About this file

This is a site improvement plan drawing for the City of Santa Cruz Fire Department's Fire Station #3, prepared by CG/Civil Consultants Group, Inc. The plan depicts the installation of a new metal storage building on the property located at 3335 Young Love Avenue in Santa Cruz, California. The project scope includes demolition of existing asphalt pavement through saw cutting and removal, utility trenching for electrical and fire sprinkler systems with pipe installation, concrete pad construction with subgrade preparation, formwork, rebar installation, concrete pour and finishing, building anchorage installation, and removal and replacement of the existing storm drain inlet connection with a new bio-retention area. The concrete pad must be designed to support fire apparatus weighing approximately 55,000 pounds each and meet all specifications outlined in the architectural, civil, and electrical plans. The site plan is drawn at a scale of 1 inch equals 10 feet and includes designations for existing and new asphalt pavement, concrete work, concrete flush curbs, bio-retention areas, and approximate locations for electrical and fire sprinkler trenches.

All work must comply with the 2022 California Building Codes, Chapter 6.12 of the Santa Cruz Municipal Code, and the Green Building Checklist requirements including site management, best management practices, construction waste reduction and recycling, product global warming potential compliance, and finish material pollutant control. Bidders are required to coordinate with previously selected vendors for electrical, above-ground fire sprinkler, and building installation work, attend all required City of Santa Cruz inspections, and maintain compliance with the Construction Waste Management Plan. A labor and performance bond and materials bond will be required upon project award, although a bid bond is not required for submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E) STORAGE

BUILDING

(N) STORAGE BUILDING

FF=64.5'

SI

TE

IM

PR

O

VE

M

EN

T

PL

AN

1" = 10'

C2.0

Date:

Scale:

Drawn:

Job:

Of Sheets

Sheet:

REVISIONS BY

05.08.25

TC/RK

5002.02

C

G

C

IV

IL

C

O N

SU

L T

A N

T S

G R

O U

P , I

N C

En gi ne er s/ Pl an ne rs Sc ot ts

V al le y, C A

S co tts

V al le y

Dr iv e / S ui te

1.

8.

N

EW

S

TO

RA

G

E

BU

IL

D

IN

G

A

1 2 3 4 5 6 7 8

S.

C.

F.

D

F

IR

E

ST

AT

IO

N

YO

UN

G

LO

VE

A

VE

N

UE

1 2 3 4 5 6 7 8

B

C

D

E

F

A

B

C

D

E

F

SA

N

TA

C

RU

Z, C A

LEGEND

EXISTING AC PAVEMENT

EXISTING CONCRETE

NEW AC PAVEMENT

NEW CONCRETE

CONCRETE FLUSH CURB

BIO-RETENTION AREA

HTTPS://WWW.YOUTUBE.COM/WATCH?V=PO2AHZUZIEW&INDEX=4&LIST=RDEMTZWQ9PH1A_JFG1KY9ULMNW

APPROVED

CITY OF SANTA CRUZ

These plans and details have been reviewed for compliance with the 2022 California building codes. The approval of these plans shall not be construed to be a permit for any violation of any code or ordinance. These plans shall be on the job for all requested inspections rdericco Line rdericco Callout Approx. Electrical Trench Location rdericco Line rdericco Callout Approx. Fire Sprinkler Trench Location rdericco Line

Architectural
A1.1 - VICINITY MAP, PROJECT DATA, SHEET INDEX
A1.2 - CAL GREEN MANDATORY MEASURES
A1.3 - CAL GREEN MANDATORY MEASURES
A1.4 - CAL GREEN MANDATORY MEASURES
A1.5 - CAL GREEN MANDATORY MEASURES
A2.1 - SITE PLAN
MB1 - Metal Building Drawings
MB2 - Metal Building Drawings
MB3 - Metal Building Drawings
Civil
C1.0 - EXISTING SITE & DEMOLITION
C2.0 - SITE IMPROVEMENT PLAN
C2.1 - SECTIONS
C3.0 - EROSION CONTROL PLAN
C3.1 - EROSION CONTROL DETAILS
C5.1 - DETAILS
Electrical
E1.01 - ELECTRICAL LAYOUT
E2.01 - PB SCHEDULES, LOAD CALCS &SLD
T01 - T24 COMPLIANCE REPOR