FACTOR 4 – COST
SUBMISSION REQUIREMENTS
Cost proposals shall be evaluated based on completeness, reasonableness, and realism. The Offeror shall provide a breakdown of their proposal by CLIN Item and major feature as identified below. Totals for each CLIN Item shall match the summary totals listed on the
STANDARD FORM 1442.
Offeror: Solicitation No.:
Cost Proposal Break-down
CLIN Description Cost Totals
CLIN 001 - BASE BID
General Construction
General Requirements General Requirements Insurance & Bonding Overhead & Profit Taxes & Permits (Break out all taxes):
Sales and Use Tax B2B Municipal Tax Sub-Total - General Requirements Administration/PIC Building Maintenance Building and Yard (incl Honor Guard space) Committal Service Shelters (2)
Early Turnover Area (Site Development, Temporary Facilities, Yards, Roads, Infrastructure, Committal Shelter, Irrigation, 1,486 PPC (incl inspection, off-load, storage and install), 1,750 IGC, 300 Alternative Burial Section, Completion within 12 months from NTP)
Site Development Site Work and Utilities Landscaping (Turf, Grass, Trees, Shrubs, and Plants) Roadways, Parking Lots, and Pedestrian Sidewalks Public Assembly Area Memorial Wall/Ossuary (incl inspection, off-load, storage and install of 150
Memorial Wall markers) Memorial Walk Entry Feature Irrigation System and Pump House Drainage and Storm Water Management Wells and Pump Station/Enclosure
Offeror: Solicitation No.:
Cost Proposal Break-down
CLIN Description Cost Totals Pedestrian Sidewalks Physical Security Systems GIS/GPS Integration
Final Burial Sections (7314 PPC and 450 Oversize Crypts (incl inspection, off-load, storage, and install), 50 Traditional, 3,020-niche columbarium, and inspection, off-load, storage, and install of 3020 niche covers, and restoration of ETO Area)
Site Improvements (Signage, Benches, Watering Stations, Lighting, etc)
Total Costs - CLIN 001A
COST-SAVING MEASURES
PRIORITY ORDER
FILL MATERIAL TO BE OBTAINED FROM FUTURE PHASES 8, 9 AND 10 ( )
ON-SITE STORAGE OF DEBRIS ( )
RE-DESIGN RETAINING WALL FROM REINFORCED CONCRETE TO MSE WALL ( )
RE-DESIGN STORMWATER POND LINER LAYERING SYSTEM ( )
RE-DESIGN MATERIAL FOR STORM SEWER PIPES (RCP TO PVC) ( )
DESIGN AND MANUFACTURING OF WATER AND FUEL TANKS ( )
RE-DESIGN MAINTENANCE YARD FENCE (RCP TO CHAIN LINK) ( )
RE-DESIGN LANDSCAPING PLAN ( )
RE-DESIGN IRRIGATION SYSTEM
RE-DESIGN MEMORIAL WALK AREA ( )
RE-DESIGN MEMORIAL WALL AND OSSUARY AREA ( )
RE-DESIGN EARLY TURN OVER (ETO) AREA ( )
RE-DESIGN PAVEMENT SECTIONS FROM CONCRETE TO ASPHALT ( )
RE-DESIGN BRIDGE, ROAD, AND UTILITIES AT BACK MAINTENANCE ENTRANCE/EXIT ( )
RE-DESIGN HEADSTONE SUPPORT SYSTEM FOR IN-GROUND CREMAIN GRAVESITES ( )
RE-DESIGN COMMITTAL SHELTER #2 AREA ( )
CLIN 001B
Procure and manufacture 9,250 pre-placed crypts
Total Costs - CLIN 001B
| FACTOR 4 – COST |
| SUBMISSION REQUIREMENTS |