VA101-17-R-0415-00005002.pdf
PDF 131 KB Posted
- Solicitation number
- VA10117R0415
About this file
VA101-17-R-0415 00005 FL National - C_C RFI I Responses.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10F18C3375-000.docx | DOCX document | |
| VA101-17-R-0415-00007001.pdf | ||
| VA101-17-R-0415-00007000.docx | DOCX document | |
| VA101-17-R-0415-00007002.pdf | ||
| VA101-17-R-0415-00006001.pdf | ||
| VA101-17-R-0415-00006000.docx | DOCX document | |
| VA101-17-R-0415-00005007.docx | DOCX document | |
| VA101-17-R-0415-00005004.pdf | ||
| VA101-17-R-0415-00005006.pdf | ||
| VA101-17-R-0415-00005008.docx | DOCX document | |
| VA101-17-R-0415-00005005.pdf | ||
| VA101-17-R-0415-00005003.pdf | ||
| VA101-17-R-0415-00005001.pdf | ||
| VA101-17-R-0415-00005000.docx | DOCX document | |
| VA101-17-R-0415-00004000.docx | DOCX document | |
| VA101-17-R-0415-00003002.docx | DOCX document | |
| VA101-17-R-0415-00002000.docx | DOCX document | |
| VA101-17-R-0415-00001000.docx | DOCX document | |
| VA101-17-R-0415-003.docx | DOCX document | |
| VA101-17-R-0415-002.docx | DOCX document | |
| VA101-17-R-0415-001.docx | DOCX document | |
| VA101-17-R-0415-004.docx | DOCX document | |
| VA101-17-R-0415-006.pdf | ||
| VA101-17-R-0415-005.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information
CONTRACTOR COMPANY:
CONSTRUCTION REQUEST
FOR INFORMATION
RFI No: ___
RFI REQUESTER: RFI DATE:
PROJECT NAME: Florida National Cemetery DESIGN FIRM:
PROJECT NUMBER:
911CM2025
CONST. PROJECT MANAGER: RFI RESPONDER: RFI DATE RESPONDED:
Requested Information/Clarification:
Fred Pearson
1. Are the Phase 1 drawings available? At a minimum, maintenance facility drawings and original public information / restroom drawings are needed.
Government Response: Attachment 1 contains useful drawings for the Maintenance Building.
The government is checking to see if PIC and public restroom facility drawings are available.
2. Are we to correct FCA Report monument deficiencies?
Government Response: FCA deficiencies associated with monuments are not in scope.
3. Page 11 paragraph 4 calls for standard plots of 3’x7’. Standard has been 3’7’8”.
Please verify if we are to use the 3’x7’8” standard.
Government Response: Use 3’ x 7’-8” for standard PPC.
May 11, 2018
Bryan BodnerBryan Bodner
May 14, 2018
C&C Contractors LLC