| OPPORTUNITIES-DESCRIPTION.docx | DOCX document | |
| SCLA Delaware.pdf | ||
| VISN 4 Estimated HbA1C Volumes.pdf | ||
| SCLA Chester.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A- Test Volumes
| DESCRIPTION | Altoona | Butler | Coatesville | Erie | Lebanon | Philadelphia | Pittsburgh | Wilkes-Barre | Wilmington | Total VISN Test Volume |
| Hgb A1c Test | ||||||||||
| Annual Test Volume By Site |
*Assume a 1% increase per year 21,000 19,000 11,000 23,000 40,000 34,482 34,048 32,000 30,000 244,530
&"-,Bold"Estimated Annual Workload and Test Menu Attachment A
Revision: 18 November 2013 Page &P of &N
B - Instrument Requirements
| Facility | Minimum Test Thruput per hour | Primary Analyzer | Back Up Analyzer | Frequency of QUALITY CONTROL | Desired SERVICE OPTION | Current INTERFACE MANAGER in Use | Desired SERVICE OPTION | Requirement for PRIMARY INSTR. INTERFACING | Requirement for BACK UP INSTR. INTERFACING |
| Altoona VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Butler VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Coatesville VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Erie VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Lebanon VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Philadelphia VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Pittsburgh VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Wilkes-Barre VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Wilmington VAMC | 35 | 1 | 0 | 2 levels @ 2x day (before and after test run) | 8x5 | Data Innovations | Required | Required | N/A |
| Indicate Total Number of Additional Attachment As Included: |
| No Additional Attachments |
&"-,Bold"Instrument Requirements Attachment B
Revision: 18 November 2013 Page &P of &N
C- Location Information
| VISN | 4 | |||
| FACILITY NAME | DELIVERY LOCATION | HOURS OF OPERATION | POINT OF CONTACT | TEL # |
| Altoona VAMC | 2907 Pleasant Valley Blvd, Altoona, PA 16602-4377 | 24 hrs per day/7 days per week | Jennifer Harkins jennifer.harkins1@va.gov | 814-943-8164 |
X17080
| Butler VAMC | 353 North Duffy Road, Butler, PA 16001 | M-F 6am-9pm | Kelly Groebel kelly.groebel@va.gov | 878-271-6880 | |
| Coatesville VAMC | 1400 Black Horse Hill Road, Coatesville, PA 19320-2096 | M-F 7:00am to 5:30pm | Stephanie Jamison | ||
| stephanie.jamison2@va.gov | 610-384-7711 X3878 | ||||
| Erie VAMC | 135 East 38th Street Blvd, Erie, Pa 16504-1596 | 24 hrs per day/7 days per week | Bernadette Hall Bernadette.Hall@va.gov | 814-860-2178 | |
| Lebanon VAMC | 1700 South Lincoln Avenue, Lebanon, PA 17042-7597 | 24 hrs per day/7 days per week | Jeanne Capparell | ||
| jeanne.capparell@va.gov | 717-272-6621 X3907 | ||||
| Philadelphia VAMC | 3900 Woodland Avenue, Philadelphia, PA 19104 | 24 hrs per day/7 days per week | Sahil Patel sahil.patel2@va.gov | 215-823-5800 X5098 | |
| Pittsburgh VAMC | University Drive C, Pittsburgh, PA 15240 | 24 hrs per day/7 days per week | Dana Jump | ||
| dana.jump@va.gov | 412-360-6557 | ||||
| Wilkes-Barre VAMC | 1111 East End Blvd., Wilkes-Barre, PA 18711 | 24 hrs per day/7 days per week | Sharon Ford sharon.ford@va.gov | 570-824-3521 ext 27535 | |
| Wilmington VAMC | 1601 Kirkwood Highway, Wilmington, DE 19805 | 24 hrs per day/7 days per week | Joanna Bakanas joanna.bakanas2@va.gov | 302-633-4388 |
X4388
| Indicate Total Number of Additional Attachment Bs Included: |
| No Additional Attachments |
| 22 |
| 23 |
| PCAC |
| PCOE |
| SAOW |
| SAOC |
| SAOE |
&"-,Bold"Locations, Hours of Operation, Point of Contact Attachment C
Revision: 18 November 2013 Page &P of &N
D- Contractor to complete
| ESTIMATED ANNUAL WORKLOAD AND TEST MENU | |||||||||
| Contractor Name: | FSS Number: | ||||||||
| FACILITY | PRIMARY ANALYZER(S) | BACK UP ANALYZER | Annual Workload: Total of Primary + Back Up | BPA PRICE including Add-Ons | Extended BPA Price | FSS Price | Extended FSS Price | EXTENDED FSS Price: Product of Annual Workload * Modified FSS Price | Savings: EXTENDED Modified FSS Price less Extended BPA Price |
| VA XYZ | Model | Model | 2000 | $ 1.75 | $ 3,500 | $ 1.24 | $ 1.24 | $ 2,480.00 | $ (1,020.00) |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| COLUMN E- PRICE WILL BE THE SAME FOR ALL SITES INCLUDED IN THIS AGREEMENT |
| Other Reagent Pricing included in agreement priced by the box | |||||||
| Special Coag Factor | BPA Box Price | FSS Box Price | Savings | ||||
| Col C less Col B | Estimated Annual Qty | Estimated Annual Expense | |||||
| Identify Coag Factor | 600 | 675 | 75 | 12 | 7200 | Indicate Total Number of Additional Attachment Cs Included: | |
| Yes, One Additional |
&"-,Bold"BPA Estimated Savings from FSS Contract Attachment D
Revision: 18 November 2013 Page &P of &N
D2- Contractor to complete Contractor Name: 0 FSS Number: 0
| Base year | Pricing Option Year 1 | Pricing Option Year 2 | ||||||||||||
| FACILITY | Annual Workload (total for Primary and Back Up) | BPA Price Base year | Special Coag Rgt Estimated Expense | Total | FACILITY | Annual Workload (total for Primary and Back Up) | BPA Price Option year 1 | Special Coag Rgt Estimated Expense | Total | FACILITY | Annual Workload (total for Primary and Back Up) | BPA Price Option year 2 | Special Coag Rgt Estimated Expense | Total |
| VA XYZ | 2000 | $ 1.75 | $ 7,500.00 | $ 11,000.00 | VA XYZ | 2000 | $ 1.75 | $ 7,500.00 | $ 11,000.00 | VA XYZ | 2000 | $ 1.75 | $ 7,500.00 | $ 11,000.00 |
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Annual Expense | $ - 0 | Annual Expense | $ - 0 | Annual Expense | $ - 0 |
Indicate Total Number of Additional Attachment Ds Included: No Additional Attachments
Contractor Name: 0 FSS Number: 0
| Pricing Option Year 3 | Pricing Option Year 4 | ||||||||
| FACILITY | Annual Workload (total for Primary and Back Up) | BPA Price Option year 3 | Special Coag Rgt Estimated Expense | Total | FACILITY | Annual Workload (total for Primary and Back Up) | BPA Price Option year 4 | Special Coag Rgt Estimated Expense | Total |
| VA XYZ | 2000 | $ 1.75 | $ 7,500.00 | $ 11,000.00 | VA XYZ | 2000 | $ 1.75 | $ 7,500.00 | $ 11,000.00 |
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | ||||||||
| Annual Expense | $ - 0 | Annual Expense | $ - 0 |
&"-,Bold"Pricing Sheet Attachment E
Revision: 18 November 2013 Page &P of &N
Data Inputs
| Yes | Data Innovations | Required | 8x5 | 1 | 0 | No Additional Attachments |
| No | Dawning | N/A | 8x7 | 2 | 1 | Yes, One Additional |
| 24x7 | 3 | 2 | Yes, Two Additional | |||
| 4 | Yes, Three Additional | |||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| PCOE | ||||||
| PCAC | ||||||
| SAOW | ||||||
| SAOE | ||||||
| SAOC |
File details come from the government source that posted it. Updated .