VA Master Specs Table of Contents.pdf

PDF 304 KB Posted

Attached to
Z2NE--Design Build Project: 629-20-120 CFM - Redesign Domestic Water Tank
Solicitation number
629-20-120
Issued by

View the file

Other files

File Type Posted
DWP-1 Data Plate.pdf PDF
0267-7SB101-N2.pdf PDF
161031_NOVA DW Storage Bypass Sketches.pdf PDF
00071-CK118 Site Civil HCP.pdf PDF
00092-CU118 Site Civil.pdf PDF
General Decision LA 20200041 10-09-2020.pdf PDF
0266-7SB101-N1.pdf PDF
DWP-3 Data Plate.pdf PDF
059-7PL601.pdf PDF
Domestic Water Pump Information.pdf PDF
DWP-4 Data Plate.pdf PDF
0268-7SB501 Details.pdf PDF
046-7PJ100.pdf PDF
RFI 00200.pdf PDF
SECTION 01321615 - PROJECT SCHEDULES.pdf PDF
050-7PJ201.pdf PDF
0269-7SB502 Details.pdf PDF
SECTION 010000 - GENERAL REQUIREMENTS.pdf PDF
36C25621R0028_1.pdf PDF
SECTION 013323 - SHOP DRAWINGS.pdf PDF
DWP-2 Data Plate.pdf PDF
EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf PDF
RFI 00438.pdf PDF
SECTION 013526 - SAFETY REQUIREMENTS.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-20

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

https://www.cfm.va.gov/til/spec.asp

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

00 11 21 Request for Proposal to Design Build 06-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20

01 32 16.01 Architectural and Engineering CPM Schedules 03-20

01 32 16.13 Network Analysis Schedules – Major Construction Project

Design-Bid-Build

03-20

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 32 16.16 Network Analysis Schedules (Design-Build Only) 03-20

01 32 16.17 Network Analysis Schedules – Major Design/Build

Projects

06-19

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 09-19

01 45 00 Quality Control 03-19

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 03-19

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 10-17

01 81 13.01 Sustainability Certification Requirements – LEED NC V3 09-15

01 81 13.02 Sustainability Certification Requirements – LEED NC V4 09-15

01 81 13.11 Sustainability Certification Requirements – LEED HC V3 09-15

01 81 13.21 Sustainability Certification Requirements – GREEN

GLOBES

09-15

01 91 00 General Commissioning Requirements 10-15

01 91 00.01 DVA/USACE Projects General Commissioning Requirements 08-19

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 08-16

02 41 00 Demolition 08-17

02 65 00 Underground Storage Tank Removal 08-16

02 82 11 Traditional Asbestos Abatement 04-19

02 82 13.13 Glovebag Asbestos Abatement 09-15

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15

02 82 13.21 Asbestos Roofing Abatement 09-15

02 82 13.31 Asbestos Transite Abatement 09-15

02 82 13.41 Asbestos Abatement for Total Demolition Project 04-15 https://www.cfm.va.gov/til/spec.asp

00 01 10-2

02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 23 00 Stressing Tendons 07-11

03 30 00 Cast-in-Place Concrete 07-19

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

03 37 13 Shotcrete 07-19

03 41 13 Precast Concrete Hollow Core Planks 07-11

03 41 33 Precast Structural Pretensioned Concrete 02-19

03 45 00 Precast Architectural Concrete 02-19

03 51 13 Cementitious Wood Fiber Decks 09-11

03 51 16 Gypsum Concrete Roof Decks 09-11

03 52 00 Lightweight Concrete Roof Insulation 05-15

03 55 11 Gypsum Concrete Floor Decks 07-11

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 02-16

04 20 00 Unit Masonry 08-17

04 72 00 Cast Stone Masonry 02-15

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 21 00 Steel Joist Framing 11-18

05 31 00 Steel Decking 02-16

05 36 00 Composite Metal Decking 10-15

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 10-15

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 16 63 Cementitious Sheathing 02-16

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 02-16

07 08 00 Facility Exterior Closure Commissioning 11-16

07 08 00.01 DVA/USACE Projects Facility Exterior Closure

Commissioning

08-19

07 11 13 Bituminous Dampproofing 02-16

07 12 00 Built-Up Bituminous Waterproofing 09-11

07 13 00 Sheet Waterproofing 04-13

07 13 52 Modified Bituminous Sheet Waterproofing 08-16

07 14 21 Latex Mastic Deck Covering 05-15

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

07 18 13 Pedestrian Traffic Coatings 05-15

07 21 13 Thermal Insulation 10-17

07 21 23 Loose-Fill Insulation 02-16

07 22 00 Roof and Deck Insulation 02-16

07 24 00 Exterior Insulation and Finish Systems 02-16

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16

07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16

07 31 13 Asphalt Shingles 02-16

07 31 26 Slate Shingles 02-16

07 31 29.13 Wood Shingles 02-16

07 32 13 Clay Roof Tiles 02-16

07 40 00 Roofing and Siding Panels 10-15

07 51 00 Built-Up Bituminous Roofing 08-18

07 51 13.11 Hot-Applied Built-Up Asphalt Roofing 08-16

07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 08-16

07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified

Bituminous Membrane Roofing

08-16

07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified

Bituminous Membrane Roofing

08-16

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16

07 54 16 Ethylene Interpolymer (KEE) Roofing 10-15

07 54 19 Polyvinyl-Chloride (PVC) Roofing 12-18

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16

07 56 00 Fluid-Applied Roofing 05-15

07 57 13 Sprayed Polyurethane Foam Roofing 10-15

07 60 00 Flashing and Sheet Metal 07-14

07 61 16 Batten Seam Copper Roofing 10-15

07 71 00 Roof Specialties 10-15

07 72 00 Roof Accessories 10-15

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 11 73 Sliding Metal Fire Doors 02-16

08 14 00 Interior Wood Doors 02-16

08 17 10 Integrated Door Assemblies 02-16

08 31 13 Access Doors and Frames 02-16

08 33 00 Coiling Doors and Grilles 02-16

08 33 13 Coiling Counter Doors 02-16

08 34 36 Darkroom Doors 07-15

08 34 53 Security Doors and Frames 05-15

08 34 59 Vault Doors and Day Gates 02-16

08 35 13.13 Accordion Folding Doors 05-15

08 36 13 Sectional Doors 05-15

08 38 16 Flexible Traffic Doors 02-16

08 41 13 Aluminum-Framed Entrances and Storefronts 08-16

08 42 33 Revolving Door Entrances 05-15

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

08 44 13 Glazed Aluminum Curtain Walls 04-20

08 51 13 Aluminum Windows 04-20

08 51 13.11 Side-Hinged Aluminum Windows 08-16

08 51 23 Steel Windows 02-16

08 51 69.11 Aluminum Storm Windows 05-15

08 56 19 Pass Windows 02-16

08 56 53 Blast Resistant Windows 02-16

08 56 59 Service and Teller Window Units 02-16

08 56 66 Detention Window Screens 02-16

08 63 00 Metal-Framed Skylights 10-15

08 71 00 Door Hardware 04-20

08 71 13 Automatic Door Operators 02-16

08 71 13.11 Low Energy Power Assist Door Operators 08-16

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 23 00 Gypsum Plastering 10-15

09 24 00 Portland Cement Plastering 10-15

09 26 00 Veneer Plastering 10-15

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 09-15

09 51 00 Acoustical Ceilings 12-18

09 54 23 Linear Metal Ceilings 10-15

09 63 13 Brick Flooring 02-16

09 63 40 Stone Flooring 10-15

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 66 13 Portland Cement Terrazzo Flooring 10-15

09 66 16 Terrazzo Floor Tile 10-15

09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14

09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring

(RES-3)

07-14

09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 07-14

09 67 23.50 Resinous (Epoxy Terrazzo) Flooring (RES-5) 07-14

09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14

09 68 00 Carpeting 10-15

09 68 21 Athletic Carpeting 10-15

09 69 00 Access Flooring 10-15

09 72 16 Vinyl-Coated Fabric Wall Covering 10-15

09 72 31 Polypropylene Fabric Wall Covering 05-15

09 84 33 Sound-Absorbing Wall Units 10-15

09 91 00 Painting 01-16

09 94 19 Multicolor Interior Finishing 08-16

09 96 59 High-Build Glazed Coatings 07-14

00 01 10-5

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15

10 11 23 Tackboards 10-15

10 13 00 Directories 05-15

10 14 00 Signage 10-15

10 21 13 Toilet Compartments 12-15

10 21 16 Shower and Dressing Compartments 08-16

10 21 23 Cubicle Curtain Tracks 05-15

10 22 13 Wire Mesh Partitions 10-15

10 22 19 Demountable Partitions 04-16

10 22 26.13 Accordion Folding Partitions 04-19

10 25 13 Patient Bed Service Walls 01-20

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

10 75 00 Flagpoles 02-16

DIVISION 11 – EQUIPMENT

11 05 12 General Motor Requirements for Equipment 11-11

11 12 00 Parking Control Equipment 02-16

11 17 36 Package Transfer Units 02-13

11 26 00 Unit Kitchens 11-11

11 27 00 Photographic Processing Equipment 11-11

11 40 11 Custom Fabricated Food Service Equipment 11-11

11 40 21 Food Service Equipment-Utility Distribution System 11-11

11 41 00 Food Storage Equipment 11-11

11 41 21 Walk-In Coolers and Freezers 05-15

11 44 00 Food Cooking Equipment 11-11

11 48 00 Cleaning and Disposal Equipment 11-11

11 53 13 Laboratory Fume Hoods 05-15

11 53 23 Laboratory Refrigerators 11-11

11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-11

11 53 61 Custom Fabricated Laboratory Equipment 11-11

11 53 71 Solution Warming Cabinets 11-11

11 71 01 Medical Washing and Sterilizing Equipment 02-11

11 71 02 Laboratory Washing and Sterilizing Equipment 10-11

11 73 00 Ceiling Mounted Patient Lift System 01-17

11 78 00 Mortuary Equipment 11-11

11 78 13 Mortuary Refrigerators 11-11

11 79 13 Hydrotherapy Equipment 11-11

11 82 19 Packaged Incinerators 11-11

DIVISION 12 – FURNISHINGS

12 22 16 Drapery Track and Accessories 05-15

12 24 00 Window Shades 08-17

12 24 21 Lightproof Shades 05-15

12 31 00 Manufactured Metal Casework 05-15

12 32 00 Manufactured Wood Casework 09-15

00 01 10-6

SECTION NO. DIVISION AND SECTION TITLES DATE

12 34 00 Manufactured Plastic Casework 10-15

12 35 70.21 Medication Cabinet 02-16

12 36 00 Countertops 12-18

12 56 70.11 Suspended Table 02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

13 17 23 Therapeutic Pools 05-15

13 17 23.11 Therapeutic Pool Accessories 05-15

13 19 13 Kennel Enclosures and Gates 02-16

13 21 29 Constant Temperature Rooms 08-16

13 34 19 Metal Building Systems 08-16

13 49 00 Radiation Protection 02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11 Traction and Winding Drum Dumbwaiter 03-20

14 21 00 New Traction Elevators 10-19

14 21 10 Modernization of Traction Elevators 10-19

14 21 11 Traction Cartlift 03-20

14 24 00 New Hydraulic Elevators 10-19

14 24 10 Modernization of Hydraulic Elevators 10-19

14 24 11 Hydraulic Cartlift 03-20

14 24 24 Renovation Hydraulic Elevator (Custom Written by VACO)

14 26 26 Renovation Traction Elevator (Custom Written by VACO)

14 91 33 Gravity Soiled Linen Chutes 03-20

14 91 82 Gravity Trash Chutes 03-20

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 08 00.01 DVA/USACE Projects Commissioning of Fire Suppression

Systems

08-19

21 12 00 Manual Dry Standpipe Systems 06-15

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 13 16 Dry-Pipe Sprinkler Systems 01-15

21-22-00 Clean Agent Fire Suppression Systems 05-15

21-30-13 Electric-Driven, Fire Pumps 05-15

21-30-16 Diesel-Driven, Fire Pumps 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 12 General Motor Requirements for Plumbing Equipment 09-15

22 05 19 Meters and Gages for Plumbing Piping 09-15

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 05 33 Heat Tracing for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

00 01 10-7

SECTION NO. DIVISION AND SECTION TITLES DATE

22 08 00.01 DVA/USACE Projects Commissioning of Plumbing Systems 08-19

22 11 00 Facility Water Distribution 11-19

22 11 23 Domestic Water Pumps 09-15

22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 13 23 Sanitary Waste Interceptors 09-15

22 13 29 Sanitary Sewerage Pumps 09-15

22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-15

22 13 33 Packaged, Submersible Sewerage Pump Units 09-15

22 14 00 Facility Storm Drainage 09-15

22 14 29 Sump Pumps 09-15

22 14 33 Packaged, Pedestal Drainage Pump Units 09-15

22 14 36 Packaged, Submersible, Drainage Pump Units 09-15

22 15 00 General Service Compressed-Air Systems 09-15

22 31 11 Water Softeners 09-15

22 33 00 Electric Domestic Water Heaters 09-15

22 34 00 Fuel-Fired Domestic Water Heaters 09-15

22 35 00 Domestic Water Heat Exchangers 12-16

22 40 00 Plumbing Fixtures 09-15

22 42 26 Commercial Disposers 09-15

22 61 13.74 Dental Compressed-Air Piping 09-15

22 61 19.74 Dental Compressed-Air Equipment 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 62 19.74 Dental Vacuum and Evacuation Equipment 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

22 66 00 Chemical-Waste Systems for Laboratory and Healthcare

Facilities

09-15

22 67 19.16 Reverse-Osmosis Water Equipment 09-15

22 67 21 Water Dealkalizing System 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam

Generation

04-20

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 51 Noise and Vibration Control for Boiler Plant 04-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 05 93.01 DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC

08-19

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 08 00.01 DVA/USACE Projects Commissioning of HVAC Systems 08-19

23 08 11 Demonstrations and Tests for Boiler Plant 04-20

23 09 11 Instrumentation and Control for Boiler Plant 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

23 10 00 Facility Fuel Systems 04-20

00 01 10-8

SECTION NO. DIVISION AND SECTION TITLES DATE

23 11 23 Facility Natural-Gas Piping 04-20

23 21 11 Boiler Plant Piping Systems 02-20 23 21 13 Hydronic Piping 02-20

23 21 23 Hydronic Pumps 02-20

23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20

23 23 00 Refrigerant Piping 02-20

23 25 00 HVAC Water Treatment 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 38 13 Commercial-Kitchen Hoods 02-20

23 40 00 HVAC Air Cleaning Devices 03-20

23 50 11 Boiler Plant Mechanical Equipment 11-17

23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 25 Low-Pressure Water Heating Boilers 04-20

23 52 28 Low Pressure Steam Boilers 04-20

23 52 33 Water-Tube Boilers 04-20

23 52 39 Fire-Tube Boilers 04-20

23 56 00 Solar Energy Heating System 03-20

23 57 33 Geothermal Energy – Direct Use (Heating Applications) 03-20

23 64 00 Packaged Water Chillers 03-20

23 65 00 Cooling Towers 03-20

23 72 00 Air-to-Air Energy Recovery Equipment 03-20

23 73 00 Indoor Central-Station Air-Handling Units 03-20

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20

23 81 00 Decentralized Unitary HVAC Equipment 03-20

23 81 23 Computer-Room Air-Conditioners 03-20

23 81 43 Air-Source Unitary Heat Pumps 03-20

23 81 46 Water-Source Unitary Heat Pumps 03-20

23 81 49 Ground-Source Heat Pump 03-20

23 82 00 Convection Heating and Cooling Units 03-20

23 82 16 Air Coils 03-20

23 84 00 Humidity Control Equipment 03-20

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 02-10

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 13 Medium-Voltage Cables 01-17

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 36 Wireways for Radiology Equipment 01-18

26 05 39 Underfloor Raceways for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

00 01 10-9

SECTION NO. DIVISION AND SECTION TITLES DATE

26 08 00 Commissioning of Electrical Systems 11-16

26 08 00.01 DVA/USACE Projects Commissioning of Electrical Systems 08-19

26 09 23 Lighting Controls 01-18

26 11 16 Secondary Unit Substations 01-18

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18

26 13 13 Medium-Voltage Circuit Breaker Switchgear 01-17

26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17

26 20 11 Isolated Power Systems 01-18

26 22 00 Low-Voltage Transformers 01-18

26 23 00 Low-Voltage Switchgear 01-17

26 23 13 Generator Paralleling Controls 01-17

26 24 13 Distribution Switchboards 01-18

26 24 16 Panelboards 01-18

26 24 19 Motor Control Centers 01-18

26 25 11 Busways 01-17

26 26 00 Power Distribution Units for Static Uninterruptible

Power Systems

01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 32 13 Engine Generators 01-18

26 33 53 Static Uninterruptible Power Supply 01-17

26 35 26 Harmonic Filters 01-18

26 36 23 Automatic Transfer Switches 01-17

26 41 00 Facility Lightning Protection 01-17

26 42 00 Cathodic Protection 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

26 55 71 Medical and Surgical Lighting Fixtures 01-18

26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 05 61 Leased Space, Communication Equipment and Systems 06-15

27 08 00 Commissioning of Communications Systems 11-16

27 08 00.01 DVA/USACE Projects Commissioning of Communications

Systems

08-19

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 31 00 Voice Communications Switching and Routing Equipment 06-15

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

27 32 41 Two-Way Radio Equipment and Systems 10-18

27 41 31 Master Antenna Television Equipment and Systems 06-15

27 51 16 Public Address and Mass Notification Systems 10-18

27 51 23 Intercommunications and Program Systems 06-15

27 52 23 Nurse Call and Code Blue Systems 10-18

00 01 10-10

SECTION NO. DIVISION AND SECTION TITLES DATE

27 52 41 Miscellaneous Medical Systems 06-15

27 53 19 Distributed Radio Antenna (Within Building) Equipment and System

10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 08 00.01 DVA/USACE Projects Commissioning of Electronic Safety and Security Systems

08-19

28 13 00 Physical Access Control System 10-11

28 13 16 Physical Access Control System and Database Management 09-11

28 13 53 Security Access Detection 09-11

28 16 00 Intrusion Detection System 10-11

28 23 00 Video Surveillance 09-11

28 26 00 Electronic Personal Protection System 09-11

28 31 00 Fire Detection and Alarm 10-11

28 52 31 Emergency Call System 06-15

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 20 11 Earthwork (Short Form) 10-12

31 23 19 Dewatering 10-12

31 23 23.33 Flowable Fill 10-12

31 32 23 Pressure Grouting Soil Stabilization 10-12

31 62 00 Driven Piles 10-12

31 63 16 Auger Cast Grout Piles 10-12

31 63 26 Drilled Caissons 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 14 16 Brick Unit Paving 08-16

32 17 23 Pavement Markings 08-16

32 31 13 Chain Link Fences and Gates 06-18

32 31 40 High Security Fences and Gates 08-16

32 84 00 Planting Irrigation 08-16

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-16

00 01 10-11

SECTION NO. DIVISION AND SECTION TITLES DATE

33 08 00.01 DVA/USACE Projects Commissioning of Site Utility

Systems

08-19

33 10 00 Water Utilities 03-17

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 12-17

33 46 13 Foundation Drainage 10-11

33 51 00 Natural-Gas Distribution 10-11

33 63 00 Steam Energy Distribution 09-17

DIVISION 34 – TRANSPORTATION

34 71 13 Passive Vehicle Barriers 04-18

34 75 13.13 Active Vehicle Barriers 08-16

DIVISION 48 – Electrical Power Generation

48 14 00 Solar Energy Electrical Power Generation System 10-17

48 15 00 Wind Energy Electrical Power Generation System 10-17

48 16 23 Geothermal Energy Electrical Power Generation System 10-17