VA250-17-B-0384-006.pdf

PDF 5 MB Posted

Attached to
Construct Surgery Addition Project 757-203 Federal contract opportunity
Solicitation number
VA25017B0384
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

VA250-17-B-0384 757-203- Construct Surgery Addition- Bid Specs 1_Redacted.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Surgery Addition Project 757-203, newest first.
File Type Posted
36C25018C0081-003.docx DOCX document
VA250-17-B-0384-00003000.docx DOCX document
VA250-17-B-0384-00003001.pdf PDF
VA250-17-B-0384-00003002.pdf PDF
VA250-17-B-0384-00002001.pdf PDF
VA250-17-B-0384-00002000.docx DOCX document
VA250-17-B-0384-00002002.pdf PDF
VA250-17-B-0384-00001000.docx DOCX document
VA250-17-B-0384-00001001.pdf PDF
VA250-17-B-0384-003.pdf PDF
VA250-17-B-0384-001.docx DOCX document
VA250-17-B-0384-009.pdf PDF
VA250-17-B-0384-005.pdf PDF
VA250-17-B-0384-004.pdf PDF
VA250-17-B-0384-007.pdf PDF
VA250-17-B-0384-008.pdf PDF
VA250-17-B-0384-002.docx DOCX document
VA250-17-B-0384-000.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P R O J E C T M A N U A L

VA PROJ NO. 757-1203

CBLH PROJ. NO. : 18904.00

February 21, 2017

Chalmers P. Wylie ACC

Construct Surgery Addition

Bid and Construction Volume 1

VA PROJECT NO. 757-203

CBLH PROJECT NO. 18904.00 08-01-16

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-15

01 32 16.15 Project Schedules 02-15

01 33 23 Shop Drawings, Product Data, and Samples 02-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 05-16

01 45 29 Testing Laboratory Services 06-16

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 09-15

01 91 00 General Commissioning Requirements 06-13

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 02-15

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 12-15

DIVISION 04 – MASONRY – NOT USED

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16

05 31 00 Steel Decking 02-16

05 36 00 Composite Metal Decking 10-15

05 50 00 Metal Fabrications 07-14

05 51 00 Metal Stairs

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-15

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 Facility Exterior Closure Commissioning 07-15

07 21 13 Thermal Insulation 02-16

07 22 00 Roof and Deck Insulation 02-16

07 24 00 Exterior Insulation and Finish Systems 02-16

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16

07 40 00 Roofing and Siding Panels 10-15

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16

07 60 00 Flashing and Sheet Metal 07-14

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 10-2

07 71 00 Roof Specialties 10-15

07 81 00 Applied Fireproofing 10-15

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-15

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 17 10 Integrated Door Assemblies 02-16

08 31 13 Access Doors and Frames 02-16

08 33 13 Coiling Counter Doors 02-16

08 35 13.23 Accordion-Type Fire Door CBLH

08 42 43 Aluminum ICU Doors CBLH

08 44 13 Glazed Aluminum Curtain Walls 10-15

08 56 19 Pass Windows 02-16

08 71 00 Door Hardware 01-16

08 71 13.11 Low Energy Power Assist Door Operators 08-16

08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 05-16

09 29 00 Gypsum Board 11-14

09 30 13 Ceramic/Porcelain Tiling 10-15

09 51 00 Acoustical Ceilings 12-16

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 02-16

09 65 19 Resilient Tile Flooring 12-15

09 67 23 Resinous Epoxy High Performance Flooring CBLH

09 68 00 Carpeting 10-15

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 21 23 Cubicle Curtain Tracks 05-15

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-14

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS

12 24 13 Roller Shades CBLH

12 59 00 Systems Furniture CBLH

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

DIVISION 14– CONVEYING EQUIPMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 10-3

21 08 00 Commissioning of Fire Suppression System 05-15

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-15

22 08 00 Commissioning of Plumbing Systems 06-13

22 11 00 Facility Water Distribution 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 14 00 Facility Storm Drainage 09-15

22 40 00 Plumbing Fixtures 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-15

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

11-10

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 08 00 Commissioning of HVAC Systems 06-13

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 09-12

23 21 23 Hydronic Pumps 02-15

23 22 13 Steam and Condensate Heating Piping 02-15

23 23 00 Refrigerant Piping 02-15

23 25 00 HVAC Water Treatment 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 40 00 HVAC Air Cleaning Devices 02-12

23 74 14 Custom Outdoor, Central-Station Air-Handling Units 04-11

23 81 00 Decentralized Unitary HVAC Equipment 02-11

23 81 23 Computer-Room Air-Conditioners 04-11

23 82 00 Convection Heating and Cooling Units 04-11

23 82 16 Air Coils 04-11

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13

26 05 26 Grounding and Bonding for Electrical Systems 12-12

26 05 33 Raceway and Boxes for Electrical Systems 05-14

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 10-4

26 05 73 Overcurrent Protection Device Coordination Study 12-15

26 08 00 Commissioning of Electrical Systems 06-13

26 09 23 Lighting Controls 05-14

26 22 00 Low-Voltage Transformers 12-15

26 24 16 Panelboards 05-14

26 27 26 Wiring Devices 01-16

26 29 11 Motor Controllers 08-14

26 29 21 Enclosed Switches and Circuit Breakers 12-12

26 41 00 Facility Lightning Protection 12-12

26 51 00 Interior Lighting 08-14

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 06-15

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

27 51 16 Public Address and Mass Notification Systems 10-15

27 52 23.01 Hill-Rom Nurse Call and Code Blue Systems 10-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 09-11

28 05 13 Conductors and Cables for Electronic Safety and

Security

09-11

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 06-13

28 13 11 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 26 00 Electronic Personal Protection System 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 23 23.33 Flowable Fill 10-12

31 63 26 Drilled Caissons 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 07-15

33 10 00 Water Utilities 01-14

33 40 00 Storm Sewer Utilities 10-11

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 10-5

DIVISION 34 – TRANSPORTATION – NOT USED

DIVISION 48 – Electrical Power Generation – NOT USED

CBLH PROJECT NO. 18904.00 07-01-15

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G-100 COVER SHEET

G-101 NOTES AND SYMBOLS

G-102 FIRST FLOOR LIFE SAFETY PLAN

G-103 SECOND FLOOR LIFE SAFETY PLAN

G-104 CONSTRUCTION SEQUENCING PLAN

CIVIL

C-100 EXISTING CONDITIONS

C-101 SITE PREPARATION PLAN

C-201 GEOMETRIC PLAN

C-301 GRADING & SWPP PLAN

C-401 UTILITY PLAN

C-501 SITE DETAILS

C-601 SWPP NOTES & DETAILS

L-101 LANDSCAPE PLAN

ARCHITECTURE

AD-201 FIRST FLOOR DEMOLITION PLAN

AD-202 SECOND FLOOR DEMOLITION PLAN - WEST

AD-203 SECOND FLOOR DEMOLITION PLAN – EAST

AD-204 DEMOLITION ELEVATIONS

AD-205 DEMOLITION WALL SECTIONS AND DETAILS

A-301 FIRST FLOOR PLAN

A-302 OVERALL SECOND FLOOR PLAN

A-303 SECOND FLOOR PLAN WEST

A-304 SECOND FLOOR PLAN EAST

A-305 THIRD FLOOR/ROOF PLAN

A-306 SECOND FLOOR FINISH PLAN WEST

A-307 SECOND FLOOR FINISH PLAN EAST

A-308 DEDUCT ALTERNATE FLOOR PLANS AND DETAILS

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 15 - 2

A-401 EXTERIOR ELEVATIONS

A-402 DEDUCT ALTERNATE ELEVATIONS

A-501 BUILDING SECTIONS

A-502 WALL SECTIONS AND DETAILS

A-503 WALL SECTIONS AND DETAILS

A-504 WALL SECTIONS AND DETAILS

A-505 WALL SECTIONS AND DETAILS

A-601 ENLARGED PLANS

A-602 ENLARGED STAIR PLAN AND DETAILS

A-603 ENLARGED PLAN DETAILS

A-701 INTERIOR ELEVATIONS AND DETAILS

A-702 INTERIOR ELEVATIONS AND DETAILS

A-801 FIRST FLOOR REFLECTED CEILING PLAN

A-802 SECOND FLOOR REFLECTED CEILING PLAN WEST

A-803 SECOND FLOOR REFLECTED CEILING PLAN EAST

A-804 DEDUCT ALTERNATE REFLECTED CEILING PLANS

A-901 ROOM FINISH SCHEDULE

A-902 DOOR SCHEDULE AND DETAILS

A-903 WALL TYPES

A-904 FIRST AND SECOND FLOOR WEST SIGNAGE PLAN

A-905 SECOND FLOOR EAST SIGNAGE PLAN

A-906 INTERIOR SIGNAGE TYPES

STRUCTURAL

S-001 GENERAL NOTES

S-101 FOUNDATION AND FIRST FLOOR PLAN

S-102 SECOND FLOOR FRAMING PLAN

S-103 ROOF/FUTURE THIRD FLOOR FRAMING PLAN

S-104 ROOF/FUTURE THIRD FLOOR FRAMING PLAN (DEDUCT

ALTERNATE 2)

S-201 SECTIONS

S-301 TYPICAL DETAILS

S-302 TYPICAL DETAILS

S-303 FUTURE EXPANSION SCHEMES AND TYPICAL DETAILS

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 15 - 3

FIRE PROTECTION

FX-001 FIRE PROTECTION SYMBOLS, DETAILS AND GENERAL

NOTES

FX-102 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN

FX-103 PARTIAL SECOND FLOOR FIRE PROTECTION DEDUCT

ALTERNATE PLANS

PLUMBING

P-001 PLUMBING SYMBOLS AND GENERAL NOTES

P-501 PLUMBING DETAILS

PD-101 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN

PD-102 PARTIAL ROOF PLUMBING DEMOLITION PLAN

PG-001 MEDICAL GAS SYMBOLS, DETAILS, AND GENERAL NOTES

PG-101 PARTIAL FIRST FLOOR MEDICAL GAS

PG-102 PARTIAL SECOND FLOOR MEDICAL GAS PLAN

PG-103 PARTIAL SECOND FLOOR MEDICAL GAS DEDUCT

ALTERNATE PLAN

PL-101 PARTIAL FIRST FLOOR PLUMBING PLAN

PL-102 PARTIAL SECOND FLOOR PLUMBING PLAN

PL-103 PARTIAL ROOF PLUMBING PLAN

MECHANICAL

M-001 MECHANICAL SYMBOLS AND GENERAL NOTES

MD-101 PARTIAL FIRST FLOOR MECHANICAL DEMOLITION PLAN

MD-102 PARTIAL ROOF MECHANICAL DEMOLITION PLAN

MD-103 PARTIAL SECOND FLOOR HVAC PIPING DEMOLITION

PLAN

MH-101 PARTIAL FIRST FLOOR HVAC DUCTWORK PLAN

MH-102 PARTIAL SECOND FLOOR HVAC DUCTWORK PLAN

MH-103 PARTIAL ROOF HVAC PLAN

MH-104 PARTIAL SECOND FLOOR HVAC DUCTWORK DEDUCT

ALTERNATE PLANS

MP-101 PARTIAL FIRST FLOOR HVAC PIPING DIAGRAM

MP-102 PARTIAL SECOND FLOOR HVAC PIPING PLAN

MP-103 PARTIAL SECOND FLOOR HVAC PIPING DEDUCT

ALTERNATE PLANS

M-301 MECHANICAL SECTIONS

M-401 ENLARGED MECHANICAL VESTIBULE PLAN

M-501 MECHANICAL DETAILS

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 15 - 4

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 ROOFTOP HVAC UNIT DETAILS AND SCHEDULES

M-603 HVAC PIPING DIAGRAM

M-701 TEMPERATURE CONTROLS

M-702 TEMPERATURE CONTROLS

ELECTRICAL

E-001 ELECTRICAL LEGEND

E-002 LIGHTING FIXTURE SCHEDULE AND NOTES

EK-101 PARTIAL FIRST FLOOR ELECTRICAL KEY PLAN

EK-102 SECOND FLOOR ELECTRICAL KEY PLAN

EK-103 THIRD FLOOR ELECTRICAL KEY PLAN

ED-101 PARTIAL SECOND FLOOR ELECTRICAL DEMOLITION PLAN

EL-201 PARTIAL SECOND FLOOR LIGHTING PLAN

EL-202 PARTIAL SECOND FLOOR LIGHTING DEDUCT ALTERNATE

PLANS

EP-201 PARTIAL SECOND FLOOR POWER PLAN

EP-202 PARTIAL SECOND FLOOR POWER DEDUCT ALTERNATE

PLANS

EM-201 PARTIAL SECOND FLOOR MECHANICAL CONNECTION PLAN

EM-202 PARTIAL ROOF ELECTRICAL PLAN

EF-201 PARTIAL SECOND FLOOR FIRE ALARM PLAN

EF-202 PARTIAL SECOND FLOOR FIRE ALARM DEDUCT

ALTERNATE PLANS

E-201 NORMAL ONE-LINE DIAGRAM

E-202 POWER DISTRIBUTION EMERGENCY ONE-LINE DIAGRAM

E-203 POWER DISTRIBUTION NORMAL ONE-LINE RISER

E-204 POWER DISTRIBUTION EMERGENCY ONE-LINE RISER

E-205 PANELBOARD SCHEDULES

E-301 FIRE ALARM RISER AND DETAILS

E-500 ELECTRICAL DETAILS

E-501 ELECTRICAL DETAILS

E-502 STAIRWELL ELECTRICAL FLOOR PLAN AND SECTIONS

TECHNOLOGY

T-001 TECHNOLOGY LEGEND

TK-101 TECHNOLOGY KEY PLANS

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

00 01 15 - 5

TD-101 PARTIAL SECOND FLOOR TECHNOLOGY DEMOLITION PLAN

TT-201 PARTIAL SECOND FLOOR TECHNOLOGY PLAN

TT-202 PARTIAL SECOND FLOOR TECHNOLOGY DEDUCT

ALTERNATE PLANS

TS-201 PARTIAL SECOND FLOOR SECURITY PLAN

TS-202 PARTIAL SECOND FLOOR SECURITY DEDUCT ALTERNATE

PLANS

TN-201 PARTIAL SECOND FLOOR NURSE CALL PLAN

TN-202 PARTIAL SECOND FLOO RNURSE CALL DEDUCT

ALTERNATE PLANS

T-501 TECHNOLOGY RISER AND DETAILS

T-502 TECHNOLOGY DETAILS

T-503 TECHNOLOGY DETAILS

T-504 SECURITY DETAILS

- - - END - - -

CBLH PROJECT NO. 18904.00 11-01-15

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.16 COR'S FIELD OFFICE – NOT USED

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.18 TEMPORARY USE OF EXISTING ELEVATORS

1.19 TEMPORARY USE OF NEW ELEVATORS – NOT USED

1.20 TEMPORARY TOILETS

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

1.22 NEW TELEPHONE EQUIPMENT

1.23 TESTS

1.24 INSTRUCTIONS

1.25 GOVERNMENT-FURNISHED PROPERTY

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – BID AND CONSTRUCTION

ii

1.26 RELOCATED ITEMS – NOT USED

1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT – NOT

USED

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.30 PHOTOGRAPHIC DOCUMENTATION

1.31 FINAL ELEVATION Digital Images – NOT USED

1.32 HISTORIC PRESERVATION – NOT USED

1.33 VA TRIRIGA CPMS – NOT USED

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Construct Surgery Addition as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Ambulatory Care Center Contracting Officer’s Representative.

C. Offices of CBLH Design, Inc., as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -2

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -3

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -4

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -5

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices, trailers) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workmen are subject to rules of Ambulatory Care Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Ambulatory Care Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -6 tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and

Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs. Provide unobstructed access to Ambulatory Care

Center areas required to remain in operation.

3. Where access by Ambulatory Care Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Ambulatory Care Center must maintain its operation 9 hours a day 5 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to

Ambulatory Care Center Director, COR and Contractor, as follows:

Phase 0: Activation

Phase 1A: Construction

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -7

1. Substructure and Superstructure including foundations, steel, and concrete.

a. Construction hours for foundations, steel erection, and concrete pouring shall be 12:00 PM to 8:30 PM

2. Demolition of existing roof and curtainwall including interior temporary partitions.

a. Only one (1) Pre-0peration/Post-Operation bays may be shutdown at any time to allow for erection of temporary partitions, construction of new partition, and demolition of existing curtainwall.

b. Existing building to remain weather tight during Construction.

c. Construction hours for demolition of roof and curtain wall shall be 12:00 PM to 8:30 PM.

3. New envelope building enclosure

a. Construction hours for envelope and building enclosure shall be

12:00 PM to 8:30 PM.

4. Remainder of work including roofing, interior build-out, and mechanical and electrical work and other work indicated on Drawings and within

Specification except for work listed in Phase II

Phase 1B:

1. Remainder of interior demolition work as indicated on Drawings.

2. Remainder of new work as indicated on Drawings and in Specifications.

3. Building Commissioning.

H. The Ambulatory Care Center will be occupied during performance of work.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Ambulatory Care Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -8 of Veterans Affairs so that Ambulatory Care Center operations will continue during the construction period.

I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Ambulatory

Care Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems

(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval OF COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -9

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Ambulatory Care Center Director’s prior knowledge and written approval. Refer to specification Sections 26

05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON

WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 21 days in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Ambulatory Care Center. Interruption time approved by Ambulatory Care Center may occur at other than

Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 21 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -10 spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Ambulatory Care Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of the building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -11 to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -12

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Ambulatory Care Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -13 facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -14

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Ambulatory

Care Center, and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -15

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -16

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall furnish to the

COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the 's COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -17

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Ambulatory

Care Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work.

Temporary roads shall be constructed and restoration performed by the

Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.16 COR'S FIELD OFFICE – NOT USED

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -18

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.18 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevator for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators.

The COR will ascertain that elevators are in proper condition.

Contractor may use elevators designated by COR for daily use and for special nonrecurring time intervals when permission is granted.

Personnel for operating elevators will not be provided by the

Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a. Entrance jambs, heads soffits and threshold plates.

CHALMERS P. WYLIE ACC – CONSTRUCT SURGERY ADDITION – 100% CONSTRUCTION

DOCUMENTS

01 00 00 -19

b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c. Finish flooring.

3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor’s expense.

1.19 TEMPORARY USE OF NEW ELEVATORS – NOT USED

1.20 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed.

This is the start of the file's text. The full file is on GovTribe.