This document outlines a federal contract opportunity for pavement preservation services. The solicitation was issued by the Department of Transportation Federal Highway Administration as number 69056723R000004 for the UT NP MULTI PMS(2) and Pavement Preservation Southern Utah & NV NP GRBA PMS(1) projects. Offerors are sought to provide pavement preservation services for southern Utah, Nevada, and surrounding areas. The 11MB file attached contains additional details on the required products and services, response timeframe and instructions, and terms for pricing and awards. Services sought under this solicitation include road maintenance and repairs to extend the life of existing pavement infrastructure across multiple national parks and federally managed lands in the region.

View the file

Other files

File Type Posted
Amendment A006.pdf PDF
Amendment A005.pdf PDF
QA_01-19-2024.pdf PDF
Amendment A004.pdf PDF
QA_01-17-2024_2.pdf PDF
QA_01-17-2024.pdf PDF
Amendment A003.pdf PDF
QA_01-10-2024.pdf PDF
Amendment A002.pdf PDF
QA 01-03-2024.pdf PDF
Amendment A001.pdf PDF
QA 12.01.23.pdf PDF
utp-multi-pms2_CANY_C6_RipReport.pdf PDF
utp-multi-pms2_CEBR_C6_RipReport.pdf PDF
utp-multi-pms2_ARCH_C6_RipReport.pdf PDF
utp-multi-pms2_GRBA_C6_RipReport.pdf PDF
utp-multi-pms2_TICA_C6_RipReport.pdf PDF
utp-multi-pms2_ZION_C6_RipReport.pdf PDF
RFP 69056723R000004.pdf PDF
utp-multi-pms2_FLH Bridge oversized or overload vehicle permit .pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRENT L COE Digitally signed by BRENT L COE Date: 2023.06.27 16:50:33 -07'00'

Sheet and Description

SECTION D SECTION E SECTION F SECTION G

PLANS EROSION

CONTROL

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0140 20401-0000 ROADWAY EXCAVATION CUYD 311 49 360

A0160 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 422 78 500

A0180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 2,000 500 2,500

A0200 40601-0000 FOG SEAL TON 362 48 410

A0240 40702-0300 CHIP SEAL, TYPE 1C SQYD 541,518 16,482 558,000

A0260 40711-0000 EMULSIFIED ASPHALT TON 970 95 1,065

A0280 40901-2000 MICRO SURFACING, TYPE 2 SQYD 251,215 5,285 256,500

A0300 41301-0900 ASPHALT PAVEMENT MILLING, 3 1/2-INCH DEPTH SQYD 7,950 400 8,350

A0320 41301-1000 ASPHALT PAVEMENT MILLING, 4-INCH DEPTH SQYD 2,227 113 2,340

A0340 41402-2000 CRACKS, CLEANING AND SEALING MILE 31.58 3.42 35.00

A0360 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 273 27 300

A0380 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 8,022 628 8,650

A0400 50202-0000 SEALING JOINTS AND CRACKS (COLORED SEALANT) LNFT 670 30 700

A0420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 50

A0440 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH

WIDTH HOUR 50

A0460 62201-2360 VACUUM SWEEPER HOUR 100

A0480 62301-0000 GENERAL LABOR HOUR 100

A0500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 835,105 41,895 877,000

A0520 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 906,364 45,636 952,000

A0540 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B) EACH 245 10 255

A0560 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 8

A0580 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 500 500

A0600 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 6 6

A0620 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 227,451 22,749 250,200

A0640 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 522 128 650

A0660 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 6,400 6,400

A0680 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 500 500

A0700 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 160 160

MileStone: 100% Sign Off Report Date: 05/04/23

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - BASE

4- M ay -2

8:

A M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities c:

\p w -w or k\ d0

B A S

ES

um m ar y

B S he et

.x ls m ]S he et

STATE PROJECT

B.1NP MULTI PMS(2)

NP GRBA PMS(1)

UT

NV

SHEET

NUMBER

326865, 250246, 240993C, 326854, 256277, 326842, and 326838

PLANS EROSION

CONTROL

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

X0020 20303-2300 REMOVAL OF PAVEMENT, CONCRETE SQYD 42 8 50

X0040 20401-0000 ROADWAY EXCAVATION CUYD 419 66 485

X0060 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 261 39 300

X0080 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 301 49 350

X0100 60905-1000 GUTTER, CONCRETE LNFT 95 15 110

X0120 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 1 1

MileStone: 100% Post QC Report Date: 04/17/23

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Option X

-A pr -2

1:

P M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities c:

\p w -w or k\ d0

O pt io n X S um m ar y

B S he et

.x ls m ]S he et

STATE PROJECT

B.2NP MULTI PMS(2)

NP GRBA PMS(1)

UT

NV

SHEET

NUMBER

PLANS EROSION

CONTROL

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

Y0040 40702-0300 CHIP SEAL, TYPE 1C (COLORED AGGREGATE) SQYD 350,478 10,522 361,000

Y0060 40711-0000 EMULSIFIED ASPHALT TON 525 26 551

Y0080 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 453,789 22,211 476,000

Y0100 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 443,309 21,691 465,000

Y0120 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B) EACH 20 5 25

Y0140 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 110,828 11,082 121,910

Y0160 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,090 1,090

Y0180 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 160 160

Y0200 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 35 35

MileStone: 100% Sign Off Report Date: 04/26/23

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Option Y

-A pr -2

1:

P M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities c:

\p w -w or k\ d0

O pt io n Y

S um m ar y B S he et

.x ls m ]S he et

STATE PROJECT

B.3NP MULTI PMS(2)

NP GRBA PMS(1)

UT

NV

SHEET

NUMBER

20401-0000 30201-2000 40301-0100 40601-0000 40702-0300 40711-0000 40901-2000 41301-0900 41402-2000 41801-2000

FT FT

CUYD CUYD TON TON SQYD TON SQYD SQYD MILE SQYD

0010 Main Park Road 63901 0.00 18.73 98,705 24.0 173.6 252,936 453.2 10,278 2.00 1,111

0010 (50) Pullouts 63901 5.8 9,061 16.2

0010 (4) Approaches 63901 0.00 0.3 400 0.7 184

0011AZ Windows Main Road 63902 0.00 2.73 14,414 25.0 21.9 30,800 55.2 9,240 1.25

0011AZ (9) Pullouts 63902 0.8 1,311 2.3 0011BZ Windows Loop Spur 63902 0.00 0.04 211 16 380 1.25 5 0100 Delicate Arch Road 63903 0.00 0.90 4,752 25.0 8.5 13,200 23.7 236 0200 La Sal Mountains Viewpoint 63905 0.00 0.15 792 20 1,742 0204 Garden of Eden Overlook Road 63908 0.00 0.11 581 24 1,529 0204 (1) Pullout 63908 123 0205 Panorama Overlook Road 63910 0.00 0.31 1,637 16.0 2,910 27 0206 Salt Valley Overlook Road 63911 0.00 0.25 1,320 18 2,699 0206 (1) Pullout 63911 59 0.25 0207 Fiery Furnace Road 63912 0.00 0.19 1,003 24 2,653 0.19 31 0208 Devils Garden Campground 63913 0.00 0.78 4,118 19.0 8,694 118 0208 (35) Slips 63913 3,112 0401 Administrative Maintenance 63917 0.00 0.27 1,426 18.0 2,851 0401 (1) Driveway 63917 133 0403 Arches Residence Area Road 63919 0.00 0.13 686 18.0 1,373 6 0403 (2) Driveway 63919 400 0404 Administration Road 100082 0.00 0.11 581 18.0 1,162 43

0900A Devils Garden Picnic Parking A 63922 870 0.04 18 0900B Devils Garden Picnic Parking B 100083 294 0.04

0901A Devils Garden Parking A 63923 3,445 0.13 39

0901B Devlis Garden Parking B 100084 468 0.13 0901C Devlis Garden Parking C 100086 1,714 0.13

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Arch Base 1

0.36 = Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

4/27/23 11:35 AM

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

NPS PMIS No.: 326865

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.1

SURFACING TABULATION SHEET - BASE

STATE

MILES

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MP to MP

LE

N

G

TH

W

ID

TH

Fog seal paved ditches/curbs from MP 0.00 - MP 15.00 as approved by the CO. Chip seal from MP 0.00- MP 18.00.

Micro surface type 2 from MP

18.00 -18.73. Crack Seal where approved by CO. No work on Bridge 1348-001.

81,550 Treat approaches to match the surface treatment of the route at the respective locations.

ROADWAY

EXCAVATION

ROADWAY

AGGREGATE,

METHOD 2

ASPHALT

CONCRETE

PAVEMENT,

TYPE 1

SQFT

FOG SEAL CHIP SEAL,

TYPE 1C

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

ASPHALT

CONCRETE

PAVEMENT

PATCH,

TYPE 2

ASPHALT

PAVEMENT

MILLING, 3

1/2 - INCH

DEPTH

CRACK,

CLEANING

AND

SEALING

Fog seal paved ditches as approved by the CO. Chip seal up to the loop (approx. MP 2.1). Micro surface loop.

1,200

3,600

28,000 Do not treat concrete slips.

4,208 15,430

Do not treat concrete.

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

ARCHES NATIONAL

PARK - BASE

56,313 5.41 1,634SHEET TOTAL 211 307,708 551

5,250

1,100

11,800

Parking Areas 7,834 2,643

31,002 Remove and reset wheelstops.

20401-0000 30201-2000 40301-0100 40601-0000 40702-0300 40711-0000 40901-2000 41301-0900 41402-2000 41801-2000

CUYD CUYD TON TON SQYD TON SQYD SQYD MILE SQYD

0901D Devils Garden Parking D 100088 732 0.05 0902 Fiery Furnace Viewpoint Parking 63924 2,270 0.16 14 0903 Salt Valley Overlook Parking 64004 339 0.02

0906AZ Panorama Point Parking A 64007 543 0906BZ Panorama Point Parking B 64007 771 0907 Garden of Eden Parking 64008 1,150 0908A Windows Parking A 64010 898 0908B Windows Parking B 100091 632 0909 Petrified Dunes Viewpoint Parking 64011 294

0910 Courthouse Towers Parking 64013 1,575

0911 La Sal Mountains Viewpoint Parking 64015 1,835 0912 Park Avenue Trailhead Parking 64016 2,144 0913 Visitor Center Parking 64018 311 422 1515 7,950 0914 Maintenance Parking 64019 2,357 0915 Balanced Rock Parking 64021 1,468

0916AZ Sand Dune Arch Parking A 64022 2,222 0.09 34 0916BZ Sand Dune Arch Parking B 64022 408 0.09 0917 Skyline Arch Parking 64023 303 0918 Campground Registration Parking 64026 141 9 0919 Canyon Wren Group Campground Parking 64028 433

0920AZ Residential Parking 64032 372 23 0920BZ Fee station Parking 64032 112 7 0921 Campground Restroom Parking 64034 139 0922 Juniper Basin Group Campground Parking 64035 259

0923AZ Campground Parking A 100092 353 0923BZ Campground Parking B 100092 237 13 0924 Amphitheater Parking 100093 283 0925A Double Arch Parking A 100094 705 0925B Double Arch Parking B 100095 503 0926AZ Visitor Center Staff Parking A 100105 625 25 0926BZ Visitor Center Staff Parking B 100105 642 0927 Administrative Parking 100106 176 7 0928 Entrance Sign Parking 227329 928

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) = Tack Coat (Gal./sqyd)

= Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Arch Base 2

0.36

7,950

7,950

4,530 5,629 5,777 1,582 8,351

422 1,515311

3,893 3,351 1,011 1,251 2,328 3,175 2,137 2,544 6,343

Remove and reset wheel stops (7).

MP to

MP LE

N G

TH

W

ID

TH

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.2

SURFACING TABULATION SHEET - BASE

STATE

MILES SQFT

BID ITEM NUMBER

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

Remarks

6,585

CRACK,

CLEANING

AND SEALING

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

FOG SEAL

CHIP SEAL,

TYPE 1C

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

ASPHALT

PAVEMENT

MILLING, 3

1/2 - INCH

DEPTH

ROADWAY

AGGREGATE,

METHOD 2

ASPHALT

CONCRETE

PAVEMENT,

TYPE 1

ROADWAY

EXCAVATION

6,942

5,688 8,086

3,050 20,428

4,891

10,354

16,516

71,550

2,648

14,174

19,297

3,673 2,725 1,268

13,211 21,215

19,995

132SHEET TOTAL

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

ARCHES NATIONAL

PARK - BASE

25,849 0.4

NPS PMIS No.: 326865

PARK TOTAL 211 307,708 551 82,162 5.82 1,766

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

4/26/2023 14:35

0.43 240.0 0.10

233.0

422 1,515311

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

41402-2000

MILE

0011 62479 4.00 18.90 14.90

0113 62552 0.00 1.35 1.35 0114 62548 0.00 4.38 4.38

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

0.36 233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Canyonlands Base

Island in the Sky Road

Green River Overlook Road Upheaval Dome Road

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.3

Stop work at milepost 4.38.

Start work from milepost 4.00.

Remarks

PROJECT

SHEET

NUMBER

SURFACING TABULATION SHEET - BASE

STATE

CRACK, CLEANING

AND SEALING

BID ITEM NUMBER

R O

U

TE

N U

M B

ER

FMSS No.

MP to MP

MILES

ROUTE NAME

20.63

TABULATION OF

SURFACING

QUANTITIES

CANYONLANDS

NATIONAL PARK - BASE

PARK TOTAL

Material Application Rates and Weights Used for Estimating Purposes These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

NPS PMIS No.: 240993C4/27/23 11:35 AM

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

40301-0100 40601-0000 40702-0300 40711-0000 40901-2000 41301-1000 41402-2000 41801-2000

TON TON SQYD TON SQYD SQYD MILE SQYD

0010 Highway 18 46904 0.00 5.13 27,086 23.5 45.5 70,726 126.7 167 0010 (1) Pullout 46904 0.2 217 0.4 0100 Point Supreme Campground Loop 52339 0.00 0.41 2,165 15.5 3,728 177 0101 Chessman Overloop Access Road 67845 0.00 0.16 845 26.2 2,459

0401AZ Maintenance Area Service Road 47022 0.00 0.26 1,373 18.1 1.8 2,761 4.9 0.26 145

0900 Visitor Center Parking 46922 3,038 44 0901 Ranger Station Access and Parking Area 52353 2,345 100 0902 Maintenance Area Parking 47023 1,173 140 0903 Apartment Housing Area 47433 0.1 100 0.2 111 0904 Picnic Area Parking 92114 489 0905 Sunset Overlook Parking 67728 469 0906 Alpine Pond Trailhead Parking Area 75414 1,284 0907 North View Overlook Parking 67851 485 2,227 0908 Chessman Overlook Parking 67844 565

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

0.36 233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Cedar Breaks Base

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

4/26/2023 14:35

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.4

SURFACING TABULATION SHEET - BASE

STATE

LE

N

G

TH

W

ID

TH ASPHALT

CONCRETE

PAVEMENT,

TYPE 1

FOG SEAL

CHIP SEAL,

TYPE 1C

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

ASHALT

PAVEMENT

MILLING, 4-

INCH DEPTH

20,047

BID ITEM NUMBER

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MP to MP

MILES SQFT

11,554

1,950

CRACK,

CLEANING

AND SEALING

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

Remarks

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

CEDAR BREAKS

NATIONAL MONUMENT -

BASE

15,550 0.26 884PARK TOTAL 485 48 73,803 132

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

2,227

NPS PMIS No.: 326854

Parking Areas 27,345 21,104 10,558

4,218

5,085

4,404

40601-0000 40702-0300 40711-0000 40901-2000 41402-2000 41801-1000 41801-2000 50202-0000

TON SQYD TON SQYD MILE SQYD SQYD LNFT

0010 Entrance Road 77068 0.00 0.71 3,749 24.5 6.6 10,205 18.3 0.71 651 0010 (2) Pullouts 77068 0.3 450 0.8 0010 (1) Approach 77068 0.1 267 0.5

0100 Wheeler Peak Scenic Drive 77070 0.00 11.75 62,040 21.5 95.6 148,207 265.5 4.00 223 909

0100 (1) Pullouts 77070 0.2 433 0.8 0100 (1) Approach 77070 0.1 89 0.2

0101Z, 0102Z, 0207Z

Upper Lehman Creek Campground Access Road, Upper Campground Access Road, and

Lower Campground Road 10,261 50 28

(25) Slips 77073 2,000 0106 Mather Overlook 77082 0.00 40 80.0 0.2 356 0.6 0201Z Wheeler Peak Campground Road 77072 0.00 0.6 3,168 20.0 7,040 0201Z (26) Slips 77072 1,950 0203Z Wheeler Peak Upper Campground Road 77072 0.00 0.23 1,214 16.0 2,159 0203Z (11) Slips 77072 642 0209 Lower Lehman Creek Campground Loop 77075 0.00 0.31 1,637 14.8 2,692 0209 (4) Slips 77075 233 0213 Cave Access Road 91505 670

0904 Bristlecone Parking Area 91294 4,676 36

0905 Summit Trailhead Parking 103839 964 0907 Osceola Ditch Trailhead Parking 103844 1,030 0908Z Lehman Creek Trailhead Parking 103849 181 0909Z Lehman Creek Lower Trailhead Parking 103849 300

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Great Basin Base 1

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.5

SURFACING TABULATION SHEET - BASE

STATE

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MP to MP LE

N G

TH

W

ID

TH CRACK,

CLEANING

AND SEALING

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

SEALING

JOINTS AND

CRACKS

(COLORED

SEALANT)

FOG SEAL CHIP SEAL,

TYPE 1C

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

Treat slips #12-22.

Fog seal curbs as approved by the CO. Crack seal from MP 0.00-

MP 4.00.

Treat slips #1-11 and 23-37.

3,900

MILES SQFT

4,050 2,400

18,000

92,347

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

GREAT BASIN

NATIONAL PARK - BASE

67034,128 4.71 273 1,624SHEET TOTAL 103.0 160,007 287.0

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

4/27/23 12:03 PM

17,550

2,100

5,775

NPS PMIS No.: 256277

Parking Areas

Treat slips 3, 6, 7, and 9.

3,650

21,041

8,675 9,272

Do not treat the lower level (except for striping). Apply two coats of micro surfacing.

Quantity includes two applications.

1,626 2,698

0.36

40601-0000 40702-0300 40711-0000 40901-2000 41402-2000 41801-1000 41801-2000 50202-0000

TON SQYD TON SQYD MILE SQYD SQYD LNFT

0911Z Upper Lehman Creek Picnic Area Parking 103849 615

0912Z Upper Lehman Creek Day Use Picnic Area Parking 103849 440

0914 Lehman Creek Winter Trailhead Parking (Upper Lehman Creek Campground) 103895 1,261 0.10

0916 Apartment Parking Area 87879 1,985 0917 Great Basin VC Parking Area 87880 6,111

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) = Tack Coat (Gal./sqyd)

= Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Great Basin Base 2 4/27/23 1:59 PM NPS PMIS No.: 256277

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

GREAT BASIN

NATIONAL PARK - BASE

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

0.43 240.0 0.10

233.0= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

0.36

10,412 0.10

PARK TOTAL 103 160,007 287 44,540 4.81 273 1,624

5,531

3,963

11,351

17,869

SHEET TOTAL

54,997

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MP to MP LE

N G

TH

W

ID

TH CRACK,

CLEANING

AND SEALING

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

SEALING

JOINTS AND

CRACKS

(COLORED

SEALANT)

FOG SEAL CHIP SEAL,

TYPE 1C

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

SURFACING TABULATION SHEET - BASE

STATE

MILES SQFT

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.6

40901-2000 41402-2000 41801-2000

SQYD MILE SQYD

0401 82924 0.00 0.05 264 9.0 264

0900 82918 3,209 0.00 0901 102597 751 0.06 121 0902 82935 824 85 0903 82932 323 118 0906 82929 1,619 111

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]TICA Base

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

Residence/Headquarters Parking Swinging Bridge Picnic Parking Canyon Nature Trail Parking

Maintenance Parking

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.7

SURFACING TABULATION SHEET - BASE

STATE

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

FMSS No.

MP to MP LE

N G

TH

W

ID

TH

MILES SQFT

ROUTE NAME

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

Parking Areas 28,881

MICRO

SURFACING,

TYPE 2

CRACK,

CLEANING

AND SEALING

Water Tank Road

Visitor Center Parking Lot

14,568

6,757 7,414 2,903

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

TIMPANOGOS CAVE

NATIONAL MONUMENT -

BASE

NPS PMIS No.: 326842

0.36

0.06 435PARK TOTAL 6,990

4/26/2023 14:35

40901-2000 41801-2000

SQYD SQYD

0010 65424 0.50 12.25 50,055 25.8 854

0202 65429 0.20 0.82 3,274 18.0 6,547 762

0202 65429 2,000 0202A 104978 0.00 0.26 1,373 15.2 2,319 0202A 104978 3,100 0202B 104983 0.00 0.40 2,112 15.2 3,567 0202B 104983 75 0202C 104985 0.00 0.29 1,531 13.9 2,365 0202C 104985 156 0202D 104989 0.00 0.28 1,478 13.4 2,201 0202D 104989 83 0202D 104989 44 0202E 104993 0.00 0.13 686 20.4 1,556 497 0202F 231609 0.00 0.19 1,003 15.0 1,672 0208 65431 0.08 422 13.8 25 0402 65433 0.00 0.57 3,010 21.6 7,223 533

0403 65435 0.00 0.08 422 19.2 901

0404 65436 0.00 0.07 370 15.3 628 61 0404 65436 133 0404 65436 300

0902 65482 23,232 492 0903 65483 718 0904 65471 370 0908 65475 2,166 0909A 65476 325 0909B 104999 920 0909C 105003 6,466 89 0912 65478 523 0918 65497 403 0919 65498 1,905 0920 65499 1,924 0923 65502 4,359 0924 65503 1,857

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Zion Base 1

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

0.36

Watchman Amphitheater Loop B Parking Administration Parking 19,493

2,928

209,089

Emerald Pools Horse Corral Parking 16,714

W

ID

TH

1,400

18,000

27,900

Watchman Campground Dump Station Parking

Big Bend Bus and Trailer Parking

(2) Slips Watchman Campground Loop D

(1) Pullout

(1) Slip

Watchman Campground Loops C and D Maintenance Access Watchman Campground Loop B (Side Loop)

East Rim Trail Access

ROUTE NAME

South to East Entrance (Zion-Mt Carmel Highway)

Watchman Campground Road

(22) Pullouts Watchman Campground Loop A

(31) Slips Watchman Campground Loop B

(1) Pullout Watchman Campground Loop C

MILES SQFT

D.8

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

PROJECT

SHEET

NUMBER

MICRO

SURFACING,

TYPE 2

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1)

SURFACING TABULATION SHEET - BASE

STATE

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

FMSS No.

MP to MP LE

N G

TH

Remove and reset wheel stops and speed bumps.

Remove and reset wheel stops.

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

ZION NATIONAL PARK -

BASE

80,039

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

No surface treatment.

3,313SHEET TOTAL

Maintenance Access Road

Oak Creek Headquarters Road

Pine Creek Residential Road

(1) Pullout

(2) Driveways

North Maintenance Area Parking A Oak Creek Maintenance Overflow Parking B

Oak Creek Maintenance Yard Tunnel East (Canyon Overlook) Parking

West Rim Trailhead Parking Grotto Picnic Parking

Visitor Center Parking

Weeping Rock Parking

Temple of Sinawava Parking 39,231

17,318

4,705 58,197

3,334

Do not treat concrete.

8,282

1,200 2,700

6,458

Parking Areas

4/26/23 2:35 PM

3,628 17,141

NPS PMIS No.: 326838

40901-2000 41801-2000

SQYD SQYD

0925A 65504 4,610 0925B 105002 611 0926 65661 4,586 0927 65665 1,803 0928 65663 1,813 0930 65662 3,229 0935 90406 1,240 0940 65606 3,848 0941 231229 194

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Zion Base 2

0.36

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.9

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

W

ID

TH MICRO

SURFACING,

TYPE 2

SURFACING TABULATION SHEET - BASE

STATE

BID ITEM NUMBER

Remarks

MILES

R O

U

TE

N U

M B

ER

FMSS No.

MP to MP LE

N G

TH

SQFT

29,057 Remove and reset wheel stops.

41,491 5,495 41,277 16,227 16,318

11,161 34,633

Remove and reset wheel stops.

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

SHEET TOTAL

1,748Headquarters Watchman Junction Parking

ZION NATIONAL PARK -

BASE

21,934

101,973 3,313

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

PARK TOTAL

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

NPS PMIS No.: 3268384/26/23 2:35 PM

ROUTE NAME

Zion Lodge Visitor Parking Zion Lodge Maintenance Parking

Kolob Visitors Center Parking Taylor Creek Trailhead Parking

South Fork Parking Area Kolob Canyon Overlook Parking

Watchman Campground Walk-In Sites Parking E.O.C. Parking Area

20303-2300 20401-0000 30201-2000 40301-0100 60905-1000

SQYD CUYD CUYD TON LNFT

I-Sky Maintenance Parking Lot 42 419 261 301 95

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]I-SKY Paving Option X

= Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

0.36

4/27/23 11:34 AM NPS PMIS No.: 250246

CANYONLANDS

NATIONAL PARK -

OPTION X

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

PARK TOTAL 42

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

419 261 301 95

12,400

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MP to MP

LE

N

G

TH

W

ID

TH

MILES SQFT

ASPHALT

CONCRETE

PAVEMENT, TYPE

GUTTER,

CONCRETE

REMOVAL OF

PAVEMENT,

CONCRETE

ROADWAY

EXCAVATION

ROADWAY

AGGREGATE,

METHOD 2

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.10

SURFACING TABULATION SHEET - OPTION X

STATE

40702-0300 40711-0000

SQYD TON

0010 65424 0.50 12.25 50,055 25.8 143,490 215.2

0010 6524 9,054 13.6 0011 65486 0.00 6.19 32,683 25.3 91,876 137.8 0011 65486 2,850 4.2 0011 65486 56 0.1 0013 65658 0.00 5.32 28,090 30.0 93,632 140.4 0013 65658 2,584 3.8 0013 65658 222 0.3 0208 65431 0.00 0.08 422 13.8 648 0.9 0208 65431 97 0.1 0208 65432 267 0.4

0913 65479 1,013 1.5 0915 65491 525 0.8 0916 65494 827 1.2 0921 65500 670 1.0 0929 65664 541 0.8 0932 90403 454 0.7 0933A 90404 167 0.3 0933B 104937 303 0.5 0939 65612 548 0.8 0943 231581 654 1.0

2000 = Hot Asphalt Concrete (lbs/ton)

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0565511\[utp-multi-pms2_ Proj_Sum_Shts_Post 100%QC.xlsm]Red Chip Option Y 4/26/23 2:35 PM NPS PMIS No.: 326838

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

ZION NATIONAL PARK -

OPTION Y

0.36 = Emulsified Asphalt for Chip Seal, Type 1C (Colored Aggregate) (Gal./sqyd)

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, grates, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings. Do not treat concrete ABA/concrete parking spaces.

PARK TOTAL 350,478

Parking Areas

4,085 1,500 2,730 4,933

Pine Creek Overlook Parking B East Entrance Station Parking Area

5,890

2,000

2,400

4,727

6,030 4,871

9,116

7,439

25,650

23,250

Do not treat concrete. No work on bridges 1590-003, 1590-004, 1590-006, 1590-007, and 1590-008.

81,490 Do not treat concrete.

CHIP SEAL, TYPE

1C (COLORED

AGGREGATE)

EMULSIFIED

ASPHALT

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

FMSS No.

MP to MP LE

N G

TH

W

ID

TH

MILES SQFT

ROUTE NAME

PROJECT

SHEET

NUMBER

UT

NV

NP MULTI PMS(2)

NP GRBA PMS(1) D.11

SURFACING TABULATION SHEET - OPTION Y

STATE

South to East Entrance (Zion-Mt Carmel Highway)

(47) Pullouts Zion Canyon Scenic Drive

(16) Pullouts

(1) Approach

Kolob Canyon Road

(12) Pullouts

(1) Approach

East Rim Trail Access

(1) Pullout

(1) Driveway

Checkerboard Mesa Viewpoint Parking Court of the Patriarchs Parking

Wylie Parking The Great White Throne Parking

Lee Pass Trailhead Parking Canyon Overlook Parking

Pine Creek Overlook Parking A

Upper Lee Pass Parking

AREA MAP 2

AREA

MAP 1

AREA

MAP 6

AREA

MAP 7

AREA

MAP 5

AREA

MAP 4

AREA

MAP 3

/2

4/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

D.1

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _K

E Y

M A

P.

m xd

NOTE:

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate routes and surface treatment.

Micro Surfacing Type 2

Chip Seal

LEGEND:

0 4 8 Miles

Mill and Overlay

ARCHES

NATIONAL PARK

KEY MAP

US HW

Y 191

To Salt Lake City

229 m iles

MOAB

HWY 128

COLORADO R

IV

ER

To G rand Ju ncti on

8 m ile s

DELICATE ARCH

ROAD

THE WINDOWS ROAD

ARCHES

NATIONAL

PARK ROAD No Work Unless Noted Otherwise

³

MP 1.0

MP 2.0

MP 3.0

MP 4.0

MP 5.0

ROUTE 0910

COURTHOUSE

TOWERS PARKING

ROUTE 0912

PARK AVENUE

TRAILHEAD PARKING

ROUTE 0928

ENTRANCE SIGN PARKING

ROUTE 0911

LA SAL MOUNTAINS

VIEWPOINT PARKING

ROUTE 0200

LA SAL MOUNTAINS

VIEWPOINT ROAD

ROUTE 0010

MAIN PARK ROAD

AREA MAP 2

/1

8/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

1.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 2,000 4,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 1

³

Mill and Overlay

(BASE)

BRIDGE 1348-001 COURTHOUSE

WASH BRIDGE D.1

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate routes and surface treatment.

ROUTE 0913

VISITOR CENTER

PARKING

ROUTE 0914

MAINTENANCE

PARKING

ROUTE 0920AZ

RESIDENTIAL PARKING

ROUTE 0926AZ

VISITOR CENTER

STAFF PARKING A

ROUTE 0927

ADMINISTRATIVE PARKING

ROUTE 0920BZ

FEE STATION PARKING

ROUTE 0926BZ

VISITOR CENTER

STAFF PARKING B

ROUTE 0404

ADMINISTRATION

ROAD

ROUTE 0403

ARCHES RESIDENCE

AREA ROAD

ROUTE 0401

ADMINISTRATIVE

MAINTENANCE ROAD

ROUTE 0010

MAIN PARK ROAD

MP 1.0

MP 2.0

/2

3/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

D.1

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

2.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 500 1,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 2

³

Mill and Overlay

(BASE)

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

ROUTE 0010

MAIN PARK ROAD

MP 6.0

MP 7.0

MP 8.0

ROUTE 0909

PETRIFIED DUNES

VIEWPOINT PARKING

/1

8/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

3.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 2,000 4,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 3

³

Mill and Overlay

(BASE)

BRIDGE 1348-001

WASH BRIDGE

D.1

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

MP 9.0

MP 10.0

MP 11.0

MP 1.0

MP 2.0

ROUTE 0908B

WINDOWS PARKING B

ROUTE 0925A

DOUBLE ARCH PARKING A

ROUTE 0915

BALANCED

ROCK PARKING

ROUTE 0906AZ

PANORAMA POINT PARKING A

ROUTE 0907

GARDEN OF EDEN PARKING

ROUTE 0908A

WINDOWS PARKING A

ROUTE 0925B

DOUBLE ARCH PARKING B

ROUTE 0906BZ

PANORAMA POINT PARKING B

ROUTE 0011BZ

WINDOWS LOOP SPUR

ROUTE 0204

GARDEN OF EDEN OVERLOOK ROAD

ROUTE 0205

PANORAMA OVERLOOK ROAD

ROUTE 0010

MAIN PARK ROAD

ROUTE 0011AZ

WINDOWS MAIN ROAD

/2

3/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

D.1

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

4.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

Mill and Overlay

No Work Unless Noted Otherwise

0 2,000 4,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 4

³

Staging Area

(BASE)

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

MP 12.0

MP 13.0

MP 14.0

MP 15.0

MP 16.0

ROUTE 0902

FIERY FURNACE

VIEWPOINT PARKING

ROUTE 0903

SALT VALLEY

OVERLOOK PARKING

ROUTE 0100

DELICATE ARCH ROAD

ROUTE 0207

FIERY FURNACE ROAD

ROUTE 0206

SALT VALLEY

OVERLOOK ROAD

ROUTE 0010

MAIN PARK ROAD

/2

3/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

D.1

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

5.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 2,000 4,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 5

³

Mill and Overlay

(BASE)

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

ROUTE 0901B

DEVILS GARDEN

PARKING B

(CONCRETE -

NO WORK)

MP 17.0

MP

18.0

ROUTE 0917

SKYLINE ARCH PARKING

ROUTE 0918

CAMPGROUND REGISTRATION PARKING

ROUTE 0919

CANYON WREN GROUP

CAMPGROUND PARKING

ROUTE 0901C

DEVILS GARDEN PARKING C

ROUTE 0921

CAMPGROUND RESTROOM PARKING

ROUTE 0922

JUNIPER BASIN GROUP

CAMPGROUND PARKING

ROUTE 0923AZ

CAMPGROUND

PARKING A

ROUTE 0924

AMPHITHEATER

PARKING

ROUTE 0900A

DEVILS GARDEN PICNIC PARKING A

ROUTE 0900B

DEVILS GARDEN

PICNIC PARKING B

ROUTE 0901A

DEVILS GARDEN PARKING A

ROUTE 0901B

DEVILS GARDEN

PARKING B

ROUTE 0901D

DEVILS GARDEN PARKING D

ROUTE 0916AZ

SAND DUNE ARCH

PARKING A

ROUTE 0916BZ

SAND DUNE

ARCH PARKING B

ROUTE 0923BZ

CAMPGROUND PARKING B

ROUTE 0208

DEVILS GARDEN CAMPGROUND ROAD

ROUTE 0010

MAIN PARK ROAD

/2

3/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

D.1

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

6.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 1,000 2,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 6

³

Mill and Overlay

(BASE)

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

MP 1.0 MP 2.0

ROUTE 0904A

WOLFE RANCH

PARKING NORTH

(NO WORK)ROUTE 0904B

WOLFE RANCH

PARKING SOUTH

(NO WORK)

ROUTE 0905

DELICATE ARCH

VIEWPOINT PARKING

(NO WORK)

ROUTE 0100

DELICATE ARCH ROAD

LOW WATER CROSSING

LOW WATER CROSSING

/2

4/

NPS PMIS NO.: 326865

STATE SHEET

NUMBERPROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \A

R C

H _A

R E

A M

A P

7.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 2,000 4,000 Feet

ARCHES

NATIONAL PARK

AREA MAP 7

³

Mill and Overlay

(BASE)

ROUTE 0100

DELICATE ARCH ROAD

(NO WORK)

See Inventory Program (RIP) data for Arches National Park Cycle 6 Report for additional maps and route information.

AREA MAP 2

MAP 1

AREA

MAP 3

AREA MAP 4

AREA

MAP 6

AREA MAP 5

/1

8/

NPS PMIS NO.: 250246 and 240993Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _K

E Y

_M A

P.

m xd

NOTE:

Crack Sealing

LEGEND:

No Work Unless Noted Otherwise

0 4 8 Miles

CANYONLANDS

NATIONAL PARK

KEY MAP

GREEN RIVER

CO

LO

RA

D

O R

IV

ER

UPHEAVAL DOME

ROAD

GRANDVIEW POINT

ROAD

To Salt Lake City

229 miles

Excavate Existing Gravel Base and Add Asphalt Pavement

³

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

ROUTE 0011

ISLAND IN

THE SKY ROAD

(NO WORK)

MP 3.0

MP 4.0

MP 5.0

ROUTE 0011

ISLAND IN

THE SKY ROAD

/2

3/

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _A

R E

A M

AP

1.

m xd

NOTE:

Crack Sealing

LEGEND:

Excavate Existing Gravel Base and Add Asphalt Pavement

No Work Unless Noted Otherwise

0 4,100 8,200 Feet

CANYONLANDS

NATIONAL PARK

AREA MAP 1

(BASE)

³

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate

NPS PMIS NO.: 250246 and 240993

MP 6.0

MP 7.0

ROUTE 0900

ISLAND IN THE SKY

VISITOR CENTER PARKING

(NO WORK)

ROUTE 0901

I-SKY VISITOR CENTER

EMPLOYEE PARKING

(NO WORK)

ROUTE 0902

NECK SPRINGS

TRAILHEAD PARKING

(NO WORK)

ROUTE 0406

I-SKY RESIDENCE ROAD

(NO WORK)

ROUTE 0011

ISLAND IN

THE SKY ROAD

I-SKY MAINTENANCE

PARKING LOT,

See Sheet D.56

/5

/2

STATE SHEET

NUMBERPROJECT

D.2

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _A

R E

A M

AP

2.

m xd

NOTE:

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate routes and surface treatment.

LEGEND:

Crack Sealing

No Work Unless Noted Otherwise

Excavate Existing Gravel Base and Add Asphalt Pavement

0 1,000 2,000 Feet

CANYONLANDS

NATIONAL PARK

AREA MAP 2

(BASE )

MP 8.0

MP 10.0

ROUTE 0011

ISLAND IN

THE SKY ROAD

MP 11.0

MP 12.0

ROUTE 0114 2

/2

3/

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _A

R E

A M

AP

3.

m xd

NOTE:

Crack Sealing

LEGEND:

Excavate Existing Gravel Base and Add Asphalt Pavement

No Work Unless Noted Otherwise

0 3,000 6,000 Feet

CANYONLANDS

NATIONAL PARK

AREA MAP 3

(BASE)

³

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate

MP 13.0

MP 14.0

MP 1.0

ROUTE 0923

WILLOW FLAT

CAMPGROUND PARKING

(NO WORK)

ROUTE 0903

MESA ARCH

PARKING

(NO WORK)

ROUTE 0922

GREEN RIVER

OVERLOOK PARKING

(NO WORK)

ROUTE 0410

WILLOW FLATS

SERVICE ROAD

(NO WORK)

ROUTE 0216

WILLOW FLATS

CAMPGROUND

(NO WORK)

ROUTE 0114

UPHEAVAL

DOME ROAD

ROUTE 0113

GREEN RIVER

OVERLOOK ROAD

ROUTE 0011

ISLAND IN

THE SKY ROAD

/5

/2

STATE SHEET

NUMBERPROJECT

D.2

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _A

R E

A M

AP

4.

m xd

NOTE:

Crack Sealing

LEGEND:

Excavate Existing Gravel Base and Add Asphalt Pavement

No Work Unless Noted Otherwise

0 1,000 2,000 Feet

CANYONLANDS

NATIONAL PARK

AREA MAP 4

(BASE)

³

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate

MP 14.0

MP 15.0

ROUTE 0011

ISLAND IN

THE SKY ROAD

MP 16.0

MP 17.0

ROUTE 0904

BUCK CANYON

OVERLOOK PARKING

(NO WORK)

ROUTE 0011

ISLAND IN

THE SKY ROAD

MP 18.0 ROUTE 0921

WHITE RIM

OVERLOOK PARKING

(NO WORK)

ROUTE 0905

ORANGE CLIFFS

OVERLOOK PARKING

(NO WORK)

ROUTE 0906

GRAND VIEW POINT

PARKING AREA

(NO WORK)

ROUTE 0215

WHITE RIM OVERLOOK

PICNIC AREA

(NO WORK)

ROUTE 0011

ISLAND IN

THE SKY ROAD

/5

/2

STATE SHEET

NUMBERPROJECT

D.2

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _A

R E

A M

AP

5.

m xd

NOTE:

Crack Sealing

LEGEND:

Excavate Existing Gravel Base and Add Asphalt Pavement

No Work Unless Noted Otherwise

0 3,800 7,600 Feet

CANYONLANDS

NATIONAL PARK

AREA MAP 5

(BASE)

³

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate

ROUTE 0907

AZTEC BUTTE

TRAILHEAD PARKING

(NO WORK)

ROUTE 0114

UPHEAVAL

DOME ROAD

ROUTE 0909

UPHEAVAL DOME

PICNIC PARKING

(NO WORK)

MP 3.0

MP 4.0

/5

/2

STATE SHEET

NUMBERPROJECT

D.2

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

A N

Y _A

R E

A M

AP

6.

m xd

NOTE:

Crack Sealing

LEGEND:

Excavate Existing Gravel Base and Add Asphalt Pavement

No Work Unless Noted Otherwise

0 2,500 5,000 Feet

CANYONLANDS

NATIONAL PARK

AREA MAP 6

(BASE)

³

S Road Inventory Program (RIP) data for Canyonlands National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate

MAP 1

AREA

MAP 3

AREA

MAP 2

/7

/2

NPS PMIS NO.: 326854Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

E B

R _K

E Y

_M A

P.

m xd

NOTE:

See Road Inventory Program (RIP) data for Cedar Breaks National Monument Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate routes and surface treatment.

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 3 6 Miles

Mill and Overlay

CEDAR BREAKS

NATIONAL MONUMENT

KEY MAP

I-15

HWY 14

To Cedar City

18 miles

HWY 143

MP 0.0

ROUTE 0905

SUNSET OVERLOOK

PARKING

ROUTE 0900

VISITOR CENTER PARKING

ROUTE 0901

RANGER STATION ACCESS

AND PARKING AREA

ROUTE 0010

HIGHWAY 18

ROUTE 0902

MAINTENANCE

AREA PARKING

ROUTE 0904

PICNIC AREA

PARKING

ROUTE 0903

APARTMENT

HOUSING AREA

ROUTE 0401AZ

MAINTENANCE AREA

SERVICE ROAD

ROUTE 0100

POINT SUPREME

CAMPGROUND

LOOP

/2

3/

NPS PMIS NO.: 326854Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

E B

R _A

R E

A M

AP

1.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 1,000 2,000 Feet

CEDAR BREAKS

NATIONAL MONUMENT

AREA MAP 1

Mill and Overlay

(BASE)

³

See Road Inventory Program (RIP) data for Cedar Breaks National Monument Cycle 6 Report for additional maps and route information.

MP 4.0

MP 3.0

ROUTE 0906

ALPINE POND TRAILHEAD

PARKING AREA

ROUTE 0908

CHESSMAN OVERLOOK

PARKING

ROUTE 0101

CHESSMAN OVERLOOK

ACCESS ROAD

ROUTE 0010

HIGHWAY 18

/2

3/

NPS PMIS NO.: 326854Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

E B

R _A

R E

A M

AP

2.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 1,000 2,000 Feet

CEDAR BREAKS

NATIONAL MONUMENT

AREA MAP 2

Mill and Overlay

Staging Area (BASE)

³

See Road Inventory Program (RIP) data for Cedar Breaks National Monument Cycle 6 Report for additional maps and route information.

MP 5.0

ROUTE 0907

NORTH VIEW

OVERLOOK PARKING

ROUTE 0010

HIGHWAY 18

ROUTE 0011

HIGHWAY 143

(NO WORK)

MP 1.0

MP 0.0

/2

3/

NPS PMIS NO.: 326854Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \C

E B

R _A

R E

A M

AP

3.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 1,000 2,000 Feet

CEDAR BREAKS

NATIONAL MONUMENT

AREA MAP 3

Mill and Overlay

(BASE)

³

See Road Inventory Program (RIP) data for Cedar Breaks National Monument Cycle 6 Report for additional maps and route information.

AREA MAP 7

MAP 1

AREA MAP 4

AREA MAP 3

AREA MAP 6

AREA MAP 5

AREA MAP 2

/5

/2

NPS PMIS NO.: 256277

STATE SHEET

NUMBERPROJECT

D.3

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \G

R B

A _K

E Y

_M A

P.

m xd

NOTE:

See Road Inventory Program (RIP) data for Great Basin National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate routes and surface treatment.

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 2 4 Miles

GREAT BASIN

NATIONAL PARK

KEY MAP

US HWY 50

HWY 488

HWY 487

BAKER CREEK ROAD

ROUTE 0917

GREAT BASIN VC PARKING AREA

ROUTE 0916

APARTMENT PARKING AREA

/2

3/

NPS PMIS NO.: 256277Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ U

T N

P M

U

LT

I P M

S \G

R B

A _A

R

EA

M A

P 1.

m xd

NOTE:

Micro Surfacing Type 2

Chip Seal

LEGEND:

No Work Unless Noted Otherwise

0 500 1,000 Feet

GREAT BASIN

NATIONAL PARK

AREA MAP 1

(BASE)

³

See Road Inventory Program (RIP) data for Great Basin National Park Cycle 6 Report for additional maps and route information.

BAKER CREEK ROAD

AREA MAP 4

AREA MAP 3

MP 1.0

MP 2.0

MP 3.0

MP 4.0

ROUTE…