0268-7SB501 Details.pdf
PDF 1 MB Posted
- Solicitation number
- 629-20-120
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL
CONCRETE
7SB501
ARCHITECTURAL CONCRETE
ARCHITECTURAL
CONCRETE
ARCHITECTURAL CONCRETE
ARCHITECTURAL
CONCRETE
ARCHITECTURAL
CONCRETE
B
A
D
C
E
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H A L
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
E E T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
X T
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE
APPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBER
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
TYPICAL STRUCTURAL DETAILS
TMD RJCJuly 15, 2011
SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
I.S.C. GROUP, INC. / IRRIGATION
DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE
Construction Documents 1
FULLY SPRINKLERED
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING / PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
COMMUNICATIONS DESIGN GROUP / LOW VOLTAGE
7SB501
7629-HS2-401
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MAINTENANCE
EWP_5
3/4" = 1'-0"8
SECTION
3/4" = 1'-0"7
SECTION
3/4" = 1'-0"1
SECTION
3/4" = 1'-0"10
SECTION
3/4" = 1'-0"6
SECTION
3/4" = 1'-0"2
SECTION
3/4" = 1'-0"3
SECTION
3/4" = 1'-0"4
SECTION
3/4" = 1'-0"9
SECTION
CEP TANK EASTCEP TANK
3/4" = 1'-0"5
SECTION
3/4" = 1'-0"11
SECTION
ALL FOUNDATION DRAWINGS WITH SB PREFIX
IN EWP04 WERE REPLACED BY THE SHEETS
OF THE SAME NAME AND NUMBER FROM EWP05
EFFECTIVE WITH ADDENDUM #5 TO EWP04
2 ADDENDUM 2 08/24/11
3 ADDENDUM 3 - Post Bid 12/2/11
7 BULLETIN 009A 10/31/2012
PER RFI-00091, IGNORE THE KEYWAY
AND USE 2" COVER FROM TOP OF
PILE CAP / FOOTING AS IT RELATES
TO THE HOOK BAR
STRUCTURAL FILL IS
ACCEPTABLE IN LIEU OF GRAVEL
RFI-00072.1
SEE RFI-239 FOR
CONTROL JOINT
INFORMATION
#9 BAR,
RFI-313
#9 BAR,
RFI-313
PLEASE REFERENCE
RFI-311 FOR
CLARIFICATION
RFI-319 FOR 3" TOPPING SLAB
DELETION AND MEMBER
CLARIFICATIONS
RFI-319 FOR 3" TOPPING SLAB DELETION AND
MEMBER CLARIFICATIONS
RFI-319 FOR 3" TOPPING SLAB
DELETION AND MEMBER
CLARIFICATIONS
RFI-319 FOR 3" TOPPING SLAB DELETION
AND MEMBER CLARIFICATIONS
RFI-319 FOR 3" TOPPING SLAB
DELETION AND MEMBER
CLARIFICATIONS
RFI-319 FOR 3" TOPPING SLAB
DELETION AND MEMBER
CLARIFICATIONS
RFI-319 FOR 3" TOPPING
SLAB DELETION AND
MEMBER CLARIFICATIONS
RFI-319 FOR 3" TOPPING SLAB DELETION AND
MEMBER CLARIFICATIONS
RFI-319 FOR 3" TOPPING
SLAB DELETION AND
MEMBER CLARIFICATIONS
SEE RFI-517 FOR ALTERNATE
SEE RFI-519 FOR REVISED
DETAIL AT CERTAIN LOCATIONS
SEE RFI-554 FOR REVISED
DETAIL AT CERTAIN LOCATIONS
RFI-957: Waterstop to be installed between top of wall and 1st floor slab
SEE RFI 00243.1 FOR
GRADE BEAM/PILE
CONNECTION
EMBEDMENT.