VAWO OPC_Specs_Vol2of3_221012.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25723B0008
About this file
This document provides specifications for ceramic/porcelain tiling work for a Consolidate Outpatient Clinic project. It requires the installation of interior porcelain tile, terrazzo divider strips, waterproofing membranes, crack isolation membranes, and tile backer boards. Materials must meet standards for abrasion resistance, slip resistance, factory blending, and temporary protective coatings. It specifies requirements for trim shapes, backer units, fasteners, setting materials, grouting materials, patching compounds, cleaning compounds, and polyethylene sheeting. It also provides detailed instructions for surface preparation, installation of cementitious backer units, metal divider strips, general tilework, and identifies applicable industry standards for the work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% SPECIFICATIONS
VOLUME 2 OF 3
CONSOLIDATE OUTPATIENT CLINIC BLDG 1
CENTRAL TEXAS VA HEALTH CARE SYSTEM
WACO, TX
US Department of Veterans Affairs Project No.: 674A4-20-102 Fiscal Year: 2021 Contract No.: 36C25720D0060 Task Order No.: 36C25721N0257
16 SEPTEMBER 2022
James E. Lyles, Jr., P.E.
Project Manager
Charles Craig Bond, P.E.
Civil
Thomas R. McCarty, A.I.A.
Architect
Renate’ L. Woods, P.E.
Structural
Milad Majdi, P.E.
Mechanical
Michael J. Senuta, P.E.
Plumbing
Michael Swahn, P.E.
Fire Protection/Alarm
Larry R. LaMette, Jr., P.E.
Electrical / Telecommunications
09-16-22
09-16-22
M.Majdi 09/16/2022
9/16/2022
Waco - Bldg 01 Finals
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
ISSUE FOR BID
16 SEP 2022
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS – VOLUME 1 OF 3
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS – VOLUME 1 OF 3
01 00 00 General Requirements 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13
DIVISION 02 – EXISTING CONDITIONS – VOLUME 1 OF 3
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE – VOLUME 1 OF 3
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY – VOLUME 1 OF 3
04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS – VOLUME 1 OF 3
05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 02-16 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES –
VOLUME 1 OF 3
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL & MOISTURE PROTECTION –
VOLUME 1 OF 3
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 10-2
07 11 13 Bituminous Dampproofing 02-16 07 12 00 Built-Up Bituminous Waterproofing 09-11 07 18 13 Pedestrian Traffic Coatings 05-15 07 21 13 Thermal Insulation 10-17 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17
DIVISION 08 – OPENINGS – VOLUME 1 OF 3
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 33 13 Coiling Counter Doors 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 51 13 Aluminum Windows 04-20 08 71 00 Door Hardware 04-20 08 71 13 Automatic Door Operators 02-16 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15
DIVISION 09 – FINISHES – VOLUME 2 OF 3
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 07-14 09 68 00 Carpeting 10-15 09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES – VOLUME 2 OF 3
10 11 13 Chalkboards and Markerboards 10-15 10 13 00 Directories 05-15 10 14 00 Signage 10-15 10 21 13 Toilet Compartments 12-15 10 21 23 Cubicle Curtain Tracks 05-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 12 – FURNISHINGS – VOLUME 2 OF 3
12 24 00 Window Shades 08-17
674A4-20-102
00 01 10-3
DIVISION 14– CONVEYING EQUIPEMENT – VOLUME 2 OF 3
DIVISION 21- FIRE SUPPRESSION – VOLUME 2 OF 3
21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15 21 30 13 Electric-Driven, Fire Pumps 05-15
DIVISION 22 – PLUMBING – VOLUME 2 OF 3
22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 11-19 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 29 Sump Pumps 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC) – VOLUME 3 OF 3
23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 11 23 Facility Natural-Gas Piping 04-20 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 23 Computer-Room Air-Conditioners 03-20 23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION - VOLUME 3 OF 3
25 10 10 Advanced Utility Metering System 02-10
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 10-4
DIVISION 26 – ELECTRICAL - VOLUME 3 OF 3
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 09 23 Lighting Controls 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 24 19 Motor Control Centers 01-18 26 25 11 Busways 01-17 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 36 23 Automatic Transfer Switches 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS - VOLUME 3 OF 3
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY –
VOLUME 3 OF 3
28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK - VOLUME 3 OF 3
31 20 11 Earthwork (Short Form) 10-12 31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS - VOLUME 3 OF 3
32 17 23 Pavement Markings 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES - VOLUME 3 OF 3
33 40 00 Storm Sewer Utilities 12-17
674A4-20-102
00 01 10-5
674A4-20-102
01-01-21
09 05 16 - 1
SECTION 09 05 16
SUBSURFACE PREPARATION FOR FLOOR FINISHES
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies subsurface preparation requirements for areas to B. receive the installation of applied and resinous flooring. This section includes testing concrete for moisture and pH, remedial floor coating for concrete floor slabs having unsatisfactory moisture or pH conditions, floor leveling and repair as required.
1.2 RELATED WORK
A. Section 07 92 00, JOINT SEALANTS.
B. Section 09 65 16, RESILIENT SHEET FLOORING; Section 09 65 19, RESILIENT
TILE FLOORING; Section 09 67 23.50, RESINOUS (Epoxy Terrazzo) FLOORING
(RES-5); Section 09 68 00, CARPETING
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and TEST DATA.
B. Written approval confirming product compatibility with subfloor material manufacturer and the flooring manufacturer
C. Product Data:
1. Moisture remediation system
2. Underlayment Primer
3. Cementitious Self-Leveling Underlayment
4. Cementitious Trowel-Applied Underlayment (Not suitable for resinous floor finishes)
D. Test Data:
1. Moisture test and pH results performed by a qualified independent testing agency or warranty holding manufacturer’s technical representative.
1.4 DELIVERY AND STORAGE
A. Deliver materials in containers with labels legible and intact and grade-seals unbroken.
B. Store material to prevent damage or contamination.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 05 16 - 2
B. ASTM International(ASTM):
D638-14(2014)...........Standard Test Method for Tensile Properties of
Plastics
D4259-18(2019)..........Standard Practice for Preparation of Concrete by Abrasion Prior to Coating Application.
C109/C109M-20b(2020)....Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or
[50-mm] Cube Specimens
7234-19(2020)...........Standard Test Method for Pull-Off Adhesion
Strength of Coatings on Concrete Using Portable
Pull-Off Adhesion Testers
E96/E96M-16(2016).......Standard Test Methods for Water Vapor
Transmission of Materials
F710-1e1(2020)..........Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
F1869-16a...............Standard Test Method for Measuring Moisture
Vapor Emission Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride
F2170-19a(2020).........Standard Test Method for Determining Relative
Humidity in Concrete Floor Slabs Using in situ
Probes
C348-20(2020)...........Standard Test Method for Flexural Strength of
Hydraulic-Cement Mortars
C191-19(2020)...........Standard Test Method for Time of Setting of
Hydraulic Cement by Vicat Needle
PART 2 - PRODUCTS
2.1 MOISTURE REMEDIATION COATING
A. System Descriptions:
1. High-solids, epoxy system designed to suppress excess moisture in concrete prior to an overlayment. For use under resinous products, VCT, tile and carpet where issues caused by moisture vapor are a concern.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up.
C. System Components: Verify specific requirements as systems vary by manufacturer. Verify build up layers and installation method. Verify
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 05 16 - 3 compatibility with substrate. Use manufacturer’s standard components, compatible with each other and as follows:
1. Liquid applied coating:
a. Resin: epoxy.
b. Formulation Description: Multiple component high solids.
c. Application: Per manufacturer’s written installation requirements.
d. Thickness: minimum 10 mils D. Material Vapor Permeance: Application shall achieve a permeance rating of less than 0.1 perm in accordance with ASTM E96/E96M.
E. Maximum RH requirement: 100% testing in accordance with ASTM F2170.
Property Test Value
Tensile Strength
ASTM D638 4,400 psi
Volatile Organic Compound
Limits (V.O.C.)
SCAMD Rule 1113 (Ammended 02/05/2016)
25 grams per liter
Permeance ASTM E96 0.1 perms
Tensile Modulus ASTM D638 1.9X105 psi
Percent Elongation ASTM D638 12%
Cure Rate Per manufacture’s Data
4 hours Tack free with 24hr recoat window
Bond Strength ASTM D7234 100% bond to concrete failure
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 05 16 - 4
2.2 CEMENTITIOUS SELF-LEVELING UNDERLAYMENT
A. System Descriptions:
1. High performance self-leveling underlayment resurfacer. Single component, self-leveling, cementitious material designed for easy application as an underlayment for all types of flooring materials.
It is used for substrate repair and leveling.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up. Gypsum-based products are unacceptable.
C. System Characteristics:
1. Wearing Surface: smooth
2. Thickness: Per architectural drawings, ranging from feathered edge to 1”, per application. Applications greater than 1” require additional 3/8” aggregate to mix or as recommended by manufacturer.
D. Underlayment shall be calcium aluminate cement-based, containing Portland cement. Gypsum-based products are unacceptable.
E. Compressive Strength: Minimum 4100 psi in 28 days in accordance with
ASTM C109/C109M.
F. Flexural Strength: Minimum 1000 psi in 28 days in accordance with ASTM C348
G. Dry Time: Underlayment shall receive the application of moisture insensitive tile in 6 hours, floor coverings in 16 hours, and resinous flooring in 3-7 days.
H. Primer: compatible and as recommended by manufacturer for use over intended substrate
I. System Components: Manufacturer's standard components that are compatible with each other and as follows:
1. Primer:
a. Resin: copolymer
b. Formulation Description: single component ready to use.
c. Application Method: Squeegee and medium nap roller.
d. All puddles shall be removed, and material shall be allowed to dry, 1-2 hours at 70F/21C.
e. Number of Coats: (1) one.
2. Grout Resurfacing Base:
a. Formulation Description: Single component, cementitious self-leveling high-early and high-ultimate strength grout.
b. Application Method: colloidal mix pump, cam rake, spike roll.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 05 16 - 5
1) Thickness of Coats: Per architectural scope, 1” lifts.
2) Number of Coats: More than one if needed.
c. Aggregates: for applications greater than 1inch, require additional 3/8” aggregate to mix.
J.
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS
A. Maintain ambient temperature of work areas at not less than 16 degree C
(60 degrees F), without interruption, for not less than 24 hours before testing and not less than three days after testing.
B. Maintain higher temperatures for a longer period of time where required by manufacturer's recommendation.
C. Do not install materials when the temperatures of the substrate or materials are not within 60-85 degrees F/ 16-30 degrees C.
3.2 SURFACE PREPARATION
A. Concrete shall meet the requirements of ASTM F710 and be sound, solid, clean, and free of all oil, grease, dirt, curing compounds, and any substance that might act as a bond-breaker before application. As required prepare slab by mechanical methods. No chemicals or solvents shall be used.
B. General: Prepare and clean substrates according to flooring manufacturer's written instructions for substrate indicated.
C. Prepare concrete substrates per ASTM D4259 as follows:
1. Dry abrasive blasting.
2. Wet abrasive blasting.
3. Vacuum-assisted abrasive blasting.
4. Centrifugal-shot abrasive blasting.
5. Comply with manufacturer's written instructions.
D. Repair damaged and deteriorated concrete according to flooring manufacturer's written recommendations.
E. Verify that concrete substrates are dry.
Property Test Value
Compressive Strength
ASTM C109/C109M
2,200 psi @ 24 hrs
3,000 psi @ 7 days
Initial set time
Final Set time
ASTM C191
30-45 min.
1 to 1.5 hours
Bond Strength ASTM D7234 100% bond to concrete failure
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 05 16 - 6
F. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application only after substrates have maximum moisture-vapor-emission rate of per flooring manufactures formal and project specific written recommendation.
G. Perform in situ probe test, ASTM F2170. Proceed with application only after substrates do not exceed a maximum potential equilibrium relative humidity per flooring manufacture’s formal and project specific written recommendation.
H. Provide a written report showing test placement and results.
I. Prepare joints in accordance with Section 07 92 00, JOINT SEALANTS and material manufacturer’s instructions.
J. Alkalinity: Measure surface pH in accordance with procedures provided in ASTM F710 or as outlined by qualified testing agency or flooring manufacturer’s technical representative.
K. Tolerances: Subsurface shall meet the flatness and levelness tolerance specified on drawings or recommended by the floor finish manufacturer.
Tolerance shall also not to exceed 1/4” deviation in 10’. As required, install underlayment to achieve required tolerance.
L. Other Subsurface: For all other subsurface conditions, such as wood or metal, contact the floor finish or underlayment manufacturer, as appropriate, for proper preparation practices.
3.3 MOISTURE REMEDIATION COATING
A. Where results of relative humidity testing (ASTM F2170) exceed the requirements of the specified flooring manufacturer, apply remedial coating as specified to correct excessive moisture condition.
B. Prior to remedial floor coating installation mechanically prepare the concrete surface to provide a concrete surface profile in accordance with ASTM D4259.
C. Mix and apply moisture remediation coating in accordance with manufacturer’s instructions.
3.4 CEMENTITOUS UNDERLAYMENT
A. Install cementitious self-leveling underlayment as required to correct surface defects, floor flatness or levelness corrections to meet the tolerance requirements as or detailed on drawings, address non-moving cracks or joints, provide a smooth surface for the installation of floor covering, or meet elevation requirements detailed on drawings.
B. Mix and apply in accordance with manufacturer's instructions.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 05 16 - 7
3.5 PROTECTION
A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, tempered hardwood, or other suitable protection course
3.6 FIELD QUALITY CONTROL
A. Where specified, field sampling of products shall be conducted by a qualified, independent testing facility.
- - - E N D - - -
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - i
SECTION 09 06 00
SCHEDULE FOR FINISHES
SECTION 09 06 00-SCHEDULE FOR FINISHES
VAMC: VA Central Texas Health System
Consolidate Outpatient Clinic
Location: Waco, TX
Project no. and Name:
Submission
Date:
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - ii
674A4-20-102
09 06 00 - 1
SECTION 09 06 00
SCHEDULE FOR FINISHES
A. This section contains a coordinated system in which requirements for materials specified in other sections shown are identified by abbreviated material names and finish codes in the room finish schedule or shown for other locations.
1.2 MANUFACTURERS
A. Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturer’s equivalent to colors, finishes, textures and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer for finish requirements.
1.3 SUBMITALS
A. Submit in accordance with SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES provide quadruplicate samples for color approval of materials and finishes specified in this section.
1. DIGITAL COLOR PHOTOS-INTERIOR VIEWS:
Room Number and Name Item/View to be Photographed
674A4-20-102
09 06 00 - 2
1.4 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
B. MASTER PAINTING INSTITUTE: (MPI)
6/1/2019................Architectural Painting Specification Manual
PART 2 - PRODUCTS
2.1 DIGITAL COLOR PHOTOS
A. Size 24 x 35 mm.
B. Labeled for:
1. Building name and Number.
2. Room Name and Number.
2.2 DIVISION 31 - EARTHWORK
A. SECTION 32 17 23, PAVEMENT MARKINGS.
Color Manufacturer MFG. Color Name/No.
Yellow
White
B. BOLLARDS (ORNAMENTAL)
Material Finish Style Name/ No. Manufacturer Mfg. Color Name/No.
Precast concrete
Stone
674A4-20-102
09 06 00 - 3
C. SITE AND STREET FURNISHINGS
Item Style Name/No. Finish Manufacture Mfg. Color Name/No.
Benches
Trash Receptacles
Ash Receptacles
2.3 DIVISION 03 – CONCRETE
A. SECTION 03 30 00, CAST IN PLACE CONCRETE // SECTION 03 30 53, (SHORT FORM) CAST-IN-PLACE CONCRETE //
Surface Finish Description
B. SECTION 03 45 00, PRECAST ARCHITECTURAL CONCRETE
Finish Color Texture Finish Manufacturer Mfg. Color
2.4 DIVISON 04 – MASONRY
A. Section 04 05 13, MASONRY MORTARING and Section 04 05 16, MASONRY GROUTING
Finish Code Manufacturer Mfg. Color Name
674A4-20-102
09 06 00 - 4
B. Section 04 20 00, UNIT MASONRY
1. FACE BRICK (FB)
Finish Code Size Pattern Manufacturer Mfg. Color
2. CONCRETE MASONRY UNIT (CMU)
Type Size Pattern Finish Mfg. Color Name/No.
CMU Standard
Glazed Face
Sound Absorbing
Split Rib
Ground Face
C. UNIT MASONRY (04 20 00)
Stone Type Color Manufacturer Mfg. Color & Texture No.
674A4-20-102
09 06 00 - 5
D. STONE MASONRY
Material Size Color, Texture, Finish, Grain
Pattern Stone Source
E. STONE FACING
Name of Stone Color, Texture, Finish Stone Source
2.5 DIVISION 05 – METALS
A. SECTION 05 12 00, STRUCTURAL STEEL FRAMING
Component Finish Color
B. SECTION 05 21 00, STEEL JOIST FRAMING
Finish Color
C. SECTION 05 50 00, METAL FABRICATIONS
Item Finish
Steel Grating and Frames
Aluminum Gratings and Frames
Steel Plank Gratings
Cast Iron Gratings
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - 6
Loose Lintels
Steel Ladders
Aluminum Ladders
Steel Ladder Rungs
Steel Pipe Railings and Gates (not on Steel Stairs)
Aluminum Railings
Stainless Steel Railings
Ornamental Railings
Screened Access Door and Frame
Steel Counter or Bench Top Frame and Legs.
D. SECTION 05 51 00, METAL STAIRS
Component Finish Color
Newel Posts
Guard Rails
Handrails
Stringers
Risers
Underside
2.6 DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
A. SECTION 06 10 00, ROUGH CARPENTRY
Item Finish Color
674A4-20-102
09 06 00 - 7
B. SECTION 06 20 00, FINISH CARPENTRY
1. RECEPTION COUNTER PUBLIC OR PATIENT SIDE
Room No.
and Name
Component Material Species Finish Color
Countertop Solid Polymer LG Hi-Macs Maui Quartz G223R
Staron Tempest Radiance (Shimmer)
Vertical Surface(s)
Plastic Laminate
Midmark Path
Trim
Reveal
Base
2. RECEPTION COUNTER STAFF SIDE
Room No. and Name Component Material Finish Color
Task Surface
Vertical Surface
Tackable Wall Covering
Shelving
Drawers
Misc. Items
674A4-20-102
09 06 00 - 8
3. MOUNTING STRIPS, SHELVES AND RODS
Room No. and Name Component Finish/Color
Strips
Shelf
Rod
4. VANITIES (TYPES S4, S4 M)
Countertop
5. FOLDING SHELVES (TYPE B OR A)
Wood Strips
Shelf
6. THROUGH – WALL COUNTER OR PASS THROUGH COUNTER (TYPE B)
Wood Edge
Brackets
674A4-20-102
09 06 00 - 9
7. DISPLAY CABINET (TYPE 25)
Room No. and Name Component Finish
Back
Sides
Shelves
Trim
Doors
Base
2.7 DIVISION 07 - THERMAL AND MOISTURE PROTECTION
A. SECTION 07 18 13, PEDESTRIAN TRAFFIC COATINGS
Finish Manufacturer Mfg. Color Name/No.
B. SECTION 07 92 00, JOINT SEALANTS
Location Color Manufacturer Manufacturer Color
Masonry Expansion Joints
CMU Control Joints
New to Existing Walls
Masonry Sealed Joints
Stone Sealed Joints
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - 10
2.8 DIVISION 08 - OPENINGS
A. SECTION 08 11 13, HOLLOW METAL DOORS AND FRAMES
1. Paint both sides of door and frames same color including ferrous metal louvers, and hardware attached to door
Component Color of Paint Type and Gloss
Door Sherwin Williams Balanced Beige SW 7037
Frame Sherwin Williams Balanced Beige SW 7037
Window frame
SECTION 08 14 00, INTERIOR WOOD DOORS
Component Finish/Color
Doors Acrovyn door cladding in Amber Cherry 373
Frames Sherwin Williams Balanced Beige SW 7037
B. SECTION 08 31 13, ACCESS DOORS AND FRAMES
Material Finish/Color
Steel
Stainless steel
C. SECTION 08 33 13, COILING COUNTER DOORS
Location Material Finish Manufacturer Manufacturer Color
674A4-20-102
09 06 00 - 11
D. SECTION 08 41 13, ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
Material Finish Manufacturer Manufacturer Color Name/No.
Aluminum
Glass
E. SECTION 08 51 13, ALUMINUM WINDOWS
Type Finish Glazing Manufacturer Mfg. Color Name/No.
Hung
Casement
Projected
Dual Horizontal Sliding
Single Horizontal Sliding
Fixed
F. SECTION 08 51 13.11, SIDE-HINGED ALUMINUM WINDOWS
Finish Ext. Glazing Blind color Int. Glazing Manufacturer Mfg. Color Name/No.
674A4-20-102
09 06 00 - 12
G. SECTION 08 71 00, BUILDERS HARDWARE
Item Material Finish
Hinges
Door Closers
Floor Closers
Floor Pivot Sets
Closer/ Holder
Floor Stops
Door Holders
Lock/ Latches
Key Cabinet Steel
Armor Plates Metal Plastic
Kick Mop Plates Metal
Plastic
Door Edging
Exit Device
Flush Bolts
Door Pulls
Push Plates
Combination Push Pull Plate
Coordinators
Light Proof Seals
Weather Strip
Threshold
674A4-20-102
09 06 00 - 13
H. SECTION 08 80 00, GLAZING
Glazing Type Manufacturer Mfg. Color Name/No.
G-6
G-7
G-8
G-9
G-10
G-11
G-12
G-13
G-14
G-15
G-16
G-17
2.9 DIVISION 09 - FINISHES
A. SECTION 09 24 00, PORTLAND CEMENT PLASTERING
Finish code Integral Color Manufacturer Mfg. Color Name/No.
674A4-20-102
09 06 00 - 14
B. SECTION 09 30 13, CERAMIC/PORCELAIN TILING
1. SECTION 09 30 13, CERAMIC/PORCELAIN TILING
Finish ode Manufacturer Mfg. Color Name/No
2. SECTION 09 30 13, [CERAMIC/PORCELAIN TILING] METAL DIVIDER STRIPS
Size Material Manufacturer
C. SECTION 09 51 00, ACOUSTICAL CEILINGS
Finish Code Component Color Pattern Manufacturer Mfg Name/No.
Exposed Suspension System
Blizzard White Armstrong
Type III
Type III A
Type V
Type VI
Type VII
Type XX A
Type XX B
Type XII White Armstrong 3314
674A4-20-102
09 06 00 - 15
D. SECTION 09 65 19, RESILIENT TILE FLOORING
Finish Code Size Material/Component Manufacturer Mfg Name/No.
VCT
R
RT
E. SECTION 09 65 16, [ RESILIENT SHEET FLOORING], HEAT WELDED SEAMS (WSF)
Finish Code Pattern name Manufacturer Mfg. Color Name/No.
F. SECTION 09 65 13, RESILIENT BASE AND ACCESSORIES
Finish Code Item Height Manufacturer Mfg Name/No.
Rubber Base (RB)
Vinyl Base (VB)
Resilient Stair Treads (RST)
Sheet Rubber Flooring (SRF)
G. SECTION 09 68 00, [CARPETING], CARPET MODULES (CFT)
Finish Code Size Pattern direction Manufacturer Mfg. Color Name/No.
674A4-20-102
09 06 00 - 16
H. SECTION 09 67 23.50, RESINOUS TERRAZO FLOORING(RES-5)
Finish code Manufacturer Mfg. Color Name/No.
I. SECTION 09 91 00, PAINTING
1. MPI Gloss and Sheen Standards Gloss @60 Sheen @85
Gloss Level 1 a traditional matte finish-flat max 5 units, and max 10 units
Gloss Level 2 a high side sheen flat-“a velvet-like” max 10 units, and finish 10-35 units
Gloss Level 3 a traditional “egg-shell like” finish 10-25 units, and 10-35 units
Gloss Level 4 a “satin-like” finish 20-35 units, and min. 35 units
Gloss Level 5 a traditional semi-gloss 35-70 units
Gloss Level 6a traditional gloss 70-85 units
Gloss level 7 a high gloss more than 85 units
2. Paint code Gloss Manufacturer Mfg. Color Name/No.
P
P
P
P
P
P
P
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - 17
P
P
P
P
P
P
P
P
P
P
P
P
P
3. Stain Code (S) Gloss and Transparency Manufacturer Mfg. Color Name/No.
Semi
S
S
S
S
S Opaque
S
S
S
S
4. Clear coatings Code(CC)
Gloss Manufacturer Mfg. Color Name/No.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - 18
CC
CC
2.10 DIVISION 10 - SPECIALTIES
A. SECTION 10 11 13, CHALKBOARDS AND MARKERBOARDS / SECTION 10 11 23, TACKBOARDS
Room No. and Name
Component Material Manufacturer Mfg. Color Name/No.
B. SECTION 10 21 23, CUBICLE CURTAIN TRACKS
Finish Code Manufacturer Mfg. Color Name/No.
Track - Inpro Whisper Cube Cubicle Track CE9000
White PVC Vinyl
Wand – ICP Medical Rapid Refresh Curtain System
C. SECTION 08 90 00, LOUVERS AND VENTS
Item Material Finish Manufacturer Mfg. Color Name/No.
674A4-20-102
09 06 00 - 19
D. SECTION 10 26 00, WALL AND DOOR PROTECTION
Item Material Manufacturer Mfg. Color Name/No.
Corner Guards Acrovyn Construction Specialties Group
Amber Cherry 373
Wall Guards and Handrail Acrovyn HRB-20 Construction Specialties Group
Amber Cherry 373
Wall Guard Acrovyn SSM-20N Construction Specialties Group
Amber Cherry 373
Door Frame Protection
E. SECTION 10 28 00, TOILET, BATH AND LAUNDRY ACCESSORIES / SECTION 10 14 00, SIGNAGE / SECTION 11 17
36, PACKAGE TRANSFER UNITS
Room No. and Name Item Finish Manufacturer Mfg. Color Name/No.
Mop racks
Package Transfer Box
Lobby Clock
F. SECTION 10 13 00, INTERIOR DIRECTORIES / 10 14 00, INTERIOR SIGNAGE
Sign Type Component Manufacturer Mfg. Color Name/No.
674A4-20-102
09 06 00 - 20
G. SECTION 10 44 13, FIRE EXTNGUISHER CABINETS
Component Material Finish
H. SECTION 10 28 00, TOILET, BATH AND LAUNDRY ACCESSORIES
Item Material Manufacturer Mfg. Color Name/No.
2.11 DIVISION 11 – EQUIPMENT
2.12 DIVISION 12- FURNISHINGS
A. SECTION 12 32 00, MANUFACTURED WOOD CASEWORK
Item Type Location Finish/Color
674A4-20-102
09 06 00 - 21
B. SECTION 12 24 00, WINDOW SHADES
Component Material Manufacturer Mfg. Color Name/No.
Shade Cloth Hunter Douglas FR Manual Roller Shades with Fascia
Sheer Weave Infinity 2 Barley, 3% openness
Blackout Fabric – Verona Twilight in Orion
Vertical Blinds
Venetian Blinds
Support Hardware
2.14 DIVISION 14 – CONVEYING EQUIPMENT
A. SECTION 14 21 00, NEW TRACTION ELEVATORS
Elevator Component Material Finish Color
Passenger Elevator No. P
Hoistway Entrance
Hoistway Doors
Corridor Position Indicator and Call
Buttons
Car Canopy Steel
Car Wainscot Stainless Steel
Panels Above Wainscot Plastic Laminate
Car Floor
Car Operating Panel
674A4-20-102
09 06 00 - 22
Freight Elevator No. F
Car Enclosure Steel
Car Floor Steel
Car Gate Wire Mesh
Rubbing Strip Wood
Hoistway Entrances Steel
Hoistway Doors Steel
2.15 DIVISION 22 - PLUMBING
A. SECTION 22 40 00, PLUMBING FIXTURES
Item Color
Water Closet
Urinal
Lavatories
Service Sink Corner
Service Sink
Clinic Service Sink
2.16 DIVISON 26 - ELECTRICAL
A. SECTION 26 51 00, INTERIOR LIGHTING
Fixture Type Exterior Finish Color
674A4-20-102
09 06 00 - 23
B. SECTION 26 56 00, EXTERIOR LIGHTING
Type and Component Exterior Finish Manufacturer Mfg. Name/No.
PART 3 - EXECUTION
3.1 FINISH SCHEDULES & MISCELLANEOUS ABBREVIATIONS
FINISH SCHEDULE & MISCELLANEOUS ABBREVIATIONS
Term Abbreviation
Access Flooring AF
Accordion Folding
Partition
AFP
Acoustical Ceiling AT
Acoustical Ceiling, Special Faced
AT (SP)
Acoustical Metal Pan
Ceiling
AMP
Acoustical Wall Panel AWP
Acoustical Wall
Treatment
AWT
Acoustical Wallcovering AWF
Anodized Aluminum
Colored
AAC
Anodized Aluminum
Natural Finish
AA
Baked On Enamel BE
Brick Face BR
Brick Flooring BF
Brick Paving BP
Carpet CP
Carpet Athletic Flooring CAF
Carpet Module Tile CPT
Ceramic Glazed Facing
Brick
CGFB
Ceramic Mosaic Tile FTCT
Concrete C
Concrete Masonry Unit CMU
Divider Strips Marble DS MB
Epoxy Coating EC
Epoxy Resin Flooring ERF
Existing E
Exposed Divider Strips EXP
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 06 00 - 24
Exterior EXT
Exterior Finish System EFS
Exterior Paint EXT-P
Exterior Stain EXT-ST
Fabric Wallcovering WF
Facing Tile SCT
Feature Strips FS
Floor Mats & Frames FM
Floor Tile, Mosaic FT
Fluorocarbon FC
Folding Panel Partition FP
Foot Grille FG
Glass Masonry Unit GUMU
Glazed Face CMU GCMU
Glazed Structural Facing
Tile
SFTU
Granite GT
Gypsum Wallboard GWB
High Glazed Coating SC
Latex Mastic Flooring LM
Linear Metal Ceiling LMC
Linear Wood Ceiling LWC
Marble MB
Material MAT
Mortar M
Multi-Color Coating MC
Natural Finish NF
Paint P
Paver Tile PVT
Perforated Metal Facing
(Tile or Panels)
PMF
Plaster PL
Plaster High Strength HSPL
Plaster Keene Cement KC
Plastic Laminate HPDL
Polypropylene Fabric
Wallcovering
PFW
Porcelain Paver Tile PPT
Quarry Tile QT
Radiant Ceiling Panel
System
RCP
Resilient Stair Tread RST
Rubber Base RB
Rubber Tile Flooring RT
Spandrel Glass SLG
Stain ST
Stone Flooring SF
Structural Clay SC
Suspension Decorative
Grids
Grids
SDG
Terrazzo Portland Cement PCT
Waco, TX 674A4-20-102
09 06 00 - 25
Terrazzo Tile TT
Terrazzo, Thin Set
Textured Gypsum Ceiling
Panel
TGC
Textured Metal Ceiling
Panel
TMC
Thin set Terrazzo TST
Veneer Plaster VP
Vinyl Base VB
Vinyl Coated Fabric
Wallcovering
W
Vinyl Composition Tile VCT
Vinyl Sheet Flooring VSF
Vinyl Sheet Flooring
(Welded Seams)
WSF
Wall Border WB
Wood WD
3.2 FINSIH SCHEDULE SYMBOLS
Symbol Definition
** Same finish as adjoining walls
- No color required
E Existing
XX To match existing
EFTR Existing finish to remain
RM Remove
--- E N D---
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
06-01-18
09 22 16 - 1
SECTION 09 22 16
NON-STRUCTURAL METAL FRAMING
This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories for the screw attachment of gypsum board, plaster bases or other building boards.
1.2 RELATED WORK
D. Ceiling suspension systems for acoustical tile or panels and lay in gypsum board panels: Section 09 51 00, ACOUSTICAL CEILINGS Section 09
29 00, GYPSUM BOARD.
1.3 TERMINOLOGY
A. Description of terms shall be in accordance with ASTM C754, ASTM C11, ASTM C841 and as specified.
B. Underside of Structure Overhead: In spaces where steel trusses or bar joists are shown, the underside of structure overhead shall be the underside of the floor or roof construction supported by beams, trusses, or bar joists. In interstitial spaces with walk-on floors the underside of the walk-on floor is the underside of structure overhead.
C. Thickness of steel specified is the minimum bare (uncoated) steel thickness.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Studs, runners and accessories.
2. Hanger inserts.
3. Channels (Rolled steel).
4. Furring channels.
5. Screws, clips and other fasteners.
C. Shop Drawings:
1. Typical ceiling suspension system.
2. Typical metal stud and furring construction system including details around openings and corner details.
3. Typical shaft wall assembly
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 2
4. Typical fire rated assembly and column fireproofing showing details of construction same as that used in fire rating test.
D. Test Results: Fire rating test designation, each fire rating required for each assembly.
1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE
In accordance with the requirements of ASTM C754.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society For Testing And Materials (ASTM)
A641-09.................Zinc-Coated (Galvanized) Carbon Steel Wire
A653/653M-11............Specification for Steel Sheet, Zinc Coated
(Galvanized) or Zinc-Iron Alloy-Coated
(Galvannealed) by Hot-Dip Process.
C11-10..................Terminology Relating to Gypsum and Related
Building Materials and Systems
C635-07.................Manufacture, Performance, and Testing of Metal
Suspension System for Acoustical Tile and
Lay-in Panel Ceilings
C636-08.................Installation of Metal Ceiling Suspension
Systems for Acoustical Tile and Lay-in Panels
C645-09.................Non-Structural Steel Framing Members
C754-11.................Installation of Steel Framing Members to
Receive Screw-Attached Gypsum Panel Products
C841-03(R2008)..........Installation of Interior Lathing and Furring
C954-10.................Steel Drill Screws for the Application of
Gypsum Panel Products or Metal Plaster Bases to
Steel Studs from 0.033 in. (0.84 mm) to 0.112
in. (2.84 mm) in Thickness
PART 2 - PRODUCTS
2.1 PROTECTIVE COATING
A. Galvanize steel studs, runners (track), rigid (hat section) furring channels, "Z" shaped furring channels, and resilient furring channels, with coating designation of G40 or equivalent.
2.2 STEEL STUDS AND RUNNERS (TRACK)
A. ASTM C645, modified for thickness specified and sizes as shown.
1. Use C 645 steel, 0.75 mm (0.0296-inch) minimum base-metal (30 mil).
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 3
2. Runners same thickness as studs.
3. Exception: Members that can show certified third party testing with gypsum board in accordance with ICC ES AC86 (Approved May 2012) need not meet the minimum thickness limitation or minimum section properties set forth in ASTM C 645. The submission of an evaluation report is acceptable to show conformance to this requirement. Use C
645 steel, 0.48mm (0.019 inch) minimum base-metal (19 mil).
B. Provide not less than two cutouts in web of each stud, approximately
300 mm (12 inches) from each end, and intermediate cutouts on approximately 600 mm (24-inch) centers.
C. Doubled studs for openings and studs for supporting concrete backer-board.
D. Studs 3600 mm (12 feet) or less in length shall be in one piece.
E. Shaft Wall Framing:
1. Conform to rated wall construction.
2. C-H Studs or C-T Studs.
3. E Studs.
4. J Runners.
5. Steel Jamb-Strut.
2.3 FURRING CHANNELS
A. Rigid furring channels (hat shape): ASTM C645.
B. Resilient furring channels:
1. Not less than 0.45 mm (0.0179-inch) thick bare metal.
2. Semi-hat shape, only one flange for anchorage with channel web leg slotted on anchorage side, channel web leg on other side stiffens fastener surface but shall not contact anchorage surface other channel leg is attached to.
C. Rolled Steel Channels: ASTM C754, cold rolled; or, ASTM C841, cold rolled.
2.4 FASTENERS, CLIPS, AND OTHER METAL ACCESSORIES
A. ASTM C754, except as otherwise specified.
B. For fire rated construction: Type and size same as used in fire rating test.
C. Fasteners for steel studs thicker than 0.84 mm (0.033-inch) thick. Use
ASTM C954 steel drill screws of size and type recommended by the manufacturer of the material being fastened.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 4
D. Clips: ASTM C841 (paragraph 6.11), manufacturer’s standard items.
Clips used in lieu of tie wire shall have holding power equivalent to that provided by the tie wire for the specific application.
E. Concrete ceiling hanger inserts (anchorage for hanger wire and hanger straps): Steel, zinc-coated (galvanized), manufacturers standard items, designed to support twice the hanger loads imposed and the type of hanger used.
F. Tie Wire and Hanger Wire:
1. ASTM A641, soft temper, Class 1 coating.
2. Gage (diameter) as specified in ASTM C754 or ASTM C841.
G. Attachments for Wall Furring:
1. Manufacturers standard items fabricated from zinc-coated
(galvanized) steel sheet.
2. For concrete or masonry walls: Metal slots with adjustable inserts or adjustable wall furring brackets. Spacers may be fabricated from 1 mm (0.0396-inch) thick galvanized steel with corrugated edges.
H. Power Actuated Fasteners: Type and size as recommended by the manufacturer of the material being fastened.
2.5 SUSPENDED CEILING SYSTEM FOR GYPSUM BOARD (OPTION)
A. Conform to ASTM C635, heavy duty, with not less than 35 mm (1-3/8 inch) wide knurled capped flange face designed for screw attachment of gypsum board.
B. Wall track channel with 35 mm (1-3/8 inch) wide flange.
PART 3 - EXECUTION
3.1 INSTALLATION CRITERIA
A. Where fire rated construction is required for walls, partitions, columns, beams and floor-ceiling assemblies, the construction shall be same as that used in fire rating test.
B. Construction requirements for fire rated assemblies and materials shall be as shown and specified, the provisions of the Scope paragraph (1.2) of ASTM C754 and ASTM C841 regarding details of construction shall not apply.
3.2 INSTALLING STUDS
A. Install studs in accordance with ASTM C754, except as otherwise shown or specified.
B. Space studs not more than 610 mm (24 inches) on center.
C. Cut studs 6 mm to 9 mm (1/4 to 3/8-inch) less than floor to underside of structure overhead when extended to underside of structure overhead.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 5
D. Where studs are shown to terminate above suspended ceilings, provide bracing as shown or extend studs to underside of structure overhead.
E. Extend studs to underside of structure overhead for fire, rated partitions, smoke partitions, shafts, and sound rated partitions and insulated exterior wall furring.
F. Openings:
1. Frame jambs of openings in stud partitions and furring with two studs placed back to back or as shown.
2. Fasten back to back studs together with 9 mm (3/8-inch) long Type S pan head screws at not less than 600 mm (two feet) on center, staggered along webs.
3. Studs fastened flange to flange shall have splice plates on both sides approximately 50 X 75 mm (2 by 3 inches) screwed to each stud with two screws in each stud. Locate splice plates at 600 mm (24 inches) on center between runner tracks.
G. Fastening Studs:
1. Fasten studs located adjacent to partition intersections, corners and studs at jambs of openings to flange of runner tracks with two screws through each end of each stud and flange of runner.
2. Do not fasten studs to top runner track when studs extend to underside of structure overhead.
H. Chase Wall Partitions:
1. Locate cross braces for chase wall partitions to permit the installation of pipes, conduits, carriers and similar items.
2. Use studs or runners as cross bracing not less than 63 mm (2-1/2 inches wide).
I. Form building seismic or expansion joints with double studs back to back spaced 75 mm (three inches) apart plus the width of the seismic or expansion joint.
J. Form control joint, with double studs spaced 13 mm (1/2-inch) apart.
3.3 INSTALLING WALL FURRING FOR FINISH APPLIED TO ONE SIDE ONLY
A. In accordance with ASTM C754, or ASTM C841 except as otherwise specified or shown.
B. Wall furring-Stud System:
1. Framed with 63 mm (2-1/2 inch) or narrower studs, 600 mm (24 inches) on center.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 6
2. Brace as specified in ASTM C754 for Wall Furring-Stud System or brace with sections or runners or studs placed horizontally at not less than three foot vertical intervals on side without finish.
3. Securely fasten braces to each stud with two Type S pan head screws at each bearing.
C. Direct attachment to masonry or concrete; rigid channels or "Z" channels:
1. Install rigid (hat section) furring channels at 600 mm (24 inches) on center, horizontally or vertically.
2. Install "Z" furring channels vertically spaced not more than 600 mm
(24 inches) on center.
3. At corners where rigid furring channels are positioned horizontally, provide mitered joints in furring channels.
4. Ends of spliced furring channels shall be nested not less than
200 mm (8 inches).
5. Fasten furring channels to walls with power-actuated drive pins or hardened steel concrete nails. Where channels are spliced, provide two fasteners in each flange.
6. Locate furring channels at interior and exterior corners in accordance with wall finish material manufacturers printed erection instructions. Locate "Z" channels within 100 mm (4 inches) of corner.
D. Installing Wall Furring-Bracket System: Space furring channels not more than 400 mm (16 inches) on center.
3.4 INSTALLING SUPPORTS REQUIRED BY OTHER TRADES
A. Provide for attachment and support of electrical outlets, plumbing, laboratory or heating fixtures, recessed type plumbing fixture accessories, access panel frames, wall bumpers, wood seats, toilet stall partitions, dressing booth partitions, urinal screens, chalkboards, tackboards, wall-hung casework, handrail brackets, recessed fire extinguisher cabinets and other items like auto door buttons and auto door operators supported by stud construction.
B. Provide additional studs where required. Install metal backing plates, or special metal shapes as required, securely fastened to metal studs.
3.5 INSTALLING SHAFT WALL SYSTEM
A. Conform to UL Design No. U438 for two-hour fire rating.
B. Position J runners at floor and ceiling with the short leg toward finish side of wall. Securely attach runners to structural supports
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 7 with power driven fasteners at both ends and 600 mm (24 inches) on center.
C. After liner panels have been erected, cut C-H studs and E studs, from 9 mm (3/8-inch) to not more than 13 mm (1/2-inch) less than floor-to-ceiling height. Install C-H studs between liner panels with liner panels inserted in the groove.
D. Install full-length steel E studs over shaft wall line at intersections, corners, hinged door jambs, columns, and both sides of closure panels.
E. Suitably frame all openings to maintain structural support for wall:
1. Provide necessary liner fillers and shims to conform to label frame requirements.
2. Frame openings cut within a liner panel with E studs around perimeter.
3. Frame openings with vertical E studs at jambs, horizontal J runner at head and sill.
F. Elevator Shafts:
1. Frame elevator door frames with 0.87 mm (0.0341-inch) thick J strut or J stud jambs having 75 mm (three-inch) long legs on the shaft side.
2. Protrusions including fasteners other than flange of shaft wall framing system or offsets from vertical alignments more than 3 mm
(1/8-inch) are not permitted unless shown.
3. Align shaft walls for plumb vertical flush alignment from top to bottom of shaft.
3.6 INSTALLING FURRED AND SUSPENDED CEILINGS OR SOFFITS
A. Install furred and suspended ceilings or soffits in accordance with
ASTM C754 or ASTM C841 except as otherwise specified or shown for screw attached gypsum board ceilings and for plaster ceilings or soffits.
1. Space framing at 400 mm (16-inch) centers for metal lath anchorage.
2. Space framing at 600 mm (24-inch) centers for gypsum board anchorage.
B. Where bar joists or beams are more than 1200 mm (48 inches) apart, provide intermediate hangers so that spacing between supports does not exceed 1200 mm (48 inches). Use clips, bolts, or wire ties for direct attachment to steel framing.
C. Existing concrete construction exposed or concrete on steel decking:
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 22 16 - 8
1. Use power actuated fasteners either eye pin, threaded studs or drive pins for type of hanger attachment required.
2. Install fasteners at approximate mid height of concrete beams or joists. Do not install in bottom of beams or joists.
D. Installing suspended ceiling system for gypsum board (ASTM C635
Option):
1. Install only for ceilings to receive screw attached gypsum board.
2. Install in accordance with ASTM C636.
a. Install main runners spaced 1200 mm (48 inches) on center.
b. Install 1200 mm (four foot) tees not over 600 mm (24 inches) on center; locate for edge support of gypsum board.
c. Install wall track channel at perimeter.
E. Installing Ceiling Bracing System:
1. Construct bracing of 38 mm (1-1/2 inch) channels for lengths up to
2400 mm (8 feet) and 50 mm (2 inch) channels for lengths over 2400 mm (8 feet) with ends bent to form surfaces for anchorage to carrying channels and over head construction. Lap channels not less than 600 mm (2 feet) at midpoint back to back. Screw or bolt lap together with two fasteners.
2. Install bracing at an approximate 45 degree angle to carrying channels and structure overhead; secure as specified to structure overhead with two fasteners and to carrying channels with two fasteners or wire ties.
3.7 TOLERANCES
A. Fastening surface for application of subsequent materials shall not vary more than 3 mm (1/8-inch) from the layout line.
B. Plumb and align vertical members within 3 mm (1/8-inch.)
C. Level or align ceilings within 3 mm (1/8-inch.)
- - - E N D - - -
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
04-01-20
09 29 00 - 1
SECTION 09 29 00
GYPSUM BOARD
A. This section specifies installation and finishing of gypsum board.
1.2 RELATED WORK
A. Installation of steel framing members for walls, partitions, furring, soffits, and ceilings: Section 09 22 16, NON-STRUCTURAL METAL FRAMING.
B. Sound deadening board: Section 07 21 13, THERMAL INSULATION.
C. Acoustical Sealants: Section 07 92 00, JOINT SEALANTS.
D. Lay in gypsum board ceiling panels: Section 09 51 00, ACOUSTICAL
CEILING.
1.3 TERMINOLOGY
A. Definitions and description of terms shall be in accordance with ASTM
C11, C840, and as specified.
B. Underside of Structure Overhead: In spaces where steel trusses or bar joists are shown, the underside of structure overhead shall be the underside of the floor or roof construction supported by the trusses or bar joists.
C. "Yoked": Gypsum board cut out for opening with no joint at the opening
(along door jamb or above the door).
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Cornerbead and edge trim.
2. Finishing materials.
3. Laminating adhesive.
4. Gypsum board, each type.
C. Shop Drawings:
1. Typical gypsum board installation, showing corner details, edge trim details and the like.
2. Typical sound rated assembly, showing treatment at perimeter of partitions and penetrations at gypsum board.
3. Typical shaft wall assembly.
4. Typical fire rated assembly and column fireproofing, indicating details of construction same as that used in fire rating test.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
09 29 00 - 2
D. Samples:
1. Cornerbead.
2. Edge trim.
3. Control joints.
E. Test Results:
1. Fire rating test, each fire rating required for each assembly.
2. Sound rating test.
F. Certificates: Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos material.
1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE
A. In accordance with the requirements of ASTM C840.
1.6 ENVIRONMENTAL CONDITIONS
A. In accordance with the requirements of ASTM C840.
1.7 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society for Testing And Materials (ASTM):
C11-15..................Terminology Relating to Gypsum and Related
Building Materials and Systems
C475-15.................Joint Compound and Joint Tape for Finishing
Gypsum Board
C840-13.................Application and Finishing of Gypsum Board
C919-12.................Sealants in Acoustical Applications
C954-15.................Steel Drill Screws for the Application of
Gypsum Board or Metal Plaster Bases to Steel
Stud from 0.033 in. (0.84mm) to 0.112 in.
(2.84mm) in thickness
C1002-14................Steel Self-Piercing Tapping Screws for the
Application of Gypsum Panel Products or Metal
Plaster Bases to Wood Studs or Steel Studs
C1047-14................Accessories for Gypsum Wallboard and Gypsum
Veneer Base
C1177-13................Glass Mat Gypsum Substrate for Use as Sheathing
C1178/C1178M-18.........Specification for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .