This solicitation is for a construction project to consolidate an outpatient clinic into Building 1 at the Central Texas VA Health Care System in Waco, Texas. Work includes renovations to the basement and first floor as well as new mechanical, electrical and plumbing systems. The solicitation also includes four add alternates to renovate additional floors and complete a new parking lot. Bids are due on September 16th, 2022. The Department of Veterans Affairs Veterans Health Administration is listed as the agency.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% SPECIFICATIONS
VOLUME 1 OF 3
CONSOLIDATE OUTPATIENT CLINIC BLDG 1
CENTRAL TEXAS VA HEALTH CARE SYSTEM
WACO, TX
US Department of Veterans Affairs Project No.: 674A4-20-102 Fiscal Year: 2021 Contract No.: 36C25720D0060 Task Order No.: 36C25721N0257
16 SEPTEMBER 2022
James E. Lyles, Jr., P.E.
Project Manager
Charles Craig Bond, P.E.
Civil
Thomas R. McCarty, A.I.A.
Architect
Renate’ L. Woods, P.E.
Structural
Milad Majdi, P.E.
Mechanical
Michael J. Senuta, P.E.
Plumbing
Michael Swahn, P.E.
Fire Protection/Alarm
Larry R. LaMette, Jr., P.E.
Electrical / Telecommunications phadley Image phadley Image phadley Snapshot phadley Text Box 09-16-22 phadley Snapshot phadley Snapshot phadley Snapshot phadley Snapshot
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS – VOLUME 1 OF 3
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS – VOLUME 1 OF 3
01 00 00 General Requirements 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13
DIVISION 02 – EXISTING CONDITIONS – VOLUME 1 OF 3
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE – VOLUME 1 OF 3
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY – VOLUME 1 OF 3
04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS – VOLUME 1 OF 3
05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 02-16 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES –
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL & MOISTURE PROTECTION –
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
ISSUE FOR BID
16 SEP 2022
00 01 10-2
07 11 13 Bituminous Dampproofing 02-16 07 12 00 Built-Up Bituminous Waterproofing 09-11 07 18 13 Pedestrian Traffic Coatings 05-15 07 21 13 Thermal Insulation 10-17 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17
DIVISION 08 – OPENINGS – VOLUME 1 OF 3
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 33 13 Coiling Counter Doors 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 51 13 Aluminum Windows 04-20 08 71 00 Door Hardware 04-20 08 71 13 Automatic Door Operators 02-16 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15
DIVISION 09 – FINISHES – VOLUME 2 OF 3
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 07-14 09 68 00 Carpeting 10-15 09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES – VOLUME 2 OF 3
10 11 13 Chalkboards and Markerboards 10-15 10 13 00 Directories 05-15 10 14 00 Signage 10-15 10 21 13 Toilet Compartments 12-15 10 21 23 Cubicle Curtain Tracks 05-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 12 – FURNISHINGS – VOLUME 2 OF 3
12 24 00 Window Shades 08-17
674A4-20-102
00 01 10-3
DIVISION 14– CONVEYING EQUIPEMENT – VOLUME 2 OF 3
DIVISION 21- FIRE SUPPRESSION – VOLUME 2 OF 3
21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15 21 30 13 Electric-Driven, Fire Pumps 05-15
DIVISION 22 – PLUMBING – VOLUME 2 OF 3
22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 11-19 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 29 Sump Pumps 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC) – VOLUME 3 OF 3
23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 11 23 Facility Natural-Gas Piping 04-20 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 23 Computer-Room Air-Conditioners 03-20 23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION - VOLUME 3 OF 3
25 10 10 Advanced Utility Metering System 02-10
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 10-4
DIVISION 26 – ELECTRICAL - VOLUME 3 OF 3
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 09 23 Lighting Controls 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 24 19 Motor Control Centers 01-18 26 25 11 Busways 01-17 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 36 23 Automatic Transfer Switches 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS - VOLUME 3 OF 3
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY –
VOLUME 3 OF 3
28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK - VOLUME 3 OF 3
31 20 11 Earthwork (Short Form) 10-12 31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS - VOLUME 3 OF 3
32 17 23 Pavement Markings 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES - VOLUME 3 OF 3
33 40 00 Storm Sewer Utilities 12-17
674A4-20-102
00 01 10-5
674A4-20-102
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
SITE PLANNING
G000a COVER SHEET/SHEET INDEX VOLUME 1 G000b COVER SHEET/SHEET INDEX VOLUME 2
G001 SHEET INDEX
G002 GENERAL INFORMATION
G003 LIFE SAFETY PLANS
G004 LIFE SAFETY DATA
G005 SITE PLAN AND STAGING AREAS
CIVIL
C-001 CIVIL LEGENDS, ABBREVIATIONS & BID ITEM DESCRIPTIONS
CS101 EXISTING FEATURES
CG101 EXISTING GRADING PLAN
CD101 BASE BID DEMOLITION PLAN
CS102 BASE BID GENERAL PROPOSED IMPROVEMENTS PLAN
CS103 BASE BID GEOMETRICS PLAN
CS104 BASE BID GEOMETRICS PLAN
CS105 BASE BID GEOMETRICS PLAN
CS105A BASE BID PROP PAVING LAYOUT
CP101 BASE BID PVMT MARKING PLAN
CG102 BASE BID GENERAL PROPOSED GRADING PLAN
CG103 BASE BID DETAILED PROPOSED GRADING PLAN
CG104 BASE BID DETAILED PROPOSED GRADING PLAN
CG105 BASE BID DETAILED PROPOSED GRADING PLAN
CG106 BASE BID EROSION CONTROL PLAN
LP101 BASE BID RE-SODDING PLAN
CD102 ALTERNATE 3 DEMOLITION PLAN
CS106 ALTERNATE 3 GENERAL PROP IMPROVEMENT PLAN
CS107 ALTERNATE 3 GEOMETRIC PLAN
CS108 ALTERNATE 3 GEOMETRIC PLAN
CS109 ALTERNATE 3 GEOMETRIC PLAN
CS110 ALTERNATE 3 GEOMETRIC PLAN
CS111 ALTERNATE 3 PROP PAVING LAYOUT
CP102 ALTERNATE 3 PVMT MARKING PLAN
CG107 ALTERNATE 3 GENERAL PROP GRADING PLAN
CG108 ALTERNATE 3 DETAILED PROP GRADING PLAN
CG109 ALTERNATE 3 DETAILED PROP GRADING PLAN
CG110 ALTERNATE 3 DETAILED PROP GRADING PLAN
CG111 ALTERNATE 3 DETAILED PROP GRADING PLAN
CG112 ALTERNATE 3 EROSION CONTROL PLAN
LP102 ALTERNATE 3 RE-SODDING PLAN
CP501 PAVING DETAILS
CP502 PAVING DETAILS
CP503 PAVING DETAILS
CU501 STORM DRAINAGE & UTILITY DETAILS
CG501 EROSION CONTROL DETAILS
CG502 EROSION CONTROL DETAILS
CG503 EROSION CONTROL DETAILS
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 15 - 2
CG504 EROSION CONTROL DETAILS
CG505 EROSION CONTROL DETAILS
CG506 EROSION CONTROL DETAILS
CG507 EROSION CONTROL DETAILS
CG508 EROSION CONTROL DETAILS
CG509 EROSION CONTROL DETAILS
STRUCTURAL
S001 GENERAL NOTES
S002 SPECIAL INSPECTIONS
S101 FOUNDATION DETAILS
S201 PARTIAL PLANS
S202 PARTIAL PLANS
S203 PARTIAL PLANS
S204 PARTIAL PLANS
S205 PARTIAL PLANS
S301 FRAMING DETAILS
S302 FRAMING DETAILS
ARCHITECTURAL
AD100 DEMOLITION PLANS
A100 OVERALL FLOOR PLAN - BASEMENT FLOOR
A101 OVERALL FLOOR PLAN - FIRST FLOOR
A102 OVERALL FLOOR PLAN - SECOND FLOOR
A103 OVERALL FLOOR PLAN - THIRD FLOOR
A104 OVERALL FLOOR PLAN - FOURTH FLOOR
A105 OVERALL FLOOR PLAN - FIFTH FLOOR
A106 OVERALL FLOOR PLAN - SIXTH FLOOR
A107 ROOF PLAN
A110A ENLARGED FLOOR PLAN - BASEMENT FLOOR - AREA A
A110B ENLARGED FLOOR PLAN - BASEMENT FLOOR - AREA B
A110C ENLARGED FLOOR PLAN - BASEMENT FLOOR - AREA C
A111A ENLARGED FLOOR PLAN - FIRST FLOOR - AREA A
A111B ENLARGED FLOOR PLAN - FIRST FLOOR - AREA B
A111C ENLARGED FLOOR PLAN - FIRST FLOOR - AREA C
A112A ENLARGED FLOOR PLAN - SECOND FLOOR - AREA A
A112B ENLARGED FLOOR PLAN - SECOND FLOOR - AREA B
A112C ENLARGED FLOOR PLAN - SECOND FLOOR - AREA C
A113A ENLARGED FLOOR PLAN - THIRD FLOOR - AREA A
A113B ENLARGED FLOOR PLAN - THIRD FLOOR - AREA B
A113C ENLARGED FLOOR PLAN - THIRD FLOOR - AREA C
AC100 REFLECTED CEILING PLAN - BASEMENT FLOOR
AC101 REFLECTED CEILING PLAN - FIRST FLOOR
AC102 REFLECTED CEILING PLAN - SECOND FLOOR
AC103 REFLECTED CEILING PLAN - THIRD THROUGH SIXTH FLOOR
A120 FINISH PLAN - BASEMENT FLOOR
A121 FINISH PLAN - FIRST FLOOR
A122 FINISH PLAN - SECOND FLOOR
A123 FINISH PLAN - THIRD FLOOR
A124 SOUND ATTENUATION PLAN - BASEMENT AND FIRST FLOOR
A125 SOUND ATTENUATION PLAN - SECOND AND THIRD FLOOR
A130 EQUIPMENT PLAN - BASEMENT FLOOR
A131 ENLARGED FURNITURE AND EQUIP. PLANS - BASEMENT FLOOR
A132 FURNITURE AND EQUIPMENT PLAN - FIRST FLOOR
A133 ENLARGED EQUIPMENT PLANS - FIRST FLOOR
A134 FURNITURE AND EQUIPMENT PLAN - SECOND FLOOR
A135 FURNITURE AND EQUIPMENT PLAN - THIRD FLOOR
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 15 - 3
A200 EXTERIOR ELEVATIONS
A201 EXTERIOR ELEVATIONS
A202 EXTERIOR ELEVATIONS
A300 BUILDING SECTIONS AND DETAILS
A301 BUILDING SECTIONS
A400 MILLWORK DETAILS
A401 INTERIOR ELEVATIONS - BASEMENT FLOOR
A402 INTERIOR ELEVATIONS
A403 INTERIOR ELEVATIONS, PERSPECTIVES - FIRST FLOOR
A410 ENLARGED PLANS /ACCESSORIES /MOUNTING HEIGHTS
A411 ENLARGED STAIR PLANS AND SECTIONS
A412 ELEVATOR PLANS AND SECTIONS
A413 CANOPY & MISC. DETAILS
A500 STANDARD PARTITION TYPES
A600 DOOR SCHEDULE, DOOR TYPES, & FRAME TYPES
A601 DOOR DETAILS
A900 SIGNAGE PLAN - BASEMENT FLOOR
A901 SIGNAGE PLAN - FIRST FLOOR
A902 SIGNAGE PLAN - SECOND FLOOR
A903 SIGNAGE PLAN – THIRD
A904 SINAGE DETAILS
FIRE PROTECTION
FA100 FIRE ALARM DETAILS
FA101 FIRE ALARM - BASEMENT
FA102 FIRE ALARM - FIRST FLOOR
FA103 FIRE ALARM - SECOND FLOOR
FA104 FIRE ALARM - THIRD FLOOR
FA105 FIRE ALARM - FOURTH FLOOR
FP101 FIRE PROTECTION - BASEMENT
FP102 FIRE PROTECTION - FIRST FLOOR
FP103 FIRE PROTECTION - SECOND FLOOR
FP104 FIRE PROTECTION - THIRD FLOOR
FP105 FIRE PROTECTION - FOURTH FLOOR
FP106 FIRE PROTECTION - FIFTH FLOOR AND PENTHOUSE
PLUMBING
P001 PLUMBING COVER SHEET, GENERAL NOTES
P002 PLUMBING COVER SHEET, GENERAL NOTES
P003 PLUMBING COVER SHEET, SYMBOLS & LEGENDS
PD000 PLUMBING DEMOLITION - PIPE BASEMENT - CRAWL SPACE PLAN
PD100 PLUMBING DEMOLITION - BASEMENT FLOOR PLAN
PD101 PLUMBING DEMOLITION - FIRST FLOOR PLAN
PD102 PLUMBING DEMOLITION - SECOND FLOOR PLAN
PD103 PLUMBING DEMOLITION - THIRD FLOOR PLAN
PD104 PLUMBING DEMOLITION - FOURTH FLOOR PLAN
PD105 PLUMBING DEMOLITION - FIFTH FLOOR PLAN
PP000 PLUMBING PLAN - PIPE BASEMENT - CRAWL SPACE
PJ100A PLUMBING WASTE & VENT PLAN - BASEMENT FLOOR - AREA A
PJ100B PLUMBING WASTE & VENT PLAN - BASEMENT FLOOR - AREA B
PJ100C PLUMBING WASTE & VENT PLAN - BASEMENT FLOOR - AREA C
PJ101A PLUMBING WASTE & VENT PLAN - FIRST FLOOR - AREA A
PJ101B PLUMBING WASTE & VENT PLAN - FIRST FLOOR - AREA B
PJ101C PLUMBING WASTE & VENT PLAN - FIRST FLOOR - AREA C
PJ102A PLUMBING WASTE & VENT PLAN - SECOND FLOOR - AREA A
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 15 - 4
PJ102B PLUMBING WASTE & VENT PLAN - SECOND FLOOR - AREA B
PJ102C PLUMBING WASTE & VENT PLAN - SECOND FLOOR - AREA C
PJ103A PLUMBING WASTE & VENT PLAN - THIRD FLOOR - AREA A
PJ103B PLUMBING WASTE & VENT PLAN - THIRD FLOOR - AREA B
PJ103C PLUMBING WASTE & VENT PLAN - THIRD FLOOR - AREA C
PJ104A PLUMBING WASTE & VENT PLAN - FOURTH FLOOR - AREA A
PJ104B PLUMBING WASTE & VENT PLAN - FOURTH FLOOR - AREA B
PJ104C PLUMBING WASTE & VENT PLAN - FOURTH FLOOR - AREA C
PJ105A PLUMBING WASTE & VENT PLAN - FIFTH FLOOR - AREA A
PJ105B PLUMBING WASTE & VENT PLAN - FIFTH FLOOR - AREA B
PJ105C PLUMBING WASTE & VENT PLAN - FIFTH FLOOR - AREA C
PK100A PLUMBING WATER & GAS PLAN - BASEMENT FLOOR - AREA A
PK100B PLUMBING WATER & GAS PLAN - BASEMENT FLOOR - AREA B
PK100C PLUMBING WATER & GAS PLAN - BASEMENT FLOOR - AREA C
PK101A PLUMBING WATER & GAS PLAN - FIRST FLOOR - AREA A
PK101B PLUMBING WATER & GAS PLAN - FIRST FLOOR - AREA B
PK101C PLUMBING WATER & GAS PLAN - FIRST FLOOR - AREA C
PK102A PLUMBING WATER & GAS PLAN - SECOND FLOOR - AREA A
PK102B PLUMBING WATER & GAS PLAN - SECOND FLOOR - AREA B
PK102C PLUMBING WATER & GAS PLAN - SECOND FLOOR - AREA C
PK103A PLUMBING WATER & GAS PLAN - THIRD FLOOR - AREA A
PK103B PLUMBING WATER & GAS PLAN - THIRD FLOOR - AREA B
PK103C PLUMBING WATER & GAS PLAN - THIRD FLOOR - AREA C
PK104A PLUMBING WATER & GAS PLAN - FOURTH FLOOR - AREA A
PK104B PLUMBING WATER & GAS PLAN - FOURTH FLOOR - AREA B
PK104C PLUMBING WATER & GAS PLAN - FOURTH FLOOR - AREA C
PK105C PLUMBING WATER & GAS PLAN - FIFTH FLOOR - AREA C
PP501 PLUMBING DETAILS
PP601 PLUMBING SCHEDULES
PJ901A PLUMBING WASTE & VENT ISOMETRIC - AREA A
PJ901B PLUMBING WASTE & VENT ISOMETRIC - AREA B
PJ901C PLUMBING WASTE & VENT ISOMETRIC - AREA C
PK901A PLUMBING DOMESTIC WATER ISOMETRIC - AREA A
PK901B PLUMBING DOMESTIC WATER ISOMETRIC - AREA B
PK901C PLUMBING DOMESTIC WATER ISOMETRIC - AREA C
MECHANICAL
M001 MECHANICAL GENERAL NOTES & LEGENDS
M002 MECHANICAL SYMBOLS & LEGENDS
M003 MECHANICAL ABBREVIATIONS
MD000 MECHANICAL DEMOLITION - PIPE BASEMENT
MD100 MECHANICAL DEMOLITION PLAN - BASEMENT FLOOR
MD101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
MD102 MECHANICAL DEMOLITION PLAN - SECOND FLOOR
MD103 MECHANICAL DEMOLITION PLAN - THIRD FLOOR
MD104 MECHANICAL DEMOLITION PLAN - FOURTH FLOOR
MD105 MECHANICAL DEMOLITION PLAN - FIFTH FLOOR
MD106 MECHANICAL DEMOLITION PLAN - SIXTH FLOOR
MD107 MECHANICAL DEMOLITION PLAN - MACHINE/STORAGE
MH100 MECHANICAL HVAC - BASEMENT FLOOR
MH100A MECHANICAL HVAC - BASEMENT FLOOR - AREA A
MH100B MECHANICAL HVAC - BASEMENT FLOOR - AREA B
MH100C MECHANICAL HVAC - BASEMENT FLOOR - AREA C
MH101 MECHANICAL HVAC - FIRST FLOOR
MH101A MECHANICAL HVAC - FIRST FLOOR - AREA A
MH101B MECHANICAL HVAC - FIRST FLOOR - AREA B
MH101C MECHANICAL HVAC - FIRST FLOOR - AREA C
MH102 MECHANICAL HVAC - SECOND FLOOR
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 15 - 5
MH102A MECHANICAL HVAC - SECOND FLOOR - AREA A
MH102B MECHANICAL HVAC - SECOND FLOOR - AREA B
MH102C MECHANICAL HVAC - SECOND FLOOR - AREA C
MH103 MECHANICAL HVAC - THIRD FLOOR
MH103A MECHANICAL HVAC - THIRD FLOOR - AREA A
MH103B MECHANICAL HVAC - THIRD FLOOR - AREA B
MH103C MECHANICAL HVAC - THIRD FLOOR - AREA C
MH104 MECHANICAL HVAC PLAN - FOURTH FLOOR
MH105 MECHANICAL HVAC PLAN - FIFTH FLOOR
MH300 MECHANICAL ROOM SECTIONS - BASEMENT FLOOR
MH301 MECHANICAL ROOM SECTIONS - FIRST FLOOR
MH302 MECHANICAL ROOM SECTIONS - SECOND FLOOR
MH303 MECHANICAL ROOM SECTIONS - THIRD FLOOR
MH501 MECHANICAL HVAC DETAILS
MH502 MECHANICAL HVAC DETAILS
MH503 MECHANICAL HVAC DETAILS
MH504 MECHANICAL HVAC DETAILS
MH505 AIR HANDLER UNIT DIMENSIONS
MH506 AIR HANDLER UNIT DIMENSIONS
MP000 MECHANICAL PIPING - SERVICE ROOM
MP100A MECHANICAL PIPING - BASEMENT FLOOR - AREA A
MP100B MECHANICAL PIPING - BASEMENT FLOOR - AREA B
MP100C MECHANICAL PIPING - BASEMENT FLOOR - AREA C
MP101A MECHANICAL PIPING - FIRST FLOOR - AREA A
MP101B MECHANICAL PIPING - FIRST FLOOR - AREA B
MP101C MECHANICAL PIPING - FIRST FLOOR - AREA C
MP102A MECHANICAL PIPING - SECOND FLOOR - AREA A
MP102B MECHANICAL PIPING - SECOND FLOOR - AREA B
MP102C MECHANICAL PIPING - SECOND FLOOR - AREA C
MP103A MECHANICAL PIPING - THIRD FLOOR - AREA A
MP103B MECHANICAL PIPING - THIRD FLOOR - AREA B
MP103C MECHANICAL PIPING - THIRD FLOOR - AREA C
MP401 MECHANICAL PIPING - ENLARGED PLANS
MH602 MECHANICAL HVAC DIAGRAMS
MH603 MECHANICAL HVAC DIAGRAMS
MH601 MECHANICAL HVAC SCHEDULES
MI501 MECHANICAL INSTRUMENTATION DETAILS
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES
E002 ELECTRICAL GENERAL NOTES
E003 ELECTRICAL LEGENDS & ABBREVIATIONS
E501 ELECTRICAL DETAILS
E600 ELECTRICAL PANEL SCHEDULES
E601 ELECTRICAL PANEL SCHEDULES
E602 ELECTRICAL PANEL SCHEDULES
E603 ELECTRICAL PANEL SCHEDULES
E604 PANEL SCHEDULES
E901 ELECTRICAL RISER DIAGRAM - DEMO
E902 ELECTRICAL RISER DIAGRAM
ED000 ELECTRICAL DEMOLITION -PIPE BASEMENT
ED100 ELECTRICAL DEMOLITION - BASEMENT FLOOR
ED101 ELECTRICAL DEMOLITION - FIRST FLOOR
ED102 ELECTRICAL DEMOLITION - SECOND FLOOR
ED103 ELECTRICAL DEMOLITION - THIRD FLOOR
ED104 ELECTRICAL DEMOLITION - FOURTH FLOOR
ED105 ELECTRICAL DEMOLITION - FIFTH FLOOR
ED106 ELECTRICAL DEMOLITION - SIXTH FLOOR
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 15 - 6
ED107 ELECTRICAL DEMOLITION - MACHINE / STORAGE
ED401 ELECTRICAL DEMOLITION - ENLARGED PLANS
ED701 ELECTRICAL SITE PLAN DEMOLITION
EL000 ELECTRICAL LIGHTING PIPE BASEMENT
EL100 ELECTRICAL LIGHTING BASEMENT FLOOR
EL100A ELECTRICAL LIGHTING PLAN - BASEMENT - AREA A
EL100B ELECTRICAL LIGHTING PLAN -BASEMENT - AREA B
EL100C ELECTRICAL LIGHTING PLAN - BASEMENT - AREA C
EL101 ELECTRICAL LIGHTING FIRST FLOOR
EL101A ELECTRICAL LIGHTING PLAN - FIRST FLOOR- AREA A
EL101B ELECTRICAL LIGHTING PLAN - FIRST FLOOR- AREA B
EL101C ELECTRICAL LIGHTING PLAN - FIRST FLOOR- AREA C
EL102 ELECTRICAL LIGHTING SECOND FLOOR
EL102A ELECTRICAL LIGHTING PLAN - SECOND FLOOR- AREA A
EL102B ELECTRICAL LIGHTING PLAN - SECOND FLOOR- AREA B
EL102C ELECTRICAL LIGHTING PLAN - SECOND FLOOR- AREA C
EL103 ELECTRICAL LIGHTING THIRD FLOOR
EL103A ELECTRICAL LIGHTING PLAN - THIRD FLOOR- AREA A
EL103B ELECTRICAL LIGHTING PLAN - THIRD FLOOR- AREA B
EL103C ELECTRICAL LIGHTING PLAN - THIRD FLOOR - AREA C
EL104 ELECTRICAL LIGHTING FOURTH FLOOR
EL104A ELECTRICAL PLAN - FOURTH FLOOR - AREA A
EL104B ELECTRICAL PLAN - FOURTH FLOOR - AREA B
EL104C ELECTRICAL PLAN - FOURTH FLOOR - AREA C
EL105 ELECTRICAL LIGHTING FIFTH FLOOR
EL105C ELECTRICAL PLAN - FIFTH FLOOR - AREA C
EL106 ELECTRICAL LIGHTING SIXTH FLOOR
EL107 ELECTRICAL LIGHTING MACHINE / STORAGE
EM000 MECHANICAL POWER PLAN - PIPE BASEMENT
EM100 MECHANICAL POWER PLAN - BASEMENT FLOOR
EM101 MECHANICAL POWER PLAN - FRIST FLOOR
EM102 MECHANICAL POWER PLAN - SECOND FLOOR
EM103 MECHANICAL POWER PLAN - THIRD FLOOR
EM104 MECHANICAL POWER PLAN - FOURTH FLOOR
EM105 MECHANICAL POWER PLAN - FIFTH FLOOR
EM106 MECHANICAL POWER PLAN - SIXTH FLOOR
EM107 MECHANICAL POWER PLAN - MACHINE / STORAGE
EP000 ELECTRICAL POWER PLAN - PIPE BASEMENT
EP100 ELECTRICAL POWER PLAN - BASEMENT FLOOR
EP100A ELECTRICAL POWER PLAN - BASEMENT FLOOR - AREA A
EP100B ELECTRICAL POWER PLAN - BASEMENT FLOOR - AREA B
EP100C ELECTRICAL POWER PLAN - BASEMENT FLOOR - AREA C
EP101 ELECTRICAL POWER PLAN - FIRST FLOOR
EP101A ELECTRICAL POWER PLAN - FIRST FLOOR - AREA A
EP101B ELECTRICAL POWER PLAN - FIRST FLOOR - AREA B
EP101C ELECTRICAL POWER PLAN - FIRST FLOOR - AREA C
EP102 ELECTRICAL POWER PLAN - SECOND FLOOR
EP102A ELECTRICAL POWER PLAN - SECOND FLOOR - AREA A
EP102B ELECTRICAL POWER PLAN - SECOND FLOOR - AREA B
EP102C ELECTRICAL POWER PLAN - SECOND FLOOR - AREA C
EP103 ELECTRICAL POWER PLAN - THIRD FLOOR
EP103A ELECTRICAL POWER PLAN - THIRD FLOOR - AREA A
EP103B ELECTRICAL POWER PLAN - THIRD FLOOR - AREA B
EP103C ELECTRICAL POWER PLAN - THIRD FLOOR - AREA C
EP104 ELECTRICAL POWER PLAN - FOURTH FLOOR
EP104A ELECTRICAL POWER PLAN - FOURTH FLOOR - AREA A
EP104B ELECTRICAL POWER PLAN - FOURTH FLOOR - AREA B
EP104C ELECTRICAL POWER PLAN - FOURTH FLOOR - AREA C
EP105 ELECTRICAL POWER PLAN - FIFTH FLOOR
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
00 01 15 - 7
EP105C ELECTRICAL POWER PLAN - FIFTH FLOOR - AREA C
EP106 ELECTRICAL POWER PLAN - SIXTH FLOOR
EP107 ELECTRICAL POWER PLAN - MACHINE/STORAGE
EP701 ELECTRICAL SITE PLAN
ET000 TELECOMMUNICATIONS PLAN - PIPE BASEMENT
ET001 ENLARGED TELECOMMUNICATIONS PLAN - PIPE BASEMENT
ET100 TELECOMMUNICATIONS PLAN - BASEMENT
ET100A TELECOMMUNICATIONS PLAN - BASEMENT - AREA A
ET100B TELECOMMUNICATIONS PLAN - BASEMENT - AREA B
ET100C TELECOMMUNICATIONS PLAN - BASEMENT - AREA C
ET101 TELECOMMUNICATIONS PLAN - FIRST FLOOR
ET101A TELECOMMUNICATIONS PLAN - FIRST FLOOR - AREA A
ET101B TELECOMMUNICATIONS PLAN - FIRST FLOOR - AREA B
ET101C TELECOMMUNICATIONS PLAN - FIRST FLOOR - AREA C
ET102 TELECOMMUNICATIONS PLAN - SECOND FLOOR
ET102A TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA A
ET102B TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA B
ET102C TELECOMMUNICATIONS PLAN - SECOND FLOOR - AREA C
ET103 TELECOMMUNICATIONS PLAN - THIRD FLOOR
ET103A TELECOMMUNICATIONS PLAN - THIRD FLOOR - AREA A
ET103B TELECOMMUNICATIONS PLAN - THIRD FLOOR - AREA B
ET103C TELECOMMUNICATIONS PLAN - THIRD FLOOR - AREA C
ET104 TELECOMMUNICATIONS PLAN - THIRD FLOOR
ET104A TELECOMMUNICATIONS PLAN - FOURTH FLOOR - AREA A
ET104B TELECOMMUNICATIONS PLAN - FOURTH FLOOR - AREA B
ET104C TELECOMMUNICATIONS PLAN - FOURTH FLOOR - AREA C
ET105C TELECOMMUNICATIONS PLAN - FIFTH FLOOR - AREA C
ET106C TELECOMMUNICATIONS PLAN - SIXTH FLOOR - AREA C
ET107C TELECOMMUNICATIONS PLAN - MACHINE/STORAGE - AREA C
- - - END - - -
Waco, TX 674A4-20-102
01 00 00 ‐1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the renovation of building 1, basement through fifth floor, and the parking lot as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the. COR
C. Offices of OEI-LBL Joint Venture, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by the contractor. The Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
674A4-20-102
01 00 00 ‐2
1.3 STATEMENT OF BID ITEM(S)
A. CLIN 0001, BASE BID:
Contractor to provide all labor, materials, equipment, supervision and testing for, consolidated outpatinet clinic to building 1 as described in the contract documents work includes but is not limited to, renovations to basement and first floor, general construction, new wall, floor and ceiling finishes, new partitions, doors and
Frames and other architectural work, structural improvements, new elevators and stairwell extension to access upper floors, new fire protection, mechanical, electrical, plumbing systems, exterior sitework improvements to include new entrance, new drive and drop-off lanes, walks and other related items, new low voltage systems including access control, security systems and certain other items.
B. CLIN 0002: ADD ALTERNATE 1, all work described in base bid and all work shown to renovate second floor and as described in the contract documents. Install two traffic barrier arms at loading dock.
C. CLIN 0003: ADD ALTERNATE 2, all work described in base bid and add alternate 1 and all work shown to renovate third floor and as described in the contract documents.
D. CLIN 0004: ADD ALTERNATE 3, all work described in base bid and add alternates 1 and 2 and all shown for completion of new concrete parking lot and as described in the contract documents.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐3
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting
Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See
Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐4 describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting
Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐5 restricted to picking up and dropping off materials and supplies.
2. An unlimited permits shall be issued for General Contractor and its employees for parking in designated areas only.
Contractor to coordinate with VA Medical Center Facility
Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
674A4-20-102
01 00 00 ‐6
D. Working space and space available for storing materials shall be as shown on the drawings.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
All such actions shall be coordinated with the COR.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐7 procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR and Contractor.
J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m
(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum
375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
K. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐8 be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.
Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the
Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11
REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐9
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐10 traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply
Service, of areas in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled
"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐11 flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by
COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐12
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental Protection Agency (EPA) and the Department of Transportation (DOT) as outlined in Code of Federal Regulation (CFR), Titled 40 and 49 respectively.
The EPA's Toxic Substance Control Act (TSCA) Compliance
Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the
"originator" copy of the Uniform Hazardous Waste Manifest (EPA
Form 8700-22), along with the Uniform Hazardous Waste Manifest
Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the Manifest to the Medical Center's Chief.
a) Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261 ...... Identification and Listing of Hazardous
Waste
40 CFR 262 ...... Standards Applicable to Generators of
Hazardous Waste
40 CFR 263 ...... Standards Applicable to Transporters of
Hazardous Waste
40 CFR 761 ...... PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐13
49 CFR 172 ...... Hazardous Material tables and Hazardous
Material Communications Regulations
49 CFR 173 ...... Shippers - General Requirements for
Shipments and Packaging
49 CRR 173 ...... Subpart A General
49 CFR 173 ...... Subpart B Preparation of Hazardous Material for Transportation
49 CFR 173 ...... Subpart J Other Regulated Material;
Definitions and Preparation
TSCA ............ Compliance Program Policy Nos. 6-PCB-6 and
6-PCB-7
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐14
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant
Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
1. Designating areas for equipment maintenance and repair;
2. Providing waste receptacles at convenient locations and provide regular collection of wastes;
3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;
and
5. Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and
Consolidate Outpatient Clinic Bldg 1 Waco, TX 674A4-20-102
01 00 00 ‐15 do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished or referred to below is for the
Contractor'…