VA101-17-R-0351-00008004.pdf

PDF 280 KB Posted

Attached to
Jacksonville National Cemetery - Phase II - Design-Build
Solicitation number
VA10117R0351
Issued by

About this file

VA101-17-R-0351 00008 Jacksonville RFI III. Responsepdf.pdf

View the file

Other files

File Type Posted
36C10F18C3383-000.docx DOCX document
VA101-17-R-0351-00011001.pdf PDF
VA101-17-R-0351-00011000.docx DOCX document
VA101-17-R-0351-00010000.docx DOCX document
VA101-17-R-0351-00009000.docx DOCX document
VA101-17-R-0351-00009002.pdf PDF
VA101-17-R-0351-00009001.pdf PDF
VA101-17-R-0351-00008007.pdf PDF
VA101-17-R-0351-00008001.pdf PDF
VA101-17-R-0351-00008005.pdf PDF
VA101-17-R-0351-00008000.docx DOCX document
VA101-17-R-0351-00008006.pdf PDF
VA101-17-R-0351-00008002.pdf PDF
VA101-17-R-0351-00008003.pdf PDF
VA101-17-R-0351-00007001.pdf PDF
VA101-17-R-0351-00007000.docx DOCX document
VA101-17-R-0351-00006000.docx DOCX document
VA101-17-R-0351-00005001.pdf PDF
VA101-17-R-0351-00005000.docx DOCX document
VA101-17-R-0351-00005006.pdf PDF
VA101-17-R-0351-00005005.pdf PDF
VA101-17-R-0351-00005004.pdf PDF
VA101-17-R-0351-00005003.pdf PDF
VA101-17-R-0351-00005002.pdf PDF
VA101-17-R-0351-A00003000.docx DOCX document
VA101-17-R-0351-A00002000.docx DOCX document
VA101-17-R-0351-A00001002.pdf PDF
VA101-17-R-0351-A00001000.docx DOCX document
VA101-17-R-0351-A00001001.pdf PDF
VA101-17-R-0351-072.pdf PDF
VA101-17-R-0351-065.docx DOCX document
VA101-17-R-0351-066.pdf PDF
VA101-17-R-0351-068.docx DOCX document
VA101-17-R-0351-071.pdf PDF
VA101-17-R-0351-070.pdf PDF
VA101-17-R-0351-067.docx DOCX document
VA101-17-R-0351-069.pdf PDF
VA101-17-R-0351-064.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

CONTRACTOR COMPANY:

RFI REQUESTER: RFI DATE:

PROJECT NAME: Jacksonville National Cemetery DESIGN FIRM:

PROJECT NUMBER:

828CM2036

CONST. PROJECT MANAGER: RFI RESPONDER:

G&C Fab-Con LLC

January 19, 2018

CONSTRUCTION REQUEST

FOR INFORMATION

RFI No: 3 Cole Vettraino

David "Dave" Martino David "Dave" Martino

RFI DATE RESPONDED:

January 24, 2018

Requested Information/Clarification:

1. Is survey available in CAD and/or PDF for the project limits, including Phase II?

Government Response:

Minor survey information available is shown on the bridging documents.

Contractor shall assume to acquire additional survey meeting project requirements

2. Can you provide CAD files from the bridging documents, including site plans and all details?

Government Response:

Yes, CAD files will be available for download from our consultant’s info exchange site.

3. Can you provide CAD files for all drawings to include original building floor plans, elevations, details, etc. for both the Admin and Maintenance buildings?

Government Response:

Yes, CAD files will be available for download from our consultant’s info exchange site.

4. Can we stockpile soils from Pond 5 onsite for future development?

Government Response:

Stockpiling of soil for future development will not be permitted.

5. Can you provide the final construction plans and stormwater calculations for Phases 1A and 1B?

Government Response:

As-built information will be available for download from our consultant’s info exchange site.

Stormwater calculations are not available

6. Can you please provide the details of the original columbarium to determine how the caps are fastened?

Government Response:

As-built information will be available for download from our consultant’s info exchange site.

7. The onsite soil is high in clay content and saturated from the high groundwater table. Can you please confirm that the onsite soil will not be suitable as fill “as is”, and this material will most likely require amendment and/or import?

Government Response:

The Contractor is to assume onsite soil will not meet percolation requirements and will require amendment. The Contractor shall be responsible to present a soil amendment plan indicating how they are meeting the requirements of 4.2 within the narrative.