This is Amendment 01 to Request for Proposal (RFP) 26.200300-020-020 issued by the Virginia Commercial Space Flight Authority (VCSFA) for the Launch Team Maintenance Facility Design-Build project. The project involves the full design and construction of approximately 22,000 square feet of interior renovation within an existing commercial/industrial building located at 13249 Lankford Highway, Mappsville, Virginia 23407. The facility will support aerospace technicians and Operations and Maintenance engineers while providing updated restrooms and general office spaces to accommodate approximately 70 personnel. A mandatory site visit was held prior to this amendment, with an attendance sheet provided as an attachment. All proposals must be submitted via email to solicitations@vaspace.org by April 1, 2026, at 4:00 p.m. EST. Offerors must acknowledge receipt of this amendment by signing and returning a copy with their proposal or, if a response was previously submitted, by submitting a signed acknowledgment prior to the deadline.
Amendment 01 addresses eleven vendor questions and provides clarifications on project scope, including confirmation that uneven concrete surfaces must be ground down and evened, existing trenches shall remain with grates replaced and cleaned, no additional site visits will be provided beyond the mandatory visit, and the project is state-funded but does not require approval from the Virginia Department of General Services' Division of Engineering and Buildings. Key scope clarifications include that ceiling liner panels will remain but must be painted and repaired as needed by the contractor, new roof penetrations are the contractor's responsibility while existing penetration removal is excluded, and a tank near the new loading dock must be removed. The amendment confirms that rubber base flooring is required as specified despite existing integral cove base in some areas, and notes that sprinkler requirements will be determined by the Engineer of Record based on the facility's mixed-use designation of office and general warehouse space.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VCSFA RFP 26.200300-020-020_LTMF Design Build.pdf | ||
| VCSFA RFP 26.200300-020-020_Amendment02.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VIRGINIA COMMERCIAL SPACE FLIGHT AUTHORITY
REQUEST FOR PROPOSAL (RFP) AMENDMENT
RFP 26.200300-020-020
Launch Team Maintenance Facility Design-Build
Amendment 01
Issue Date:
Subject:
Reference:
3/13/2026
Request for Proposal (RFP) Amendment 01
Launch Team Maintenance Facility Design-Build
Issuing Organization: Virginia Commercial Space Flight Authority 101 West Main Street, Suite 602 Norfolk, VA 23510
Location of Work: Mappsville Facility 13249 Lankford Hwy, Mappsville, VA 23407
This document shall serve as official notice of amendment to above Reference. Such notice is being provided to all offerors to which the original solicitation was sent. Offerors submitting a proposal response shall acknowledge receipt of this solicitation amendment prior to the hour and date specified herein as follows: sign and return a copy of this amendment with the solicitation response being submitted, or, if the offeror has already submitted a response and desires not to change their proposal, submit this acknowledgement signed and return prior to the solicitation deadline. If the Offeror has already submitted a response, the response may be withdrawn, revised and re-submitted if the supplier chooses. Any re-submitted response shall be accompanied by signed acknowledgment of this amendment. All amendment acknowledgments sent separately or with a revised proposal shall have the solicitation number in the subject line of the email.
All proposals shall be emailed to solicitations@vaspace.org on or before the final deadline of 4/01/2026 4:00 p.m.
EST.
The purpose of Amendment 01 is as follows:
1. To answer vendor questions and provide the Attendance Sheet from the Mandatory Site Visit, attached.
All terms and conditions remain unchanged.
Name and Address of Offeror: ________________________________________________________________
Authorized Signature/Title Date Printed Name
Email Phone Number mailto:solicitations@vaspace.org
VIRGINIA COMMERCIAL SPACE FLIGHT AUTHORITY
REQUEST FOR PROPOSAL (RFP) AMENDMENT
RFP 26.200300-020-020
Amendment 01
Questions and VCSFA Responses
1. Will there be an opportunity for sub-tier vendors to visit the site?
VCSFA: No additional site visits will be provided. Vendors may submit requests for pictures of areas or other questions to gain information about site conditions.
2. For the areas of uneven concrete, will the contractor be required to ground down and even them?
VCSFA: Yes. See Sheet AD100 and AD101.
3. Are the trenches staying or will the contractor remove them?
VCSFA: Trenches to remain. Contractor shall replace grates and perform general cleaning of trenches. See Sheet A100.
4. Is this project state-funded, and will it require approval from Virginia DEB?
VCSFA: This project is state-funded but will not require review or approval from the Virginia Department of General Services' Division of Engineering and Buildings (DEB).
5. The flooring specs include a rubber base, but some existing floor has an integral cove base – is rubber still required?
VCSFA: Yes, include rubber base as specified.
6. Will liner panels be removed?
VCSFA: No. Ceiling liner panels will remain, and Contractor is required to paint them.
7. Will damaged portions of liner panels need to be repaired?
VCSFA: Yes, repairing and/or replacing damaged liner panels will be the responsibility of the Contractor.
8. Are roof penetrations part of this scope?
VCSFA: Existing penetration removal/repair is excluded from this scope of work, but the contractor shall be responsible for any new roof penetrations as required to accomplish the scope of work outlined in this RFP.
9. Can the contractor use rooftop units for HVAC?
VCSFA: Offerors may suggest this approach in their proposals and discuss the benefits of such a methodology.
The Contractor would be responsible for all design associated with this approach under the contract.
10. Will there be a requirement for sprinklers in this area?
VCSFA: This shall be determined by the Engineer of Record or delegated design engineer based on VCSFA’s intended utilziation of this space as mixed use of office and general warehouse.
11. Will the tank located near the new loading dock need to be removed?
VCSFA: Yes, the tank is included as part of the equipment identified for demo on Sheet AD-101
ATTACHMENTS
1. Site Visit Attendance Sheet
| 1. VCSFA RFP 26.200300-020-020_Amendment01 |
| Site Visit Attendance |