VISN 10 JOB ORDER CONTRACT IDIQ Federal contract opportunity
Solicitation number
VA25017R0136
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This solicitation is for multiple indefinite delivery/indefinite quantity job order contracts for general construction services at Department of Veterans Affairs medical centers across Indiana, Michigan, and Ohio. The Veterans Integrated Service Network 10 seeks to award ten IDIQ contracts to provide construction projects valued between $2,000 and $500,000 at individual medical centers. The base IDIQ value is $5 million per contract with option years increasing the total potential value to $10 million. The solicitation will be set aside exclusively for service-disabled veteran-owned small businesses. Technical evaluation will consider experience, past performance, and schedule and cost controls, and is more important than price. The government intends to award contracts by September 2017 to ensure expedited procurement of non-complex construction, maintenance, and repair projects across ten VA medical centers.

VA250-17-R-0136 0003 VA250-17-R-0136 0003.docx

View the file

Other files for this federal contract opportunity

Other files attached to VISN 10 JOB ORDER CONTRACT IDIQ, newest first.
File Type Posted
VA250-17-R-0136-0009000.docx DOCX document
VA250-17-R-0136-0008000.docx DOCX document
VA250-17-R-0136-0007000.docx DOCX document
VA250-17-R-0136-0006000.docx DOCX document
VA250-17-R-0136-0005000.docx DOCX document
VA250-17-R-0136-0004000.docx DOCX document
VA250-17-R-0136-0002000.docx DOCX document
VA250-17-R-0136-0002001.docx DOCX document
VA250-17-R-0136-0001000.docx DOCX document
VA250-17-R-0136-031.pdf PDF
VA250-17-R-0136-036.pdf PDF
VA250-17-R-0136-038.pdf PDF
VA250-17-R-0136-032.pdf PDF
VA250-17-R-0136-045.pdf PDF
VA250-17-R-0136-030.pdf PDF
VA250-17-R-0136-043.pdf PDF
VA250-17-R-0136-029.pdf PDF
VA250-17-R-0136-044.pdf PDF
VA250-17-R-0136-027.docx DOCX document
VA250-17-R-0136-034.pdf PDF
VA250-17-R-0136-028.docx DOCX document
VA250-17-R-0136-037.pdf PDF
VA250-17-R-0136-042.pdf PDF
VA250-17-R-0136-041.pdf PDF
VA250-17-R-0136-040.pdf PDF
VA250-17-R-0136-035.pdf PDF
VA250-17-R-0136-039.pdf PDF
VA250-17-R-0136-033.pdf PDF
VA250-17-R-0136-007.docx DOCX document
VA250-17-R-0136-006.docx DOCX document
VA250-17-R-0136-000.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 3 – RFI Responses

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06-11-2018 Multiple Department of Veterans Affairs Network Contracting Office (NCO) 10 2780 Airport Drive, Suite 340 Columbus

OH

43219 Department of Veterans Affairs Network Contracting Office (NCO) 10 2780 Airport Drive, Suite 340 Columbus

OH

43219 To all Offerors/Bidders

VA250-17-R-0136

06-04-2018

X X X X Solicitation VA250-17-R-0136 AMENDMENT 3

AMENDMENT 3 - Posting of VA responses to all RFI's received as of June 11, 2018.

1. Section 13 B of SF1442 indicates an offer guarantee is required. However, this is IDIQ/JOC, there is no seed nor prototype project. What amount of the bid bond is required to submit with the bid for each location? Please clarify.

RESPONSE: APPLIES ONLY TO TASK ORDER AWARDS AND NOT THE BASE CONTRACT.

2. Revised solicitation is provided in amendment 2. Under the instruction on page 12 & 13 of 87 of this document, it indicates to submit 3 computer disks in Excel or work (as appropriate). Please clarify if PDF is acceptable as we would prefer to provide our proposal in a format that cannot be edited after we submit.

RESPONSE: For clarification the requirement of 3 CDs & 3 copies is also stated in Block 13 of page 1 of the SF1442.

PDF copies are NOT acceptable. The Offeror is required to submit three Computer Disks in Excel or Word (as appropriate). It is recommended the instructions for creating a “read-only” Computer Disk be applied.

3. Reference “VA250-17-R-0136 Attachment 4 - Performance Relevancy Survey.pdf” and Solicitation page 15 of 87, Sub-Factor 1: Capability and Multiple Project Experience, subparagraphs (1) thru (4). There is quite a bit of difference in the submission requirements for these two references. None of the highlighted fields on the following self-generated form (based on requirements of the subparagraphs) are required per Attachment 4. There are also a few items on the Attachment that are not required by the subparagraphs. We believe Attachment 4 is sufficient for all project identification requirements and that responses to the subparagraphs under Sub-Factor 1 are not required. Is it your intent for us to submit project information in both formats, or are we to use only Attachment 4 in describing our projects?

RESPONSE: BOTH FORMATS ARE REQUIRED.

Sub-Factor 1: Capability and Multiple Project Experience: speaks directly to handling MULTIPLE PROJECTS IN ONE LOCATION. To be demonstrated in Offeror’s technical proposal. Offeror can state no experience if applicable.

SUB-FACTOR 1: CAPABILITY AND MULTIPLE PROJECT EXPERIENCE: The Offeror shall demonstrate relevant company construction work experience in handling multiple projects in one location by providing the following information for projects performed within the past three (3) years:

(1) Project titles, location and brief description including the building use (Medical Facility etc.) and contracting method (design build, design bid build).

(2) Project owner and name and telephone number of owner’s contact person.

(3) Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s). Note each firm and managing persons (project manager/superintendent/foreman as the case may be) also proposed for this solicitation.

(4) Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; foundation type; number of levels; and any awards (prizes) received.

4. If we are to use “VA250-17-R-0136 Attachment 4 - Performance Relevancy Survey.pdf” to describe our projects, what are we required to submit for “D. Provide detailed description of the work…”? Do you expect an answer immediately following paragraph D, or is paragraph D a preface to the information required on the second page of the Attachment?

RESPONSE: Complete sections A, B, C; then select appropriate relevancy in D and describe why you believe the work is VERY REVELANT, RELEVANT, SOMEWHAT RELEVANT, NOT RELEVANT.” Using descriptions 1, 2 & 3 to description relevancy of the project.

5. Reference solicitation, page 13 of 87, Part 1 – Technical Proposal. The solicitation states here that this Part is limited to 40 pages. The last line on page 17 of 87, under Sub-Factor 4 – Quality Control, requires us to submit our QA/QC Plan. Our QA/QC Plan is 36 pages long. If we submit it, we can’t provide much else. Can you either significantly raise the Part 1 page limits, exclude the QA/QC plan from the page count limit, or eliminate the requirement to submit the QA/QC Plan?

RESPONSE: Page 13, Part I-TECHNICAL PROPOSAL: page count is increased from 40 pages (max) to 60 pages (max).

6. Reference page 17 of 87, at Sub-Factor 2, subparagraph (2). This directs us to provide our available bonding capacity. We are also told to use Attachment 6 – Surety Form. This attachment does not have a space to indicate available bonding capacity. Can you please clarify what we are to provide?

RESPONSE: Attachment 6 – Surety Form: Space is provided for “Bonding Limit for a single project” and “Aggregate amount.”

7. Reference page 16 of 87, Sub-Factor 2, subparagraph (9), Key Personnel (PM, QCM, & SM. The solicitation states that these individuals are to “present a copy of 30-hour OSHA Construction Safety training certificate.” At what time do they present this certificate? Are we to include a copy of it in the proposal, do we submit upon contract award, are these individuals to present a copy of it their first day on a worksite, etc.?

RESPONSE: 30-hour OSHA Construction Safety Training Certificate to be presented with JOC proposal.

8. Reference page 18 of 87, Sub-Factor 5, subparagraph (2). We are directed to provide a sample schedule. Given that some schedules can be multiple pages long (and consuming our 40-page limit), may we submit just the first page of a previously used schedule?

RESPONSE: Requirements as stated in 1 & 2 must be met. Note: as stated in 2 “May provide a sample schedule from a previously completed project.” But must also comply with 1 & 2.

9. Proposal RFI #1 – Reference page 11 of 87 and page 14 of 87, which states: “All Offerors shall submit information regarding their current Experience Modification Rate (EMR).” There is a discussion about who can provide the EMR rating if there is no insurance company that has the information. Our company has only recently established a relationship with an insurance company that can provide our EMR, so no EMR is available from them at this time. One of the points in the solicitation is that contractors from Ohio “shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.” We are not an Ohio contractor, but we maintain our information in the Ohio workers compensation bureau (see following page). Will this suffice for our company or must we go through the NCCI to obtain the EMR?

RESPONSE: 3.) Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

4.) If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.

10. Is there going to be any type of Site Visit for this IDIQ? Please advise?

RESPONSE: A site-visit for this JOC solicitation will not be conducted. Refer to page 31, Section 2.9 52.236-27 Site Visit (Construction) clarifies site visits shall be conducted for each task order resulting from any contract awarded as a result of this solicitation.

11. Page 17 paragraph following (4):

“The proposal should address technical and administrative capabilities and plans for meeting Government requirements, and should address self-performance capabilities for the prototypical project as set forth in the corresponding “Instruction to Offerors”.”

Corrected to remove any reference to prototypical project and now by this Amendment 3 reads as follows:

“The proposal should address technical and administrative capabilities and plans for meeting Government requirements.”

12. Page 18 Sub-Factor 5 (2) Workload Management:

(2) Workload Management: The proposal should adequately describe the offeror’s capability to meet formatting requirements of the Critical Path Method (CPM) and demonstrate with a sample schedule, the ability to appropriately utilize this method of scheduling. (May provide the prototypical or a sample schedule from a previously completed project.)

Corrected to remove any reference to prototypical project and now by this Amendment 3 reads as follows:

(2) Workload Management: The proposal should adequately describe the offeror’s capability to meet formatting requirements of the Critical Path Method (CPM) and demonstrate with a sample schedule, the ability to appropriately utilize this method of scheduling. (May provide a sample schedule from a previously completed project.)