VA 620A4-22-101 Combined Drawing Set.pdf

PDF 16 MB Posted

Attached to
Y1DZ--620A4-22-101 Replace Fan Coils in Building 18 at the Castle Point VA Medical Center
Solicitation number
36C24226B0001
Issued by

About this file

This document is a comprehensive set of construction design and engineering drawings for a fan coil unit replacement project at the Castle Point VA Medical Center, Building 18. The project involves a fully sprinklered renovation to replace existing fan coil units across multiple floors, including basement, first, second, third floors, and the penthouse. The detailed drawing set includes architectural, mechanical, electrical, and abatement plans with specific focus on phasing the replacement of heating and cooling infrastructure while maintaining facility operations.

The project scope encompasses comprehensive mechanical system upgrades, including removing existing two-pipe fan coil units and replacing them with new four-pipe units from Daikin, updating piping distribution systems, modifying electrical connections, and implementing careful infection control measures. The design documents outline specific demolition and installation procedures for each floor, with meticulous attention to maintaining negative air pressure, managing dust control, and ensuring minimal disruption to the medical facility's ongoing functions. The project is scheduled for completion by December 10, 2024, with work to be performed under VA solicitation number 36C24226B0001.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

TITLE SHEET & DRAWING INDEX CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GI001

620A4-22-101

ELK KRL

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

CASTLE POINT VAMC

REPLACE FAN COIL UNITS

BUILDING 18

NORTH ARROW

DETAIL NUMBER

DETAIL IDENTIFIER

DETAIL TITLE NUMBER /

SHEET REF NUMBER

SECTION IDENTIFIER

SHEET REF NUMBER

DETAIL

IDENTIFIER

SHEET REF

NUMBER

DETAIL SECTION IDENTIFIER

VIEWING

DIRECTION

VIEW TITLE

BUILDING/WALL SECTION CUT

EXTERIOR ELEVATION

DETAIL SECTION CUT

DETAIL CALLOUT

DRAWING SYMBOLS

N

INTERIOR ELEVATION

DD###

DD###

X

DD###

X

SCALE: 1'-0" = 1'-0"

DETAIL TITLEX

1 / DD###

DD###

X

DD###

X

TRUE NORTH

PLAN NORTH

VIEWING

DIRECTION

SHEET REF NUMBER

SHEET REF NUMBER

DRAWING LIST

DRAWING

NUMBER DRAWING TITLE

GENERAL

GI001 TITLE SHEET & DRAWING INDEX

GC101 GENERAL PHASING PLAN - ROOF-PENTHOUSE

GC102 GENERAL PHASING PLAN - ROOF-CRAWLSPACE

GC103 GENERAL PHASING PLAN - BASEMENT FLOOR

GC104 GENERAL PHASING PLAN - FIRST FLOOR

GC105 GENERAL PHASING PLAN - SECOND FLOOR

GC106 GENERAL PHASING PLAN - THIRD FLOOR

GC107 GENERAL PHASING PLAN - ROOF-CRAWLSPACE

GC401 ICRA PLAN - PHASE 3 - RISER 1

GC402 ICRA PLAN - PHASE 3 - RISER 2

GC403 ICRA PLAN - PHASE 3 - RISER 3

GC404 ICRA PLAN - PHASE 3 - RISER 4

GC405 ICRA PLAN - PHASE 3 - RISER 5

GC406 ICRA PLAN - PHASE 3 - RISER 6

GC407 ICRA PLAN - PHASE 3 - RISER 7

GC408 ICRA PLAN - PHASE 3 - RISER 8

GC409 ICRA PLAN - PHASE 3 - RISER 9

GC410 ICRA PLAN - PHASE 3 - RISER 10

GC411 ICRA PLAN - PHASE 3 - RISER 11

GC412 ICRA PLAN - PHASE 3 - RISER 12

HAZARDOUS MATERIALS

H-101 ABATEMENT DESIGN PLAN - BASEMENT

H-121 ABATEMENT DESIGN PLAN - FIRST FLOOR

H-141 ABATEMENT DESIGN PLAN - SECOND FLOOR

H-161 ABATEMENT DESIGN PLAN - THIRD FLOOR

ARCHITECTURAL

A-001 ARCHITECTURAL NOTES & LEGENDS

AD121 ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR

AD141 ARCHITECTURAL DEMOLITION PLAN - SECOND FLOOR

AD161 ARCHITECTURAL DEMOLITION PLAN - THIRD FLOOR

AE121 ARCHITECTURAL PLAN - FIRST FLOOR

AE141 ARCHITECTURAL PLAN - SECOND FLOOR

AE161 ARCHITECTURAL PLAN - THIRD FLOOR

AE401 ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR

AE501 ARCHITECTURAL WALL TYPES AND DETAILS

MECHANICAL

M-001 MECHANICAL NOTES AND LEGEND

MD101 MECHANICAL DEMOLITION PLAN - BASEMENT

MD121 MECHANICAL DEMOLITION PLAN - FIRST FLOOR

MD141 MECHANICAL DEMOLITION PLAN - SECOND FLOOR

MD161 MECHANICAL DEMOLITION PLAN - THIRD FLOOR

MD191 MECHANICAL DEMOLITION PLAN - ROOF-PENTHOUSE

MD406 MECHANICAL DEMOLITION PLAN - ROOF-PENTHOUSE

MH601 MECHANICAL SCHEDULES

MH602 MECHANICAL SCHEDULES

MI601 MECHANICAL CONTROLS DIAGRAMS

MI602 MECHANICAL CONTROLS DIAGRAMS

MP111 MECHANICAL PIPING PLAN - BASEMENT FLOOR AT CEILING

MP121 MECHANICAL PIPING PLAN - FIRST FLOOR

MP131 MECHANICAL PIPING PLAN - FIRST FLOOR AT CEILING

MP141 MECHANICAL PIPING PLAN - SECOND FLOOR

MP151 MECHANICAL PIPING PLAN - SECOND FLOOR AT CEILING

MP161 MECHANICAL PIPING PLAN - THIRD FLOOR

MP171 MECHANICAL PIPING PLAN - THIRD FLOOR AT CEILING

MP181 MECHANICAL PIPING PLAN - ROOF-CRAWLSPACE

MP191 MECHANICAL PIPING PLAN - ROOF-PENTHOUSE

MP201 MECHANICAL PIPING SCHEMATIC - ROOF-PENTHOUSE

MP301 MECHANICAL PIPING SECTIONS

MP401 MECHANICAL ENLARGED PIPING PLAN - ROOF PENTHOUSE

MP501 MECHANICAL PIPING DETAILS

MP601 MECHANICAL PIPING RISER - ROOF PENTHOUSE

MP602 MECHANICAL PIPING RISER - ROOF PENTHOUSE

MP603 MECHANICAL PIPING RISER - ROOF PENTHOUSE

ELECTRICAL

E-001 ELECTRICAL NOTES AND LEGENDS

ED101 ELECTRICAL DEMOLITION PLAN - BASEMENT

ED121 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

ED141 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR

ED161 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR

ED191 ELECTRICAL DEMOLITION PLAN - PENTHOUSE

EP101 ELECTRICAL POWER PLAN - BASEMENT

EP121 ELECTRICAL POWER PLAN - FIRST FLOOR

EP141 ELECTRICAL POWER PLAN - SECOND FLOOR

EP161 ELECTRICAL POWER PLAN - THIRD FLOOR

EP191 ELECTRICAL POWER PLAN - PENTHOUSE

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

MULTICORELINK:DWG-22187-GC101.REVX GENERAL PHASING PLAN - ROOF-PENTHOUSE-DWG-22187-GC101.REVX GENERAL PHASING PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-GC101.REVX GENERAL PHASING PLAN - ROOF-PENTHOUSE-DWG-22187-GC101.REVX GENERAL PHASING PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-GC102.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE-DWG-22187-GC102.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE MULTICORELINK:DWG-22187-GC102.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE-DWG-22187-GC102.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE MULTICORELINK:DWG-22187-GC103.REVX GENERAL PHSNG PLN - BASEMENT FL-DWG-22187-GC103.REVX GENERAL PHSNG PLN - BASEMENT FL MULTICORELINK:DWG-22187-GC103.REVX GENERAL PHSNG PLN - BASEMENT FL-DWG-22187-GC103.REVX GENERAL PHSNG PLN - BASEMENT FL MULTICORELINK:DWG-22187-GC104.REVX GENERAL PHSNG PLN - FIRST FL-DWG-22187-GC104.REVX GENERAL PHSNG PLN - FIRST FL MULTICORELINK:DWG-22187-GC104.REVX GENERAL PHSNG PLN - FIRST FL-DWG-22187-GC104.REVX GENERAL PHSNG PLN - FIRST FL MULTICORELINK:DWG-22187-GC105.REVX GENERAL PHASING PLAN - SCND FL-DWG-22187-GC105.REVX GENERAL PHASING PLAN - SCND FL MULTICORELINK:DWG-22187-GC105.REVX GENERAL PHASING PLAN - SCND FL-DWG-22187-GC105.REVX GENERAL PHASING PLAN - SCND FL MULTICORELINK:DWG-22187-GC106.REVX GENERAL PHASING PLAN - THIRD FL-DWG-22187-GC106.REVX GENERAL PHASING PLAN - THIRD FL MULTICORELINK:DWG-22187-GC106.REVX GENERAL PHASING PLAN - THIRD FL-DWG-22187-GC106.REVX GENERAL PHASING PLAN - THIRD FL MULTICORELINK:DWG-22187-GC107.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE-DWG-22187-GC107.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE MULTICORELINK:DWG-22187-GC107.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE-DWG-22187-GC107.REVX GENERAL PHASING PLAN - ROOF-CRAWLSPACE MULTICORELINK:DWG-22187-GC401.REVX ICRA PLAN - PHASE 3 - RISER 1-DWG-22187-GC401.REVX ICRA PLAN - PHASE 3 - RISER 1 MULTICORELINK:DWG-22187-GC401.REVX ICRA PLAN - PHASE 3 - RISER 1-DWG-22187-GC401.REVX ICRA PLAN - PHASE 3 - RISER 1 MULTICORELINK:DWG-22187-GC402.REVX ICRA PLAN - PHASE 3 - RISER 2-DWG-22187-GC402.REVX ICRA PLAN - PHASE 3 - RISER 2 MULTICORELINK:DWG-22187-GC402.REVX ICRA PLAN - PHASE 3 - RISER 2-DWG-22187-GC402.REVX ICRA PLAN - PHASE 3 - RISER 2 MULTICORELINK:DWG-22187-GC403.REVX ICRA PLAN - PHASE 3 - RISER 3-DWG-22187-GC403.REVX ICRA PLAN - PHASE 3 - RISER 3 MULTICORELINK:DWG-22187-GC403.REVX ICRA PLAN - PHASE 3 - RISER 3-DWG-22187-GC403.REVX ICRA PLAN - PHASE 3 - RISER 3 MULTICORELINK:DWG-22187-GC404.REVX ICRA PLAN - PHASE 3 - RISER 4-DWG-22187-GC404.REVX ICRA PLAN - PHASE 3 - RISER 4 MULTICORELINK:DWG-22187-GC404.REVX ICRA PLAN - PHASE 3 - RISER 4-DWG-22187-GC404.REVX ICRA PLAN - PHASE 3 - RISER 4 MULTICORELINK:DWG-22187-GC405.REVX ICRA PLAN - PHASE 3 - RISER 5-DWG-22187-GC405.REVX ICRA PLAN - PHASE 3 - RISER 5 MULTICORELINK:DWG-22187-GC405.REVX ICRA PLAN - PHASE 3 - RISER 5-DWG-22187-GC405.REVX ICRA PLAN - PHASE 3 - RISER 5 MULTICORELINK:DWG-22187-GC406.REVX ICRA PLAN - PHASE 3 - RISER 6-DWG-22187-GC406.REVX ICRA PLAN - PHASE 3 - RISER 6 MULTICORELINK:DWG-22187-GC406.REVX ICRA PLAN - PHASE 3 - RISER 6-DWG-22187-GC406.REVX ICRA PLAN - PHASE 3 - RISER 6 MULTICORELINK:DWG-22187-GC407.REVX ICRA PLAN - PHASE 3 - RISER 7-DWG-22187-GC407.REVX ICRA PLAN - PHASE 3 - RISER 7 MULTICORELINK:DWG-22187-GC407.REVX ICRA PLAN - PHASE 3 - RISER 7-DWG-22187-GC407.REVX ICRA PLAN - PHASE 3 - RISER 7 MULTICORELINK:DWG-22187-GC408.REVX ICRA PLAN - PHASE 3 - RISER 8-DWG-22187-GC408.REVX ICRA PLAN - PHASE 3 - RISER 8 MULTICORELINK:DWG-22187-GC408.REVX ICRA PLAN - PHASE 3 - RISER 8-DWG-22187-GC408.REVX ICRA PLAN - PHASE 3 - RISER 8 MULTICORELINK:DWG-22187-GC409.REVX ICRA PLAN - PHASE 3 - RISER 9-DWG-22187-GC409.REVX ICRA PLAN - PHASE 3 - RISER 9 MULTICORELINK:DWG-22187-GC409.REVX ICRA PLAN - PHASE 3 - RISER 9-DWG-22187-GC409.REVX ICRA PLAN - PHASE 3 - RISER 9 MULTICORELINK:DWG-22187-GC410.REVX ICRA PLAN - PHASE 3 - RISER 10-DWG-22187-GC410.REVX ICRA PLAN - PHASE 3 - RISER 10 MULTICORELINK:DWG-22187-GC410.REVX ICRA PLAN - PHASE 3 - RISER 10-DWG-22187-GC410.REVX ICRA PLAN - PHASE 3 - RISER 10 MULTICORELINK:DWG-22187-GC411.REVX ICRA PLAN - PHASE 3 - RISER 11-DWG-22187-GC411.REVX ICRA PLAN - PHASE 3 - RISER 11 MULTICORELINK:DWG-22187-GC411.REVX ICRA PLAN - PHASE 3 - RISER 11-DWG-22187-GC411.REVX ICRA PLAN - PHASE 3 - RISER 11 MULTICORELINK:DWG-22187-GC412.REVX ICRA PLAN - PHASE 3 - RISER 12-DWG-22187-GC412.REVX ICRA PLAN - PHASE 3 - RISER 12 MULTICORELINK:DWG-22187-GC412.REVX ICRA PLAN - PHASE 3 - RISER 12-DWG-22187-GC412.REVX ICRA PLAN - PHASE 3 - RISER 12 MULTICORELINK:DWG-22187-H-101-REV.X ABATEMENT DESIGN PLAN - BASEMENT-DWG-22187-H-101-REV.X ABATEMENT DESIGN PLAN - BASEMENT MULTICORELINK:DWG-22187-H-101-REV.X ABATEMENT DESIGN PLAN - BASEMENT-DWG-22187-H-101-REV.X ABATEMENT DESIGN PLAN - BASEMENT MULTICORELINK:DWG-22187-H-121-REV.X ABATEMENT DESIGN PLAN FIRST FLOOR-DWG-22187-H-121-REV.X ABATEMENT DESIGN PLAN FIRST FLOOR MULTICORELINK:DWG-22187-H-121-REV.X ABATEMENT DESIGN PLAN FIRST FLOOR-DWG-22187-H-121-REV.X ABATEMENT DESIGN PLAN FIRST FLOOR MULTICORELINK:DWG-22187-H-141-REV.X ABATEMENT DESIGN PLAN SECOND FLOOR-DWG-22187-H-141-REV.X ABATEMENT DESIGN PLAN SECOND FLOOR MULTICORELINK:DWG-22187-H-141-REV.X ABATEMENT DESIGN PLAN SECOND FLOOR-DWG-22187-H-141-REV.X ABATEMENT DESIGN PLAN SECOND FLOOR MULTICORELINK:DWG-22187-H-161-REV.X ABATEMENT DESIGN PLAN THIRD FLOOR-DWG-22187-H-161-REV.X ABATEMENT DESIGN PLAN THIRD FLOOR MULTICORELINK:DWG-22187-H-161-REV.X ABATEMENT DESIGN PLAN THIRD FLOOR-DWG-22187-H-161-REV.X ABATEMENT DESIGN PLAN THIRD FLOOR MULTICORELINK:DWG-22187-A-001.REVX ARCHITECTURAL NOTES & LEGENDS-DWG-22187-A-001.REVX ARCHITECTURAL NOTES & LEGENDS MULTICORELINK:DWG-22187-A-001.REVX ARCHITECTURAL NOTES & LEGENDS-DWG-22187-A-001.REVX ARCHITECTURAL NOTES & LEGENDS MULTICORELINK:DWG-22187-AD121.REVX ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR-DWG-22187-AD121.REVX ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-AD121.REVX ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR-DWG-22187-AD121.REVX ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-AD141.REVX ARCHITECTURAL DEMOLITION PLAN - SECOND FL-DWG-22187-AD141.REVX ARCHITECTURAL DEMOLITION PLAN - SECOND FL MULTICORELINK:DWG-22187-AD141.REVX ARCHITECTURAL DEMOLITION PLAN - SECOND FL-DWG-22187-AD141.REVX ARCHITECTURAL DEMOLITION PLAN - SECOND FL MULTICORELINK:DWG-22187-AD161.REVX ARCHITECTURAL DEMOLITION PLAN - THIRD FLOOR-DWG-22187-AD161.REVX ARCHITECTURAL DEMOLITION PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-AD161.REVX ARCHITECTURAL DEMOLITION PLAN - THIRD FLOOR-DWG-22187-AD161.REVX ARCHITECTURAL DEMOLITION PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-AE121.REVX ARCHITECTURAL PLAN - FIRST FLOOR-DWG-22187-AE121.REVX ARCHITECTURAL PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-AE121.REVX ARCHITECTURAL PLAN - FIRST FLOOR-DWG-22187-AE121.REVX ARCHITECTURAL PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-AE141.REVX ARCHITECTURAL PLAN - SECOND FLOOR-DWG-22187-AE141.REVX ARCHITECTURAL PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-AE141.REVX ARCHITECTURAL PLAN - SECOND FLOOR-DWG-22187-AE141.REVX ARCHITECTURAL PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-AE161.REVX ARCHITECTURAL PLAN - THIRD FLOOR-DWG-22187-AE161.REVX ARCHITECTURAL PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-AE161.REVX ARCHITECTURAL PLAN - THIRD FLOOR-DWG-22187-AE161.REVX ARCHITECTURAL PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-AE401.REVX ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR-DWG-22187-AE401.REVX ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-AE401.REVX ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR-DWG-22187-AE401.REVX ARCHITECTURAL ENLARGED PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-AE501.REVX ARCHITECTURAL WALL TYPES AND DETAILS-DWG-22187-AE501.REVX ARCHITECTURAL WALL TYPES AND DETAILS MULTICORELINK:DWG-22187-AE501.REVX ARCHITECTURAL WALL TYPES AND DETAILS-DWG-22187-AE501.REVX ARCHITECTURAL WALL TYPES AND DETAILS MULTICORELINK:DWG-22187-M-001.REVX MECHANICAL NOTES AND LEGEND-DWG-22187-M-001.REVX MECHANICAL NOTES AND LEGEND MULTICORELINK:DWG-22187-M-001.REVX MECHANICAL NOTES AND LEGEND-DWG-22187-M-001.REVX MECHANICAL NOTES AND LEGEND MULTICORELINK:DWG-22187-MD101.REVX MECHANICAL DEMOLITION PLAN - BASEMENT-DWG-22187-MD101.REVX MECHANICAL DEMOLITION PLAN - BASEMENT MULTICORELINK:DWG-22187-MD101.REVX MECHANICAL DEMOLITION PLAN - BASEMENT-DWG-22187-MD101.REVX MECHANICAL DEMOLITION PLAN - BASEMENT MULTICORELINK:DWG-22187-MD121.REVX MECHANICAL DEMOLITION PLAN - FIRST FLOOR-DWG-22187-MD121.REVX MECHANICAL DEMOLITION PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-MD121.REVX MECHANICAL DEMOLITION PLAN - FIRST FLOOR-DWG-22187-MD121.REVX MECHANICAL DEMOLITION PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-MD141.REVX MECHANICAL DEMOLITION PLAN - SECOND FLOOR-DWG-22187-MD141.REVX MECHANICAL DEMOLITION PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-MD141.REVX MECHANICAL DEMOLITION PLAN - SECOND FLOOR-DWG-22187-MD141.REVX MECHANICAL DEMOLITION PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-MD161.REVX MECHANICAL DEMOLITION PLAN - THIRD FLOOR-DWG-22187-MD161.REVX MECHANICAL DEMOLITION PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-MD161.REVX MECHANICAL DEMOLITION PLAN - THIRD FLOOR-DWG-22187-MD161.REVX MECHANICAL DEMOLITION PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-MD191.REVX MECHANICAL DEMOLITION PLAN - ROOF-PENTHOUSE-DWG-22187-MD191.REVX MECHANICAL DEMOLITION PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MD191.REVX MECHANICAL DEMOLITION PLAN - ROOF-PENTHOUSE-DWG-22187-MD191.REVX MECHANICAL DEMOLITION PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MD406.REVX MECHANICAL DEMO PLAN - ROOF-PENTHOUSE-DWG-22187-MD406.REVX MECHANICAL DEMO PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MD406.REVX MECHANICAL DEMO PLAN - ROOF-PENTHOUSE-DWG-22187-MD406.REVX MECHANICAL DEMO PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MH601.REVX MECHANICAL SCHEDULES-DWG-22187-MH601.REVX MECHANICAL SCHEDULES MULTICORELINK:DWG-22187-MH601.REVX MECHANICAL SCHEDULES-DWG-22187-MH601.REVX MECHANICAL SCHEDULES MULTICORELINK:DWG-22187-MH602.REVX MECHANICAL SCHEDULES-DWG-22187-MH602.REVX MECHANICAL SCHEDULES MULTICORELINK:DWG-22187-MH602.REVX MECHANICAL SCHEDULES-DWG-22187-MH602.REVX MECHANICAL SCHEDULES MULTICORELINK:DWG-22187-MI601.REVX MECHANICAL CONTROLS DIAGRAMS-DWG-22187-MI601.REVX MECHANICAL CONTROLS DIAGRAMS MULTICORELINK:DWG-22187-MI601.REVX MECHANICAL CONTROLS DIAGRAMS-DWG-22187-MI601.REVX MECHANICAL CONTROLS DIAGRAMS MULTICORELINK:DWG-22187-MI602.REVX MECHANICAL CONTROLS DIAGRAMS-DWG-22187-MI602.REVX MECHANICAL CONTROLS DIAGRAMS MULTICORELINK:DWG-22187-MI602.REVX MECHANICAL CONTROLS DIAGRAMS-DWG-22187-MI602.REVX MECHANICAL CONTROLS DIAGRAMS MULTICORELINK:DWG-22187-MP111.REVX MECHANICAL PIPING PLAN - BASEMENT CEILING-DWG-22187-MP111.REVX MECHANICAL PIPING PLAN - BASEMENT CEILING MULTICORELINK:DWG-22187-MP111.REVX MECHANICAL PIPING PLAN - BASEMENT CEILING-DWG-22187-MP111.REVX MECHANICAL PIPING PLAN - BASEMENT CEILING MULTICORELINK:DWG-22187-MP121.REVX MECHANICAL PIPING PLAN - FIRST FLOOR-DWG-22187-MP121.REVX MECHANICAL PIPING PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-MP121.REVX MECHANICAL PIPING PLAN - FIRST FLOOR-DWG-22187-MP121.REVX MECHANICAL PIPING PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-MP131.REVX MECHANICAL PIPING PLAN - FIRST FLOOR CEILING-DWG-22187-MP131.REVX MECHANICAL PIPING PLAN - 1ST FLOOR CEILING MULTICORELINK:DWG-22187-MP131.REVX MECHANICAL PIPING PLAN - FIRST FLOOR CEILING-DWG-22187-MP131.REVX MECHANICAL PIPING PLAN - 1ST FLOOR CEILING MULTICORELINK:DWG-22187-MP141.REVX MECHANICAL PIPING PLAN - SECOND FLOOR-DWG-22187-MP141.REVX MECHANICAL PIPING PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-MP141.REVX MECHANICAL PIPING PLAN - SECOND FLOOR-DWG-22187-MP141.REVX MECHANICAL PIPING PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-MP151.REVX MECHANICAL PIPING PLAN - SECOND FLOOR AT CEILING-DWG-22187-MP151.REVX MECHANICAL PIPING PLAN - 2ND FLOOR CEILING MULTICORELINK:DWG-22187-MP151.REVX MECHANICAL PIPING PLAN - SECOND FLOOR AT CEILING-DWG-22187-MP151.REVX MECHANICAL PIPING PLAN - 2ND FLOOR CEILING MULTICORELINK:DWG-22187-MP161.REVX MECHANICAL PIPING PLAN - THIRD FLOOR-DWG-22187-MP161.REVX MECHANICAL PIPING PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-MP161.REVX MECHANICAL PIPING PLAN - THIRD FLOOR-DWG-22187-MP161.REVX MECHANICAL PIPING PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-MP171.REVX MECHANICAL PIPING PLAN - THIRD FLOOR AT CEILING-DWG-22187-MP171.REVX MECHANICAL PIPING PLAN - 3RD FLOOR CEILING MULTICORELINK:DWG-22187-MP171.REVX MECHANICAL PIPING PLAN - THIRD FLOOR AT CEILING-DWG-22187-MP171.REVX MECHANICAL PIPING PLAN - 3RD FLOOR CEILING MULTICORELINK:DWG-22187-MP181.REVX MECHANICAL PIPING PLAN - ROOF-CRAWLSPACE-DWG-22187-MP181.REVX MECHANICAL PIPING PLAN - ROOF-CRAWLSPACE MULTICORELINK:DWG-22187-MP181.REVX MECHANICAL PIPING PLAN - ROOF-CRAWLSPACE-DWG-22187-MP181.REVX MECHANICAL PIPING PLAN - ROOF-CRAWLSPACE MULTICORELINK:DWG-22187-MP191.REVX MECHANICAL PIPING PLAN - ROOF-PENTHOUSE-DWG-22187-MP191.REVX MECHANICAL PIPING PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MP191.REVX MECHANICAL PIPING PLAN - ROOF-PENTHOUSE-DWG-22187-MP191.REVX MECHANICAL PIPING PLAN - ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MP201.REVX MECHANICAL PIPING SCHEMATIC-ROOF-PENTHOUSE-DWG-22187-MP201.REVX MECHANICAL PIPING SCHEMATIC-ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MP201.REVX MECHANICAL PIPING SCHEMATIC-ROOF-PENTHOUSE-DWG-22187-MP201.REVX MECHANICAL PIPING SCHEMATIC-ROOF-PENTHOUSE MULTICORELINK:DWG-22187-MP301.REVX MECHANICAL SECTIONS-DWG-22187-MP301.REVX MECHANICAL SECTIONS MULTICORELINK:DWG-22187-MP301.REVX MECHANICAL SECTIONS-DWG-22187-MP301.REVX MECHANICAL SECTIONS MULTICORELINK:DWG-22187-MP401.REVX MECHANICAL ENLARGED PIPING PLAN - ROOF PENTHOUSE-DWG-22187-MP401.REVX MECHANICAL ENLARGED PIPING PLAN - ROOF PENTHOUSE MULTICORELINK:DWG-22187-MP401.REVX MECHANICAL ENLARGED PIPING PLAN - ROOF PENTHOUSE-DWG-22187-MP401.REVX MECHANICAL ENLARGED PIPING PLAN - ROOF PENTHOUSE MULTICORELINK:DWG-22187-MP501.REVX MECHANICAL PIPING DETAILS-DWG-22187-MP501.REVX MECHANICAL PIPING DETAILS MULTICORELINK:DWG-22187-MP501.REVX MECHANICAL PIPING DETAILS-DWG-22187-MP501.REVX MECHANICAL PIPING DETAILS MULTICORELINK:DWG-22187-MP601.REVX MECHANICAL PIPING RISER - RF PENTHOUSE-DWG-22187-MP601.REVX MECHANICAL PIPING RISER - ROOF PENTHOUSE MULTICORELINK:DWG-22187-MP601.REVX MECHANICAL PIPING RISER - RF PENTHOUSE-DWG-22187-MP601.REVX MECHANICAL PIPING RISER - ROOF PENTHOUSE MULTICORELINK:DWG-22187-MP602.REVX MECHANICAL PIPING RISER-DWG-22187-MP602.REVX MECHANICAL PIPING RISER MULTICORELINK:DWG-22187-MP602.REVX MECHANICAL PIPING RISER-DWG-22187-MP602.REVX MECHANICAL PIPING RISER MULTICORELINK:DWG-22187-MP603.REVX MECHANICAL PIPING RISER-DWG-22187-MP603.REVX MECHANICAL PIPING RISER MULTICORELINK:DWG-22187-MP603.REVX MECHANICAL PIPING RISER-DWG-22187-MP603.REVX MECHANICAL PIPING RISER MULTICORELINK:DWG-22187-E-001-REVX ELECTRICAL NOTES AND LEGENDS-DWG-22187-E-001-REVX ELECTRICAL NOTES AND LEGENDS MULTICORELINK:DWG-22187-E-001-REVX ELECTRICAL NOTES AND LEGENDS-DWG-22187-E-001-REVX ELECTRICAL NOTES AND LEGENDS MULTICORELINK:DWG-22187-ED101-REVX ELECTRICAL DEMOLITION PLAN - BASEMENT-DWG-22187-ED101-REVX ELECTRICAL DEMOLITION PLAN - BASEMENT MULTICORELINK:DWG-22187-ED101-REVX ELECTRICAL DEMOLITION PLAN - BASEMENT-DWG-22187-ED101-REVX ELECTRICAL DEMOLITION PLAN - BASEMENT MULTICORELINK:DWG-22187-ED121-REVX ELECTRICAL DEMOLITION PLAN - FIRST FLOOR-DWG-22187-ED121-REVX ELECTRICAL DEMOLITION PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-ED121-REVX ELECTRICAL DEMOLITION PLAN - FIRST FLOOR-DWG-22187-ED121-REVX ELECTRICAL DEMOLITION PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-ED141-REVX ELECTRICAL DEMOLITION PLAN - SECOND FLOOR-DWG-22187-ED141-REVX ELECTRICAL DEMOLITION PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-ED141-REVX ELECTRICAL DEMOLITION PLAN - SECOND FLOOR-DWG-22187-ED141-REVX ELECTRICAL DEMOLITION PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-ED161-REVX ELECTRICAL DEMOLITION PLAN - THIRD FLOOR-DWG-22187-ED161-REVX ELECTRICAL DEMOLITION PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-ED161-REVX ELECTRICAL DEMOLITION PLAN - THIRD FLOOR-DWG-22187-ED161-REVX ELECTRICAL DEMOLITION PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-ED191-REVX ELECTRICAL DEMOLITION PLAN - PENTHOUSE-DWG-22187-ED191-REVX ELECTRICAL DEMOLITION PLAN - PENTHOUSE MULTICORELINK:DWG-22187-ED191-REVX ELECTRICAL DEMOLITION PLAN - PENTHOUSE-DWG-22187-ED191-REVX ELECTRICAL DEMOLITION PLAN - PENTHOUSE MULTICORELINK:DWG-22187-EP101-REVX ELECTRICAL POWER PLAN - BASEMENT-DWG-22187-EP101-REVX ELECTRICAL POWER PLAN - BASEMENT MULTICORELINK:DWG-22187-EP101-REVX ELECTRICAL POWER PLAN - BASEMENT-DWG-22187-EP101-REVX ELECTRICAL POWER PLAN - BASEMENT MULTICORELINK:DWG-22187-EP121-REVX ELECTRICAL POWER PLAN - FIRST FLOOR-DWG-22187-EP121-REVX ELECTRICAL POWER PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-EP121-REVX ELECTRICAL POWER PLAN - FIRST FLOOR-DWG-22187-EP121-REVX ELECTRICAL POWER PLAN - FIRST FLOOR MULTICORELINK:DWG-22187-EP141-REVX ELECTRICAL POWER PLAN - SECOND FLOOR-DWG-22187-EP141-REVX ELECTRICAL POWER PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-EP141-REVX ELECTRICAL POWER PLAN - SECOND FLOOR-DWG-22187-EP141-REVX ELECTRICAL POWER PLAN - SECOND FLOOR MULTICORELINK:DWG-22187-EP161-REVX ELECTRICAL POWER PLAN - THIRD FLOOR-DWG-22187-EP161-REVX ELECTRICAL POWER PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-EP161-REVX ELECTRICAL POWER PLAN - THIRD FLOOR-DWG-22187-EP161-REVX ELECTRICAL POWER PLAN - THIRD FLOOR MULTICORELINK:DWG-22187-EP191-REVX ELECTRICAL POWER PLAN - PENTHOUSE-DWG-22187-EP191-REVX ELECTRICAL POWER PLAN - PENTHOUSE MULTICORELINK:DWG-22187-EP191-REVX ELECTRICAL POWER PLAN - PENTHOUSE-DWG-22187-EP191-REVX ELECTRICAL POWER PLAN - PENTHOUSE AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 620A4-22-101 41 CASTLE POINT RD. WAPPINGERS FALLS, NY

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SITE LOCATION

B

A

PENTHOUSE 03

ELEV. MECH.

ROOM

CENTER

STAIR HALL

PENTHOUSE 02 -

ROOF

P-2

P-1

1.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN -

ROOF-PENTHOUSE

CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GC101

620A4-22-101

DJU IJS

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1/8" = 1'-0"

GENERAL PHASING PLAN - ROOF/PENTHOUSE1

N

GENERAL NOTES

1. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

3.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

4.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

5. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

6. REFER TO H-SERIES DRAWINGS FOR HAZARDOUS MATERIAL REQUIREMENTS

7. EXCECUTE WORK BY METHODS TO MINIMIZE RAISING DUST.

8. IMMEDIATELY REPLACE CEILING TILE IF DISPLACED.

9. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

10. WATER-MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

11. SEAL UNUSED DOORS WITH DUCT TAPE

12. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

13. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

14. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED CONTAINERS.

15. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

16. OPEN PREVIOUSLY SEALED HVAC REGISTERS AND GRILLS.

17. HOUSEKEEPING TO WIPE WORK SURFACES AND FLOORS WITH DISINFECTANT.

18. ALL PENETRATIONS THROUGH FLOORS AND/OR RATED WALLS SHALL BE FIRE SEALED PRIOR

TO THE END OF EACH SHIFT.

PHASE NOTES

1. REMOVE PUMPS, HEAT EXCHANGER AND PIPING

2. INSTALL NEW PUMPS, HEAT EXCHANGER, AND TIE IN TO STEAM AND CHILLED WATER

PHASE & RISER SCHEDULE

PHASE # RISER ASSOCIATED

1.1 PENTHOUSE

2.1 PENTHOUSE

2.2 CRAWLSPACE (1 THRU 12)

3.1 1

3.2 3

3.3 2

3.4 12

3.5 8

3.6 9, 10

3.7 11

3.8 7

3.9 6

3.10 5

3.11 4

15H 15E

17G 18D

16F

111 19C

20B

75A

21A

73A

59A

N

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

A

PENTHOUSE 03

ELEV. MECH.

ROOM

CENTER

STAIR HALL

PENTHOUSE 02 -

ROOF

P-2

P-1

■■ 7

2 8

2.2

2.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN -

ROOF-CRAWLSPACE

CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GC102

620A4-22-101

DJU IJS

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1/8" = 1'-0"

GENERAL PHASING PLAN - ROOF/CRAWLSPACE1

N

GENERAL NOTES

1. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

3.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

4.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

5. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

6. REFER TO H-SERIES DRAWINGS FOR HAZARDOUS MATERIAL REQUIREMENTS

7. EXCECUTE WORK BY METHODS TO MINIMIZE RAISING DUST.

8. IMMEDIATELY REPLACE CEILING TILE IF DISPLACED.

9. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

10. WATER-MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

11. SEAL UNUSED DOORS WITH DUCT TAPE

12. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

13. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

14. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED CONTAINERS.

15. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

16. OPEN PREVIOUSLY SEALED HVAC REGISTERS AND GRILLS.

17. HOUSEKEEPING TO WIPE WORK SURFACES AND FLOORS WITH DISINFECTANT.

18. ALL PENETRATIONS THROUGH FLOORS AND/OR RATED WALLS SHALL BE FIRE SEALED PRIOR

TO THE END OF EACH SHIFT.

PHASE NOTES

1. PERFORM ROUTING OF NEW 4 PIPE DISTRIBUTION PARALLEL TO EXISTING.

PHASE & RISER SCHEDULE

PHASE # RISER ASSOCIATED

1.1 PENTHOUSE

2.1 PENTHOUSE

2.2 CRAWLSPACE (1 THRU 12)

3.1 1

3.2 3

3.3 2

3.4 12

3.5 8

3.6 9, 10

3.7 11

3.8 7

3.9 6

3.10 5

3.11 4

15H 15E

17G 18D

16F

111 19C

20B

75A

21A

73A

59A

N

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

A

ELEVATOR

CLEAN

PREPARATION

SCOPE

PROCESS

WASHER

DECONTAMINATION

CART AUTO.

WASH

SCOPE

DECON.

ANTE RM. 03

ANTE RM. 04

H.A.C.

FEMALE

LOCKER

MALE

LOCKER 17

MALE

BATH.

FEMALE

BATH.

STERILE/

NON-STERILE

STERILIZERS

ANTE RM. 02 32

CLEAN

STORAGE

ENTRY

CHIEF OFFICE

SYSTEMS RM.

TECH. OFFICE

ANTE RM. 01

H.A.C.

MALE

BATH.

FEMALE

LOCKER 39

O.I.F.

OFFICE

FEMALE

TOILET

MALE

TOILET

CORRIDOR 1 017

MECHANICAL

RM.

TOILET

CORRIDOR 2

- (008)

VEST. 01

- (008A)

VEST. 02

CENTER

STAIR HALL

EMERGENCY POWER

ELEC RM

001H

ELEC RM

001I

OFFICE C

001J

OFFICE B

001N.3

EQUIP STOR001N.2

OFFICE A

001H.1

STORAGE

001F

ULTRASOUND 1

001K

R/F ROOM

001N.4

STAFF

TOILET

001K.1

TOILET

001L

SOILED

UTILITY

WAITING

001M

RADIOLOGY

001N.5

RECEPTION

001F.1

TOILET

001E.1

TOILET

001E

ULTRASOUND 2

001D

CLEAN

UTILITY

001C

TOUCHDOWN

SPACE

001B

BONE

DENSITOMETRY

001A

ULTRASOUND 3

C001

CORRIDOR

001A.1

TOILET

001N.1

STORAGE

TOILET

001N

WORK AREA

001G

STAIR

HALL 03

ELEC

DISTRIB

45678910 3 2 1

11109

12 3.6 3.7

3.10

3.9

3.4

3.5

3.8

3.11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN -

BASEMENT FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GC103

620A4-22-101

DJU IJS

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1/8" = 1'-0"

GENERAL PHASING PLAN - BASEMENT FLOOR1

N

GENERAL NOTES

1. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

3.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

4.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

5. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

6. REFER TO H-SERIES DRAWINGS FOR HAZARDOUS MATERIAL REQUIREMENTS

7.

INSTALL PLASTIC DUST BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

8.

WHERE CEILING TILES ARE TO REMAIN DISPLACED FOR LONGER THAN A SINGLE SHIFT,

CONTRACTOR SHALL PROVIDED UL APPROVED 1-HOUR RATED CONSTRUCTION BARRIERS FOR

THAT WORK AREA.

9. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

10. MAINTAIN NEGATIVE PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION

UNITS.

11. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

12. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED CONTAINERS.

13. ALL WORK ASSOCIATED WITH A MAJOR PROJECT THAT HAS AN APPROVED ICRA

AUTHORIZATION FORM WILL BE ASSESSED ON AN INDIVIDUAL BASIS.

14. WET MOP AND VACUUM WITH HEPA FILTER VACUUM BEFORE LEAVING WORK AREA.

15. DO NOT REMOVE BARRIES FROM WORK AREA UNTIL A HEALTH SYSTEM RESPONSIBLE PERSON

INSPECTS COMPLETED PROJECT.

16. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

17. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK WAS BEING PERFORMED.

18. HOUSEKEEPING TO WIPE WORK SURFACES AND FLOORS WITH DISINFECTANT.

19. ALL PENETRATIONS THROUGH FLOORS AND/OR RATED WALLS SHALL BE FIRE SEALED PRIOR

TO THE END OF EACH SHIFT.

PHASE NOTES

1. REMOVE FCUS, DISTRIBUTION PIPING AND RISE PIPING UP TO FLOOR ABOVE.

2. INSTALL NEW PIPING AND FCUS.

3. REPAIR PIPING CHASE.

PHASE & RISER SCHEDULE

PHASE # RISER ASSOCIATED

1.1 PENTHOUSE

2.1 PENTHOUSE

2.2 CRAWLSPACE (1 THRU 12)

3.1 1

3.2 3

3.3 2

3.4 12

3.5 8

3.6 9, 10

3.7 11

3.8 7

3.9 6

3.10 5

3.11 4

15H 15E

17G 18D

16F

111 19C

20B

75A

21A

73A

59A

N

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

ROOF

CONNECTING

CORRIDOR

B

5678910 3 2 1

A

EXAM

ROOM

OFFICE

EXAM

ROOM

ANTE

CORRIDOR

WEST

STAIR HALL

EXAM

ROOM

TOILET

ANTE

CORRIDOR

EXAM

ROOM

OFFICE

SOCIAL WORKER

OFFICE

SUPPLY

CLOSET

NUTRITION

CLINIC

WAITING

AREA

CENTER

STAIR HALL

CHECK-IN

RECEPTION 02

PROVIDER

SOCIAL WORKER

OFFICE

STORAGE

ROOM

CONFERENCE

ROOM

STOCK

ROOM -

EAST

STAIR HALL

STAFF

LOUNGE

PROVIDER

WAITING

ROOM

PATIENT

EDUCATION

E.M.S.

CLOSET

TOILET

DATA

CLOSET

SPRINKLER

CLOSET

WAITING

AREA

144A

TOILET

ANTE

CORRIDOR

148A

BATHROOM

OFFICE

OFFICE

OFFICE

OFFICE 138

OFFICE

OFFICE

OFFICE144

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

TOILET

ANTE

CORRIDOR

CORRIDOR 03 132

CORRIDOR 01

CORRIDOR 03

CORRIDOR 05

OFFICE

OFFICE

OFFICE 101

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

ROOM 104

EXAM

ROOM

EXAM

ROOM125

EXAM

ROOM131

OFFICE

CORRIDOR 02

RECEPTION 02

ANTE

CORRIDOR 120

ANTE

CORRIDOR

ANTE

CORRIDOR 109

ANTE

CORRIDOR

CORRIDOR 06

TOILET

TOILET

CCC

2 8

3.43.33.1

3.5

3.6 3.7 3.8

3.2

3.10

3.9

3.11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - FIRST

FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GC104

620A4-22-101

DJU IJS

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1/8" = 1'-0"

GENERAL PHASING PLAN - FIRST FLOOR1

N

GENERAL NOTES

1. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

3.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

4.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

5. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

6. REFER TO H-SERIES DRAWINGS FOR HAZARDOUS MATERIAL REQUIREMENTS

7.

INSTALL PLASTIC DUST BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

8.

WHERE CEILING TILES ARE TO REMAIN DISPLACED FOR LONGER THAN A SINGLE SHIFT,

CONTRACTOR SHALL PROVIDE UL APPROVED 1-HOUR RATED CONSTRUCTION BARRIERS FOR

THAT WORK AREA

9. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

10. MAINTAIN NEGATIVE PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION

UNITS.

11. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

12. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED CONTAINERS.

13. ALL WORK ASSOCIATED WITH A MAJOR PROJECT THAT HAS AN APPROVED ICRA

AUTHORIZATION FORM WILL BE ASSESSED ON AN INDIVIDUAL BASIS.

14. WET MOP AND VACUUM WITH HEPA FILTER VACUUM BEFORE LEAVING WORK AREA.

15. DO NOT REMOVE BARRIES FROM WORK AREA UNTIL A HEALTH SYSTEM RESPONSIBLE PERSON

INSPECTS COMPLETED PROJECT.

16. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

17. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK WAS BEING PERFORMED.

18. HOUSEKEEPING TO WIPE WORK SURFACES AND FLOORS WITH DISINFECTANT.

19. ALL PENETRATIONS THROUGH FLOORS AND/OR RATED WALLS SHALL BE FIRE SEALED PRIOR

TO THE END OF EACH SHIFT.

PHASE NOTES

1. REMOVE FCUS, DISTRIBUTION PIPING AND RISE PIPING UP TO FLOOR ABOVE.

2. INSTALL NEW PIPING AND FCUS.

3. REPAIR PIPING CHASE.

PHASE & RISER SCHEDULE

PHASE # RISER ASSOCIATED

1.1 PENTHOUSE

2.1 PENTHOUSE

2.2 CRAWLSPACE (1 THRU 12)

3.1 1

3.2 3

3.3 2

3.4 12

3.5 8

3.6 9, 10

3.7 11

3.8 7

3.9 6

3.10 5

3.11 4

15H 15E

17G 18D

16F

111 19C

20B

75A

21A

73A

59A

N

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5678910 3 2 1

A

EXAM

ROOM

EXAM

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE222

OFFICE

223B2

OFFICE

TOILET

214C

TOILETS

208A

TOILET

206A

TOILET

207A

TOILET

211A

TOILET

223U4A

WOMENS

TOILET

EXAM

ROOM

EAST

STAIR HALL

JEFFERSON

CONFERENCE RM.

212B

ACCU. 01

208D

ACCU. 02

212A

ACCUPUNCTURE

CLINIC

WELLNESS

CLINIC

215B

SCHEDULING

WAITING

ROOM

OFFICE

214B

SHOWER

ROOM

UTILITY

ROOM

214A

SHOWER

ROOM

ENTRY

212C

BREAK

215A

CLOSET

E.M.S.

CLOSET

CORRIDOR 03

CORRIDOR 04

CORRIDOR 01

223B

RECEPTION

223A

WAITING

ROOM

223B1

STORAGE

223B3

ANTE

223C

DARK

ROOM

223D

PANORAMIC

X-RAY

223E

OPERATORY

#02

223F

OPERATORY

#01223G

OPERATORY

#03

223H

OFFICE

223I

OPERATORY

#04

223J

OPERATORY

#05

223K

OPERATORY

#06

223L

OPERATORY

#07

223M

OPERATORY

#08

CORRIDOR 02223V1

CORRIDOR 05

223V2

CORRIDOR 06

223V3

CORRIDOR 07

DENTAL ENTRY

WEST

STAIR HALL

223R1

RESIN CAST.

223Q

MECH. CL.

223R

LAB.

223U1

BREAK

ROOM

223U5A

CL.

223O

CL.

223N

CL.

223T

CL.223P

CORRIDOR 08

223S

INSTR.

PREP

223U2

CL.

223U

ANTE

223U5A

MENS

TOILET

223U5

MENS

LOCKER

223U4

WOMENS

LOCKER

223U3

CONFERENCE

ROOM

CENTER

STAIR HALL CC

C

1110912

3.43.33.1 3.5 3.6 3.7 3.8

3.2

3.10

3.9

3.11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - SECOND

FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GC105

620A4-22-101

DJU IJS

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1/8" = 1'-0"

GENERAL PHASING PLAN - SECOND FLOOR1

GENERAL NOTES

1. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

3.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

4.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

5. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

6. REFER TO H-SERIES DRAWINGS FOR HAZARDOUS MATERIAL REQUIREMENTS

7.

INSTALL PLASTIC DUST BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

8.

WHERE CEILING TILES ARE TO REMAIN DISPLACED FOR LONGER THAN A SINGLE SHIFT,

CONTRACTOR SHALL PROVIDE 1-HOUR RATED CONSTRUCTION BARRIERS FOR THAT WORK

AREA.

9. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

10. MAINTAIN NEGATIVE PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION

UNITS.

11. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

12. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED CONTAINERS.

13. ALL WORK ASSOCIATED WITH A MAJOR PROJECT THAT HAS AN APPROVED ICRA

AUTHORIZATION FORM WILL BE ASSESSED ON AN INDIVIDUAL BASIS.

14. WET MOP AND VACUUM WITH HEPA FILTER VACUUM BEFORE LEAVING WORK AREA.

15. DO NOT REMOVE BARRIES FROM WORK AREA UNTIL A HEALTH SYSTEM RESPONSIBLE PERSON

INSPECTS COMPLETED PROJECT.

16. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

17. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK WAS BEING PERFORMED.

18. HOUSEKEEPING TO WIPE WORK SURFACES AND FLOORS WITH DISINFECTANT.

19. ALL PENETRATIONS THROUGH FLOORS AND/OR RATED WALLS SHALL BE FIRE SEALED PRIOR

TO THE END OF EACH SHIFT.

PHASE NOTES

1. REMOVE FCUS, DISTRIBUTION PIPING AND RISE PIPING UP TO FLOOR ABOVE.

2. INSTALL NEW PIPING AND FCUS.

3. REPAIR PIPING CHASE.

PHASE & RISER SCHEDULE

PHASE # RISER ASSOCIATED

1.1 PENTHOUSE

2.1 PENTHOUSE

2.2 CRAWLSPACE (1 THRU 12)

3.1 1

3.2 3

3.3 2

3.4 12

3.5 8

3.6 9, 10

3.7 11

3.8 7

3.9 6

3.10 5

3.11 4

15H 15E

17G 18D

16F

111 19C

20B

75A

21A

73A

59A

N

N

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

FD

AutoCAD SHX Text 215A

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5678910 3 2 1

A

ELEVATOR

SHAFT

GU CLINIC

GU CLINIC

GU CLINIC

GU CLINIC

GU CLINIC

GU CLINIC

GU CLINIC

CORRIDOR 08-

CORRIDOR 07-

CORRIDOR 06

CORRIDOR 02

CORRIDOR 03

307A

TOILET

306A

TOILET308A

TOILET

EAST

STAIR HALL

MINOR

PROCEDURE RM.

UROLOGY

PROCEDURE RM.

312C

CONFERENCE

ROOM

WAITING

ROOM

STAFF

LOUNGE

CHECK-IN

314A

LOGISTICS

STORAGE

312F

TOILET

312G

KICH.

312B

COPY

311A

TOILET

CART ON

WHEELS

ANTE

314B

EMS

STORAGE

314C

PHARMACY CARE

STORAGE

UTILITY

ROOM

321B

OFFICE

OFFICE

DATA

CLOSET

E.M.S.

CLOSET

321A

OFFICE

315A

WAITING

ROOM

OFFICE

CENTER

STAIR HALL

CORRIDOR 01

BATHROOM

324A

MAIL ROOM

IN-TAKE

RM. 01

OFFICE

CONFERENCE

ROOM

330A

TOILET

IN-TAKE

RM. 02

RECOVERY

ROOM

STORE

ROOM

IN-TAKE

RM. 03336

OFFICE

PROCEDURE

RM. 02

PROCEDURE

RM. 02

331A

CONTROL RM.

338A

CONTROL RM.

DARK ROOM

SOILED UTILITY

CLEAN

UTILITY 339

ANTE

CORRIDOR

WEST

STAIR HALL

329A

TOILET

G.U. WORK

ROOM

327A

HOUSE-

KEEPING

CC C

1110912

3.43.33.1 3.5 3.6 3.7 3.8

3.2

3.10

3.9

3.11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN - THIRD

FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

REPLACE FAN COIL UNITS, BLDG 18

41 CASTLE POINT RD.

WAPPINGERS FALLS, NY 12590

2024-12-10

GC106

620A4-22-101

DJU IJS

REV 0 CONTRACT DOCUMENTS 2024/12/10

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1/8" = 1'-0"

GENERAL PHASING PLAN - THIRD FLOOR1

N

GENERAL NOTES

1. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

3.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

4.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

5. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

6. REFER TO H-SERIES DRAWINGS FOR HAZARDOUS MATERIAL REQUIREMENTS

7.

INSTALL PLASTIC DUST BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

8.

WHERE CEILING TILES ARE TO REMAIN DISPLACED FOR LONGER THAN A SINGLE SHIFT,

CONTRACTOR SHALL PROVIDE UL APPROVED 1-HOUR RATED CONSTRUCTION BARRIERS FOR

THAT WORK AREA.

9. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

10. MAINTAIN NEGATIVE PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION

UNITS.

11. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

12. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED CONTAINERS.

13. ALL WORK ASSOCIATED WITH A MAJOR PROJECT THAT HAS AN APPROVED ICRA

AUTHORIZATION FORM WILL BE ASSESSED ON AN INDIVIDUAL BASIS.

14. WET MOP AND VACUUM WITH HEPA FILTER VACUUM BEFORE LEAVING WORK AREA.

15. DO NOT REMOVE BARRIES FROM WORK AREA UNTIL A HEALTH SYSTEM RESPONSIBLE PERSON

INSPECTS COMPLETED PROJECT.

16. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

17. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK WAS BEING PERFORMED.

18. HOUSEKEEPING TO WIPE WORK SURFACES AND FLOORS WITH DISINFECTANT.

19. ALL PENETRATIONS THROUGH FLOORS AND/OR RATED WALLS SHALL BE FIRE SEALED PRIOR

TO THE END OF EACH SHIFT.

PHASE NOTES

1. REMOVE FCUS, DISTRIBUTION PIPING AND RISE PIPING UP TO FLOOR ABOVE.

2. INSTALL NEW PIPING AND FCUS.

3. REPAIR PIPING CHASE.

PHASE & RISER SCHEDULE

PHASE # RISER ASSOCIATED

1.1 PENTHOUSE

2.1 PENTHOUSE

2.2 CRAWLSPACE (1 THRU 12)

3.1 1

3.2 3

3.3 2

3.4 12

3.5 8

3.6 9, 10

3.7 11

3.8 7

3.9 6

3.10 5

3.11 4

15H 15E

17G 18D

16F

111 19C

20B

75A

21A

73A

59A

N

Exp. 11/30/2027

23 Mechanic Street, Springville, NY 14141

12/10/2024

AutoCAD SHX Text E.P.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

Auto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .