This document provides details for a federal contract solicitation to upgrade the fire alarm system at the Temple VA medical center in Temple, Texas. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 seeking bids to upgrade the fire alarm system in Phase 2 of the project under Solicitation Number 36C25722B0021. Bids are due by the specified date to upgrade the fire alarm system as described in the project details for work to be completed at the Temple VA located at 1901 Veterans Memorial Dr in Temple, Texas. The purpose of the project is to upgrade the fire alarm system in Phase 2 of the work at the specified location.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--674-22-801 Upgrade Fire Alarm System Phase 2, newest first.
File Type Posted
Temple Fire Alarm Phase II - Addendum 002.pdf PDF
36C25722B0021 0012.docx DOCX document
Building 202 with existing mechanical drawings.pdf PDF
163 Mechanical drawings.pdf PDF
2nd set of RFIs 36C25722B0021 Upgrade Fire Alarm System.docx DOCX document
36C25722B0021 0011.docx DOCX document
204 Mechanical Drawings.pdf PDF
36C25722B0021 0010.docx DOCX document
36C25722B0021 0009.docx DOCX document
36C25722B0021 0008.docx DOCX document
36C25722B0021 0007.docx DOCX document
Sign in sheet for 2nd Site visit .pdf PDF
36C25722B0021 0006.docx DOCX document
RFIs 36C25722B0001 Upgrade Fire Alarm System Phase 2.docx DOCX document
Temple Phase II Addendum 1 Summary.doc DOC document
Responses RFI Upgrade Fire Alarm System Phase 2.docx DOCX document
VA TEM FA ADDENDUM 1 Drawings Phase 2 signed.pdf PDF
Submittal 28 31 00 PD 00 Fire Alarm Product Data.pdf PDF
Professional Seals FPE signed.pdf PDF
VA TEM FA ADDENDUM 1 Narrative Phase 2.pdf PDF
Submittal 28 31 00 PD2 00 Fire Alarm Product Data.pdf PDF
36C25722B0021 0005.docx DOCX document
VA TEM FA ADDENDUM 1 Specifications Phase 2.pdf PDF
36C25722B0021 0004.docx DOCX document
36C25722B0021 0003.docx DOCX document
36C25722B0021 0002.docx DOCX document
36C25722B0021 0001.docx DOCX document
VA TEMPLE PHASE II - DESIGN NARRATIVE_01.pdf PDF
VA TEMPLE PHASE II - BID SET SPECS_SIGNED_01.pdf PDF
36C25722B0021_1.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Above finished floor AFF Acoustic ACST Acoustic Panel Ceiling APC Addendum ADD Alternate ALT Aluminum AL Angle L Approximate APPROX Architecture, architectural ARCH Asbestos ASB Asphalt ASPH Assistant ASST Association ASSN Automatic AUTO Average AVG Base plate BP Basement BSMT Beam BM Bearing BRG Bedroom BR Benchmark BM Board BD Boiler BLR Bottom BOT Brick BRK Building line BL Building BLDG Built-up-roof BUR Cabinet CAB Carpet CPT Catalog CAT Ceiling height CH Ceiling CLG Center CTR Centerline CL Ceramic Tile CT Ceramic CER Chalkboard CB Clear CLR Closet CLO Coated CTD Cold rolled CR Column COL Company CO Composition COMP Concrete Masonry Unit CMU Concrete CONC Construction joint CJ Construction CONSTR "Continue, Continuous" CONT Corridor CORR Countersink CSK Cubic CU Curve(d) CRV Dampproofing DP Degree DEG Department(al) DEPT Detail DET Diagonal DIAG Diameter DIA Dimension DIM Dishwasher DW Dispenser DISP Door DR Double DBL Double-hung DH Down DN Downspout DS Drain DR Drawing DWG Each EA East E Electric Water Cooler EWC "Electric, electrical" ELEC Elevation EL Elevator ELEV Engineer ENGR Entrance ENTR Equal EQ Equipment EQUIP Exhaust EXH Existing EXIST Expansion joint EXP JT Exposed EXP Exterior EXT Fabricate FAB Face of Stud F. OF S.

Fan Coil Unit FCU Fiberglass-reinforced plastics FRP Finish FIN Finished Floor FF Fire Extinguisher FE Fire Extinguisher & Cabinet FEC Fire Retardant Treated FRT Fireproof FPRF Fixture FXTR Flange FLG Flashing FL Floor FL Floor drain FD Flooring FLG Fluorescent FLUOR

Footing FTG Foundation FDN Furnish(ed), furniture FURN Furring FURR Gage (gauge) GA Galvanize(d) GALV Galvanized Iron GALVI Glazed Wall Tile GWT Grab Bar GB Grade GR Gravel GVL Gypsum Wallboard GWB Gypsum GYP Handicapped HC Hardware HDW Heating ventilating and HVAC air conditioning Height HGT High Point HPT High Performance HP High Performance Coating HPC Hollow Metal HM Horizontal HORIZ Include(d), inclusive INCL Incorporated INC Information INFO Inside diameter ID Install(ed), installation INSTL Insulation INSUL Interior INT Janitor JAN Joint JT Joist J, JST Junction box JB Knock down KD Laboratory LAB Lavatory LAV Left Hand LH Left L Length LG Level LVL Light LT Machine MACH Maintenance MAINT Manager MGR Manual MNL Manufacturing MFG Markerboard MB Masonry opening MO Masonry MSNRY Master bedroom MBR Material MATL Maximum MAX Mechanical MECH Membrane MEMB Men M Metal MET, MTL Mezzanine MEZZ Minimum MIN Mirror MIR Miscellaneous MISC Mounted MTD Mounting MTG Necessary NEC Noise-reduction coefficient NRC Nominal NOM Non Combustible NC, NONCOM North N Not in Contract NIC Not to scale NTS Not available NA Number NO Office OFF On center OC Opening OPNG Opposite OPP Outside diameter OD Overall OA Overhead OVHD Page P Painted PTD Pair PR Panel PNL Partition PTN Percent PCT Perforate(d) PERF Permanent PERM Perpendicular PERP Piece PC Plastic Laminate PLAM Plastic Laminate PLAS.LAM Plate PL Plumbing PLMB Plywood PLYWD Point PT Polyvinyl chloride PVC Precast PRCST Prefabricated PREFAB Preliminary PRELIM Preparation, prepare PREP Program PRGM Projection Screen PS

Project PROJ Property PROP Public Address PA Quality control QC Quality QUAL Quantity QTY Quarry Tile QT Radius RAD Rain Leader RL Received RCVD Receptacle RCPT Receptionist RECPT Recess(ed) REC Refer, reference REF Refrigerate, refrigerator REFR Reinforce REINF Reinforced concrete RC Remove RMV Repair RPR Required REQD Revise, revision REV Right hand RH Road RD Roof Drain RD Roof RF Roofing RFG Room RM Rubber tile floor RTF Rubber RBR Schedule SCHED Schematic SCHEM Section SECT Service SVCE "Sheet, sheeting" SHT Shower SH Siding SDG Similar SIM Slope SL Sound-transmission class STC South S Speaker SPKR Specification SPEC Sprinkler SPR Square SQ Stainless steel SS Standard STD Standpipe SP Steel STL Storage STOR Structural Glazed Facing Tile SGFT Structural, structure STRUCT Substitute SUBST Surface SURF Suspend(ed) SUSP Switch SW Symmetrical SYM System SYS Tackboard TB Tackstrip TS Telephone TEL Television TV Temporary TEMP Terrazzo TER Thick THK Through THRU Toilet T Tongue and groove T&G Top and bottom T&B Top chord TC Top of Masonry Parapet TMP Top of Bearing TOFB Top of Steel T.O.S.

Topping TOPG Total TOT Transformer XFMR Transom TR Transparent TRANS Tread TRD Threshold THRESH Typical TYP Underground UG Underwriters Laboratories UL Unfinished UNF Unit Ventilator UV Unless Otherwise Noted UON Urinal UR US Gypsum Company USG Vertical VERT Vestibule VEST, V Vinyl Reducing Strip VRS Vinyl Composite Tile VCT Vinyl asbestos tile VAT Wardrobe WARD Water closet WC Waterproof WP Weight WT Welded WLD Welded Wire Mesh WWM With W/ Without W/O Women W Wood WD Wrought Iron WI

A100A

SIM

A101

SIM

DEPT.

ADD

GRID LINES

SECTIONS

DETAIL NUMBER

SHEET NUMBER

DETAIL NUMBER

SHEET NUMBER

DETAILS IN PLAN/SECTION

ROOM NUMBER

DOOR NO. ON PLAN

H.M. FRAME

NO. ON PLAN

REVISION: TYPE =

A.S.I/P.R./C.C.D./ADD.

CASEWORK

(FURNISHING PLANS ONLY)

ALUM. FRAME/WINDOW

TYPE

WALL TYPE

# # INTERIOR ELEVATION

DETAIL NUMBER

SHEET NUMBER

A3

ROOM NAME

B101a

BOUNDARY INDICATES

BUILDINGS INCLUDED IN

THIS PACKAGE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

Drawing of

11/09/2021

100% BID SET SUBMISSION 1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSDLO

COVER SHEET

GI001

-1

-1

G I0

/0

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

Fire Alarm Campus Upgrade Phase II

Temple VA Medical Center 1901 Veterans Memorial Drive

Temple, TX 76504

100% CD Submission 674-22-801

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

FIRE PROTECTION:

GI003 PENETRATION DETAILS X X

GI002 SITE ORIENTATION PLAN X

GI001 COVER SHEET X X X

GENERAL:

SHEET NUMBER SHEET NAME 35% 65% 100% 100% FINAL

163-FA105 BUILDING 163 - FIRE ALARM PLAN - LEVEL 5 - OVERALL

163-FA104 BUILDING 163 - FIRE ALARM PLAN - LEVEL 4 - OVERALL

163-FA103 BUILDING 163 - FIRE ALARM PLAN - LEVEL 3 - OVERALL

163-FA102-D BUILDING 163 - FIRE ALARM PLAN - LEVEL 2 - AREA D

163-FA102-CM BUILDING 163 - FIRE ALARM PLAN - LEVEL 2 - AREA CM

163-FA102-C BUILDING 163 - FIRE ALARM PLAN - LEVEL 2 - AREA C

163-FA102-AB BUILDING 163 - FIRE ALARM PLAN - LEVEL 2 - AREA AB

163-FA102 BUILDING 163 - FIRE ALARM PLAN - LEVEL 2 - OVERALL

163-FA101-BCD BUILDING 163 - FIRE ALARM PLAN - LEVEL 1 - AREA BCD

163-FA101-BC BUILDING 163 - FIRE ALARM PLAN - LEVEL 1 - AREA BC

163-FA101-ABD BUILDING 163 - FIRE ALARM PLAN - LEVEL 1 - AREA ABD

163-FA101-AB BUILDING 163 - FIRE ALARM PLAN - LEVEL 1 - AREA AB

163-FA101 BUILDING 163 - FIRE ALARM PLAN - LEVEL 1 - OVERALL

163-FA100-BCD BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA BCD

163-FA100-BC BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA BC

163-FA100-ABD BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA ABD

163-FA100-AB BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA AB

163-FA100 BUILDING 163 - FIRE ALARM PLAN - BASEMENT - OVERALL

163-FA001 BUILDING 163 - FIRE ALARM GENERAL NOTES AND DETAILS

X

X X

X

X

X

202-FA102-D BUILDING 202 - FIRE ALARM PLAN - LEVEL 2 - AREA D

202-FA102-C BUILDING 202 - FIRE ALARM PLAN - LEVEL 2 - AREA C

202-FA102-B BUILDING 202 - FIRE ALARM PLAN - LEVEL 2 - AREA B

202-FA102-AF BUILDING 202 - FIRE ALARM PLAN - LEVEL 2 - AREA AF

202-FA102 BUILDING 202 - FIRE ALARM PLAN - LEVEL 2

202-FA101-EW BUILDING 202 - FIRE ALARM PLAN - LEVEL 1 - AREA EW

202-FA101-EE BUILDING 202 - FIRE ALARM PLAN - LEVEL 1 - AREA EE

202-FA101-D BUILDING 202 - FIRE ALARM PLAN - LEVEL 1 - AREA D

202-FA101-C BUILDING 202 - FIRE ALARM PLAN - LEVEL 1 - AREA C

202-FA101-B BUILDING 202 - FIRE ALARM PLAN - LEVEL 1 - AREA B

202-FA101-AF BUILDING 202 - FIRE ALARM PLAN - LEVEL 1 - AREA AF

202-FA101 BUILDING 202 - FIRE ALARM PLAN - LEVEL 1

202-FA001 BUILDING 202 - FIRE ALARM GENERAL NOTES AND DETAILS

X

X X

X

BUILDING 204 - FIRE ALARM PLAN - LEVEL 6 - AREA K

BUILDING 204 - FIRE ALARM PLAN - LEVEL 6 - AREA J

BUILDING 204 - FIRE ALARM PLAN - LEVEL 6 - AREA G

BUILDING 204 - FIRE ALARM PLAN - LEVEL 6

BUILDING 204 - FIRE ALARM PLAN - LEVEL 5 - AREA K

BUILDING 204 - FIRE ALARM PLAN - LEVEL 5 - AREA J

BUILDING 204 - FIRE ALARM PLAN - LEVEL 5 - AREA G

BUILDING 204 - FIRE ALARM PLAN - LEVEL 5

BUILDING 204 - FIRE ALARM PLAN - LEVEL 4 - AREA K

BUILDING 204 - FIRE ALARM PLAN - LEVEL 4 - AREA J

BUILDING 204 - FIRE ALARM PLAN - LEVEL 4 - AREA G

BUILDING 204 - FIRE ALARM PLAN - LEVEL 4

BUILDING 204 - FIRE ALARM PLAN - LEVEL 3 - AREA K

BUILDING 204 - FIRE ALARM PLAN - LEVEL 3 - AREA J

BUILDING 204 - FIRE ALARM PLAN - LEVEL 3 - AREA G

BUILDING 204 - FIRE ALARM PLAN - LEVEL 3

BUILDING 204 - FIRE ALARM PLAN - LEVEL 2 - AREA K

BUILDING 204 - FIRE ALARM PLAN - LEVEL 2 - AREA J

BUILDING 204 - FIRE ALARM PLAN - LEVEL 2 - AREA G

BUILDING 204 - FIRE ALARM PLAN - LEVEL 2

BUILDING 204 - FIRE ALARM PLAN - LEVEL 1 - AREA K

BUILDING 204 - FIRE ALARM PLAN - LEVEL 1 - AREA J

BUILDING 204 - FIRE ALARM PLAN - LEVEL 1 - AREA G

BUILDING 204 - FIRE ALARM PLAN - LEVEL 1

BUILDING 204 - FIRE ALARM PLAN - BASEMENT LEVEL - AREA G

BUILDING 204 - FIRE ALARM PLAN - BASEMENT LEVEL

BUILDING 204 - FIRE ALARM GENERAL NOTES AND DETAILS

204-FA106-K

204-FA106-J

204-FA106-G

204-FA106

204-FA105-K

204-FA105-J

204-FA105-G

204-FA105

204-FA104-K

204-FA104-J

204-FA104-G

204-FA104

204-FA103-K

204-FA103-J

204-FA103-G

204-FA103

204-FA102-K

204-FA102-J

204-FA102-G

204-FA102

204-FA101-K

204-FA101-J

204-FA101-G

204-FA101

204-FA100-G

204-FA100

204-FA001

ELECTRICAL:

ELECTRICAL PLAN – LEVEL 1

ELECTRICAL PLAN – LEVEL 1

ELECTRICAL PLAN – LEVEL 1

163-E101

202-E101

204-E101

X

X X X

X X

X X X X

X X

X X X X

X X

X X X X

X X X X

X X X X

X X X X X X

X X

CAMPUS MAIN FIRE

ALARM CONTROL PANEL

IN BUILDING 58 & 204

FACP RM 102

BUILDING 53

FACP RM 101

BUILDING 55

FACP

BUILDING 46

FACP RM A23

BUILDING 171

FACP RM 10

BUILDING 158

FACP RM E133

BUILDING 147

FACP RM 102

BUILDING 222

FACP RM C1-29

BUILDING 202

FACP W. WALL

BUILDING 62FACP

BUILDING 58

FACP RM 1A-102 / RM 1C-102

BUILDING 221

FACP CORR. 115

BUILDING 220

FACP W. WALL

BUILDING 206

FACP RM 1R40

BUILDING 205

FACP RM 1G23

BUILDING 204

FACP CORR. 102

BUILDING 64

FACP RM C1-4

BUILDING 99

FACP CORR. C1

BUILDING 146

BUILDING 201

NOTE: BUILDINGS 209, 214, AND 215 ARE NOT INCLUDED IN THE ALARM REPLACEMENT

SCOPE FOR THIS PROJECT. THESE BUILDINGS ARE MONITORED BY THE FIRE ALARM

CONTROL PANEL IN BUILDING 171. THESE BUILDINGS WILL NEED TO BE MONITORRED

BY THE NEW ALARM CONTROL PANEL AND MAIN CONTROL UNITS. THE SAME HOLDS

TRUE FOR BUILDINGS 200, AND 201 IN REGARDS TO BUILDING 204.

FACP

BUILDING 47

BUILDING 200

FACP IN CORR.

B/W 46 & 47

FACP

BUILDING 44

FACP

BUILDING 45

BUILDING 215

BUILDING 209

BUILDING 214

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

Drawing of

11/09/2021

100% BID SET SUBMISSION 1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSDLO

SITE ORIENTATION PLAN

GI002

-1

-1

G I0

/2

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

Building # Building Name

SCALE: NTS

A15

VA TEMPLE - SITE ORIENTATION PLAN

SCALE: NTS

C5

VA TEMPLE - CAMPUS FIRE ALARM RISER DIAGRAM

NOTE: BLDG 204

INCLUDED IN PHASE II

NOTE: BLDG 202

INCLUDED IN PHASE II

Teague Tower Hosp. Clinics, Surg, Lab, Rad, cafeteria, gift store

Domicilliary, WTRC, Mental Health Clinic

Teague Hospital

TER - FIRE

: PHASE II

FIRE RESISTANT RATED WALL CONSTRUCTION

THROUGH PENETRATION FIRESTOPPING SYSTEM

PROVIDE SYSTEM IN ACCORDANCE WITH FIRESTOPPING SCHEDULE

WALL PENETRATION - SEE DRAWINGS

SLAB PENETRATION - SEE DRAWINGS

THROUGH PENETRATION FIRESTOPPING SYSTEM

PROVIDE SYSTEM IN ACCORDANCE WITH

FIRESTOPPING SCHEDULE

FIRE RESISTANCE RATED FLOOR CONSTRUCTION

FLOOR PIPE PENETRATION

UL No: F-L-1020

JOINT SEALANT APPLIED

WITHIN OPENING

METAL PIPE

CONCRETE OVER COMPOSITE

STEEL DECK

MINERAL WOOL INSULATION

JOINT SEALANT

JOINT SEALANT

MINERAL WOOL

INSULATION

METAL PIPE

FLOOR PIPE PENETRATION

UL No: F-L-5014

JOINT SEALANT APPLIED

WITHIN OPENING

METAL PIPE

CONCRETE OVER COMPOSITE

STEEL DECK

MINERAL WOOL INSULATION

JOINT SEALANT

JOINT SEALANT

MINERAL WOOL

INSULATION

GLASS FIBER INSULATION

GLASS FIBER

INSULATION

METAL PIPE

SINGLE CONDUIT/PIPE PENETRATION

UL No: W-L-1063

JOINT SEALANT

PIPE / CONDUIT

JOINT SEALANT

RATED WALL ASSEMBLY - VERIFY

WALL TYPE IN FIELD

48" MAX

V A

R

IE

S

6" M

A X

2" MAX, 1" MIN

1" M

A X

MULTIPLE CONDUIT/PIPE PENETRATIONS

UL No: W-L-1063

MINERAL WOOL INSULATION

WALL TYPE, SEE PLAN

MINERAL WOOD INSULATION

MINERAL WOOL INSULATION

WALL TYPE, SEE PLAN

WALL TYPE, SEE PLAN

SINGLE CONDUIT/PIPE PENETRATION

UL No: W-L-5044

PIPE/CONDUIT

FORMING MATERIAL

JOINT SEALANT

VERIFY WALL TYPE IN FIELD

JOINT SEALANT

PIPE / CONDUIT

WALL TYPE

SMALL PENETRATIONS IN PARTITIONS

RATED UP TO 2 HOURS

NO TREATMENT REQUIRED FOR UP

TO 1/8" GAP

MAXIMUM GAP 1/4"

MAXIMUM GAP 1/2", FILL TO FULL DEPTH

OF DRYWALL AND STRIKE OFF AT FACE

OF DRYWALL, DO NOT SPREAD BEYOND

OPENING

2'-0" (PER UL)

SHALLOW FIVE SIDED BOX

RATED WALL ASSEMBLY-

SEE PARTITION TYPES FOR

NUMBER OF LAYERS OF

GYPSUM BOARD

ELECTRICAL JUNCTION BOX

16 SQ INCH MAX OPENING

MAX 100 SQ INCHES IN 100 SQ FEET

LAMINATE BACK PIECE

TO WALLBOARD

REQUIRED BOX EXCEEDS 16 SQ INCHES

OR AGGREGATE SUM OF BOXES

EXCEEDS 100 SQ INCHES IN 100 SQ

FEET OF WALL AREA

ADJACENT ELECTRICAL BOXES

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

Drawing of

11/09/2021

100% BID SET SUBMISSION 1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

EWMDLO

PENETRATION DETAILS

GI003

-1

-1

G I0

/1

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: NTS

A5

THROUGH PENETRATION FIRESTOP SYSTEM KEY

SCALE: NTS

F6

PENETRATION DETAIL

SCALE: NTS

F3

PENETRATION DETAIL

SCALE: NTS

A9

PENETRATION DETAIL

SCALE: NTS

D9

PENETRATION DETAIL

SCALE: NTS

D6

PENETRATION DETAIL

SCALE: NTS

D3

PENETRATIONS

SCALE: NTS

F9

ELECTRICAL JUNCTION BOX DETAIL

TER - FIRE

F

S

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

CODE DATA

OCCUPANCY HEALTHCARE

SPRINKLERS FULLY SPRINKLERED

NOTIFICATION SPEAKERS, STROBES AND COMBINATION SPEAKER-STROBES IN

NORMALL OCCUPIED AREAS

DETECTION MANUAL PULL-STATIONS, SPRINKLERS, SMOKE DETECTOR AT

FACP, CO DETECTOR AT FUEL FIRED EQUIPMENT

FIRE ALARM

ZONING

FIRE ALARM SYSTEM ZONING TO MATCH EXISTING SMOKE

ZONES

1. PROVIDE AND INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT THE BUILDING

PER THE VA DESIGN GUIDE AND NFPA 72. REFER TO SPEC SECTION 28 31 00

INTERIOR FIRE ALARM SYSTEM. FIRE ALARM SYSTEM WILL BE ZONED PER FLOOR.

2. ALL EXISTING FIRE ALARM DEVICES, PANELS AND RELATED EQUIPMENT ARE TO

BE DEMOLISHED. EXISTING ALARM SYSTEMS MUST REMAIN IN-SERVICE AND

FUNCTIONAL WHILE NEW ALARM SYSTEM IS INSTALLED. FOLLOW ILSM

PROTOCOLS FOR SHUTDOWN AND PHASE DEMO OF EXISTING ALARM SYSTEM SO

THAT REMOVAL ONLY OCCURS ONCE NEW ALARM SYSTEM IS FULLY INSTALLED

AND FUNCTIONAL.

3. THE NEW FIRE ALARM SYSTEM SHALL REPORT TO THE MAIN GRAPHIC

ANNUNCIATOR IN BUILDING 58. A SECONDARY MONITORING STATION SHALL BE

INSTALLED IN THE POLICE ROOM IN BUILDING 204. THE EXISTING CAMPUS FIRE

ALARM SYSTEM WILL NOT BE REUSED AND A NEW CAMPUS WIDE SYSTEM IS TO

BE PROVIDED, SEE FIRE ALARM SITE PLAN.

4. COORDINATE FIRE ALARM SYSTEM DEVICE LOCATIONS WITH LIGHT FIXTURES,

STRUCTURAL MEMBERS, SPRINKLER HEADS AND PIPING, HVAC EQUIPMENT AND

DUCTWORK.

5. ALL EXISTING INTERFACING DEVICES (TAMPERS, FLOWS, PRESSURE SWITCHES,

ETC) WILL BE CONNECTED TO THE NEW FA SYSTEM AND REPORT TO THE MAIN

GRAPHIC ANNUNCIATORS IN BUILDINGS 58, AND 204. INTERFACING DEVICES ARE

SHOWN WHEN LOCATIONS ARE KNOWN, HOWEVER THE DRAWINGS SHOULD NOT

BE USED AS AN EXHAUSTIVE LIST.

6. ALL EXISTING DOOR HOLDING/CLOSING DEVICES TO BE TIED IN TO THE NEW FA

SYSTEM AND REPORT TO THE MAIN GRAPHIC ANNUNCIATORS. EXISTING

LOCATIONS ARE SHOWN WHERE THE CLOSER IS REQUIRED FOR SMOKE

COMPARTMENTS.

7. THE CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND

SATISFACTORILY OPERATING SYSTEMS AS INDICATED ON THE CONTRACT

DOCUMENTS AND AS EVIDENTLY INTENDED. IT IS NOTED THAT THE DRAWINGS

ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENTS OF SYSTEMS AND

WORK. INTERCONNECTIONS HAVE BEEN SHOWN, AND THE CONTRACTOR SHALL

FURNISH AND INSTALL CONDUIT AND WIRING AS REQUIRED TO ACCOMPLISH THE

FUNCTIONS INDICATED. ADDITIONALLY, FIRE ALARM SYSTEMS HAVE BEEN

SHOWN AND THE CONTRACTOR SHALL FURNISH AND INSTALL THE REQUIRED

QUANTITIES AND TYPES OF CABLES, CONDUCTORS, RACEWAYS, REMOTE POWER

SUPPLIES AND CONNECTIONS, SHIELDING REQUIREMENTS, ETC., AS REQUIRED

BY THE SYSTEM MANUFACTURER, THE SPECIFICATIONS, AND ANY APPLICABLE

CODES. ALL WIRING SHOWN ON RISER DIAGRAMS SHALL ALSO BE FURNISHED

AND INSTALLED REGARDLESS OF WHETHER THESE ITEMS ARE SHOWN ON THE

FLOOR PLANS.

8. THE CONTRACTOR SHALL COORDINATE THE ELECTRICAL WORK WITH THE WORK

OF ALL OTHER TRADES AND EXISTING CONDITIONS SO AS TO AVOID CONFLICTS.

RESOLVE ALL CONFLICTS THROUGH THE A/E PRIOR TO ROUGH-IN. FAILURE TO

PROVIDE SUCH COORDINATION PRIOR TO WORK BEING INSTALLED SHALL NOT BE

CAUSE FOR ADDITIONAL COMPENSATION TO THE CONTRACTOR, AND MAY

RESULT IN REJECTION OF THE WORK.

9. ADDITIONAL DEVICES MAY BE REQUIRED. DO NOT USE THESE DRAWINGS FOR

DEVICE COUNTS.

10. ALL MATERIALS SHALL BE NEW, SHALL BE SUITABLE FOR THE APPLICATION

INTENDED, AND SHALL BEAR LABELS OR MARKINGS INDICATING THIRD PARTY

TESTING LABORATORY LISTINGS ACCEPTABLE TO THE AUTHORITY HAVING

JURISDICTION.

11. EXISTING CONDUIT IN GOOD CONDITION THAT HAS BEEN SALVAGED FROM OTHER

BUILDINGS MAY BE REUSED IF POSSIBLE AND SHALL BE STRIPED IN PATIENT

AREAS. NEW CONDUIT SHALL BE MARKED WITH RED COUPLINGS. ALL OTHER

MATERIALS SHALL BE NEW, SHALL BE SUITABLE FOR THE APPLICATION INTENDED,

AND SHALL BEAR LABELS OR MARKINGS INDICATING THIRD PARTY TESTING

LABORATORY LISTINGS ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION.

12. ALL FIRE ALARM CABLES SHOULD BE INSTALLED IN METAL RACEWAYS.

13. ALL RACEWAY AND WIRING SHALL BE CONCEALED IN FINISHED SPACES AND MAY

BE EXPOSED IN UNFINISHED SPACES SUCH AS MECHANICAL AND ELECTRICAL

ROOMS. ALL RACEWAY AND WIRING SHALL BE ROUTED EITHER PERPENDICULAR

OR PARALLEL TO THE BUILDING'S STRUCTURAL COMPONENTS.

14. PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET CODE AND

INSTALLATION REQUIREMENTS. PULL AND JUNCTION BOXES SHALL BE

CONCEALED IN FINISHED SPACES AND LOCATIONS SHALL BE COORDINATED WITH

THE WORK OF ALL OTHER TRADES SO AS TO AVOID CONFLICTS.

15. ALL CONDUCTORS SHALL BE IDENTIFIED AT EACH JUNCTION BOX, OUTLET BOX,

CABINET, PULL BOX, ETC., WITH VINYL SELF-ADHESIVE TAGS INDICATING PANEL

AND CIRCUIT NUMBER, CONTROL WIRE IDENTIFICATION NUMBER, OR OTHER

APPROPRIATE INFORMATION. ALL PULL AND JUNCTION BOXES SHALL BE LABELED

AS TO FUNCTION.

16. ALL EQUIPMENT SHALL BE SECURELY FASTENED BY MEANS OF ANCHORS, RODS,

HANGERS, SUPPORTS, GUIDES, SWAY BRACES, ETC., TO MAINTAIN ALIGNMENT

AND PREVENT EQUIPMENT MOVEMENT. ALL EQUIPMENT LOCATED IN SEISMIC

ZONES SHALL BE SECURED WITH MEANS APPROVED FOR THE SEISMIC

CLASSIFICATION ENCOUNTERED.

17. ALL PENETRATIONS OF FIRE OR SMOKE RATED CONSTRUCTION SHALL BE SEALED

WITH FIRESTOPPING MATERIALS APPROVED AND LISTED FOR THE RATING OF THE

CONSTRUCTION TO BE PENETRATED. PROVIDE DOCUMENTATION ON ALL SUCH

PENETRATION SEALING SYSTEMS FOR VERIFICATION OF PROPER INSTALLATION.

18. ALL PENETRATIONS OF ROOFS, EXTERIOR WALLS, FOUNDATIONS, OR OTHER

WATER OR MOISTURE PROOF CONSTRUCTION SHALL BE SEALED WITH

APPROPRIATE SEALING FITTINGS OR SEALED CONSTRUCTION TO PREVENT THE

INTRODUCTION OF MOISTURE INTO THE BUILDING.

19. WHERE EMPTY RACEWAYS ARE INSTALLED, THEY SHALL BE LABELED AT BOTH

ENDS AND FITTED WITH NYLON PULLSTRINGS FOR FUTURE USE.

20. ELECTRICAL WORK SHALL BE PERFORMED ON DE-ENERGIZED SYSTEMS ONLY TO

PREVENT PERSONNEL INJURY AND POTENTIAL SYSTEM FAILURE. WHERE WORK

ON EXISTING SYSTEMS WILL REQUIRE INTERRUPTION OF ELECTRICAL SERVICE,

THEN TEMPORARY PROVISIONS ACCEPTABLE TO THE OWNER FOR TEMPORARY

POWER SHALL BE UTILIZED UNTIL THE WORK IS COMPLETE.

21. THE FIRE ALARM SYSTEM SHALL COMPLY WITH ALL RELATED NFPA, BUILDING

CODES AND LOCAL FIRE DEPARTMENT REGULATIONS.

22. WALL MOUNTED FIRE ALARM PULL STATIONS ARE TO BE LOCATED 46" A.F.F. AND

WITHIN 5' OF THE NEAREST ADJACENT EXIT DOOR FROM THE FLOOR OR

BUILDING.

23. WALL MOUNTED FIRE ALARM NOTIFICATION APPLIANCES, EITHER VISUAL, OR

COMBINATION AUDIO/VISUAL, SHALL BE LOCATED SUCH THAT THE ENTIRE LENS

OF THE VISUAL PORTION IS BETWEEN 80" AND 96" A.F.F. AUDIO ONLY APPLIANCES

SHALL BE LOCATED, NOT LESS THAN 90" A.F.F. TO TOP OF APPLIANCE, OR 6"

BELOW CEILING.

FIRE ALARM GENERAL NOTES

FIRE ALARM SYMBOLS

DEVICES

WEATHERPROOF SPEAKER/STROBE

SYMBOL DESCRIPTION

DETECTORS

MANUAL PULL STATION

SPEAKER ONLY CEILING MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

SPEAKER ONLY WALL MOUNTED

STROBE ONLY CEILING MOUNTED

STROBE ONLY WALL MOUNTED

MNS SPEAKER/STROBE CEILING MOUNTED

GAS DETECTOR - CARBON MONOXIDE

HEAT DETECTOR - FIXED TEMPERATURE ONLY

SMOKE DETECTOR - IN DUCT

SMOKE DETECTOR - PHOTOELECTRIC

SWITCHES

FLOW DETECTOR/SWITCH

TEMPERATURE SUPERVISORY SWITCH

VALVE SUPERVISORY SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

PANELS

LINE TYPES

SMOKE/ALARM ZONE BOUNDARY LINES

DOOR HOLDER

DOOR CLOSER

W

DUCT SMOKE DETECTOR

AREA SMOKE DETECTOR

DOOR RELEASE SMOKE DETECTOR

S O

U N

D G

E N

E R

A L

B U

IL

D

IN

G

A

LA

R

M

X

X

N O

T

IF

Y N

E C

E S

S A

R Y

S T

A

X

INPUT

OUTPUT

N O

T

IF

Y F

IR

E

D E

P A

R M

E N

T

IN

IT

IA

T

E S

U P

E R

V

IS

O R

Y S

IG

N

A L

T O

A

4- H

O U

R M

A N

N E

D P

O

IN

O

R

IM

M E

D

IA

T E

R E

S P

O N

S E

X

C

LO

S E

A S

S O

C

IA

T E

S M

O K

E

B

R R

IE

R

D O

O R

S O

N T

H

LO

O

R

X

MANUAL PULL STATION

ELEVATOR MACHINE ROOM HEAT DETECTOR

GENERATOR ROOM HEAT DETECTOR

X

X

X

X

X

X

X

X

X

ELEVATOR SMOKE DETECTOR X X X

X

C

LO

S E

D A

M P

E R

S O

N F

N

P

R O

X

IM

A T

E T

O D

E T

E C

T O

R

X

X

S H

U T

D O

W N

A U

R H

A N

D

LE

R V

E D

B Y

T H

E D

E T

E C

T O

R

X1

1. DO NOT PROVIDE DUCT DETECTORS IN DEDICATED (100%) EXHAUST FANS, THEY SHOULD CONTINUE TO RUN.

* THIS IS THE FULL VA ALARM MATRIX, SOME ELEMENTS WILL NOT BE USED IN THIS SPECIFIC BUILDING.

R E

C A

LL

E

LE

V

A T

O R

X

IN

IT

IA

T

E E

LE

V

A T

O R

S H

U

D

W

N A

N D

D

IS

C O

N N

E C

LE

V A

T O

R P

O W

E R

X

O P

E N

L O

C K

E D

E G

R E

D

O

R S

O N

F

LO

O R

O F

F

IR

IG

IN

X

X

X

X

FIRE ALARM MATRIX

D

IS

C O

N N

E C

T F

E U

L S

O U

R C

O M

C O

O K

IN

G

E Q

U

IP

M E

N T

SPRINKLER WATERFLOW / PRESSURE SWITCH

WATER CONTROL VALVE TAMPER

FIRE PUMP

HI/LOW PRESSURE DRY PIPE SPRINKLER SYS.

KITCHEN HOOD SUPPRESSION SYSTEM

GAS EXTINGUISHING SYSTEM

DRY-PIPE VALVE ROOM TEMPERATURE ALARM

DEDICATED FIRE WATER STORAGE TANK LOW LEVEL

DEDICATED FIRE WATER STORAGE TANK LOW TEMPERATURE

X X X X X

X

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

FIRE ALARM

CONTROL PANEL

RM 1G23

BUILDING 204

LEVEL 1

NOTE: CONTRACTOR SHALL VERIFY ALL

NECESSARY DEVICE COUNTS

LEVEL 2

LEVEL 3

CAMPUS MAIN FACP

LOCATED IN BUILDING 58 &

LEVEL 4

LEVEL 5

NOTIFICATION APPLIANCES

BASEMENT ZONE 1 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 1 FIRE/SMOKE

BASEMENT

NOTIFICATION APPLIANCES

BASEMENT ZONE 2 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 2 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 3 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 3 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 4 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 4 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 5 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 5 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 6 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 6 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 7 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 7 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 8 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 8 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 9 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 9 FIRE/SMOKE

NOTIFICATION APPLIANCES

BASEMENT ZONE 10 FIRE/SMOKE

INITIATING DEVICES

BASEMENT ZONE 10 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 1 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 1 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 2 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 2 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 4 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 4 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 5 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 5 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 6 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 6 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 7 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 7 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 1 ZONE 3 FIRE/SMOKE

INITIATING DEVICES

LEVEL 1 ZONE 3 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 1 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 1 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 2 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 2 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 4 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 4 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 5 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 5 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 6 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 6 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 7 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 7 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 2 ZONE 3 FIRE/SMOKE

INITIATING DEVICES

LEVEL 2 ZONE 3 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 3 ZONE 1 FIRE/SMOKE

INITIATING DEVICES

LEVEL 3 ZONE 1 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 3 ZONE 2 FIRE/SMOKE

INITIATING DEVICES

LEVEL 3 ZONE 2 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 4 ZONE 1 FIRE/SMOKE

INITIATING DEVICES

LEVEL 4 ZONE 1 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 4 ZONE 2 FIRE/SMOKE

INITIATING DEVICES

LEVEL 4 ZONE 2 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 5 ZONE 1 FIRE/SMOKE

INITIATING DEVICES

LEVEL 5 ZONE 1 FIRE/SMOKE

NOTIFICATION APPLIANCES

LEVEL 5 ZONE 2 FIRE/SMOKE

INITIATING DEVICES

LEVEL 5 ZONE 2 FIRE/SMOKE

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

FULLY

SPRINKLERED Drawing of

11/09/2021

100% BID SET SUBMISSION B163 - TEAGUE TOWER HOSP.

1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSDLO

BUILDING 163 - FIRE ALARM

GENERAL NOTES AND DETAILS

163-FA001

-1

-1

-F

A

/2

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: NTS

A12

BUILDING 163 - FIRE ALARM RISER DIAGRAM & CAMPUS RISER DIAGRAM

TER - FIRE

UP

UP

UP

UP

UP

DN

DN

DN

DN

DN

DN

DN

DN

UP

UP

DN

UP

UP

UP

UP

UP

DN

DN

DN

DN

DN

DN

DN

UP

UP

DN

F

F

F

F

F

F

F

C

S C

S C

S C

C

C

C S C

S C C

S C

C S

P H

R

S P

C

C S C S C

C

S C

C

C S C

C S C S C C

C S C

S C C

S C

C

C S C S C C C

S C

C

S

PC

C

C

C S C C CC

C

S C

S C S C S C C C

S C

C

S C

S C

C

C S C

S C C

CS CS C

S CC

S C C

C S C

C S C C S C

S C

C

S C

S C

C

S C

S C

CC

C C C

C

C

S C

C C

C

S P

S P

C

C S C

S C

C

CS C

C

S C

CS C

CS CS CC

S C

S C

S C

C C

S C

S C

C

C

C

C

C

C

S C

C

C C C C S C C

C S C

S C C

C C

C

C

C S C S C

S C C S C

C S C C

C

C

C

C

S C C S C

S C C

S C

S C C S C

C S C S C

C

S C C

S CC

C S C S C

C

S C

C

C

C

C S C

S C

S C C S C

C C

CC

C S C S C S C C

C

C

C

CCS C

S C C C

CC

C

C S C

CS C

C

S C

C

S C

C

S C

C

S C

S C

C

S C

S P

H R S

P

F

VS

VS

VS

VS

VS

VS

VS

VS

VS

WFWF

WF

WF

DCL

D C

L

D C

L

DCL

D C

L

VSVSVS

VSVSVS

VSWF

VSVSWFWF

DCL

S P

S P

S P

S P

S P

S P

S P

S P

S P

S P

S P

S P

DCL

S P

S P

DCL

D C

L

S P

S P

S P

S P

DCL DCL

D C

L

S P

S P

S P

S P

D C

L

S P

S P

DCL

S P

S P

S P

S P

C

C

S C

S C

C

S C

F

S

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

HOUSEKEEPING

BD108D

BACK OF

STERILIZER

N/A GAS STORAGE

BD116

ELECTRICAL

ROOM

BD116A

EMERGANCY

GEN.

BD116B

TRAINING

BD108E

STAIR 7

BS-7LMS STORAGE

BD100

SPD

BD108C

STAIR 6

BS-6

LMS RECEIVING

BD115CART LIFT

BD108B

LMS

DISTRIBUTION

BD108AELEVATOR

LOBBY

CORRIDOR

CB23

AUTOMATIC CART

WASHER

BD103B

SPD MALE

DECON/

BD101 SPD

DECONTAMINATION

BD103SPD FEMALE

DECON/

BD102

SOILED LINEN

BD114SUPPLY

BD103C

IDF

BD113

HOUSEKEEPING

BD103A

MECHANICAL

ROOM

BD111TRASH ROOM

BD112

ELEC. ROOM

BD110

CORRIDOR

ELEVATOR

EQUIPMENT

BC102

MECHANICAL

ROOM

BC101

CORRIDOR

CB22

SPS ECUCATOR

BD105

CART LIFT

MECHANICAL RM

BD104

COMPUTER

BD107

CHIEF,

BD106A

MSD&E SECTION

BD108A

ELE.

BD109

A5 OFFICE

BD111A

CORRIDOR

CB21

CLOSET

BB

126C

COMMUNICATIONS

ROOM

BC103

RESEARCH

STORAGE

BB130A

ASST CHIEF SPS

BB126B

CONTROL ROOM

BA108

LMS EQUIPMENT

STORAGE

BC104

HAC

BC105

TRANSFORMER

ROOM

BA108

PIPE BASEMENT

ACCESS

MECHANICAL

ROOM

BA108B

PT OFFICE

BB127A

PHYSICAL

THERAPY

BB127RESEARCH

BB130

SPS ADMIN

BB126RESTROOM, MEN

BC127B

CHIEF SPS

BB126A

ELECTRICAL

ROOM

BC106

CORRIDOR

CB10

STAIR 3

BS-3FIRE EQUIPMENT

CORRIDOR

CB14

CORRIDOR

CB12

CORRIDOR

CB13 FIRE EQUIPMENT

LOCKER ROOM,

MEN

BC127 KINESIOTHERAPY

OFFICE

BB125

WOMEN SHOWER

BB129B

STAFF

PHYSIATRIST

BC128

EXAM ROOM

BC108

MEN SHOWER

BB129A

ELECTRICAL

ROOM

BA108B1KINESIOTHERAPY

BB124

OCCUPATIONAL

THERAPY

BC109

KINESIOTHERAPY

BB128 WAITING/RECEPTION

BB120

STORAGE

BA112A

OFFICE

BC126

EXAM ROOM

BC110A

COLD

BA121FAUTOPSY

BA121G

PHYSIATRIC

CLINIC

BC110

CROSS

BA121JCANTEEN RETAIL

BA112

EXAM ROOM

BC125

NOT

BA119

OFFICE

BC109B

OFFICE

BC109A

LOCKER ROOM,

WOMEN

BC124

THERAPEUTIC

POOL

BB129

LINEN ROOM

BB129E

HOUSEKEEPING

BB115B

SUPPLY ROOM

BB129C

MEN

BA121C

MORGUE

BA108C

IT ROOMS

BB117

NOT

NOT

LABELED

PHYSIATRY

BC115

PHARMACY

FLOOR

NO

TAG

PHARMACY

FLOOR

NO

TAG

PHARMACY

FLOOR

NO

TAG

PREP

BA121H

STAFF

PHYSIATRIST

BC111

GEN. STO.

BA117

WOMEN

BA121A

PHARMACY

FLOOR

NO

TAG

CHIROPRACTIC

OFFICE

BC107

CHIROPRACTIC

EXAM ROOM

BC107A

DRESSING ROOM

BB129F

CORRIDOR

CB16

ELECTRICAL

CLOSET

BB116CORRIDOR

CB15 CORRIDOR

CB6

SUPERVISOR

OFFICE PHYSICAL

THERAPY

BC114A

SUPERVISOR

OFFICE

KINESIOTHERAPY

THERAPY

BC114B

OFFICE

NO

TAG

OFFICE

NO

TAG

CORRIDOR

CB5

EXAM ROOM

BC112

BA115

STERALIZATION

ROOM

NO

TAG

RESTROOM

BA118D

PUMP ROOM

BB129G

FIRE EQUIPMENT

SLP LAB &

TREATMENT RM.

BC116D

ELECTRICAL

ROOM

BC123

HAC

BA110

EXAM ROOM

BC122A

MRI

BA118B

ADPAC

BC113

ASSISTANT CHIEF

PHARMACY

SERVICE

BB112E

PROGRAM

SPECIALIST

BB112F

CHIEF

PHARMACY

SERVICE

BB112G

CONT. SUB.

VAULT

BB115A

MEN

BA107

HOUSEKEEPING

CENTRAL

STORAGE

BA120

CLINICAL

COORDINATOR

BC114

SUPERVISOR

OFFICE

OCCUPATIONAL

THERAPY

BC114C

HOUSEKEEPING

EQUIPMENT RM

BA113

SOILED LINEN

ROOM

BA111

CONTROL ROOM

BA118G

VCS SUPPORT

OPERATION

BA109

COMPUTER

ROOM

BC116C

STAIR 2

BS-2

EXAM ROOM

BC122A

STAFF

PHYSIATRIST

BC122

OFFICE

BB113B

DRESSING ROOM

BA118C

OFFICE CBOC

BB112H

OFFICE

NO

TAG

RESTROOM

NO

TAG

CLINICAL

COORDINATOR

BB112D

CONFERENCE

ROOM

BB113D MRI

BA118E

PHARMACY

SERVICE

BB

SPEECH &

LANGUAGE

PATHOLOGY

BC116

EXAM ROOM

BC119B WOMEN

BA106

OFFICE

BC119

PIPE BASEMENT

ACCESSCOORIDOR

BB

CAN STORAGE

BA123PSYCHOLOGIST

BC121

PHARMACY

FLOOR

NO

TAG

ELECTRICAL

ROOM

BA104 MRI

BA118F

CHIEF,

BA105

PHARMACY

SERVICE

BB110 VCS STORAGE

BA114

SPEECH

PATHOLOGIST

BC116B

CHIEF PM & RS

BC119A

SPEECH

PATHOLOGIST

BC116A

CORRIDOR

CB3

PHARMACY

SERVICE

BB112

BREAKROOM

NO

TAG

ADMIN OFFICE

BB112B

ELEVATOR

LOBBY, SERVICE

CB2

CLERKS

BB112A

STORAGE

BC118

MECHANICAL

ROOM

BA118H

SECRETARY PM &

RS

BC119

ADPAC

BB113A

SLP SUPERVISOR

BC120

IDF

BA103

MECHANICAL

ROOM

BA229 MENS ROOM

BA228

STORAGE

BA114A

N & FS

BA225

CORRIDOR

CB8

CORRIDOR

CB7

CORRIDOR

CB9

F.A.C.

BA231

STAIR 5

BS-5

CORRIDOR

CB4NO #STAFF ONLY

BB104

ELEVATOR

LOBBY,

PASSENGER

CB1STORAGE

BC152

RADIOACTIVE

WASTE STORAGE

BB114A

TELEPHONE

BB11

NO TAG

BB11A1

EMS

BA221

MECH ROOM

BB113

NOT LABELED

BC153

WOMEN ROOM

BA227

NO NAME

BA200B

NUTRITION &

BA222

SITE

BA224

STAIR 1

BS-1

FOOD

PROCUREMENT

BA223

MECHANICAL

ROOM

BC150 OFFICE SUPPLIES

BA220

N & FS

BA225

ELEVATOR

MACHINE ROOM

BC151

ELECTRICAL

ROOM

BC154

DISHWASHING

BA200

CANTEEN

DINING/VENDING

BB100A

CORRIDOR

DINING ROOM

BB103 DIETITIAN

BA216

CHIEF, FOOD

PRODUCTION

BA217

DIET

BA218

CORRIDOR

STORAGE

BA225A

STORAGE

BB105

RECEIVING

BA213

NO TAG

BB11A

FOOD SERVICE

BA219CENTRAL TRAY

BA214

EMS

BB106 COOK FORMAN

BA215

STORAGE

BA214A

STORAGE

BB105

NO NAME

BA214AELECTRICAL

BB108WALK-IN 1

BB107C FOOD

BA226

CANTEEN

BB109

RECEIVING

BA210MECH ROOM

BB114

INGREDIENT

CONTROL

BA211

MECHANICAL

ROOM

NO #

COOLER

N/A

BOX#4

N/A

WALK-IN 2

BB107B

STORAGE

BB101A

VESTIBULE

BA212

MECHANICAL

ROOM

BC150A

KITCHEN

BB101

DRY STORAGE

BA81

EMS

BA201

PRODUCE

BA209

MEAT

BA207

FOOD

PRODUCTION

BA208

BOX#1

N/A

BOX#3

N/A

NO NAME

XXXX

ADVANCED FOOD

BA203

STAIR 12

BS-12

INGREDIENT

CONTROL

BA206

BOX#2

N/A

CONVENTIONAL

BA204

POT & PAN

BA205

ALARM ZONE 1

ALARM ZONE 2

ALARM ZONE 3

ALARM ZONE 4

ALARM ZONE 5

ALARM ZONE 6

ALARM ZONE 7

ALARM ZONE 8

ALARM ZONE 9

ALARM ZONE 10

FA05

FA05

FIRE ALARM SYMBOLS

DEVICES

WEATHERPROOF SPEAKER/STROBE

SYMBOL DESCRIPTION

DETECTORS

MANUAL PULL STATION

SPEAKER ONLY CEILING MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

SPEAKER ONLY WALL MOUNTED

STROBE ONLY CEILING MOUNTED

STROBE ONLY WALL MOUNTED

MNS SPEAKER/STROBE CEILING MOUNTED

GAS DETECTOR - CARBON MONOXIDE

HEAT DETECTOR - FIXED TEMPERATURE ONLY

SMOKE DETECTOR - IN DUCT

SMOKE DETECTOR - PHOTOELECTRIC

SWITCHES

FLOW DETECTOR/SWITCH

TEMPERATURE SUPERVISORY SWITCH

VALVE SUPERVISORY SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

PANELS

LINE TYPES

SMOKE/ALARM ZONE BOUNDARY LINES

DOOR HOLDER

DOOR CLOSER

W

C

D

B A

1 2

3 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

FULLY

SPRINKLERED Drawing of

11/09/2021

100% BID SET SUBMISSION B163 - TEAGUE TOWER HOSP.

1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSDLO

BUILDING 163 - FIRE ALARM PLAN -

BASEMENT - OVERALL

163-FA100

-1

-1

-F

A

/2

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: 1/16" = 1'-0"

A14

BUILDING 163 - FIRE ALARM PLAN - BASEMENT - OVERALL

KEYNOTE LEGEND

FA05 HEAT DETECTOR IN ELEVATOR MACHINE ROOM TO REMOVE POWER PRIOR TO

DISCHARGE FROM SPRINKLERS.

N

TER - FIRE

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

UP

DN

DN

UP

UP

F

F

F

C

S C C

S C

S C

C

S C

S C

CC

C C C

C

C

S C

C C

C

S P

S P

C

C S C

S C

C

S C C

S C

C

C C

C

C

C S C S C

S C C S C

C S C C

C

C

C

C

S C C S C

S C

C

S C

S C C S C

C S C S C

C

S C C

S CC

C S C S C

C

S C

C

C

C

C S C

S C

S C C S C

C C

CC

C

S C S C S C C

C

C

C

CCS C

S C C C

C

F

VS VS

WF WF

DCL

D C

L

D C

L

DCL

D C

L

VS VS WF WF

DCL

S P

S

PS

P

S P

S P

S P

S

PS

P

S P

S P

S P

S P

S C

FIRE ALARM SYMBOLS

DEVICES

WEATHERPROOF SPEAKER/STROBE

SYMBOL DESCRIPTION

DETECTORS

MANUAL PULL STATION

SPEAKER ONLY CEILING MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

SPEAKER ONLY WALL MOUNTED

STROBE ONLY CEILING MOUNTED

STROBE ONLY WALL MOUNTED

MNS SPEAKER/STROBE CEILING MOUNTED

GAS DETECTOR - CARBON MONOXIDE

HEAT DETECTOR - FIXED TEMPERATURE ONLY

SMOKE DETECTOR - IN DUCT

SMOKE DETECTOR - PHOTOELECTRIC

SWITCHES

FLOW DETECTOR/SWITCH

TEMPERATURE SUPERVISORY SWITCH

VALVE SUPERVISORY SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

PANELS

LINE TYPES

SMOKE/ALARM ZONE BOUNDARY LINES

DOOR HOLDER

DOOR CLOSER

W

IT ROOMS

BB117

NOT

NOT

LABELED

PHARMACY

FLOOR

NO

TAG

PHARMACY

FLOOR

NO

TAG

PREP

BA121H

GEN. STO.

BA117

WOMEN

BA121A

PHARMACY

FLOOR

NO

TAG

ELECTRICAL

CLOSET

BB116

CORRIDOR

CB6

CORRIDOR

CB5

BA115

STERALIZATION

ROOM

NO

TAG

RESTROOM

BA118D

FIRE EQUIPMENT

HAC

BA110

MRI

BA118B

MEN

BA107

HOUSEKEEPING

CENTRAL

STORAGE

BA120

HOUSEKEEPING

EQUIPMENT RM

BA113SOILED LINEN

ROOM

BA111

CONTROL ROOM

BA118G

VCS SUPPORT

OPERATION

BA109 STAIR 2

BS-2

DRESSING ROOM

BA118C

MRI

BA118E

WOMEN

BA106 PIPE BASEMENT

ACCESS CAN STORAGE

BA123

PHARMACY

FLOOR

NO

TAG

ELECTRICAL

ROOM

BA104

MRI

BA118F

CHIEF,

BA105

VCS STORAGE

BA114

CORRIDOR

CB3

ELEVATOR

LOBBY, SERVICE

CB2

MECHANICAL

ROOM

BA118H

IDF

BA103

MECHANICAL

ROOM

BA229

MENS ROOM

BA228

STORAGE

BA114A N & FS

BA225CORRIDOR

CB7

F.A.C.

BA231

CORRIDOR

CB4NO #

ELEVATOR

LOBBY,

PASSENGER

CB1

EMS

BA221

WOMEN ROOM

BA227NO NAME

BA200B

NUTRITION &

BA222

SITE

BA224STAIR 1

BS-1

FOOD

PROCUREMENT

BA223

OFFICE SUPPLIES

BA220

N & FS

BA225

DISHWASHING

BA200

CANTEEN

DINING/VENDING

BB100A

DINING ROOM

BB103

DIETITIAN

BA216

CHIEF, FOOD

PRODUCTION

BA217

DIET

BA218

STORAGE

BA225A RECEIVING

BA213FOOD SERVICE

BA219CENTRAL TRAY

BA214

COOK FORMAN

BA215

STORAGE

BA214A

NO NAME

BA214A

FOOD

BA226 RECEIVING

BA210

INGREDIENT

CONTROL

BA211

MECHANICAL

ROOM

NO #

COOLER

N/A

BOX#4

N/A

VESTIBULE

BA212

DRY STORAGE

BA81

EMS

BA201

PRODUCE

BA209 MEAT

BA207

FOOD

PRODUCTION

BA208 BOX#1

N/A

BOX#3

N/A

NO NAME

XXXX

ADVANCED FOOD

BA203

STAIR 12

BS-12

INGREDIENT

CONTROL

BA206

BOX#2

N/A

CONVENTIONAL

BA204

POT & PAN

BA205

ALARM ZONE 8

ALARM ZONE 9

ALARM ZONE 10

P-1

P-2

S-3 S-4

C

D

B

A

1 2

3 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

FULLY

SPRINKLERED Drawing of

11/09/2021

100% BID SET SUBMISSION B163 - TEAGUE TOWER HOSP.

1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSChecker

BUILDING 163 - FIRE ALARM PLAN -

BASEMENT - AREA AB

163-FA100-AB

-1

-1

-F

A -A

B

/0

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: 1/8" = 1'-0"

A16

BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA D

N

TER - FIRE

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

UP

UP

DN

DN

DN

DN

DN

DN

DN

DN

F

F

C

S C

C

C

C

S C

C

S P

C

C C

S C

C

S C

S C

C S C

S C C

C

S C C

S C

C C C

S C C C

CC

C

C S C

CS C

C

S C

C

S C

C

S C

C

S C

S C

C

S C

VS

VSWF

D C

L

VS VS VS

VSVSVS

VS WF

DCL

S P

S P

FIRE ALARM SYMBOLS

DEVICES

WEATHERPROOF SPEAKER/STROBE

SYMBOL DESCRIPTION

DETECTORS

MANUAL PULL STATION

SPEAKER ONLY CEILING MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

SPEAKER ONLY WALL MOUNTED

STROBE ONLY CEILING MOUNTED

STROBE ONLY WALL MOUNTED

MNS SPEAKER/STROBE CEILING MOUNTED

GAS DETECTOR - CARBON MONOXIDE

HEAT DETECTOR - FIXED TEMPERATURE ONLY

SMOKE DETECTOR - IN DUCT

SMOKE DETECTOR - PHOTOELECTRIC

SWITCHES

FLOW DETECTOR/SWITCH

TEMPERATURE SUPERVISORY SWITCH

VALVE SUPERVISORY SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

PANELS

LINE TYPES

SMOKE/ALARM ZONE BOUNDARY LINES

DOOR HOLDER

DOOR CLOSER

W

GAS STORAGE

BD116

ELECTRICAL

ROOM

BD116A

EMERGANCY

GEN.

BD116B

TRAINING

BD108E

STAIR 7

BS-7

LMS RECEIVING

BD115

CORRIDOR

CB23

SOILED LINEN

BD114

IDF

BD113

MECHANICAL

ROOM

BD111

TRASH ROOM

BD112

CORRIDOR

CB22

A5 OFFICE

BD111A

CLOSET

BB

126C

ASST CHIEF SPS

BB126B

CONTROL ROOM

BA108

TRANSFORMER

ROOM

BA108

PIPE BASEMENT

ACCESS MECHANICAL

ROOM

BA108B

SPS ADMIN

BB126

CHIEF SPS

BB126A

CORRIDOR

CB10

STAIR 3

BS-3

FIRE EQUIPMENT

KINESIOTHERAPY

OFFICE

BB125

ELECTRICAL

ROOM

BA108B1

KINESIOTHERAPY

BB124

WAITING/RECEPTION

BB120 STORAGE

BA112A

COLD

BA121F

AUTOPSY

BA121GCROSS

BA121J

CANTEEN RETAIL

BA112

NOT

BA119

MEN

BA121C

MORGUE

BA108C

IT ROOMS

BB117

NOT

NOT

LABELED

PHARMACY

FLOOR

NO

TAG

PHARMACY

FLOOR

NO

TAG

PREP

BA121H

GEN. STO.

BA117

WOMEN

BA121A

PHARMACY

FLOOR

NO

TAG

ELECTRICAL

CLOSET

BB116

CORRIDOR

CB6

CORRIDOR

CB5

STERALIZATION

ROOM

NO

TAG

ALARM ZONE 3

ALARM ZONE 5

S-7

C

D

B

A

1 2

3 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

FULLY

SPRINKLERED Drawing of

11/09/2021

100% BID SET SUBMISSION B163 - TEAGUE TOWER HOSP.

1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSChecker

BUILDING 163 - FIRE ALARM PLAN -

BASEMENT - AREA ABD

163-FA100-ABD

-1

-1

-F

A -A

B D

/0

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: 1/8" = 1'-0"

A16

BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA B

N

FIRE PUMP LOCATION - PROVIDE

MONITORING OF POWER OFF, PHASE

REVERSAL, AND PUMP RUNNING AS

REQUIRED BY NFPA 20

TER - FIRE

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

UP

F

C S C

C S C

S C

C

S C

C

CS C

C

S C

CS C

CS CS CC

S C

S C

S C

C

C

S C

C

C C C

C S

C

S C

S P

H R

S P

VS

VS

VS

VS WF

DCL

D C

L S

P

S P

S P

S P

C

C

S C

S C

C

FIRE ALARM SYMBOLS

DEVICES

WEATHERPROOF SPEAKER/STROBE

SYMBOL DESCRIPTION

DETECTORS

MANUAL PULL STATION

SPEAKER ONLY CEILING MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

SPEAKER ONLY WALL MOUNTED

STROBE ONLY CEILING MOUNTED

STROBE ONLY WALL MOUNTED

MNS SPEAKER/STROBE CEILING MOUNTED

GAS DETECTOR - CARBON MONOXIDE

HEAT DETECTOR - FIXED TEMPERATURE ONLY

SMOKE DETECTOR - IN DUCT

SMOKE DETECTOR - PHOTOELECTRIC

SWITCHES

FLOW DETECTOR/SWITCH

TEMPERATURE SUPERVISORY SWITCH

VALVE SUPERVISORY SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

PANELS

LINE TYPES

SMOKE/ALARM ZONE BOUNDARY LINES

DOOR HOLDER

DOOR CLOSER

W

SUPPLY ROOM

BB129C

PHYSIATRY

BC115

PHARMACY

FLOOR

NO

TAG

PHARMACY

FLOOR

NO

TAGSTAFF

PHYSIATRIST

BC111 CHIROPRACTIC

OFFICE

BC107

CHIROPRACTIC

EXAM ROOM

BC107A

DRESSING ROOM

BB129F

CORRIDOR

CB16

CORRIDOR

CB15

SUPERVISOR

OFFICE PHYSICAL

THERAPY

BC114A

SUPERVISOR

OFFICE

KINESIOTHERAPY

THERAPY

BC114B

OFFICE

NO

TAG

OFFICE

NO

TAG

EXAM ROOM

BC112

PUMP ROOM

BB129G

SLP LAB &

TREATMENT RM.

BC116D

ELECTRICAL

ROOM

BC123EXAM ROOM

BC122A ADPAC

BC113

ASSISTANT CHIEF

PHARMACY

SERVICE

BB112E

PROGRAM

SPECIALIST

BB112F

CHIEF

PHARMACY

SERVICE

BB112G

CONT. SUB.

VAULT

BB115A

CLINICAL

COORDINATOR

BC114

SUPERVISOR

OFFICE

OCCUPATIONAL

THERAPY

BC114C

COMPUTER

ROOM

BC116CEXAM ROOM

BC122A

STAFF

PHYSIATRIST

BC122 OFFICE

BB113B

OFFICE

CBOC

BB112H OFFICE

NO

TAG

RESTROOM

NO

TAG

CLINICAL

COORDINATOR

BB112D

CONFERENCE

ROOM

BB113DPHARMACY

SERVICE

BB

SPEECH &

LANGUAGE

PATHOLOGY

BC116

EXAM ROOM

BC119B

OFFICE

BC119

COORIDOR

BBPSYCHOLOGIST

BC121

PHARMACY

SERVICE

BB110

SPEECH

PATHOLOGIST

BC116B

CHIEF PM & RS

BC119A

SPEECH

PATHOLOGIST

BC116A

PHARMACY

SERVICE

BB112

BREAKROOM

NO

TAG

ADMIN OFFICE

BB112B

CLERKS

BB112A

STORAGE

BC118

SECRETARY PM &

RS

BC119

ADPAC

BB113A

SLP SUPERVISOR

BC120

CORRIDOR

CB8

CORRIDOR

CB9

STAIR 5

BS-5

STAFF ONLY

BB104

STORAGE

BC152

RADIOACTIVE

WASTE STORAGE

BB114A

TELEPHONE

BB11

NO TAG

BB11A1MECH ROOM

BB113

NOT LABELED

BC153

MECHANICAL

ROOM

BC150

ELEVATOR

MACHINE ROOM

BC151

ELECTRICAL

ROOM

BC154

CORRIDOR

0 DINING ROOM

BB103

CORRIDOR

STORAGE

BB105NO TAG

BB11A

EMS

BB106

STORAGE

BB105

ELECTRICAL

BB108

WALK-IN 1

BB107C

CANTEEN

BB109

MECH ROOM

BB114

WALK-IN 2

BB107B

STORAGE

BB101A

MECHANICAL

ROOM

BC150A KITCHEN

BB101

ALARM ZONE 6

ALARM ZONE 7

ALARM ZONE 8

P-12 P-11

FA05

C

D

B

A

1 2

3 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

FULLY

SPRINKLERED Drawing of

11/09/2021

100% BID SET SUBMISSION B163 - TEAGUE TOWER HOSP.

1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSChecker

BUILDING 163 - FIRE ALARM PLAN -

BASEMENT - AREA BC

163-FA100-BC

-1

-1

-F

A -B

C

/0

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: 1/8" = 1'-0"

A16

BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA C

KEYNOTE LEGEND

FA05 HEAT DETECTOR IN ELEVATOR MACHINE ROOM TO REMOVE POWER PRIOR TO

DISCHARGE FROM SPRINKLERS.

N

TER - FIRE

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

UP

F

F

C

S C

S C

S C

C

C

C S C

S C C

S C

C

S P

H R

S P

C

C S C S C

C

S C

C

C S C

C S C S C

C

S C

S C

C S C S C C

C

C

C S C C CC

C

S C

S C S C S C

CS CS C

S CC

S C C

C S C

C S C

S C

C C

S C

C

C

C

C

VS

DCL DCL

D C

L

S P

S P

S P

S P

D C

L

S P

S P

DCL

S P

S P

S P

S P

FIRE ALARM SYMBOLS

DEVICES

WEATHERPROOF SPEAKER/STROBE

SYMBOL DESCRIPTION

DETECTORS

MANUAL PULL STATION

SPEAKER ONLY CEILING MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

SPEAKER ONLY WALL MOUNTED

STROBE ONLY CEILING MOUNTED

STROBE ONLY WALL MOUNTED

MNS SPEAKER/STROBE CEILING MOUNTED

GAS DETECTOR - CARBON MONOXIDE

HEAT DETECTOR - FIXED TEMPERATURE ONLY

SMOKE DETECTOR - IN DUCT

SMOKE DETECTOR - PHOTOELECTRIC

SWITCHES

FLOW DETECTOR/SWITCH

TEMPERATURE SUPERVISORY SWITCH

VALVE SUPERVISORY SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

PANELS

LINE TYPES

SMOKE/ALARM ZONE BOUNDARY LINES

DOOR HOLDER

DOOR CLOSER

W

HOUSEKEEPING

BD108D

BACK OF

STERILIZER

N/A

LMS STORAGE

BD100

SPD

BD108C

STAIR 6

BS-6

CART LIFT

BD108B

LMS

DISTRIBUTION

BD108A

ELEVATOR

LOBBY

AUTOMATIC CART

WASHER

BD103B

SPD MALE

DECON/

BD101

SPD

DECONTAMINATION

BD103

SPD FEMALE

DECON/

BD102

SUPPLY

BD103C

HOUSEKEEPING

BD103A

ELEC. ROOM

BD110

CORRIDOR

ELEVATOR

EQUIPMENT

BC102

MECHANICAL

ROOM

BC101

SPS ECUCATOR

BD105

CART LIFT

MECHANICAL RM

BD104

COMPUTER

BD107

CHIEF,

BD106A

MSD&E SECTION

BD108A

ELE.

BD109

CORRIDOR

CB21

COMMUNICATIONS

ROOM

BC103

RESEARCH

STORAGE

BB130A ASST CHIEF SPS

BB126BLMS EQUIPMENT

STORAGE

BC104 HAC

BC105

PT OFFICE

BB127A

PHYSICAL

THERAPY

BB127

RESEARCH

BB130

RESTROOM, MEN

BC127B

CHIEF SPS

BB126AELECTRICAL

ROOM

BC106

CORRIDOR

CB14 CORRIDOR

CB12

CORRIDOR

CB13 FIRE EQUIPMENT

LOCKER ROOM,

MEN

BC127

KINESIOTHERAPY

OFFICE

BB125

WOMEN SHOWER

BB129B

STAFF

PHYSIATRIST

BC128

EXAM ROOM

BC108

MEN SHOWER

BB129A

KINESIOTHERAPY

BB124

OCCUPATIONAL

THERAPY

BC109

KINESIOTHERAPY

BB128

OFFICE

BC126

EXAM ROOM

BC110A PHYSIATRIC

CLINIC

BC110

EXAM ROOM

BC125

OFFICE

BC109B

OFFICE

BC109A

LOCKER ROOM,

WOMEN

BC124

THERAPEUTIC

POOL

BB129 LINEN ROOM

BB129E

HOUSEKEEPING

BB115BSUPPLY ROOM

BB129C

PHYSIATRY

BC115

PHARMACY

FLOOR

NO

TAG

PHARMACY

FLOOR

NO

TAGSTAFF

PHYSIATRIST

BC111 CHIROPRACTIC

OFFICE

BC107

CHIROPRACTIC

EXAM ROOM

BC107A

DRESSING ROOM

BB129F

CORRIDOR

CB16

CORRIDOR

CB15

SUPERVISOR

OFFICE PHYSICAL

THERAPY

BC114A

SUPERVISOR

OFFICE

KINESIOTHERAPY

THERAPY

BC114B

OFFICE

NO

TAG

OFFICE

NO

TAG

EXAM ROOM

BC112

ALARM ZONE 1

ALARM ZONE 2

ALARM ZONE 4

S-7

P-5

P-6

FA05

C

D

B A

1 2

3 4

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

FIRE PROTECTION:

LEO A DALY

730 Second Avenue South Suite 1300 Minneapolis, MN 612.338.8741 POC: Melisa Rodriguez

ARCHITECT:

CB DESIGN GROUP

421 KING ST., SUITE 301

ALEXANDRIA, VA 22314

POC: WES BRIDGES

703.772.4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

FULLY

SPRINKLERED Drawing of

11/09/2021

100% BID SET SUBMISSION B163 - TEAGUE TOWER HOSP.

1901 VETERANS MEMORIAL DRIVE

TEMPLE, TX 76504

674-22-801

CSSChecker

BUILDING 163 - FIRE ALARM PLAN -

BASEMENT - AREA BCD

163-FA100-BCD

-1

-1

-F

A -B

C D

/0

/2

.p d f

TEMPLE VA MEDICAL CENTER - FIRE

ALARM CAMPUS UPGRADE: PHASE II

SCALE: 1/8" = 1'-0"

A16

BUILDING 163 - FIRE ALARM PLAN - BASEMENT - AREA A

KEYNOTE LEGEND

FA05 HEAT DETECTOR IN ELEVATOR MACHINE ROOM TO REMOVE POWER PRIOR TO

DISCHARGE FROM SPRINKLERS.

N

TER - FIRE

DN

UP

UP

UP

UP

UP

UP

UP

UP

DN

UP

DN

DN

DN

DN

DN

DN

DN

DN

F

S

S C

M

C

CO

H F

S

ID

S P

WF

TSS

VS

FAA

FACP

FATC

DH

DCL

ALARM ZONE 1

ALARM ZONE 2

ALARM ZONE 3

ALARM ZONE 1

ALARM ZONE 5

ALARM ZONE 4

ALARM ZONE 6

ALARM ZONE 7

CORRIDOR

CORRIDOR

CYTOLOGY

1D108C

CHIEF P&LM SVC.

1D124A

TB/MYCOLOGY

IMMUNOLOGY

1D101A

STAIR 7

3LABORATORY

ADMINISTRATION

1D124

PROCESSING

1D108A

MICROBIOLOGY

1D105

HISTOLOGY

1D108

BIOLOGICAL

SAFETY

1D101B

FLUOR

MICROSCOPE

1D101C

PREPARATION

1D101

HEATLTH

SYSTEMS

SPECIALIST

1D123

SLIDE & BLOCK

FILES

1D109

MEDICAL GAS

1D100 MICROBIOLOGIST

1D106

SUPERVISORS

OFFICE

1D103

LABORATORY

INFORMATION

1D122

SUPERVISORS

OFFICE

1D121

MOTHER

FRIENDLY ROOM

1C41

STAIR 6

1S6 CORRIDOR

1D

CORRIDOR

1K

PROFESSIONAL

CONFERENCE

ROOM

1D120

STAFF

PATHOLOGIST

1D110

LABORATORY

INFORMATION

1D122A

STAFF

PATHOLOGIST

1D119

UNISEX

1D107 WOMEN

1D111

CORRIDOR

CORRIDOR

5STORAGE

1D104AHEMATOLOGY

1D102

IDF

1D114

H.A.C.

1D118

CORRIDOR

6 MECH.

1D127

STAFF

PATHOLOGIST

1D112

ELE.

1D116

H.A.C.

1C29

LAB

CONFERENCE

1D117

SPECIAL

CHEMISTRY

1D104B

STAFF

PATHOLOGIST

1D113

CHEMISTRY

OFFICE

1D104C

LABORATORY

OPERATIONS

1D115

WOMEN

1C30

W.C.

1A126A

W.C.

1A118

ELE.

1A121A

MEN

1A129

ULTRASOUND

1A126

CHIEF

TECHNOLOGIST

1A130A

TEL.

1B172

WOMEN

1A128

AMPHITHEATRE

OFFICE

1B150B

ADMINISTRATIVE

OFFICE

1A123

RADIOGRAPHIC

ROOM

1A117

PROGRAM

SPECIALIST

1A123A

SPECIMEN

PROCESSING

1C36C

STORAGE

1A119

CORRIDOR

STAIR 3MECH.

1B165

MEN

1C31

IT TRAINING

ROOM

1B154A

TEL.

1B171

CORRIDOR

1B164 OFFICE

1A121

LABORATORY

1B160

STORAGE

1B164B

CORRIDOR

1A W.C.

1A115A

IDF

1C32

PROJECTION

ROOM

1B150C

MAIN

AMPHITHEATRE

1B150

CHIEF IMAGING

SERVICE

1A130

ELE.

1C33

IDF

1A127

CORRIDOR

RADIOGRAPHIC

ULTRA SOUND

1A115

IT SUPPORT

ROOM

1B154D

ANCILLARY

TESTING

COORDINATOR

1B169

WOMEN

1B166

W.C.

1B164A ULTRASOUND

1A124B

ULTRASOUND

1A124A

SPECIMAN

COLLECTION

1C36

WOMEN

1A132

RADIOGRAPHIC

FLUOROSCOPY

1A114

IT SUPPORT

ROOM

WORKROOM

1A120

STORAGE

1B163

STAFF

RADIOLOGIST

1A131

BREAKROOM

1B158

STORAGE

1B150A

EOC RADIO

ROOM

1B155

S. UTILITY

1A122

ASST. CHIEF

TECHNOLOGIST

1A113

BLOOD BANK

1B156 H.A.C.

1A134

H.A.C.

1B168

MEN

1B167ELE.

1B152

IDF

1B151 DRESSING ROOM

1A112B

W.C.

1A112D

SUPPLY ROOM

1A120A

STORAGE

1A148 CORRIDOR

VIEWING

1A120B

CORRIDOR

STAFF

RADIOLOGIST

1A136A

STAFF

RADIOLOGIST

1A136B

STAFF

RADIOLOGIST

1A135

CORRIDOR

W.C.

1A112C

ELE.

1A147DRESSING ROOM

1A112A HALLWAY

1A136

HOLDING AREA

1A109A

BENEFITS &

TRAVEL

1B153

MED. ROOM

1B162C

WORKROOM

OFFICE

1C35

AGENT CASHIER

1B149

STAFF

RADIOLOGIST

1A137

RADIOGRAPHIC

FLUOROSCOPY

1A152A

WAITING AREA

1C02E

WAITING AREA

PAIN

PROCEDURE

ROOM

1C18

RADIOGRAPHIC

FLUOROSCOPY

1A111

ASST. MANAGER

1A146

PHARMACY

1B162

H.A.C.

1B162A

PAIN EXAM ROOM

1C16 W.C.

1A144AELE.

1A111A

STAFF

RADIOLOGIST

1A138

PSYCHOLOGY

INTERN

1C02D W.C.

1A142A

W.C.

1A152D

W.C.

1A152C

ELIGIBILTY

OFFICE

1C41

ELE.

1C15

SOILED UTILITY

1C13

GENERAL

RADIOGRAPHIC

1A141

RADIOGRAPHIC

ROOM

1A144PAIN EXAM ROOM

1C14 OFFICE

1B172B

WAITING

1A109

CORRIDOR

CHEST

RADIOLOGY

1A110

DRESSING ROOM

1A152

OFFICE

1B172

MEN

1B148

OFFICE

1B172A

BREAKROOM

1B162B

PHARMACY

OFFICE

1B173

DRESSING ROOM

1A142

STORAGE

1A110B

STAFF

RADIOLOGIST

1A139

PSYCHOLOGY

INTERN

1C38

WOMEN

1B147

WOUND CARE

1C11

CORRIDOR

ELE.

1A150

STORAGE

1A110A

SOCIAL WORKER

1C40PAIN EXAM ROOM

1C12 CORRIDOR

CORRIDOR

STAFF

RADIOLOGIST

1A133

WORKROOM

1C39BREAKROOM

1C02C MECH.

1A143

W.C.

1A151

NURSE OFFICE

1B23

W.C.

1A145A

NUTRITION MOVE

PROGRAM

1B22

EXAM ROOM

1B24

DIRECTOR,

RESIDENCY

PROGRAM

1B230

WOUND CARE

EXAM

1C10

DENTAL

OFFICE

1B205

EXAM ROOM

1C09

IMAGING

SCHEDULING

1A108

ORAL SURGERY

1B231

GENERAL

TREATMENT

1B203

GENERAL

TREATMENT

1B201

MAMMOGRAPHY

READING ROOM

1A140STAIR 2

STORAGE

1B204

CT SCAN

HOLDING

1A145

RECEPTION

1C02 NURSE OFFICE

1B25

VETERANS ID

CARDS

1B21

EXAM ROOM

1C01

S. UTILITY

1B229

DENTAL

X-RAY

1B206

EXAM ROOM

1C07

EXAM ROOM

1C08

EXAM ROOM

1B26

CORRIDOR

C1-28 OFFICE

1A105

DW

1B20

MAMMOGROPHY

EXAM

1A155C

ORAL SURGERY

1B228

H.A.C.

1A103

MECH.

1A154

C. LINEN

1B227

CT SCAN UNIT 2

1A145C

CORRIDOR

C1-27

NURSE OFFICE

1B27 W.C.

1B202

CLERK

1B19A

ELE.

1B173J

EXAM ROOM

1B28

GENERAL

TREATMENT

1B207

CORRIDOR

SUPPLY

ROOM

1B209

CORRIDOR

C1-29

CORRIDOR

SUPPLY ROOM

1B226

WAITING ROOM

C1-18A

MAMMO WAITING

AREA

1A155B

EXAM…