5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITE
M 10A.
15C. DATE
SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE
SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00006 11-22-2017 581-16-101 Department of Veterans Affairs
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg WV 25405 Department of Veterans Affairs
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 308B Martinsburg WV 25405 To all Offerors/Bidders
VA245-17-B-0086
09-18-2017
X X X
BID OPENING DATE REMAINS 12/15/17 @ 2PM LOCAL TIME
X
VA245-17-B-0086 FACILITY BACKUP GENERATORS AT VAMC HUNTINGTON,
WV PROJECT
581-16-101 -
See pages
2-10 for Questions from bidders and VA responses.
See attached specs 000110, 220511, 220523, 220533, 220711 dtd 3-15-17 and VA Pipe Hangers.pdf dwg no
. 50230511-21.DWG.
BID OPENING DATE REMAINS 12/15/2017 @ 2PM LOCAL TIME.
SHARI M. KESECKER
Contract Specialist Emergency Generators RFI Response Date 11/22/17
| 1. | Bidder’s Question: | Contractor Page 10 of 89 lists the risk levels that are associated with various background checks and costs. What level of risk do you classify this project? | |
| A/E Response: | This is low risk and no costs will be billed to the contractor for getting individuals badged (at least they don’t do that here at this facility). The superintendent would get a non-PIV badge (fingerprint required) since the contract will be over 180 calendar days. All others will get a Flash badge (no fingerprint) and that takes little time to get done. | ||
| 2. | Bidder’s Question: | Specifications section 1.5 (C) Guards states that unarmed guards must be provided by the General Contractor during after construction hours. In lieu of this requirement, will be VA allow for a technology solution, such as cameras, monitoring and access control | |
| A/E Response: | Guards are not required, but contractor shall be responsible for securing their site and materials. | ||
| 3. | Bidder’s Question: | Will the VA provide a geotechnical report for this project? | |
| A/E Response: | Yes. | ||
| 4. | Bidder’s Question: | Specifications section 28 05 00 Part 1.1 (E) contains the statement “The Contractor shall provide 24-hour telephone support for the software program at no additional charge to the owner.” For what period of time should this 24-hour telephone support be provided under this contract? | |
| A/E Response: | Subject support shall be provided for the duration of the warranty (1-year). | ||
| 5. | Bidder’s Question: | Page CC001, Civil Site Notes, General, Item 3 references submitting a Notice of Intent to the Ohio EPA. Is the Ohio EPA the correct office from which we should request a permit? | |
| A/E Response: | The project should request all required permits from the State of West Virginia. | ||
| 6. | Bidder’s Question: | Will the VA provide temporary office space for the contractor? If not, will there be additional space provided onsite, near the construction area, for a trailer and staging? | |
| A/E Response: | No. However, the Contractor can work with the COR for a location for a trailer if space is available. | ||
| 7. | Bidder’s Question: | Does the VA have a riser detail for the 35kV Service, it is our understanding that Customer is to install riser and terminate to Overhead AEP furnished disconnect? | |
| A/E Response: | Drawing Sheet E-601 includes a riser detail of the pertinent portion of the 35kV Service. This sheet and Sheets E-101 and E-102 detail the 35kV work to be performed by the Contractor, which shall include connecting to the AEP furnished disconnect. | ||
| 8. | Bidder’s Question: | There are no control integration drawings included in the set. Per 23 10 00 the leak detection system, tank fluid level monitor and alarm systems, and fuel oil quality maintenance systems shall communicate with the boiler plant computer workstation via RS232 Modbus to indicate system in service and alarm conditions. There is also reference to modem communication capability. The RS232 requirements and communication requirements should be outlined in a one-line diagram. Routing needs to be outlined. | |
| A/E Response: | Per Specifications Section 23 10 00, 1.3., The fuel oil system shall be a complete, engineered system developed and produced by a manufacturer that has similar systems in operation for at least three years. Aspects of the system to be monitored shall be as described in our response to question #45 below. Equipment and inter-wiring details will vary with equipment manufacturers. Pathways for low voltage wiring from the generator platform to existing Building 26 are indicated on Sheet E-603 in the Feeder Schedule with Cable ID’s #20 and #21, and their routings are shown on Sheets E-101 and E-102. Details for providing a new fiber-optic cable from existing Building 26 to the existing facility data distribution system are detailed in Keyed Notes #3 & #4 on Sheet E-101. | ||
| 9. | Bidder’s Question: | Generally the FO systems are ran back to an existing SCADA system (which would be outlined in230911 not 230923). Please confirm it is the Government’s intent to have these items run back to JCI’s workstation (230923 and not the SCADA – 230911). | |
| A/E Response: | The Fuel Oil System shall be monitored by the JCI (BAS) system. | ||
| 10. | Bidder’s Question: | 262313 (Generator Paralleling Controls), requires interconnecting controls diagrams, showing connections to switchgear, generators, automatic transfer switches, and remote annunciators. For preliminary pricing purposes, shouldn’t a one-line drawing on the bid documents be included to ensure all interconnection conduit and routing and wiring requirements are outlined? 2.1-F of the applicable spec speaks to a dedicated fiber optic network (i.e. provide all necessary fiber optic and copper media, raceways, hardware, software, and programming necessary to establish interconnection between all components. This is generally outlined on a one-line. | |
| A/E Response: | Equipment and inter-wiring details will vary with the equipment manufacturers. Pathway for the wiring shall be Feeder #21 as shown on Sheets E-101, E-102, & E603. | ||
| 11. | Bidder’s Question: | The remote annunciator panel (262313 2.2) shall be installed at the ECC or location as shown on the drawings. This is not outlined on the drawings. | |
| A/E Response: | Location of Remote Annunciator Panel is shown on Sheet E-101, inside existing Building #26 in the south west corner of the building. Pathway for the wiring for this shall be Feeder #21 as shown on Sheets E-101, E-102, & E603. | ||
| 12. | Bidder’s Question: | 262313 3.1 states to mount generator paralleling controls on concrete slab (4” thick), please provide location for generator paralleling controls. | |
| A/E Response: | Drawing Sheet E-102 shows the locations of the new Paralleling Switchgear and New Paralleling Digital Master Controller on the new Generator Platform. These are the generator paralleling controls referred to in the specification. | ||
| 13. | Bidder’s Question: | Drawings MP101, MP301 and MP601 show fuel oil control panel FCP 1, fuel oil fill station FOF 1and fuel transfer pump FTP 1. These items are also identified on the Equipment Schedule found on Drawing MP501. We cannot find specifications for these items and several details of the Equipment Schedule are blank. Can you provide specifications for these pieces of fuel oil equipment? | |
| A/E Response: | Per Specifications Section 23 10 00, 1.3., The fuel oil system shall be a complete, engineered system developed and produced by a manufacturer that has similar systems in operation for at least three years. FCP-1 is the system controller. FOF-1, per Sheet MP601, is a packaged fuel oil fill station with 3” quick coupling for connection to a fuel tanker truck. FTP-1 (fuel transfer pump) shall be as engineered by the system manufacturer to perform the functions required in the drawings and specifications. | ||
| 14. | Bidder’s Question: | Specification Section 231000, Paragraph 2.1 describes a fire-rated above ground storage tank that conforms to the UL208 standard. Further, on in the specification, Paragraph 3.1, D identifies field- applied insulation for this tank. The UL2085 above ground storage tank contains insulation between the outer and inner tank. Is additional, exterior insulation required? | |
| A/E Response: | No exterior insulation shall be required for the subject storage tanks. | ||
| 15. | Bidder’s Question: | Also related to the installation of above ground tank described above, Paragraph 3.1, E identifies surface finish coating requirements. Can the manufacturer apply the finish coating in the factory? | |
| A/E Response: | Coatings applied in the factory by the manufacturer are preferred. | ||
| 16. | Bidder’s Question: | Please confirm the project is not sales tax exempt. | |
| A/E Response: | Confirmed. | ||
| 17. | Bidder’s Question: | Per 01 35 26 1.7-C, the SSHO must be a separate qualified individual from the Prime Contractor’s Superintendent and/or Quality Control Manager with duties only as the SSHO. Please confirm a full-time SSHO (by the Prime Contractor) is required, in addition to the full-time Project Superintendent and Quality Control Manager. This will add additional expenses to the project. | |
| A/E Response: | Delete the requirement for the SSHO. But Contractor shall provide OSHA 30 certified Supervisor and APP. | ||
| 18. | Bidder’s Question: | 01 35 26 1.7-C references a Quality Control Manager. There is no other mention of Quality Control Manager within the specification. Please confirm a full-time Quality Control Manager (in addition to the full-time Project Superintendent and full-time SSHO) is NOT required. | |
| A/E Response: | Delete the requirement for the QCM. But Contractor must provide a QA/QC Plan. | ||
| 19. | Bidder’s Question: | 01 91 00 references the Commissioning Agent (and the Commissioning Agent’s responsibilities –part 1.11), however 1.8 does not state who appoints the Commissioning Agent. Please advise if the VA is appointing the Commissioning Agent. Please note, the Commissioning Manager and Commissioning Agent are two separate positions – and should not be mixed up as the same. | |
| A/E Response: | Delete the requirements related to the Commissioning Agent. The VA will not appoint a Commissioning Agent for this project. | ||
| 20. | Bidder’s Question: | Fuel oil fill – please confirm the Contractor should include all FO to completely fill the tanks and all FO for testing of the system in their base bid. | |
| A/E Response: | Contractor shall provide fuel in the storage tanks and in the day tanks as detailed in the various Bid Items. Contractor shall provide fuel for generator testing as indicated in Specifications Section 26 32 13, 3.2. | ||
| 21. | Bidder’s Question: | 31 63 26 (Drilled Caissons) makes reference to unit pricing (part 1.6). Unit pricing is not outlined on SF1442 – please advise. | |
| A/E Response: | Unit pricing for drilled caissons shall not be required. Reference the Drawings for lengths of caissons. | ||
| 22. | Bidder’s Question: | Please confirm the Independent Testing and Inspection Agency as outlined in 31 63 26 1.8-H (i.e. Contractor shall retain an Independent Testing and Inspection Agency (Agency) to document, monitor, and observe load test, probe pile, test pile, and production pile work. This Agency shall submit field reports and test results required for pile load tests, pile installations, and grout testing and inspection. They shall submit a pile installation report for each pile no later than three days after the installation is complete) shall be the same Special Inspector as outlined in div. 01? | |
| A/E Response: | Yes. | ||
| 23. | Bidder’s Question: | Please advise if the Geotechnical Consultant as outlined in 31 63 26 can be the same firm as the |
Special Inspector?
| A/E Response: | Yes. | ||
| 24. | Bidder’s Question: | Please confirm unarmed guards at the project site after construction hours 01 00 00 – 6 (Guards) is NOT required. | |
| A/E Response: | Guards are not required, but contractor shall be responsible for securing their site and materials. | ||
| 25. | Bidder’s Question: | 10. 01 00 00 1.30 (Photographic Documentation) is very extensive; please confirm this is required on this project. | |
| A/E Response: | Photographic Documentation is not required. | ||
| 26. | Bidder’s Question: | MP101, Keyed Note #14 states, “support storm piping from platform structure”, however no detail for supporting is provided. Please provide detail. | |
| A/E Response: | Piping shall be supported per attached specification Section 22 05 11, See attached VA “Pipe Hangers” standard detail for additional information. | ||
| 27. | Bidder’s Question: | 23 10 00 3.3 & 3.4 reference locating panels inside the building, please confirm these noted panels shall be located adjacent to the FO tank outside (and not inside a building) | |
| A/E Response: | Leak detector systems shall be located on the generator platform as shown on the drawings. | ||
| 28. | Bidder’s Question: | Those Systems are listed in their own Sections 23-10-00; 23-10-01; 23-05-13 to be furnished; installed; and wired by the Div 23 Mechanical Contractor. Please clarify if Div 23-09-23 is to furnish; install; and wire those Systems listed in Responsibility Table. | |
| A/E Response: | This question #28 appears to be a partial duplicate of the more complete question #44 below. Please see our response to question #44 below. | ||
| 29. | Bidder’s Question: | Please identify the Control Points that are to be monitored and/or controlled by the DDC/BAS. | |
| A/E Response: | This question #29 appears to be a partial duplicate of the more complete question #45 below. Please see our response to question #45 below. | ||
| 30. | Bidder’s Question: | Will the Generators have Circuit Breakers? If yes, what is the amperage? | |
| A/E Response: | The generator output circuit breakers will be the 1,200-Amp, draw-out breakers integrated into the New Paralleling Switchgear (PSG) shown on Sheets E-102 & E-601. There will not be generator output circuit breakers in the generator enclosures. | ||
| 31. | Bidder’s Question: | Are there specifications on the 12,000 gallon above ground storage tanks? | |
| A/E Response: | The tank requirements are listed in Specifications Section 23 10 00. | ||
| 32. | Bidder’s Question: | 2.13 CONTROLS, please clarify if the Generator Controls are to be remote mounted instead of Generator Mounted, and if so please indicate location on the drawings. Or is generator mounted controls acceptable. | |
| A/E Response: | This question is answered in Specifications Section 26 23 13 - 2.1 as follows: | ||
| A. | Generator paralleling controls shall be integral to the switchgear, or housed in a separate cubicle, or be integrated into the controls on each paralleled engine generator. The functional requirements are identical for all system topologies. | ||
| B. | The generator paralleling controls shall perform automatic and manual operation, synchronization, load management, monitoring, and alarm annunciation functions of the paralleled engine generator system. | ||
| C. | The control logic shall be distributed between the generator paralleling controls and each engine generator such that each engine generator is capable of starting and paralleling to the bus, in the event of failure of the generator paralleling controls and receipt of a start signal from any automatic transfer switch. | ||
| 33. | Bidder’s Question: | Alternate-4: We are asked to deduct the cost of the 2000kW permanent load bank and feeders, but it does not specifically state to deduct the load bank breaker. Should we deduct the load bank breaker as well? | |
| A/E Response: | The circuit breaker shown feeding the load bank from the new Paralleling Switchgear (PSG) on sheet E-601 shall be furnished in the (PSG) under Deduct Alternate – 4. | ||
| 34. | Bidder’s Question: | Alternate-5: We are asked to deduct the master section, however, we are not asked to replace the master section with some other form of paralleling means. Without the master section the generators will not be able to be paralleled. In this case would we only bid the MVATS? | |
| A/E Response: | The generators shall be configured to parallel with each other without need of the master section. See Specifications Section 26 23 13 - 2.1. | ||
| 35. | Bidder’s Question: | Alternate-6: We are asked to deduct a single 1750kW generator and feeders, but it does not specifically state to deduct the generator breaker. Should we deduct the generator breaker? | |
| A/E Response: | The new Paralleling Switchgear (PSG) shall be furnished with three (3) generator circuit breakers as shown on Sheet E-601 under Deduct Alternate – 6. | ||
| 36. | Bidder’s Question: | Is a ConVault UL2085/752 tank acceptable as an equal for the fuel storage tanks? | |
| A/E Response: | ConVault is an acceptable manufacturer. Submitted tanks shall comply with all pertinent requirements as listed in the drawings and specifications. | ||
| 37. | Bidder’s Question: | Reference Dwg MP101 / Detail 1. Confirm exterior storm piping material. | |
| A/E Response: | Storm water pipe material shall be cast iron as specified in attached specification Sections 22 05 23 and 22 14 00. | ||
| 38. | Bidder’s Question: | Reference Spec Section 23 07 11. Confirm if exterior storm piping is to receive insulation and / or heat tracing? If so, insulation type & jacketing? | |
| A/E Response: | For exterior storm piping, provide heat trace and insulate with fiberglass or elastomeric insulation with an aluminum jacket. Reference attached specification Sections 22 05 33, 22 07 11, and 22 08 00. Provide two (2) 20-Amp, 1-pole circuit breakers with GFCI protection for equipment in new Power Panel ‘GEN MDP’, to protect heat trace circuits. | ||
| 39. | Bidder’s Question: | Reference Spec Section 23 07 11. Confirm if fuel oil piping system is to receive insulation? If so, insulation type & jacketing? | |
| A/E Response: | Fuel Piping shall not require insulation. | ||
| 40. | Bidder’s Question: | In 260513-8, 3.7, E, it says maintenance cable testing should occur; but no other mention of any other equipment in any other spec section to be maintained. Please confirm that no service – aged cable/equipment testing is required. | |
| A/E Response: | No service-aged cables shall need to be tested under this project. | ||
| 41. | Bidder’s Question: | Is the Huntington VAMC within city limits? If so are B&O taxes to city government required? | |
| A/E Response: | Huntington VAMC is not in city Limits. It is exempt from B&O taxes. | ||
| 42. | Bidder’s Question: | Handrail shown on Section 4/A101. What is the profile and type of material for the listed handrail? | |
| A/E Response: | Refer to Specification 05 50 00, Section 2.7 Railings. | ||
| 43. | Bidder’s Question: | Structural Drawings call for a 3” Deck but no gauge is provided. Can you please provide clarification? | |
| A/E Response: | Deck is 20 gauge per Sheet SI001. | ||
| 44. | Bidder’s Question: | Section 23-09-23 Direct Digital Control System for HVAC: |
Responsibility Table (pg. 3 to 5) calls for the following Systems to be “Furnished; Installed; Low Voltage Wiring; Line Power” by the Section 23-09-23 Contractor/Supplier:
| • | Fuel Mgt. System |
| • | Fuel Quality Maintenance System |
| • | Fuel & Water Leak Detection System |
| • | Oil Detection System |
| • | Main Tank Selection Panel |
RFI > Those Systems are listed in their own Sections 23-10-00; 23-10-01; 23-05-13 to be furnished; installed; and wired by the Div 23 Mechanical Contractor. Please clarify if Div 23-09-23 is to furnish; install; and wire those Systems listed in Responsibility Table.
| A/E Response: | All the above-referenced specifications sections include descriptive information and requirements for the provision, installation, and performance of the subject Fuel Management System for the new Generator plant. Where the specifications include requirements for systems such as HVAC, which are not indicated to be provided in the “MP***” series of sheets in the construction drawings, then those requirements shall not apply. The Prime Contractor for the project shall determine whom among his team shall perform any given task associated the work, and is responsible for establishing that the work shall be performed by qualified individuals as described in the specifications. | ||
| 45. | Bidder’s Question: | Section 23-09-23 Direct Digital Control System for HVAC, |
RFI > Please identify the Control Points that are to be monitored and/or controlled by the DDC/BAS Control System.
A/E Response: Please note that Per Specifications Section 23 10 00 2.6, D., the facility fuel system shall include a digital PLC control system in a NEMA 12 enclosure. This controller is indicated as “FCP-1” on Drawing Sheets MP101, MP301, MP501 & MP601. The DDC/BAS System shall collect data from FCP-1 and elsewhere as required to monitor the following:
· Per Specifications Section 23 10 00 2.4, Leak Detection Systems shall be monitored.
· Per Specifications Section 23 10 00 2.5, Tank Fluid Level and Alarm Systems shall be monitored.
· Per Specifications Section 23 10 00 2.6, Fuel Oil Quality Maintenance Systems shall be monitored.
· The Oil Sensor Controller (Signal Processor) shown on Detail 3, Sheet MP401 shall be monitored.
46. Bidder’s Question: Where is the Comm. Cabinet and the DMC on the East Platform for the terminations of Feeders 20 and 21?
A/E Response:
The Comm. Cabinet is shown on Sheet E-102, on the west end of the Paralleling Switchgear, where the plan note says, “TERMINATE RACEWAY ‘T’ AT NEW 24” X 24” X 24” NEMA 4X BOX. This box shall be the Comm. Cabinet. Please note that “Raceway ‘T’”, where used in these drawings should read, “Raceway #20”. The raceway was renamed, and some instances in the drawings apparently were not changed.
The Digital Master Controller (DMC) is shown on Sheet E-102, on the east end of the Paralleling Switchgear.
| 47. | Bidder’s Question: | What does designation ‘T’ stand for in Duct Bank H and where is it feeding to and from? | |
| A/E Response: | “Raceway ‘T’”, where used in these drawings should read, “Raceway #20”. The raceway was renamed, and some instances in the drawings apparently were not changed. Duct bank ‘H’ as shown on Sheets E-101 and E-102 has nine (9) cells, but shall be changed to have ten (10) cells. On the end-view detail of the ‘H’-duct bank shown on Sheet E-101, change ‘T’ to ‘20’ and add one cell, Cell ‘21’, to the west of Cell ‘20’. Similarly, Detail H, Sheet E-102 shall be modified to show four (4) ducts in a commonly encased horizontal arrangement instead of three (3) ducts. Duct cell 21 shall be as described in the Feeder Schedule on Sheet E-603. | ||
| 48. | Bidder’s Question: | The Feeder Schedule for Feeder 20 does not match the Single-Line Diagram on E-601, please clarify? | |
| A/E Response: | The callout for “20” shown on the Single Line Diagram, Sheet E-601 is not correct. Change this call-out to say, “[(4)-#2AWG, (1)-#6 AWG EGC, 600V THWN] in 1-1/2” PVC-coated Rigid Steel suspended from structure on the underside of platform.” This shall apply to each of the three panel-board feeders shown. | ||
| 49. | Bidder’s Question: | Cable ID 20 indicated Fiber and Innderduct but does not specify the type and quantity of Fiber, please specify. | |
| A/E Response: | Fiber Optic Cables shall be as indicated in Specification Section 28 05 13, 2.5. | ||
| 50. | Bidder’s Question: | Drawing E-101 Keyed Note 4 indicates to run Fiber from the New Surveillance Cabinet to the |
Existing IT Closet. Please specify the type and quantity of the Fiber to be run.
A/E Response: Fiber Optic Cables shall be as indicated in Specification Section 28 05 13, 2.5.
See attached document: 00 01 10 TOC.
See attached document: 22 14 00- Facility Storm Drainage.
See attached document: 22 05 33- Heat Tracing for Plumbing Piping.
See attached document: 22 05 11- Common Work Results for Plumbing.
See attached document: 22 07 11- Plumbing Insulation.
See attached document: 22 05 23- General-Duty Valves for Plumbing Piping.
See attached document: VA Pipe Hangers.