VA245-17-B-0086-A00006002.pdf
PDF 38 KB Posted
- Solicitation number
- VA24517B0086
About this file
VA245-17-B-0086 A00006 22 14 00- Facility Storm Drainage.pdf
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Huntington March 15, 2017 Install Back-Up Generator 1 00% Construction Documents Huntington, WV 25704 Project No. 581-16-101
22 14 00 - 1
SECTION 22 14 00
FACILITY STORM DRAINAGE
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section describes the requirements for storm d rainage systems, including piping and all necessary accessories as d esignated in this section.
B. A complete listing of all acronyms and abbreviation s are included in
Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 09 91 00, PAINTING: Preparation and finish painting and identification of piping systems.
D. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING: Pipe Hangers and
Supports, Materials Identification.
E. Section 22 05 33, HEAT TRACING FOR PLUMBING PIPING.
F. Section 23 07 11, PLUMBING INSULATION: Pipe Insulat ion.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this s pecification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
A112.6.4-2003 (R2012) Roof, Deck, and Balcony
Drains
A13.1-2007 (R2013) Scheme for Identification of
Piping Systems
B1.20.1-2013 Pipe Threads, General Purpose, Inch
B16.3-2011 Malleable Iron Threaded Fittings:
Classes 150 and 300
B16.9-2012 Factory-Made Wrought Buttwelding
Fittings
B16.11-2011 Forged Fittings, Socket-Welding and
Threaded
B16.12-2009 (R2014) Cast Iron Threaded Drainage
Fittings
22 14 00 - 2
B16.15-2013 Cast Copper Alloy Threaded
Fittings: Classes 125 and 250
B16.18-2012 Cast Copper Alloy Solder-Joint
Pressure Fittings
B16.22-2013 Wrought Copper and Copper Alloy
Solder-Joint Pressure Fittings
B16.23-2011 Cast Copper Alloy Solder Joint
Drainage Fittings - DWV
B16.29-2012 Wrought Copper and Wrought Copper
Alloy Solder-Joint Drainage Fittings – DWV
C. American Society of Sanitary Engineering (ASSE)
1079-2012 Performance Requirements for
Dielectric Pipe Unions
D. American Society for Testing and Materials (ASTM):
A47/A47M-1999 (R2014) Standard Specification for Ferritic Malleable Iron Castings
A53/A53M-2012 Standard Specification for Pipe, Steel, Black And Hot-Dipped, Zinc-coated Welded and Seamless
A74-2013a Standard Specification for Cast Iron
Soil Pipe and Fittings
A183-2014 Standard Specification for Carbon
Steel Track Bolts and Nuts
A536-1984(R2014) Standard Specification for
Ductile Iron Castings
A888-2013a Standard Specification for Hubless
Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping
Applications
C564-2014 Standard Specification for Rubber
Gaskets for Cast Iron Soil Pipe and Fittings
C1173-2010 (R2014) Standard Specification for
Flexible Transition Couplings for Underground
Piping Systems
D2000-2012 Standard Classification System for
Rubber Products in Automotive Applications
22 14 00 - 3
F477-2014 Standard Specification for
Elastomeric Seals (Gaskets) for Joining Plastic
Pipe
F1545-2015 Standard Specification for Plastic-
Lined Ferrous Metal Pipe, Fittings, and Flanges
E. American Welding Society (AWS):
A5.8M/A5.8 AMD1-2011 Specification for Filler
Metals for Brazing and Braze Welding
F. Cast Iron Soil Pipe Institute (CISPI):
301-2012 Standard Specification for Hubless
Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping
Applications
310-2012 Standard Specification for Coupling for Use in Connection with Hubless Cast Iron
Soil Pipe and Fittings for Sanitary and Storm
Drain, Waste, and Vent Piping Applications
G. International Code Council (ICC):
IPC-2015 International Plumbing Code
H. Manufacturers Standardization Society of the Valve and Fittings
Industry, Inc. (MSS):
SP-72-2010a Ball Valves with Flanged or Butt-
Welding Ends for General Service
SP-110-2010 Ball Valves Threaded, Socket-
Welding, Solder Joint, Grooved and Flared Ends
1.4 SUBMITTALS
A. Submittals, including number of required copies, sh all be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PR ODUCT DATA, AND
SAMPLES.
B. Information and material submitted under this secti on shall be marked
“SUBMITTED UNDER SECTION 22 14 00, FACILITY STORM D RAINAGE”, with applicable paragraph identification.
C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensio ns, weights, materials, applications, standard compliance, model numbers, size, and capacity.
1. Pipe and Fittings.
22 14 00 - 4
2. Specialty Pipe Fittings.
3. Cleanouts.
4. Deck Drains.
5. Expansion Joints.
D. Detailed shop drawing of clamping device and extens ions when required in connection with the waterproofing membrane.
1.5 QUALITY ASSURANCE
A. Bio-Based Materials: For products designated by the USDA’s Bio-
Preferred Program, provide products that meet or ex ceed USDA recommendations for bio-based content, so long as p roducts meet all performance requirements in this specifications sec tion. For more information regarding the product categories covere d by the Bio-
Preferred Program, visit http://www.biopreferred.gov .
1.6 AS-BUILT DOCUMENTATION
A. Submit manufacturer’s literature and data updated t o include submittal review comments and any equipment substitutions.
B. Submit operation and maintenance data updated to in clude submittal review comments, substitutions and construction rev isions shall be in electronic version on compact disc or DVD inserted into a three-ring binder. All aspects of system operation and mainten ance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and se quence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include tro ubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices such as damper and door closure interlocks shall be included. A List of recommended spare part s (manufacturer, model number, and quantity) shall be furnished. Inf ormation explaining any special knowledge or tools the owner will be re quired to employ shall be inserted into the As-Built documentation.
C. The installing contractor shall maintain as-built d rawings of each completed phase for verification; and, shall provid e the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in Auto-CAD version 10 provided on compact disk or DVD. Should the installing contr actor engage the testing company to provide as-built or any portion thereof, it shall
22 14 00 - 5 not be deemed a conflict of interest or breach of t he ‘third party testing company’ requirement.
D. Certification documentation shall be provided to CO R 10 working days prior to submitting the request for final inspectio n. The documentation shall include all test results, the names of indivi duals performing work for the testing agency on this project, detail ed procedures followed for all tests, and certification that all results of tests were within limits specified.
PART 2 - PRODUCTS
2.1 STORM WATER DRAIN PIPING
A. Cast Iron Storm Pipe and Fittings:
1. Cast iron storm pipe and fittings shall be used for the following applications:
a. Pipe buried in or in contact with earth.
b. Extension of pipe to a distance of approximately 5 feet (1500 mm) outside of building walls.
c. Interior storm piping above grade.
d. All mechanical equipment rooms or other areas conta ining mechanical air handling equipment.
2. The cast iron storm Pipe shall be bell and spigot, or hubless (plain end or no-hub) as required by selected jointing met hod.
3. The material for all pipe and fittings shall be cas t iron soil pipe and fittings and shall conform to the requirements of CISPI Standard
301, ASTM A-888, or ASTM A-74.
4. Joints for hubless pipe and fittings shall conform to the manufacturer’s installation instructions. Couplings for hubless joints shall conform to CISPI 310. Joints for hub a nd spigot pipe shall be installed with compression gaskets conform ing to the requirements of ASTM Standard C-564.
B. Drain piping in locations where the outdoor conditi ons are subject to freezing shall be insulated.
2.3 SPECIALTY PIPE FITTINGS
A. Transition pipe couplings shall join piping with sm all differences in outside diameters or be of different materials. End connections shall be of the same size and compatible with the pipes b eing joined. The transition coupling shall be unshielded, elastomeri c, sleeve type reducing or transition pattern conforming with ASTM C1173 and include
22 14 00 - 6 shear ring and corrosion resistant metal tension ba nd and tightening mechanism on each end. The transition coupling slee ve coupling shall be of the following material:
1. For cast iron soil pipes, the sleeve material shall be rubber conforming to ASTM C564.
2. For PVC soil pipes, the sleeve material shall be el astomeric seal conforming to ASTM F477 or PVC conforming to ASTM D 5926.
3. Dissimilar pipes: The sleeve material shall be PVC conforming to
ASTM D5926, or other material compatible with the p ipe materials being joined.
2.4 CLEANOUTS
A. Cleanouts shall be the same size as the pipe, up to 4 inches (100 mm);
not less than 4 inches (100 mm) for larger pipe. Cl eanouts shall be easily accessible and shall be gastight and waterti ght. A minimum clearance of 24 inches (600 mm) shall be provided f or clearing a clogged storm sewer line.
B. Floor cleanouts shall be gray iron housing with cla mping device and round, secured, scoriated, gray iron cover conformi ng to ASME
A112.36.2M. A gray iron ferrule with hubless, socke t, inside calk or spigot connection and counter sunk, taper-thread, b rass or bronze closure plug shall be included. The frame and cover material and finish shall be nickel-bronze copper alloy with a square s hape. The cleanout shall be vertically adjustable for a minimum of 2 i nches (50 mm). When a waterproof membrane is used in the floor system, clamping collars shall be provided on the cleanouts. Cleanouts shall consist of wye fittings and eighth bends with brass or bronze scre w plugs. The loading classification for cleanouts in sidewalk areas or s ubject to vehicular traffic shall be heavy duty.
2.5 DECK DRAINS AND CONNECTIONS
A. Deck Drains: Deck Drains (DD) shall be cast iron wi th clamping device for making watertight connection. Free openings thr ough strainer shall be twice area of drain outlet. For deck drains not installed in connection with a waterproof membrane, a soft coppe r membrane shall be provided 12 inches (300 mm) in diameter greater tha n outside diameter of drain collar. Integral no-hub, soil pipe gasket or threaded outlet connection shall be provided.
22 14 00 - 7
1. Promenade Decks: The deck drain shall have a flat, round, loose, non-slip, bronze grate set in square, non-slip, bro nze frame with the integral flange not larger than 8 inches (200 m m) in diameter.
The deck drain shall be provided with an adjustable drainage collar, which can be raised or lowered to meet the required deck height, sump receiver and deck clamp.
2. Pedestrian Deck: The deck drain shall have a bronze promenade top 14 inches (356 mm) square, set in square secured frame support collar.
3. Deck drains in areas subject to freezing shall have heat tape and shall be insulated.
B. Expansion Joints: Expansions joints shall be heavy cast iron with cast brass or copper expansion sleeve having smooth bear ing surface working freely against a packing ring held in place and und er pressure of a bolted gland ring, forming a water and air tight fl exible joint.
Asbestos packing is prohibited.
PART 3 - EXECUTION
3.1 PIPE INSTALLATION
A. The pipe installation shall comply with the require ments of the IPC and these specifications.
B. Branch piping shall be installed from the piping sy stem and connect to all drains and outlets.
C. Pipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for glass, shall be reamed to r emove burrs and a clean smooth finish restored to full pipe inside di ameter.
D. All pipe runs shall be laid out to avoid interferen ce with other work/trades.
E. Unless otherwise stated on the documents, minimum h orizontal slope shall be one inch for every 8 feet (2.44 m) (1 perc ent slope) of pipe length.
F. The piping shall be installed free of sags and bend s.
G. Changes in direction for storm drainage piping shal l be made using appropriate branches, bends and long sweep bends. S anitary tees and short sweep 1/4 bends may be used on vertical stack s if change in direction of flow is from horizontal to vertical. L ong turn double wye branch and 1/8 bend fittings shall be used if two d rains are installed back to back or side by side with common drain pipe . Do not change direction of flow more than 90 degrees. Proper size of standard
22 14 00 - 8 increaser and reducers shall be used if pipes of di fferent sizes are connected. Reducing size of drainage piping in dire ction of flow is prohibited.
H. Buried storm drainage piping shall be laid beginnin g at the low point of each system. Piping shall be installed true to g rades and alignment indicated with unbroken continuity of invert. Hub e nds shall be placed upstream. Required gaskets shall be installed accor ding to manufacturer’s written instruction for use of lubri cants, cements, and other installation requirements. Bio-based material s shall be utilized when possible.
I. Cast iron piping shall be installed according to CI SPI’s “Cast Iron
Soil Pipe and Fittings Handbook,” Chapter IV, “Inst allation of Cast
Iron Soil Pipe and Fittings”
3.2 JOINT CONSTRUCTION
A. Hub and spigot, cast iron piping with gasket joints shall be joined in accordance with CISPI’s “Cast Iron Soil Pipe and Fi ttings Handbook” for compression joints.
B. Hubless, cast iron piping shall be joined in accord ance with CISPI’s
“Cast Iron Soil Pipe and Fittings Handbook” for hub less piping coupling joints.
C. For threaded joints, thread pipe with tapered pipe threads according to
ASME B1.20.1. The threads shall be cut full and cle an using sharp disc cutters. Threaded pipe ends shall be reamed to remo ve burrs and restored to full pipe inside diameter. Pipe fitting s and valves shall be joined as follows:
1. Apply appropriate tape or thread compound to extern al pipe threads unless dry seal threading is required by the pipe s ervice
2. Pipe sections with damaged threads shall be replace d with new undamaged sections of pipe at no additional time or cost to
Government.
3.3 SPECIALTY PIPE FITTINGS
A. Transition coupling shall be installed at pipe join ts with small differences in pipe outside diameters.
3.4 PIPE HANGERS, SUPPORTS AND ACCESSORIES
A. All piping shall be supported according to the IPC, Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING, and these specifi cations.
22 14 00 - 9
B. Hangers, supports, rods, inserts and accessories us ed for Pipe supports shall be shop coated with zinc Chromate primer pain t. Electroplated copper hanger rods, hangers and accessories may be used with copper tubing.
C. Horizontal piping and tubing shall be supported wit hin 12 inches (200
mm) of each fitting or coupling.
D. Horizontal cast iron piping shall be supported with the following maximum horizontal spacing and minimum hanger rod d iameters:
1. 4 to 5 inch (100 to 125 mm): 60 inches (1500 mm) wi th 5/8 inch (18
mm) rod.
2. 6 to 8 inch (150 to 200 mm): 60 inches (1500 mm) wi th 3/4 inch (20
mm) rod.
E. Miscellaneous materials shall be provided as specif ied, required, directed or as noted on the drawings for proper ins tallation of hangers, supports and accessories. All necessary au xiliary steel shall be provided to provide that support.
3.5 INSULATION
A. Install insulation in accordance with the requireme nts of Section 22 07
11, PLUMBING INSULATION.
3.6 TESTS
A. Storm sewer system shall be tested either in its en tirety or in sections.
B. Storm Water Drain tests shall be conducted before t renches are backfilled or fixtures are connected. A water test or air test shall be conducted, as directed.
1. If entire system is tested with water, tightly clos e all openings in pipes except the highest opening, and fill system w ith water to point of overflow. If system is tested in sections, tightly plug each opening except highest opening of section unde r test, fill each section with water and test with at least a 10 feet (3 m) head of water. In testing successive sections, test at leas t upper 10 feet
(3 m) of next preceding section so that each joint or pipe except upper most 10 feet (3 m) of system has been submitt ed to a test of at least a 10 feet (3 m) head of water. Water shall be kept in the system, or in portion under test, for at least 15 m inutes before inspection starts. System shall then be tight at al l joints.
22 14 00 - 10
2. For an air test, an air pressure of 5 psig (35 kPa) gauge shall be maintained for at least 15 minutes without leakage. A force pump and mercury column gauge shall be used for the test.
3. Final Tests: While either one of the following test s may be used, Contractor shall check with VA as to which test wil l be performed.
a. Smoke Test: After fixtures are permanently connecte d and traps are filled with water, fill entire drainage and ven t systems with smoke under pressure of 1 inch (0.25 kPa) of water with a smoke machine. Chemical smoke is prohibited.
b. Peppermint Test: Introduce 2 ounces (0.06 L) of pep permint into each line or stack.
C. COR shall witness all tests. Contractor shall coord inate schedules with the COR. Contractor shall provide a minimum of 10 w orking days prior to flushing, disinfection/sterilization, startup, and testing.
- - - E N D - - -
File details come from the government source that posted it.