Pt 02B--Schedule A MCW - Traverse City, MI.docx

DOCX document 38 KB Posted

Attached to
TRAVERSE CITY, MI CBOC Clarification #1
Solicitation number
VA10115R0222
Issued by

About this file

VA10115R0222 Attachment

View the file

Other files

File Type Posted
VA101-15-R-0222-015.docx DOCX document
VA101-15-R-0222-011.docx DOCX document
VA101-15-R-0222-012.pdf PDF
Pt 08U--SF-3881 and Instructions - Vendorizing Form.doc DOC document
Pt 08N--Cert of Curr Cost or Pricing Data.doc DOC document
Pt 01--BasicRequirements - Traverse City, MI.PDF PDF
Pt 08I--GSA527 - Oct 2015.pdf PDF
Pt 08F(2)--Modified General Clauses.pdf PDF
Pt 05B--Schedule D - Traverse City, MI.xls XLS spreadsheet
Pt 08B(2) -- Attachment 1 to 1364 - Traverse City.xlsx XLSX spreadsheet
Pt 05A--Schedule D - Traverse City, MI.pdf PDF
Pt 08D--GSA1217 - Nov 2016.pdf PDF
Pt 08G--GSA_Form_3518-SAM_Reps_and_Certs_Addendum.pdf PDF
Pt 09A--Conceptual Plans - Traverse City, MI.pdf PDF
Pt 09B--PDF Drawings.zip ZIP file
Pt 10A--Schedule F -Traverse City, MI.pdf PDF
Pt 03A--Schedule B - Traverse City, MI.pdf PDF
Pt 07--Labor Standards Provision - Traverse City, MI.pdf PDF
Pt 08M--SF 25_Performance Bond - Exp 07-31-19.pdf PDF
Pt 08B(1)--GSA Form 1364A - Dec 2004.doc DOC document
Pt 06A--Schedule E - Traverse City, MI.pdf PDF
Pt 08F(1)--GSA Form 3517B_06_07_16.pdf PDF
Pt 08P--Seismic Certificates_A - F - Sept 2012.pdf PDF
Pt 08T--FAR Clause 52.209-5 - Oct 2015.pdf PDF
Pt 08L--SF 25A - Payment Bond - Exp 07-31-19.pdf PDF
Pt 08J —
Pt 04A--Schedule C - Traverse City, MI.pdf PDF
Pt 08C--1364A - Guidance.doc DOC document
Pt 08E--GSA3516 - Apr 2015.pdf PDF
Pt 08S--FAR 52.204-10 Reporting Exec Comp Oct 2016.pdf PDF
Pt 08A--Forms Divider.pdf PDF
Pt 08R--VA National Rules of Behavior.pdf PDF
Pt 08H--SF330 - Mar 2013.pdf PDF
Pt 02A--Schedule A - Traverse City, MI.pdf PDF
Pt 06B--Schedule E - Traverse City, MI.xlsx XLSX spreadsheet
Pt 08W--Offering Entity Acknowledgment Page.pdf PDF
Pt 04B-- Schedule C -Traverse City, MI.xls XLS spreadsheet
Pt 09C--CAD Drawings.zip ZIP file
Pt 01--BasicRequirements - Traverse City, MI.DOC DOC document
Pt 08Q--FPLS 12000 - May 2015.pdf PDF
Pt 08O--Cert of Build Energy Performance.doc DOC document
Pt 08K--SF24_Bid Bond - Exp 07-31-19.pdf PDF
Pt 10B--Schedule F -Traverse City, MI.xlsx XLSX spreadsheet
PT 08V--Contractor Confidentiality Cert_PS Design Stds Data Def.pdf PDF
Pt 08J —
VA101-15-R-0222-010.docx DOCX document
VA101-15-R-0222-005.docx DOCX document
VA101-15-R-0222-003.docx DOCX document
VA101-15-R-0222-001.pdf PDF
VA101-15-R-0222-000.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMUNITY-BASED

MAY 2017

SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO No. VA101-15-R-0222

TRAVERSE CITY, MI

FMA WORKSHEET

1. SOLICITATION FOR OFFERS
2. BUILDING NAME AND ADDRESS (No., street, city, state, and zip code)
Part I – Annual Operating Expenses
Materials
Labor
Total

A. Cleaning, Janitor and/or Char Service

3. Salaries (Enter on Line 5 GSA form 1217)

4. Supplies (wax, cleaners, cloths, etc.) (Enter on Line 6 GSA form 1217)

5. Contract Services (window washing, waste and snow removal) (Enter on Line 7 GSA form 1217)

B. Heating System Maintenance and Repair

6. Salaries (Enter on Line 8 GSA form 1217)

7. Filters, belts, lubricants, fluids, supplies

8. Labor (includes contracted work)

9. Subtotal Heating System (Add Lines 7 and 8. Enter result here and on Line 10 GSA form 1217)

C. Electrical System Maintenance and Repair

10. Bulbs, Tubes, Starters (Enter on Line 12 GSA form 1217)

11. Ballasts, fixtures, devices, etc.

12. Small tools and expendable supplies

13. Labor (includes contracted work)

14. Subtotal Electrical System (Add Lines 11 to 13. Enter result here and on Line 14 GSA form 1217)

D. Plumbing System Maintenance and Repair

15. Soap, towels, tissues not in Line 4 above (Enter on Line 16 GSA form 1217)

16. Fixtures, pipe and fittings

17. Small tools and expendable supplies

18. Labor (includes contracted work)

19. Subtotal Plumbing System (Add Lines 16 to 18. Enter result here and on Line 17 GSA form 1217)

E. Air Conditioning System Maintenance and Repair

20. Filters, belts, lubricants, fluids, supplies

21. Labor (includes contracted work)

22. Subtotal A/C System (Add Lines 20 to 21. Enter result here and on Line 19 GSA form 1217)

F. Elevators

23. Salaries (operators, starters, etc) (Enter on Line 20 GSA form 1217)

24. Small tools and expendable supplies

25. Labor (includes contracted work)

26. Subtotal Elevators (Add Lines 24 and 25. Enter result here and on Line 21 GSA form 1217)

G. Miscellaneous

26. Building Engineer/Manager (Enter on Line 22 GSA form 1217)

27. Security (Watchmen, Guards) (Enter on Line 23 GSA form 1217)

28. Social Security Tax and Workmen’s Compensation Insurance (Enter on Line 24 GSA form 1217)

29. Landscape and Grounds (materials, fertilizers, supplies)

30. L/S and Grounds Labor (includes contracted work)

31. Lawn and Landscaping (Add Line 30 and 31. Enter result here and on Line 25 GSA form 1217)

32. Other (Explain on separate sheet. Include Schedule B Special Requirement Items) (Enter amount here and on Line 26 GSA form 1217)

33. Subtotal – Annual Operating Expenses

34. SOLICITATION FOR OFFERS

35. Annual Operating Expenses (from Part I, Line 33 above)

Replacement Cost

Useful Life (Years)
Annual

Reserve

A. Exterior and Grounds

36. Parking Lot and Road Repair and/or Resurfacing

37. Sidewalks

38. Landscaping / Lawn Care (Equipment)

39. Exterior Painting

40. Windows

41. Roof

B. Building and Equipment

42. Doors

43. Floor Coverings (other than Carpeting)

44. Carpeting

45. Interior Painting

46. Wall Coverings

47. Ceilings

48. Blinds / Drapes

49. Dock Leveler

50. Elevators

51. HVAC (include refrigeration equipment and cooling towers)

52. Air Handling Equipment

53. Exhaust Systems

54. Special HVAC Systems

55. Plumbing Systems (supply, waste and vent)

56. Hot Water Heater

57. Fire Protection (fire suppression systems)

58. Electrical Systems (distribution and power)

59. Generator

60. Fire Alarm System

61. Communications and Signal Systems

62. Security Systems

63. Light Fixtures

64. Schedule B Special Requirement Items

C. Other / Miscellaneous (attach additional sheets if necessary)

65.

66.

67.

68.

69.

70. Subtotal Capital Reserve (Add Lines 36 to 69. Enter result here and on Line 30 of GSA Form 1217)

71. Annual Reserve Grand Total (Add Line 35 and 70. Enter result here).

Schedule A – Page 6 of 7

Lessor __________ Gov’t. __________ __________ of __________ Pages

File details come from the government source that posted it. Updated .