1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25621R0028
X
12-23-2020
TBD 629-21-1-6598-0002
629-20-120
Department of Veterans Affairs
Gulf Coast Veterans Health Care System
Network Contracting Office 16
400 Veterans Avenue
Biloxi MS 39531
Department of Veterans Affairs
Gulf Coast Veterans Health Care System
400 Veterans Avenue, Bldg. T-102
Biloxi MS, 39531
Charles Powell 228-523-5068
Project No: 629-20-120 Redesign and Repair Domestic Water Tank
Note: Any reference contained herein concerning "bid" or "bidder" means "offer" or "offeror".
This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSBs) under
Public Law (PL) 109-461. Offerors must be verified as a SDVOSB in the VetBiz Vendor Informaiton (VIP) at http://www.vetbiz.va.gov. Offers received from contractors who are not SDVOSB in VetBiz will not be considered for award.
This is a TWO-PHASE DESIGN-BUILD ACQUISITION - All qualified SDVOSB offerors may submit for Phase I. After
Phase I evaluation, selected Phase II offerors will be notified with instructions to submit PHASE II proposals.
The contractor shall provide all labor, supervision, equipment, material and resources necessary to design and build
Design/Build) a project to provide full usage of the water inside of the tank at the Southeast Louisiana Veterans
Health Care System, 2400 Canal Street, New Orleans, Louisiana 70119.
See attached technical specifications package for RFP instructions.
SITE VISIT: A site visit will be held for this project during Phase II proposals. Only the most highly qualified offerors from Phase I evaluations will be invited to attend the site visit which will be scheduled after Phase I evaluations.
MAGNITUDE OF CONSTRUCTION PROJECT: In accordance with FAR 36.204 and VAAR 836.20, Disclosure of the Magnitude of
Construction Projects, this project falls between the following price range: Between $250,000 and $500,000.
NAICS CODE: 237110 SMALL BUSINESS SIZE STANDARD: $39.5M
GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: New Orleans, Louisiana
***END OF ITEMS***
10 270
X X 52.211-10
X
0 2:00 PM
01-25-2021
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 38 U.S.C. 8127(d) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Gulf Coast Veterans Health Care System
Network Contracting Office 16
400 Veterans Avenue
Biloxi MS 39531
Financial Services Center
P.O. Box 149971
Austin TX 78714 8972
1-877-353-9791 1-512-460-5429
William A. Geary
NCO165L3-0926
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or
Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
STATEMENT OF WORK……………………………………………………………………….7
ATTACHMENTS………………………………………………………………………………..29
A.3 PRICE/COST SCHEDULE……………………………………………………………….30
ITEM INFORMATION…………………………………………………………………….30
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
B. PART II - RESPONSIBILITIES
2.1 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF
FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS, FPMR PART 101-29 (AUG 1998)
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (MAY 2014)
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.6 52.228-1 BID GUARANTEE (SEP 1996)
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.12 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES
INCORPORATED BY REFERENCE (JAN 2008)
2.13 PARTNERING
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) ..68
3.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
3.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (JUL 2020)
GENERAL CONDITIONS
4.1 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,
AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER
COVERED ENTITIES (JUL 2018)
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
4.3 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2020)
4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.10 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN
2020)
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.12 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)
4.13 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.15 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
4.16 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN
2008)
4.24 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020)
DESIGN BUILD SPECIFICATIONS
4.22 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES
4.23 OWNERSHIP OF ORIGINAL DOCUMENTS
4.24 RETENTION OF REVIEW DOCUMENTS
4.25 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED
PLANNING INFORMATION
4.26 COORDINATION WITH MEDICAL CENTER
4.27 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR
Statement of Work
Department of Veterans Affairs
Southeast Louisiana Veterans Health Care System
2400 Canal Street, New Orleans, LA 70119
Design/Build
Project No. 629-20-120
Redesign and Repair Domestic Water Tank
1. GENERAL REQUIREMENTS:
1.1. The contractor shall provide all labor, travel, materials, tools, equipment and supervision necessary to design and build (Design/Build) a project to provide full usage of the water inside of a domestic water storage tank located at the New Orleans VA Medical Center, 2400 Canal St., New Orleans, LA. Work includes but is not limited to producing the following outcomes:
1.1.1. The medical center is fully capable of utilizing greater than 80% of the domestic water tank’s volume (280,000 gallons) without the distribution system entering into alarm.
1.1.2. The medical center is fully capable of utilizing greater than 80% of the domestic water tank’s volume (280,000 gallons) without the distribution system pumps cavitating or producing a loss of suction pressure.
1.1.3. The medical center shall be able to fill the tank 85% or higher than the tank’s total volume without prompting distribution system alarm, spillage, or overflow.
1.1.4. The execution of the proposed design will not compromise the facility’s access to potable domestic water during the course of this work.
1.1.5. The execution of the proposed design will not compromise the water within the tank nor expose staff or patients within the facility to water borne pathogens.
1.2. The contractor shall provide a turnkey solution of design and the execution of that design. The
DB Contractor shall include in their total bid price the scope of work for all items listed.
1.3. Background
1.3.1. The main facility has a 280,000 gallon above ground storage tank (110’-11’’ with space available 8 inches below inset at top of tank; total depth 10’-8’’ at low point) reserved for domestic water. The tank is fed by two domestic water loops that encircle the 2400 St.
Campus. The facility has a bypass in place that allows for water from the municipal source to bypass the tank and proceed to the domestic water pumps. If the bypass is not in use, water from the municipality enters the tank. The outlet of the tank then branches into three:
the first going to the above ground fire tank and out to the campus for consumption; the second to the processing tank which provides water for the boiler plant; and the third which provides potable water to the facility Currently, it is estimated that less than 50% of the volume of the tank produces usable and system accessible water. Under the current programming protocols, alarms are set at about the 8.5-foot mark and higher and at 4-foot mark and lower. It is currently assumed that the outlet of the tank which feeds the four (4) facility domestic water pumps is too high and does not allow the use of approximately 25% of the tank’s water. The inability to fully utilize greater than 50% of the tank has resulted in skewed expectations of water provisions and potential usage during an emergency event.
Over filling of the tank has led to flooding and spillage.
2. DEFINITIONS:
2.1. Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer.
2.2. VA Project Engineer/Contracting Officer's Representative (COR): The Contracting Officer's authorized representative at the construction site. The COR is responsible for protecting the
Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc.
2.3. Firm-Fixed Price (FFP) Contract: This term, as used herein, refers to the Contract(s) to perform all provisions and implementation of the project.
2.4. Contractor: This term, as used herein, refers to the General Contractor under this contract or the
Design Build (DB, D/B) team (or firm).
2.5. Occupational Safety and Health Administration (OSHA)
2.6. Veterans Affairs (VA)
2.7. The Joint Commission (TJC)
2.8. Construction Documents (CD)
2.9. Design Development Documents (DD)
2.10. Schematic Design Documents (SD)
3. Design & Build Scope:
3.1. The design shall be in accordance with and capture the following requirements:
3.1.1. Design Development (DD): The DB Contractor shall develop 35%, 65% & 100% plans and specifications for review and approval by the VA. Verify all dimensions and equipment requirements.
3.1.1.1. The design documents shall incorporate proper construction phasing of work where required within the project period of performance.
3.1.1.2. Design drawings shall include all demolition and new work in sufficient detail to provide for a thorough review by the VA.
3.1.2. The work (design and construction) shall include, but not limited to: demolition, architectural, structural, electrical, mechanical, plumbing, access platforms, controls, pump and system modifications, x-raying of slabs and concrete in excess of 10 inches but no more than 24 inches, welding, pipefitting, sealant and water proofing of tanks, masonry repairs, diving (work within the domestic water tank), and tank cleaning.
3.1.3. Design submission shall include load and usage calculations, equipment catalog cutsheets and performance data. The Final design documents shall be stamped by a registered
Professional Engineer for each discipline.
3.1.4. Design shall include all site investigation, site survey, measurements, calculations, and testing for documents to construct the subject project.
3.1.5. Materials and equipment brought to the site shall be verified to have available space to maneuver the inside dimensions of corridors, elevators and stairwells. Maximum dimensions of sections or pieces of materials may be necessary as part of the design.
3.1.5.1. The water pumps and tank controls are housed in an area called the “submarine”, a space directly adjacent to and with a shared wall of the domestic water tank. Access to this space is limited by a narrow metal staircase and has only one exit/entry point.
See drawing 059-7PL601.
3.2. The DB shall complete a full assessment starting from the water entry into the CEP to the domestic water tank (exterior, interior, water entry and exit points), submarine which houses the domestic water pumps and processing tank pumps, to the main line that branches to the processing tank and the rest of the campus to the main riser in the 4th floor interstitial. This assessment shall include reconfirming existing design considerations and develop recommendations and modifications to improve system usage, eliminate latent design flaws and improve system performance.
3.3. Upon completion of this assessment and firmly establishing existing conditions, the contractor shall produce a design that meets the intent of this scope and execute.
3.3.1. During the design and as part of construction close out, the contractor shall provide the following:
3.3.1.1. Tank dimensions
3.3.1.2. Total tank volume
3.3.1.3. Usable tank volume prior to construction
3.3.1.3.1. To be measured in gallons
3.3.1.4. Measured usable water height (maximum and minimum)
3.3.1.5. New usable tank volume after redesign
3.3.1.5.1. To be measured in gallons
3.3.1.6. New water height maximum and minimums after redesign
3.3.2. This assessment and redesign shall also include the completion of all necessary hydraulic calculations and ensure that all changes proposed for completion are verified by the design engineer to provide adequate water pressure.
3.4. At the conclusion of all work, the contractor shall:
3.4.1. Clean the interior of the tank
3.4.2. Disinfect all new piping
3.5. Tank Information. The current tank volume is 280,000 gallons (Tank Height 10’-11’’). Below outlines current programming alarms and the water height in the tank associated with them.
Alarm Water Height in Tank
High Level Alarm 9.1 ft
High Level Warning 9.0 ft
Water Valve 1 Close 8.8 ft
Water Valve 1 Open 8.2 ft
Water Valve 1 Close 8.0 ft
Water Valve 1 Open 7.30 ft
Low Level Warning 6.95 ft
Low Level Alarm 6.90 ft
Pump Suction Loss 4.2 ft
3.5.1. Domestic Water Pump Information
3.5.1.1. Model: Peerless – MC1125
3.5.1.2. Quantity: four (4)
3.6. The DB shall complete a full test of the domestic water tank, post completion of the construction, to demonstrate design intent met. The following items, at a minimum, must be measured and observed in order to be considered met:
3.6.1. Observation of system performance at each of the alarm and warning levels present
3.6.1.1. All readings shall be reported with respect to water height in the tank and gallons present in the tank
3.6.1.2. The new tank height levels shall be physically confirmed against system reporting
3.6.2. The confirmation of the point of pump cavitation, which is beyond pump suction loss
3.6.2.1. The contractor shall definitively identify the point in which pump failure is imminent against the detection of pump suction loss. This shall be relayed in feet and inches and represent by water height in the tank. This may not be at the same tank height.
VA staff have physically observed this at reported readouts of 2.3 to 3.0 ft in the tank
(height). This new design should have this occurring at lower levels in order to meet the usable and accessible water design criteria. The contractor shall report the remaining volume of water in this tank and its overall percentage against total tank volume (physical dimensions).
3.6.3. Testing of the domestic water to ensure that no microbes were introduced or remain in the tank at the completion of work. This shall be achieved via water sampling. All testing shall meet American Water Works Associations (AWWA) and NSF INTERNATIONAL (NSF) standards.
3.6.3.1. Any water samples taken shall be submitted to a Center for Disease Control (CDC)
Elite Laboratory for testing
3.6.3.2. Total Coliform Bacteria
3.6.4. Demonstrate the usability of water from the domestic, in totality of the volume restrictions, noted in two uninterrupted tests
3.6.4.1. Tank is filled, volume recorded, water is used via exiting the only outlet of the tank, with volume incrementally recorded until:
3.6.4.1.1. Volume design usage is met
3.6.4.1.2. Each of the alarm levels is met
3.6.4.1.3. The onset of pump cavitation, prior to exercised cavitation
3.7. The DB Contractor shall include in their design all phasing required in order to execute this work. This shall include the provision of a phasing plan with construction documents. The phasing shall detail:
3.7.1. Phased system and tank access
3.7.2. Tank entry
3.7.3. Utility disruptions
3.7.4. Duration for each phase
3.8. The DB Contractor shall include in their total bid all services necessary to complete utility assessments required in order to achieve the goals and design intent associated with this contract as well as the execution of the developed design. This may include but is not limited to:
3.8.1. Pressure testing
3.8.2. Tank diving
3.8.3. System modeling
3.9. Work Restrictions and Considerations
3.9.1. Due to the nature of work and access required, the contractor may be required to enter a confined space.
3.9.1.1. The contractor must ensure that all provisions for the completion of this are included in the design and execution of the project. This shall include but is not limited to providing confined space training staff, the provision of confined space rescue equipment, execution of a confined space permit, etc.
3.9.2. In order to access the tank via a diver, the contractor shall take into consideration the height of the tank and depth to be accessed. From past experience, a pump has been required in order to provide the necessary air for the diver. The contractor shall take this into consideration when completing their design and construction.
3.9.3. The contractor shall create a design that works within the constraints of the existing tank and tank structure
3.9.3.1. The replacement of a domestic water tank is not included in the scope of this project, though repairs, patching, plugging, etc. are expected in this contract
3.9.4. Replacement of the domestic water pumps are not in the scope of this project
3.9.4.1. Relocation, reconfiguration or change of tie ins into the tanks are within the scope of the project should the design warrant it
3.9.5. Replacement of the controls and reporting system for the tanks is not in the scope of this project
3.9.5.1. Reprogramming and changes in system configurations in order to meet scope intent is within the scope of this project (reporting on the domestic tank and report outs on the domestic water pumps)
3.9.6. Processing tank controls and refilling features are not in the scope of this project
3.9.7. Additions to the existing building automation system (Metasys) are excluded
3.10. Design shall be in accordance with the VA Master Specifications and the following provided specifications with this solicitation and shall become a part of this contract and design documents. The Design Build Contractor shall develop all other applicable project specifications.
3.10.1. 00 11 21 Request for Proposal to Design Build
3.10.2. 01 00 00 General Requirements
3.10.3. 01 32 16.15 Project Schedules
3.10.4. 01 33 23 Shop Drawings, Product Data & Samples
3.10.5. 01 35 26 Safety Requirements
3.11. Design and construction code must meet, at a minimum, the following references as applicable:
3.11.1. American Institute of Steel Construction (AISC):
3.11.1.1. 325-2011 Steel Construction Manual, 14th Edition
3.11.1.2. 360-2010 Specification for Structural Steel Buildings
3.11.2. American Society of Civil Engineers (ASCE):
3.11.2.1. ASCE/SEI 7-2010 Minimum Design Loads for Buildings and Other
Structures
3.11.3. American Society of Mechanical Engineers (ASME):
3.11.3.1. A112.6.3-2001 (R2007) Floor and Trench Drains
3.11.3.2. B16.1–2010 Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125,
3.11.3.3. B16.34-2013 Valves Flanged, Threaded and Welding End
3.11.4. ASME Boiler and Pressure Code -
3.11.4.1. BPVC Section IX-2015 Welding, Brazing, and Fusing Qualifications
3.11.5. American Society for Testing and Materials (ASTM):
3.11.5.1. A36/A36M-2014 Standard Specification for Carbon Structural Steel
3.11.5.2. A53/A53M-2012 Standard Specification for Pipe, Steel, Black and Hot-
Dipped, Zinc-Coated, Welded and Seamless
3.11.5.3. A123/A123M-2013 Standard Specification for Zinc (Hot-Dip Galvanized)
Coatings on Iron and Steel Products
3.11.5.4. A153/A153M-2009 Standard Specification for Zinc Coating (Hot-Dip) on
Iron and Steel Hardware
3.11.5.5. A234/A234M-2014 Standard Specification for Piping Fittings of Wrought
Carbon Steel and Alloy Steel for Moderate and High Temperature Service
3.11.6. American Water Works Associations (AWWA):
3.11.6.1. B300-2010 Hypochlorites
3.11.6.2. B301-2010 Liquid Chlorine
3.11.6.3. C110-2012 Ductile-Iron and Gray-Iron Fittings
3.11.6.4. C115-2011 Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron
Threaded Flanges
3.11.6.5. C151-2009 Ductile-Iron Pipe, Centrifugally Cast
3.11.6.6. C213-2007 Fusion-Bonded Epoxy Coating for the Interior and Exterior of
Steel Water Pipelines
3.11.6.7. C651-2014 Disinfecting Water Mains
3.11.6.8. C652-2011 Disinfection of Water Storage Facilities
3.11.6.9. D100-2011 Welded Carbon Steel Tanks for Water Storage
3.11.6.10. D102-2014 Coating Steel Water-Storage Tanks
3.11.7. American Welding Society (AWS):
3.11.7.1. D1.1/D1.1M-2010 Structural Welding Code-Steel
3.11.7.2. D1.3/D1.3M-2008 Structural Welding Code-Sheet Steel
3.11.7.3. D1.4/D1.4M-2011 Structural Welding Code-Reinforcing Steel
3.11.8. American Society of Sanitary Engineers (ASSE):
3.11.8.1. 1010-2004 Performance Requirements for Water Hammer Arresters
3.11.9. Manufacturers Specification Society (MSS):
3.11.9.1. SP-58-2009 Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation
3.11.9.2. SP-72-2010a Ball Valves with Flanged or Butt-Welding Ends for General
Service
3.11.9.3. SP-110-2010 Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends
3.11.10. International Code Council (ICC)
3.11.10.1. IBC-2012 International Building Code
3.11.10.2. IPC-2012 International Plumbing Code
3.11.11. National Fire Protection Association (NFPA):
3.11.11.1. 70-2014 National Electric Code
3.11.11.2. 99-2018 Healthcare Facilities
3.11.11.3. 101-2018 Life Safety Code
3.11.12. NSF INTERNATIONAL (NSF):
3.11.12.1. 61-2014a Drinking Water System Components–Health Effects
3.11.12.2. 372-2011 Drinking Water System Components–Lead Content
3.11.13. Plumbing and Drainage Institute (PDI):
3.11.13.1. PDI-WH 201-2010 Water Hammer Arrestors
3.11.14. The Joint Commission
3.11.15. VA Directives
3.11.16. VA Plumbing Design Manual
3.12. Shop drawings and As-Builts.
3.12.1. Shop drawings shall be prepared and engineered.
3.12.2. Accurate As-Built drawings shall be required in the form of three hard copies and two copies on CD in the specified AutoCAD format specified in Section 4.5.1. The signature of the engineer constitutes an affidavit that the statements, representations, and information presented in the submittal constitute a complete operational system conforming to applicable state laws and recognized good engineering practices.
3.13. Refer to the provided drawings for reference of existing conditions and detailed scope.
These documents are reference documents for contractor use. These documents are not as-builts.
All conditions noted must still be physically field verified:
3.13.1. 0266-7SB101-N1.pdf
3.13.2. 0267-7SB101-N2.pdf
3.13.3. 0268-7SB501 Details.pdf
3.13.4. 0269-7SB502 Details.pdf
3.13.5. 046-7PJ100.pdf
3.13.6. 050-7PJ201.pdf
3.13.7. 059-7PL601.pdf
3.13.8. Domestic Water Pump Information.pdf
3.13.9. RFI 00200.pdf
3.13.10. RFI 00438.pdf
3.13.11. 161031_NOVA DW Storage Bypass Sketches.pdf
3.13.12. 00071-CK118 Site Civil HCP.pdf
3.13.13. 00092-CU118 Site Civil.pdf
3.13.14. DWP-1 Data Plate.jpg
3.13.15. DWP-2 Data Plate.jpg
3.13.16. DWP-3 Data Plate.jpg
3.13.17. DWP-4 Data Plate.jpg
3.14. The Contractor shall guarantee and service all workmanship and materials to be as represented by him, and shall repair or replace, at no additional cost to the VA, any part thereof, which may become defective within the period of one (1) year after the date of final acceptance by the VA. Contractor shall be responsible for, and pay for, any damages caused by, or resulting from defects in his work.
3.15. Work shall occur for the following location:
3.15.1.1. Southeast Louisiana Veterans Health Care System, 2400 Canal Street, New
Orleans, LA 70119
3.15.2. Construction items, such as site visits for specific tasks that cannot be completed during
“regular work hours” (7:30 am – 4:00 pm), may be required as part of this contract.
4. DESIGN DELIVERABLE REQUIREMENTS:
4.1. Design Submissions – Statement of Task:
4.1.1. 35% Design Development (DD)
4.1.2. 65% Design Development (DD)
4.1.3. 100% Design Development (DD)
4.1.4. Construction Documents (CD)
Note 1: Detailed design submission requirements can be found in VA Guide PG-18- 15.
Note 2: The VA staff shall have 10 calendar days to review and coordinate each design submission unless noted otherwise.
4.2. 35% Design Development: These drawings shall show all work in the scope necessary to provide information that will carry the design to the next review.
4.2.1. Drawings & Specifications: Provide two hard copy 17”x22” size C sets of preliminary construction drawings.
4.2.2. Provide one set of preliminary specifications indicating all the DB Contractor proposed edits. Drawings and specifications to indicate potential deductive bid alternates and any phasing requirements. Also provide electronic copies in PDF format.
4.2.3. Cost Estimate: Provide a detailed cost estimate indicating labor, material and equipment cost in RS Means CostWorks format. Estimate shall include DB Contractors Overhead, Profit, Bond and Labor Burden. Estimate shall indicate feasible deductive bid alternates to bring the construction cost within the allotted construction budget. This cost estimate shall be submitted in hard copy and PDF format.
4.2.4. Design Analysis: Provide a design analysis for each discipline indicating the design rational, thought process and design calculations. Provide a summary of deductive bid alternates. Provide a draft preliminary detailed submittal register. Provide a list on what outstanding data or feedback is required from the VA. Provide one hard copy and PDF format of the Design Analysis.
Note: The DB Contractor shall not proceed with the 65% design without written concurrence from the VA COR.
4.3. 65% Design Development: This submission of drawings, specifications and cost estimate shall be very close to complete. This review by the VA shall be to validate that the 35% comments were incorporated into the project. The construction documents should be sufficiently developed to cover all work items to be addressed by the project. No major items shall be missing from this submission. The VA review of these documents should result in very minor comments to allow for the next 100% submission. The DB Contractor shall provide a list of questions on anything that’s needed from the VA to continue and fully develop the next 100% design submission.
Additionally, the DB Contractor shall provide minutes from the last design review meeting and shall provide responses to all VA comments noted or identified during the last review submission.
4.3.1. Drawings & Specifications: Submit in the same manner as the 35% DD submittal.
4.3.2. Cost Estimate & Design Analysis: Submit in the same manner as the 35% DD submittal.
4.3.3. Submittal Register: Submit a fully developed submittal register per the noted specifications developed. The document shall be an excel sheet and shall note a minimum:
4.3.3.1. Submittal name
4.3.3.2. Submittal number
4.3.3.3. Specification division
4.3.3.4. Specification section and reference
4.3.3.5. Submittal type
4.3.3.5.1. Letter of Affidavit of Compliance
4.3.3.5.2. Shop Drawing
4.3.3.5.3. Data Sheets
4.3.3.5.4. Brochure
4.3.3.5.5. Physical Sample
4.3.3.5.6. Manufacturer’s Literature or Catalog Cuts
4.3.3.5.7. Test reports
4.3.3.5.8. Other (specify)
4.3.3.6. Submission date for VA approval
4.3.3.7. Status: Approved, approved as noted, disapproved
4.3.3.8. Date approval or rejection was received
4.4. 100% Design Development: This submission of drawings, specifications and cost estimate shall be complete. This review by the VA shall be to validate that the 65% comments were incorporated into the project. There shall be nothing missing from the construction documents.
The VA review of these documents should result in very minor comments to allow for the next submission to be final. If the comments of this set of documents results in numerous comments, then a 99% review or a check set of certain elements of the design may be required before the
DB Contractor shall proceed to the Final Construction Documents.
4.4.1. Drawings & Specifications: Submit in the same manner as the 65% DD submittal.
4.4.2. Cost Estimate: Submit in the same manner as the 65% DD submittal.
4.4.3. Submittal Register: Submit final register in the same manner as previous submittal.
4.5. Construction Documents: This submission shall incorporate all project requirements and previous comments. These documents shall be ready for construction.
4.5.1. Drawings & Specifications: ALL ENGINEERS PROFESSIONAL “STAMPS” SHALL BE
ON THIS SET OF DOUMENTS. Provide three 17”x22” size C sets of final construction drawings. Provide two set of final fully edited specifications, printed on both sides of the paper. Drawings and specifications to indicate accepted deductive bid alternates and any phasing requirements. Provide one CD electronic copy of the entire package (Construction
Drawings and Specifications). The drawings shall be as both AutoCAD (2017) and scanned individual PDF files per drawing. The specifications shall be in separate Word and separate
PDF files for each specification section.
4.5.2. Cost Estimate: Submit final CostWorks cost estimate in the same manner as previous submittal.
4.5.3. Submittal Register: Submit final register in the same manner as previous submittal.
4.6. Construction Document – Bid Documents
4.6.1. All final documents shall bear the stamp and seal of the responsible design/engineering professional. An electronic copy of all documents shall be provided to the VA in addition to the copies mentioned in this section.
4.6.2. Specifications: Furnish two (2) copies, typed and bound in final format, to include the contract special provisions for each project. Provide index pages as required.
4.6.3. Drawings: Furnish three (3) complete sets of drawings, including all necessary details and schedules for each project. The single-line layouts will have been transformed to full scale, double-line drawings. Single line drawings of any system will NOT be acceptable for the
100% review documents with the exception of the electrical wiring drawings.
4.7. Reviews.
4.7.1. All reviews must be approved by VA prior to beginning the next design phase. Redesigns that do not meet VA requirements or achieve project intent shall be completed at no cost to the Government. Redesigns as previously mentioned will not constitute justification for more time. The D/B FIRM shall be required to meet the contractual timelines established for the design described.
4.7.1.1. Any design delays that are the result of Government delay shall not apply to the aforementioned.
4.8. Construction Period:
4.8.1. Review and comment on Contractor's submittals, shop drawings, etc., with recommendations for approval/rejection to VA. NOTE: VA is approving authority; D/B
FIRM recommends subsequent VA actions.
4.8.2. The D/B FIRM shall conduct site visits, at no cost to the Government, should issues arise with implementation of the design. If the existing design should prove to be unfeasible or incapable of being implemented, the D/B FIRM shall create a new design to address the issue at no cost to the Government. The D/B FIRM shall also pay for all costs associated with any change orders that arise from the implementation of the new design.
4.8.3. As Built Drawings:
4.8.3.1. After completion of the project construction, revise the entire set of reproducible drawings and the AutoCAD/Revit CD disks showing any changes from original design. The VA shall provide marked-up working drawings and/or change order documentation as received from the construction Contractor. A note for the requirement of accurate As-Built drawings is to be clearly shown on each sheet of the construction drawings. The complete set of "as-built" 30 in. by 42 in. drawings (one
(1) set) and writeable AutoCAD CD disks will be delivered to the Chief, Engineering
Service. The reproducible as-built drawings will be delivered in good condition, inside of a protective drawing mailing tube, and with an appropriate cover letter.
4.9. CONSTRUCTION SUBMITTAL REQUIREMENTS:
4.9.1. Submittals: Construction and product submittals shall be as outlined in the VA Master specifications and are to be submitted during the design phase and incorporated into the design once approved. Provide submittals in accordance with the Shop Drawings, Product
Data & Samples Specification provided.
4.9.2. Manufacturer’s data sheets shall be provided for all materials and equipment for approval before purchase or installation. Data sheets shall describe the type of material, capacities, manufacturer, part numbers of equipment, and give information necessary for verifying equipment approval.
4.9.3. No pumps or controllers, assemblies or installations shall be submitted or installed that are not UL (United Laboratories) approved.
4.9.4. The Contractor shall submit detailed and accurate shop drawings prepared in accordance with all required codes and directives for approval of all equipment to be constructed and installed. Shop drawings shall identify all materials and list all equipment to be used. Shop drawings shall include ceiling grid or reflected ceiling layout and shall be coordinated with other trades prior to submittal. Shop drawings are to be submitted with a minimum 1/8” scale and all details at a minimum ¼” scale. All other submittals shall be in accordance with VA Master Specifications and as developed during design.
4.9.5. Work Hours/Dates: Monday through Friday 7:30am to 4:00pm, excluding federal holidays.
The contractor may be required to accomplish some work after hours or on weekends to minimize disruption to hospital operations. All work shall be coordinated with the COR.
4.9.6. Utility Outages: Any required utility system outages needed in order to perform work will be scheduled at the convenience of the VA and may require work to be performed during hours or when government staffing is available. This may be either during business hours or after-hours work, depending on the nature of the outage and VA staffing availability. All utility outages will be coordinated two weeks in advance with the COR.
4.9.7. Adjacent Space: Access and continued function/operation of adjacent occupied spaces
(above, below and beside) shall be considered within the construction phasing plan to minimize the overall impact and disruptions generated by the construction activities.
4.9.8. Safety, Infection Control & Code Requirements: Contractor to work in accordance with the
Infection Control Risk Assessment provided and in accordance with the General
Requirements and Safety Requirements specifications provided.
4.10. Existing Record Drawings. Existing VA record drawings may not indicate actual existing conditions and should be considered a guide only. At D/B FIRM’s request, VA will provide appropriate record drawings.
4.11. Reference Review.
4.11.1. Prior to beginning design, the D/B FIRM shall review each reference listed below. The
D/B FIRM and the assigned government Contracting Officer's Representative (COR) will determine which references are applicable to this design.
4.11.2. VA Master Construction Specifications (PG-18-1): Table of contents. All specifications available in Microsoft Word format via Internet.
4.11.2.1. (http://www.cfm.va.gov/til/).
4.11.2.1.1. VA Construction Standards
4.11.2.1.2. VA Standard Details
4.11.2.1.3. VA Equipment Guide List
4.11.2.1.4. VA List of Equipment Symbols
4.11.2.1.5. VA Planning Criteria for VA Facilities
4.11.2.1.6. VA Barrier Free Design Handbook
4.11.2.1.7. VA Room Finishes and Door Schedule
4.11.2.1.8. VA Energy Conservation Manual
4.11.2.1.9. VA Design Manuals
4.11.2.1.10. VA Office of Information and Technology Design Guide
4.12. Communication: The cost of all communications, mailings, copying and reproductions initiated by the Contractor in providing these services shall be included in the cost proposal without additional reimbursement.
4.12.1. The Contractor shall correspond by cloud-based software or a communication format capable of large file storage and distribution.
4.12.2. The Contractor shall provide access to the site to all stakeholders associated with the project.
4.12.3. Other correspondence means such as fax, overnight delivery or first-class mail, or other paperless transmissions are acceptable as secondary methods of communication. Scheduled submittals (SD, DD & CD) shall be delivered by courier or overnight mail service.
4.13. Document requirements.
4.13.1. Specifications
4.13.1.1. Sheet size: 8 ½”x11”
4.13.1.2. Word processing Format: MS Word 2010 or later
http://www.cfm.va.gov/til/
4.13.1.3. Organization: Master Specification with VA header and footer format
4.13.1.4. Bound
4.13.1.5. Electronic (PDF and Word file) and paper copy
4.13.1.6. Submissions shall be made with the DD and CD (65% and 100%) submissions.
4.13.2. Cost Estimate
4.13.2.1. Sheet size: 8 ½”x11” or 11”x17’’
4.13.2.2. Spreadsheet Format: Excel 2010 or later
4.13.2.3. Bound
4.13.2.4. Formats: Spreadsheet
4.13.2.5. Electronic (PDF and Excel file) and paper copy
4.13.2.6. Submissions shall be made during the DD and CD (65% and 100%) submissions.
4.13.3. Design Schedule
4.13.3.1. Sheet size: 8 ½”x11” or 11”x17’’
4.13.3.2. Spreadsheet Format: Microsoft Project, latest version.
4.13.3.3. Task list and Gantt Chart
4.13.3.3.1. Each design submission shall be noted.
4.13.3.4. Electronic (PDF and MS Projects) and paper copy
4.13.3.5. Schedule shall be submitted within fifteen (15) calendar days of award
4.13.4. Schedule of Values
4.13.4.1. AIA G703 Format
4.13.4.2. Electronic (PDF and Word) copies shall be submitted to the VA.
4.13.4.3. Scheduled of Values shall include the following at a minimum
4.13.4.3.1. Design Period Services
4.13.4.3.1.1. SD Submissions
4.13.4.3.1.2. DD Submissions
4.13.4.3.1.3. CD Submissions
4.13.4.3.1.4. Associated design review meetings
4.13.4.3.1.5. Site visits
4.13.4.3.2. Construction Administrative Documents
4.13.4.3.2.1. Submittal reviews
4.13.4.3.2.2. Site Visits with reports
4.13.4.3.2.3. As Built development
4.13.4.3.3. Construction Work
4.13.4.3.3.1. Major tasks for execution
4.13.4.3.3.2. General Conditions
4.13.5. Progress payments
4.13.5.1. Submission Frequency:
4.13.5.1.1. Design:
4.13.5.1.2. Upon approval of 35%, 65% and 100% design document submissions, construction documents
4.13.5.1.3. Construction
4.13.5.1.3.1. Monthly, based upon percentage of work completion
4.13.5.2. Format: Electronic (PDF), AIA G702 Form, Schedule of values completion to accompany (G703 Form)
4.13.5.3. To be reviewed by VA and approved by VA prior to submission for certification
4.13.5.3.1. Note: Payment will be made based on work completed and presented to
VA. In no part will payments for design packages be issued without a fully compliant and approved design having been submitted and accepted by VA.
4.13.6. Construction Schedule
4.13.6.1. Sheet size: 8 ½”x11” or 11”x17’’
4.13.6.2. Spreadsheet Format: Microsoft Project 2010 or later
4.13.6.3. Task list and Gantt Chart
4.13.6.4. Electronic (PDF and MS Projects) and paper copy
4.13.7. Daily Logs
4.13.7.1. File Format: Electronic Copy (PDF)
4.13.7.2. Signed by the writer
4.13.7.3. Submission Frequency: Submitted daily via email
4.13.8. Certified Payrolls
4.13.8.1. File Format: Electronic Copy (PDF)
4.13.8.2. Submission Frequency Weekly. Last workday in the week, for the previous week
4.13.9. As-Builts
4.13.9.1. Sheet size: 30”x42” shall be “to scale” and legible when printed at that size
4.13.9.2. CADD Format: AutoCAD 2015 or later and Revit
4.13.9.3. Organization: VA
4.13.9.4. CADD-Drafting Standards
4.13.9.5. Electronic (PDF and CAD file) and paper copy
4.13.9.6. Submitted no later than ten (10) calendar days after construction completion.
4.13.10. Meetings and Meeting Minutes
4.13.10.1. D/B FIRM shall keep meeting minutes and written responses to review comments within one week of the meeting conclusion or receipt of comments for all formal meetings between the D/B FIRM and the VA.
4.13.10.2. File Format: Electronic (PDF)
4.13.10.3. The following meetings at a minimum shall be held by the D/B:
4.13.10.3.1. Design Kick Off Meeting
4.13.10.3.2. 35% Schematic Design Review
4.13.10.3.3. 65% Schematic Design Review
4.13.10.3.4. 100% Schematic Design Review
4.13.10.3.5. Construction Kick Off Meeting
4.13.10.3.6. Weekly Construction Progress Meetings
4.13.10.3.7. Project Closeout/Lessons Learned
4.14. Site Visits
4.14.1. The D/B FIRM shall conduct site visits during the construction period. For this project, the D/B FIRM shall provide two (2) site visits.
4.14.1.1. All costs associated with travel for the noted site visits shall be borne by the
Contractor (D/B Firm) and not the Government. Should all two (2) site visits later be determined by the Government as not needed, the Government reserves the right to rescind the visits and deduct the cost from the contract.
4.14.2. The Contractor (D/B Firm) shall also conduct as many site visits and design meetings with VA as necessary to completely assess the property and develop the bid documents as requested. These site visits are not inclusive of any site visits, meetings, etc. established or that occurred after commencement of Construction (i.e. after receipt of final and approved bid documents). This is anticipated not to exceed two (2) each two-person instances.
4.14.3. For every site visit conducted during the construction period, a report shall be submitted to the VA to include: date, time, observations, log of those present, signature of the employee completing the report.
5. CONTRACT AWARD MEETING:
5.1. The Contractor shall commence work only when the Contracting Officer (CO) has conducted a
“kick-off” meeting and/or a Notice to Proceed has been issued.
6. TRAVEL:
6.1. The Contractor (Design Build Contractor) is responsible for providing transportation/travel for all materials, supplies, personnel and all items needed for the duration of this contract unless stated otherwise elsewhere. Site visits and overall travel to the job sites in all instances covered under this contract shall be wholly provided by the Contractor (D/B Firm), including but not limited to: transportation, parking fees, tolls, gas mileage, etc.
7. PERIOD OF PERFORMANCE:
7.1. Performance period for this contract shall be 270 calendar days for design and construction from
Notice-To-Proceed date per the following breakdown noted. Work on site shall begin no more than fifteen (15) calendar days after notice to proceed. Work at the Government site is permissible on Federal holidays or weekends, but subject to approval by Contracting Officer’s
Representative (COR) and/or the Contracting Officer (CO).
Task # Task Name Schedule Days from Notice to
Proceed (NTP)
T-00 Notice to Proceed Within fifteen (15) calendar days of
Award
D
T- 01 Design Kick Off Meeting
Architect representative of D/B
Team attendance is mandatory
(either by phone or in person). To occur no later than ten (10) calendar days after Notice to Proceed (NTP).
D+10
T-02 Design Schedule and
Schedule of Values
Shall be submitted within fifteen
(15) calendar days after NTP
D+15
T-03 Preliminary Site Visits As many as needed in order to complete all design work
D+25
T-04 35% Schematic
Submission
No later than 30 calendar days after
Notice to Proceed
D+30
T-05 Schematic Design Review
Meeting
No later than 10 calendar days after submission and receipt of 35% documents by VA. Minutes by D/B from meeting are due by the following week.
D+40
T-06
65% Design
Development
Documents
No later than 40 calendar days after
Schematic Submission (pending
Schematic submission approval by
VA)
D+80
T-07
65% Design
Development
Specifications
No later than 40 calendar days after approval of Schematic Submission
D+80
T-08
65% Design
Development Cost
Estimate
No later than 40 calendar days after approval of Schematic Submission
D+80
T-09 Submittal Register No later than 40 calendar days after approval of Schematic Submission
D+80
T-10 Design Development
Review Meeting
No later than 10 calendar days after submission and receipt of 65% documents by VA. Minutes by D/B from meeting are due by the following week.
D+90
T-11 100 % Construction
Documents
No later than 30 calendar days after approval of 65 % DD Submission
D+120
T-12 100% Construction
Specifications
No later than 30 calendar days after approval of 65% DD Submission
D+120
T-13 100% Construction
Cost Estimate
No later than 30 calendar days after approval of 65% DD Submission
D+120
T-14 Submittal Register No later than 30…