VA101-17-R-0415-00005002.pdf

PDF 131 KB Posted

Attached to
Florida National Cemetery - Design-Build Construction Contract for the Phase 5
Solicitation number
VA10117R0415
Issued by

About this file

VA101-17-R-0415 00005 FL National - C_C RFI I Responses.pdf

View the file

Other files

File Type Posted
36C10F18C3375-000.docx DOCX document
VA101-17-R-0415-00007001.pdf PDF
VA101-17-R-0415-00007000.docx DOCX document
VA101-17-R-0415-00007002.pdf PDF
VA101-17-R-0415-00006001.pdf PDF
VA101-17-R-0415-00006000.docx DOCX document
VA101-17-R-0415-00005007.docx DOCX document
VA101-17-R-0415-00005004.pdf PDF
VA101-17-R-0415-00005006.pdf PDF
VA101-17-R-0415-00005008.docx DOCX document
VA101-17-R-0415-00005005.pdf PDF
VA101-17-R-0415-00005003.pdf PDF
VA101-17-R-0415-00005001.pdf PDF
VA101-17-R-0415-00005000.docx DOCX document
VA101-17-R-0415-00004000.docx DOCX document
VA101-17-R-0415-00003002.docx DOCX document
VA101-17-R-0415-00002000.docx DOCX document
VA101-17-R-0415-00001000.docx DOCX document
VA101-17-R-0415-003.docx DOCX document
VA101-17-R-0415-002.docx DOCX document
VA101-17-R-0415-001.docx DOCX document
VA101-17-R-0415-004.docx DOCX document
VA101-17-R-0415-006.pdf PDF
VA101-17-R-0415-005.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

CONTRACTOR COMPANY:

CONSTRUCTION REQUEST

FOR INFORMATION

RFI No: ___

RFI REQUESTER: RFI DATE:

PROJECT NAME: Florida National Cemetery DESIGN FIRM:

PROJECT NUMBER:

911CM2025

CONST. PROJECT MANAGER: RFI RESPONDER: RFI DATE RESPONDED:

Requested Information/Clarification:

Fred Pearson

1. Are the Phase 1 drawings available? At a minimum, maintenance facility drawings and original public information / restroom drawings are needed.

Government Response: Attachment 1 contains useful drawings for the Maintenance Building.

The government is checking to see if PIC and public restroom facility drawings are available.

2. Are we to correct FCA Report monument deficiencies?

Government Response: FCA deficiencies associated with monuments are not in scope.

3. Page 11 paragraph 4 calls for standard plots of 3’x7’. Standard has been 3’7’8”.

Please verify if we are to use the 3’x7’8” standard.

Government Response: Use 3’ x 7’-8” for standard PPC.

May 11, 2018

Bryan BodnerBryan Bodner

May 14, 2018

C&C Contractors LLC