WATER SERVICE LINE MATERIAL VERIFICATION
Solicitation number
20240105
Issued by
Macomb County, Michigan

About this file

This is a comprehensive bid specification document for the City of Utica, Michigan's Water Service Line Material Verification Program. The project seeks to hire a professional construction services contractor to verify existing water service line materials throughout the city, with a goal of completing 250 service line verifications prior to March 31, 2026. The work will commence as weather permits, with contractors expected to complete verifications within 90 days of receiving address lists, which will be provided in batches of at least 30 addresses. Bid proposals are due on Monday, March 31, 2025, at 2:00 p.m. local time, with the project aimed at helping the city comply with the amended lead and copper provisions of the Michigan Safe Drinking Water Act.

The bid includes multiple unit price line items with a total estimated contract value covering service line material verification, additional verification excavations, and potential supplementary work such as sewer cleanout repairs, curb stop replacements, and site restoration. Bidders must provide pricing for each line item and propose escalation rates for potential work in subsequent years (April 1, 2026 to March 31, 2027, and April 1, 2027 to March 31, 2028). The project requires a 5% bid deposit, and the successful contractor will need to furnish performance, labor and material, and maintenance bonds. The city reserves the right to award the contract that best meets its needs and may consider additional quantities in future years, though there is no guarantee of additional work beyond the initial contract period.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

WATER SERVICE LINE MATERIAL VERIFICATION

CITY OF UTICA

MACOMB COUNTY, MICHIGAN

FEBRUARY 2025

HRC JOB NO. 20240105

555 Hulet Drive • P.O. Box 824

Bloomfield Hills, Michigan 48303-0824

CITY OF UTICA TABLE OF CONTENTS

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00010 / 1

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s m a s t e r s p e c t o c d o c x A M

TABLE OF CONTENTS

NUMBER SECTION NAME PAGE NUMBER

BIDDING REQUIREMENTS - CONTRACT PROVISIONS

00001 Title Page

00010 Table of Contents

00030 Advertisement

00120 Instructions to Bidders .....................................................................................................1 thru 4

00200 Project Overview and Scope of Services .........................................................................1 thru 3

00300 Proposal Form ..................................................................................................................1 thru 8

00500 Contract ........................................................................................................................... 1 and 2

00610 Performance Bond ........................................................................................................... 1 and 2

00620 Labor and Material Bond ................................................................................................. 1 and 2

00630 Maintenance and Guarantee Bond ................................................................................... 1 and 2

00700 General Conditions ........................................................................................................1 thru 18

00702 Enrolled House Bill No. 5541 .........................................................................................1 thru 4

00704 Enrolled Senate Bill No. 1024 .........................................................................................1 thru 4

00800 General Supplementary Conditions ...............................................................................1 thru 14

DIVISION 1 GENERAL REQUIREMENTS

01000 General Specifications ...................................................................................................1 thru 11

01220 Bid Item Description ....................................................................................................... 1 and 3

01300 Submittals ........................................................................................................................1 thru 4

01400 Quality Control ................................................................................................................1 thru 3

01500 Construction Facilities ..................................................................................................... 1 and 2

01600 Material and Equipment ..................................................................................................1 thru 4

DIVISION 2 SITE WORK

02315 Utility Trenching, Backfill and Compaction .................................................................1 thru 12

02660 Water Mains – General ....................................................................................................1 thru 9

02929 Seeding ............................................................................................................................1 thru 4

02958 Special Landscaping Requirements for Site ....................................................................1 thru 7

02970 Landscape Maintenance and Guarantee Standards ..........................................................1 thru 3

02990 Permits

SPECIAL PROVISIONS

Site Restoration ..........................................................................................................................................1 thru 5

Maintenance Aggregate, 21AA .................................................................................................................1 thru 3

Water Service Verification ........................................................................................................................1 thru 3

CITY OF UTICA ADVERTISEMENT FOR BIDS

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00030 / 1

Job No. 20240105 y d e s i g n p r o j e c t d o c s s p e c s a d v e r t i s e m e n t d o c x A M

ADVERTISEMENT FOR BIDS

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM

Sealed proposals for the construction of the Water Service Line Material Verification Program will be received by the City of Utica at the office of the City Clerk located at 7550 Auburn Road, Utica, MI 48317, (586)-739-

1600, until 2:00 p.m., Local Time on Monday, March 31, 2025, at which time and place all bids will be publicly opened and read.

Bidders shall review and comply with the Instructions to Bidders, which are incorporated by reference, and carefully review all Contract Documents, as defined in the Instructions to Bidders. Bids submitted after the exact time specified for, receipt will not be considered.

Description of Work

The approximate quantities for the major items of work for this project are as follows:

Service Line Material Verification, Curb Stop ........................................................................................... 250 Ea

Itemized breakdown of estimated quantities pertaining to the above items are included in the Proposal and must be quoted individually.

Copies of the Plans, Specifications and Proposal Forms for the project may be obtained through the Michigan

Inter-Governmental Trade Network (MITN), which may be access online at http://www.bidnetdirect.com/mitn.

Vendors wishing to obtain copies of the bidding documents will need to register through the MITN website.

Proposals submitted by Bidders who have been debarred, suspended, or made ineligible by any Federal Agency will be rejected.

Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any bid.

Each bid proposal shall be submitted on the proposal forms provided and shall be accompanied by a certified check, cashier's check or bid bond, executed by the bidder and Surety Company, payable to the City of Utica in the amount of Five Percent (5%) of the accompanying bid. Proposal Guarantee shall provide assurance that the bidder will, upon acceptance of the bid, execute the necessary Contract with the City of Utica. No bid may be withdrawn after scheduled closing time for receiving bids for at least sixty (60) days.

The successful bidder will be required to furnish the original certified bid check, satisfactory Performance, Labor and Material, and Maintenance and Guarantee Bonds in the amount of 100% of the project prior to award.

The City of Utica reserves the right to reject all bids and to waive irregularities in bidding. No Proposal will be received unless made on blanks furnished and delivered to the City Clerk on or before 2:00 p.m., Local time, Monday, March 31, 2025.

For questions pertaining to the project contact the City’s consulting engineer, Hubbell, Roth & Clark, Inc., 555

Hulet Drive, Bloomfield Hills, Michigan 48302, Attention: Rebecca Duggar. Email: rduggar@hrcengr.com

Published on MITN in February 28, 2025

CITY OF UTICA INSTRUCTIONS TO BIDDERS

WATER SERVICE LINE MATERIAL VERIFICATION 00120 / 1

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s i n s t r u c t i o n s t o b i d d e r s d o c x A M

SECTION 00120

INSTRUCTIONS TO BIDDERS

RECEIPT AND OPENING OF BIDS:

The City of Utica, Macomb County, Michigan invites Bids on the form attached hereto, all blanks of which must be appropriately filled in. Bids will be received at the office of the City Clerk of the City of Utica until the time and date stated in the “Advertisements for Bids.” Bids will be opened and read aloud at the stated time. The published invitation for Bids or Advertisement for the proposed work contains information for Bidders. A copy of the Advertisement is to be considered a part of the “Instructions to Bidders” as fully as if repeated herein.

SCOPE OF WORK

The work under this Contract shall consist of the furnishing of all labor, material, equipment, services, and all incidental items necessary to complete the project in accordance with the Contract Documents.

OBSERVATION OF SITE

Before submitting a Bid, each Bidder shall investigate the potential sites of the proposed work and to arrive at a clear understanding of the conditions under which the work is to be done.

The Bidder shall be held to have compared the Procurement Documents with the proposed scope of work and to have satisfied themselves as to the potential conditions of the premises, existing constructions, and any other conditions that may affect the carrying out of the work, before delivery of his Proposal.

No allowance or extra consideration on behalf of the Bidder will subsequently be allowed by reason of error or oversight on the part of the Bidder or on account of interferences by the Owner's or by other Bidder’s activities.

SOIL CONDITIONS

The Contractor, as such and as bidder, shall make their own determination as to soil and/or rock conditions and shall complete the work in whatever material and under whatever conditions may be encountered or created, without extra cost to the Owner. This shall apply whether or not borings are provided in the Procurement Documents.

All bidders conducting soil tests shall restore the area of their testing to original condition as closely as possible.

The Owner does not guarantee that the ground encountered during construction will conform with any boring information furnished herein.

The Owner and Hubbell, Roth & Clark, Inc. may have been involved in the design, observation, and/or construction of other underground projects in the area of the proposed construction. The observation reports, soil reports, and any soil information connected with these projects are available for construction observation and review by the prospective bidders.

INSTRUCTIONS TO BIDDERS CITY OF UTICA

00120 / 2 WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s i n s t r u c t i o n s t o b i d d e r s d o c x A M

ADVERTISEMENT

The published Advertisement for the proposed work contains information necessary to bidders. A copy of the Advertisement shall be considered a part of the Instructions to Bidders as fully as if repeated herein.

PROPOSALS

Proposals will be received in accordance with the Advertisement and shall be submitted only on forms provided by the Engineer.

Proposals shall be made in full conformity with all the conditions set forth in the Procurement Documents.

Proposals are firm and cannot be withdrawn for a period of 60 days after opening of the proposals, unless otherwise specified in the Advertisement for Bids.

NAME AND STATUS OF BIDDER

The name and legal status of the bidder, either as a corporation, partnership, or individual, shall be stated in the Proposal.

Anyone signing a Proposal as an agent of another or others, must submit with the Proposal, legal evidence of his authority to do so.

The place of residence of each bidder, or the office address and telephone number in the case of a firm or company, with County and State, must be given after his signature.

BIDDER’S QUALIFICATIONS

It is the intention of the Owner to award this Contract to a Bidder fully capable, both financially and with regard to experience to perform and complete the work in a satisfactory manner. If required by the Owner, each bidder under consideration may be required to furnish the Owner, within 48 hours at the Owner's request, the following information sworn to under oath by him:

1. Performance record.

2. The address and description of the bidder’s plant and place of business.

3. Itemized list of equipment available for use on the project.

4. A description of any similar project which the bidder has constructed in a satisfactory manner.

5. A certified or authenticated financial statement dated within sixty days prior to the opening of the proposals. The Owner may require that any items of such statements be further verified.

6. A list of contracts on which the bidder is currently engaged.

7. Such additional information as will satisfy the Owner that the bidder is adequately prepared, in technical experience and otherwise, to fulfill the Contract.

CITY OF UTICA INSTRUCTIONS TO BIDDERS

WATER SERVICE LINE MATERIAL VERIFICATION 00120 / 3

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s i n s t r u c t i o n s t o b i d d e r s d o c x A M

BID DEPOSIT

Each Proposal must be accompanied by a bid deposit in the form described in the Advertisement for Bids, Specification Section 00030, as a guarantee on the part of the bidder that they will, if called upon to do so, enter into contract in the attached form, to do the work covered by such proposal and at the price stated therein and to furnish acceptable surety for its faithful and entire fulfillment. Such certified check or bidder's bond shall be made out to the Owner and shall be subject to the conditions specified in the Proposal.

The bid deposits of all except the three lowest bidders will be returned within three days after the opening of bids. The bid deposits of the three lowest bidders will be returned within 48 hours after the Contract is awarded to the successful bidder and the signed agreement has been delivered and the required bonds have been finally approved by the Owner, or after rejection of all bids.

Surety companies providing and executing Bid Bonds shall appear on the United States Treasury Department's most current list (Circular 570) as holding certificates of authority as acceptable sureties on federal bonds. The penal sum of such bonds shall not exceed a company's underwriting limitation as stated therein. A surety company shall be licensed in the State in which it provides a bond and in the State where the Contract work is to be performed.

Failure to provide a bid bond from a qualified company shall be a basis for rejection of a proposal as non-responsive and non-responsible.

EXPLANATION TO BIDDERS BY ADDENDUMS

Neither the Owner nor the Engineer will give verbal answers to inquiries, regarding the meaning of the Procurement Documents, or give verbal instructions, previous to the award of the Contract. Any verbal statements regarding same by any persons, previous to the award, shall be unauthoritative.

Explanations desired by bidders shall be requested of the Engineer in writing and, if explanations are necessary, a reply will be made in the form of an addendum, a copy of which will be forwarded to each bidder whose work is affected.

Addendums issued to bidders prior to date of receipt of proposals shall become a part of the Procurement Documents, and all proposals shall include the work described in the addendums.

No inquiry received within 4 days of the date fixed for the opening of the bids will be given consideration.

Failure of the Engineer to send, or of the bidder to receive, any such interpretations shall not relieve the bidder from obligation under the proposal as submitted.

RIGHT TO ACCEPT, TO REJECT, AND TO WAIVE DEFECTS

The Owner reserves the right to accept any Proposal, to reject any or all Proposals, and to waive any defects or irregularity in the Proposal if it appears advantageous to the Owner to do so.

Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and recommendation of any proposal.

INSTRUCTIONS TO BIDDERS CITY OF UTICA

00120 / 4 WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s i n s t r u c t i o n s t o b i d d e r s d o c x A M

TIME OF COMPLETION

The Owner and the individual citizens of the CITY OF UTICA affected by this project are vitally concerned with the prompt completion of the construction together with the cleanup and restoration of roads and lawns within the time allowed in the Proposal.

The Bidder shall use sufficient labor and equipment to complete and place in service all of the work being constructed within this Contract within the time specified in the Proposal. The surface cleanup shall follow closely behind construction with earth spoil removed from lawns and roads and any trenches neatly finished by the end of each work day. Failure of the Bidder to comply with this type of workmanlike job will result in the suspension of construction operations until the cleanup is affected.

If the Bidder shall be unavoidably delayed in beginning or fulfilling this Contract by reason of excessive storms or floods, or by Acts of Providence, or by strikes, or by court injunction, or by stopping of the work by the Owner because of any emergency or public necessity, or by reason of alterations ordered by the Owner, the Bidder shall have no valid claim for damages on account of any cause or delay; but he shall in such case be entitled to such an extension of the above time limit herein, as the Engineer shall adjudge to be just and reasonable; provided, however, that formal claim for such extension shall be made in writing by the Bidder within a week after the date upon which such alleged cause or delay shall have occurred.

FAIR EMPLOYMENT PRACTICES

Section 4 of the Fair Employment Practices Act PA 1955, No. 251, provides:

Section 4. Every Contract to which the State or any of its political or civil subdivisions is a party shall contain a provision requiring the Bidder and his subcontractors not to discriminate against any employee or applicant for employment, to be employed in the performance of said contract, with respect to his hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment, because of his race, color, religion, national origin or ancestry. Breach of this covenant may be regarded as a material breach of the Contract.

Section 4A of the Act provides:

Section 4A. Every contract which the State or any of its political or civil subdivisions is a party shall contain a provision requiring the Bidder and his subcontractors not to discriminate against any employee or applicant for employment to be employed in the performance of such contract with respect to his hire, tenure, terms, conditions or privileges of employment or any matter directly or indirectly related to employment because of his age or sex, except where based on a bona fide occupational qualification.

END OF SECTION

CITY OF UTICA PROJECT OVERVIEW & SCOPE OF SERVICES

WATER SERVICE LINE MATERIAL VERIFICATION 00200 / 1

y d e s i g n p r o j e c t d o c s s p e c s p r o j e c t o v e r v i e w d o c x A

SECTION 00200

PROJECT OVERVIEW & SCOPE OF SERVICES

DEFINITIONS

1. Owner shall refer to the City of Utica, Utica, or City.

2. “Water Service Line” means the pipe from the discharge of the corporation fitting attached to the public water supply main to the customer premise plumbing or to the building plumbing at the first shut-off valve inside the building or 18 inches inside the building, whichever is shorter.

3. “Public Side Water Service Line” or “Public Water Service Line” means that portion of the Water

Service Line from the discharge of the corporation fitting attached to the public water supply main to the discharge of the curb stop.

4. “Private Side Water Service Line” or “Private Water Service Line” means that portion of the service line from the discharge of the curb stop to the customer premise plumbing or to the building plumbing at the first shut-off valve inside the building or 18 inches inside the building, whichever is shorter.

5. For the purposes of this RFP, a service line will be considered a “lead service line” or “LSL” if any portion of the existing service line is made of lead or any portion of the service is made of galvanized steel that is or ever was downstream of a lead pipe.

6. Service Company, Vendor, Contractor, Firm or Proposer shall refer to the company providing a proposal for the work outlined in the specifications.

PROJECT OVERVIEW

The City of Utica is accepting bids for professional construction services for the verification of existing water service line materials within the City.

As required by the amended lead and copper provisions of the Michigan Safe Drinking Water Act (MI-SDWA), each water supply system was required to submit a Complete Distribution System Materials Inventory (CDSMI) to EGLE by October 16, 2024. A result of the CDSMI was the summation of the number of water service lines in the City’s water supply system in which the piping material is unknown.

The City of Utica will utilize this Contract to assist with verifying unknown water service line materials (both public and private side) within the City.

The EGLE guidance has identified four (4) locations along the water service line for identifying materials. These four (4) points are as follows;

Point 1 – The interior portion of the service line up to the first shutoff valve or 18 inches inside the building, whichever is shorter;

Point 2 – a minimum of 18-inches away from the curb stop on the “Private” side of the service line, Point 3 – a minimum of 18-inches away from the curb stop on the “Public” side of the service line and

Point 4 – at the connection of the service line to the water main (i.e. gooseneck/pigtail)

The work for this Proposal will focus on identifying the water service line materials at Point 2 and Point 3 and potentially at Point 4.

As a part of this Contract, the contractor should be prepared to complete water service line verifications within

90 days of receiving the addresses in which the Work is to be performed. Addresses will be provided a minimum of 30 at a time.

WATER SERVICE LINE MATERIAL VERIFICATION 00200 / 2

y d e s i g n p r o j e c t d o c s s p e c s p r o j e c t o v e r v i e w d o c x A M

It is the goal for the City to have 250 service line verifications complete prior to March 31, 2026 with commencement to begin as soon as weather permits during the winter months. The list of addresses will be provided at project commencement.

The Proposal has been prepared with multiple unit price bid items, described in detail within Section 01220.

The intent is to provide options and competitively bid as-needed services for all service line verification needs that exist within a municipal water system. Bidders are required to provide a price for each line item in the

Proposal to be considered for award. The City of Utica reserves the right to award a Contract that best meets the needs of the City. Unit prices should be reasonable and well-balanced, and items should not be over-weighted.

Subject to Owner’s discretion and approval, there is a potential for additional quantities (Line Items No. 1-13) as time and budget allows for future years. Quantities for future years have not been established yet. There is also no guarantee that additional work after March 31, 2026 will be awarded. Should additional work be issued, it is assumed it will be similar in scope the estimated quantities included in the Proposal. Future Years and additional quantities will be issued by change order solely at the discretion of the Owner.

SCOPE OF SERVICES

The City is seeking a contractor(s) to expose the piping at Point 2 and Point 3 (and potentially at Point 4) of the water service line (as previously defined) to physically verify the material of the piping in place.

There are 250 water service line material verifications that need to be completed; the site addresses for these verifications will be provided at project commencement.

The goal of the Water Service Line Material Verification Program is to physically verify the total number of water services lines at Point 2 and Point 3 in the fewest number of excavations and causing as little undue disruption to the project areas as possible. Ideally, Point 2 and Point 3 can be physically verified at the curb stop

(or technically 18-inches on either side of the curb stop) within one (1) excavation. However, there may be locations where an excavation of the size necessary to expose 18-inches of piping on either side of the curb stop would cause undue disruption such as the removal of driveways, sidewalks, trees or other ornamental features.

In these cases, this Contract has provided an as-needed line item in the Proposal for an additional verification excavation so that each excavation along the service line could be located such that they do not cause undue disruption to the area. An example of this would be in a location where the curb stop is located in a sidewalk;

the location of the excavation to verify Point 2 could be moved up the Private Side of the service line (towards the house/building) far enough away from the curb stop (and sidewalk) to physically verify the service line without damaging the sidewalk. A similar process would be completed for Point 3 where the location of the excavation is moved closer to the water main (typically between the sidewalk and the back of curb or roadway) in a location that would not damage any pavement. In addition, potentially a Point 4 verification if the location is out of the roadway, sidewalk, driveway. The end result would be a physical verification of Point 2 and Point

3 (and/or Point 4) along a water service line, within the requirements of EGLE’s guidance, without having to remove any sidewalk or pavement.

During the physical verification process the Contractor shall provide the Owner documentation of material information collected from the exposed service line prior to backfilling the excavation. Specific documentation arrangements are identified in Spec Section 01220.

The Contractor shall allow time to assess the condition of the curb stop and curb stop valve box if exposed and make a recommendation on whether the curb stop or valve box need to be replaced. As-needed bid items have been included in the Proposal for the replacement of these items if deemed necessary. In addition, frequently, water service lines and sewer service lines were installed in the same trench, as such, sewer cleanouts may be

WATER SERVICE LINE MATERIAL VERIFICATION 00200 / 3

y d e s i g n p r o j e c t d o c s s p e c s p r o j e c t o v e r v i e w d o c x A M impacted by the service line verification. The Contractor shall use caution when excavating in the vicinity of a known cleanout, however, if the cleanout was unknown, buried or in poor condition and needs to be replaced or raised to the surface, an as-needed bid item has been added to the contract for this work as well. The use of any

“as-needed” Proposal items shall be used at the discretion of and only after approval by the Owner.

Maintaining traffic along typical residential streets and low volume commercial or industrial avenues should be considered included with the project. Maintaining traffic shall consist of signage, barrels, cones and other means of traffic control and site safety measures in accordance with the latest edition of the MMUTCD to assure the safety of the traveling public while also maintaining access to all local residents. Should the authority having jurisdiction (AHJ) deem that more coordinated traffic control is needed, the AHJ will either perform the traffic control themselves or negotiate a cost proposal from the Contractor based on the scope, terms, and traffic control plan needed.

The selected contractor(s) shall exercise caution when performing the Work to prevent damage to existing materials/items within the project area. The contractor shall be responsible for repairing any damage to the project area and replacing any materials/items within the project area that were damaged due to and caused by their construction operation.

The selected contractor(s) shall identify the location of any existing utility services to the home and conduct operations in such a manner as to ensure the Work does not damage any existing utilities. Work shall be accomplished in accordance with all local ordinances and right-of-way permitting, Energy Gas Company requirements for Protecting Gas Facilities, and the technical specifications for the project. The contractor shall be responsible for repairing any damages to the satisfaction of the homeowner, municipality and the utility company.

Bidders are required to provide a price for each line item in the Proposal and an escalation rate percentage for

April 1, 2026 to March 31, 2027 and April 1, 2027 to March 31, 2028 in order to be considered for award. Unit prices should be reasonable and well-balanced and items should not be over-weighted.

Any replacement work shall be guaranteed to the City to be free from defects in material and workmanship for a period of one (1) year from its completion.

Work may be needed to be completed on Saturdays or off hours to accommodate residents. No additional compensation will be allowed for work completed on Saturdays or off hours.

CITY OF UTICA PROPOSAL

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 1

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x A M

PROPOSAL

FOR

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM

MACOMB COUNTY, MICHIGAN

City of Utica Proposals Due: Monday, March 31, 2025 7550 Auburn Road On or Before 2:00 PM, Local Time Utica, MI 48317 HRC Job No. 20240105

To Prospective Bidders:

Name of Bidder:

Address:

Date: Telephone: Fax:

The above, as Bidder, hereby declares this bid is made in good faith without fraud or collusion with any persons bidding, and that the Specifications and all other information referenced in the Instructions to Bidders have been examined. Further, the Bidder is familiar with the location of the work described herein and is fully informed as to the nature of the work and the conditions relating to the performance of the Contract.

The Bidder acknowledges that no representations or warranties of any nature whatsoever have been received or are relied upon from the City of Utica its agents or employees, as to any conditions to be encountered in accomplishing the work and that the proposal is based solely upon the Bidder’s own independent judgment.

The above, as Bidder, hereby certifies that the Specifications and other data provided by the Owner for proposal purposes have been examined. Further, the undersigned certifies that the proposed construction methods have been reviewed and found acceptable for the conditions, which can be anticipated from the information provided for proposing.

The Bidder hereby affirms that the site of work has been inspected and further declares that no charges in addition to the Individual Unit Prices in the Cost Worksheet shall be made on account of any job circumstances or field conditions which were present and/or ascertainable prior to proposal submission. In addition, the Contractor, as such and as Bidder, shall make the determination as to existing soil conditions and shall also complete the work under whatever conditions created by the Contractor/Bidder’s sequence of construction, construction methods, or other conditions the Contractor/Bidder may create, at no additional cost to the Owner.

The above, as Bidder, confirms knowledge of the location of the proposed Water Service Line Material Verification Program and appurtenant construction for the City of Utica and the conditions under which it must be constructed. In addition, the Bidder agrees to perform Work in the City of Utica without prejudice.

The Bidder also declares to have carefully examined the Specifications, Request for Proposal documents and other Contract Documents which the Bidder understands and accepts as sufficient for the purpose of said Water Service Line Material Verification Program, and appurtenant work, and agrees to contract with the City of Utica to furnish all labor, materials, tools, equipment, facilities and supervision necessary to do all the work specified and prescribed for the City of Utica, in strict accordance with the Owner’s General Conditions, and with the full

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 2

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x A M intent of the Specifications, prepared by Hubbell, Roth & Clark, Consulting Engineers, and will accept in full payment therefore the sum of:

PROPOSAL ITEMS:

Item Quantity Unit Price Total Cost

1. Service Line Material Verification, Curb Stop 250 Ea @ $ = $ *

2. Additional Service Line Material Verification, (As Needed, Min. $100/Each) 50 Ea @ $ = $

3. Sewer Cleanout Repair (As Needed, Min.

$200/Each) 25 Ea @ $ = $

4. Curb Stop, 1-inch, Brass Curb Stop CTW Flare

Copper/CTS or Flare Copper (As Needed) 25 Ea @ $ = $

5. Curb Stop, 1-1/2-inch, Brass Curb Stop CTW

Flare Copper/CTS or Flare Copper (As Needed) 1 Ea @ $ = $

6. Curb Stop, 2-inch, Brass Curb Stop CTW Flare

Copper/CTS or Flare Copper (As Needed) 1 Ea @ $ = $

7. 6' Curb Valve Box, including Stainless Steel

Rod (As Needed) 25 Ea @ $ = $

8. Driveway and Sidewalk, Rem (As Needed) 60 Syd @ $ = $

9. Maintenance Aggregate, 21AA (As Needed) 30 Ton @ $ = $

10. Non-Reinforced Concrete Driveways and

Sidewalks, MDOT P1 (As Needed) 35 Syd @ $ = $

11. HMA Driveways and Handpatching, MDOT

MDOT 36A (As Needed) 25 Syd @ $ = $

12. Irrigation System Repair 15 Ea @ $ = $

13. Lawn Restoration (incl. 3” Topsoil, Seed and

Mulch Blanket, and 14-Day Watering) 200 Syd @ $ = $

Total Amount of Bid $ ___________

*Subject to Owner’s discretion and approval, there is a potential for additional quantities (Line Items No. 1-13) as time and budget allows.

Escalation Rate (%) per Unit Items

(No. 1-13)

April 1, 2026 –

March 31, 2027

April 1, 2027 –

March 31, 2028

Note: The Bidder understands that quantities for future years have not been established yet. Therefore, escalation rates for each unit item price for April 2026-2027 and April 2027-2028 will be adhered to if this project is extended. There is no guarantee that additional work after March 31, 2026 will be awarded. Should additional work be issued, it is assumed it will be similar in scope the estimated quantities included in the Proposal. Future Years and additional quantities will be issued by change order solely at the discretion of the Owner.

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 3

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x A

SUBMITTAL GUIDELINES

a. Submit sealed bids to City Clerk: 7550 Auburn Road, Utica, MI 48317

b. Bidders must provide pricing on all line items in order to be considered for award;

c. All required forms and information as requested must be furnished and presented in an organized, comprehensive and easy to follow manner;

d. Emailed proposals WILL NOT be accepted.

e. The following documents shall be submitted with the bid proposal:

• Complete bid form worksheets on Owner supplied forms.

• Certified check, cashier’s check or bid bond and completed Bid Bond form included in this Section.

• Addenda Acknowledgement herein

• Statement of Qualifications form herein

• Non-Iran linked business Vendor Certification (Section 00704)

OWNERS RIGHTS

The Owner reserves the right to add or delete items and/or quantities from the Contract. Deletion of items and/or quantities by the Owner shall not be grounds for the qualified low-bidder to adjust unit prices for other items that the Owner intends to execute as a Contract, nor shall the Contractor be entitled to compensation from unrealized profits resulting from the deletion of items and/or quantities from the

Contract. Bid unit prices are to be held firm for the duration of the project regardless of any potential changes that may occur in market value during the contractual period.

The Owner, at its sole discretion, reserves the right to award to the Bidder(s) who, in the sole determination of the Owner, will best serve the interest of the Owner. The Owner reserves the right to accept any bid, to reject any or all bids, to waive any and all informalities involving price, time, or changes in the work, and to negotiate contract terms with the successful Bidder(s), and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional bids.

Also, the Owner reserves the right to reject the bid of any Bidder if the Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the bid is not responsive or the Bidder is unqualified, of doubtful financial ability, or fails to meet any other pertinent standard or criteria established by the Owner.

Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and recommendation of any proposal.

Each Proposal must be accompanied by a bid deposit in the form of a scanned copy of a certified check, cashier's check or bid bond, executed by the bidder and Surety Company, payable to the City of Utica in the amount of Five Percent (5%) of the amount of the Proposal. See Instructions to Bidders – Bid Deposit for more information

TAXES

The Bidder affirms that all applicable Federal, State and Local taxes of whatever character and description are included in all prices stated in this Form of Proposal.

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 4

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x

ADDENDA

The Bidder acknowledges the following Addenda, covering revisions to the drawings or specifications and the cost, if any, of such revision has been included in the quoted proposal:

Addendum No. ___________________________ Dated _______________________

Addendum No. ___________________________ Dated _______________________

Addendum No. ___________________________ Dated _______________________

Addendum No. ___________________________ Dated _______________________

FEES

The Bidder shall refer to the General Conditions for allowable Fees for additional work performed, upon Owner’s written authorization, by Bidder’s own forces and/or for additional work, upon Owner’s written authorization, by Bidder’s subcontractors.

TIME OF COMPLETION

If awarded a Contract for the City of Utica Water Service Line Material Verification Program, we agree to have all work substantially completed by March 31, 2026. Please refer to Section 00200 (Project Overview and

Scope of Services) for additional information and requirements regarding the time of completion.

The Bidder hereby agrees to furnish the required Bonds, Insurance Certificates, and Policies within fifteen (15) days after acceptance of this Proposal.

Final Completion with all clean up, surface restoration and punch-list items shall be complete within 14 days of the substantial completion date in accordance with the Special Provision for Site Restoration. Final completion of the project shall be no later than April 14, 2026.

LIQUIDATED DAMAGES

Completion of the Work as scoped and provided to the selected contractors is critical for the City of Utica to meet State regulatory reporting requirements. As such, the Bidder guarantees that the work will be completed within the time limit developed and agreed to with the City of Utica.

Inasmuch as the damage and loss to the Owner which will result from the failure of the Bidder to complete the work within the stipulated time, will be most difficult or impossible to accurately determine, it is mutually agreed that the damages to the Owner for such delay and failure on the part of the Bidder shall be liquidated in the amount of Five Hundred Dollars ($500.00), for each and every calendar day by which the Bidder shall fail to complete the work or any part thereof within the provisions hereof, and such liquidated damages shall not be considered as a penalty.

The Owner will deduct and retain out of any money due or to become due hereunder the amount of the liquidated damages, and in case those amounts are less than the amount of actual liquidated damages, the Bidder shall pay the difference upon demand of the Owner.

We understand that liquidated damages may be assessed should we fail to meet the stipulated completion dates.

Specifically, liquidated damages will be assessed daily beginning April 1, 2026, until such a time that Substantial Completion is achieved and further if all work is not completed by the Final Completion Date.

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 5

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x

QUALIFICATIONS/MUNICIPAL PROJECTS/REFERENCES

The City of Utica, requires the Bidder, as the Prime Contractor, to include three (3) municipal references for projects similar to the Water Service Line Material Verification Program, as follows. The references will be checked prior to the award of the contract.

Project No. 1: Name of Project:

Project Completion Date: Contract Amount:

Name: Address:

Telephone: Firm:

Project No. 2: Name of Project:

Project No. 3: Name of Project:

PROPOSALS TO REMAIN FIRM

The price stated in this Proposal shall be guaranteed for a period of not less than sixty (60) days from the bid due date and if authorized to proceed within that period, the bidder agrees to complete the work covered by the Proposal at said price.

If this Proposal is accepted by the Owner and the undersigned shall fail to contract as aforesaid and to furnish the required surety bonds within fifteen (15) days after being notified of the acceptance of their bid, then the undersigned shall be considered to have abandoned the contract, and the Certified Check, Cashier’s Check or Bid Bond accompanying this Proposal shall be forfeited to the City of Utica.

If the undersigned enters into the contract in accordance with their proposal, or if their proposal is not accepted, then the accompanying bid guarantee shall be returned to the undersigned.

Company Name:

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 6

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x

Signature: Title:

Address:

County: State:

Telephone No.: Fax No.:

Email Address:

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 7

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x A

LEGAL STATUS OF BIDDER

This Bid is submittal in the name of:

(Print)

The undersigned hereby designates below the business address to which all notices, directions or other communications may be served or mailed:

Street

City

State Zip Code

The undersigned hereby declares the legal status checked below:

( ) INDIVIDUAL

( ) INDIVIDUAL DOING BUSINESS UNDER AN ASSUMED NAME

( ) CO-PARTNERSHIP

The Assumed Name of the Co-Partnership is registered in the County of , Michigan

( ) CORPORATION INCORPORATED UNDER THE LAWS OF THE STATE OF

. The Corporation is

( ) LICENSED TO DO BUSINESS IN MICHIGAN

( ) NOT NOW LICENSED TO DO BUSINESS IN MICHIGAN

The name, titles, and home addresses of all persons who are officers or partners in the organization are as follows:

A corporation duly organized and doing business under the laws of the State of

NAME AND TITLE HOME ADDRESS

Signed and Sealed this day of , 20__.

By (Signature)

Printed Name of Signer

Title

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00300 / 8

y d e s i g n p r o j e c t d o c s s p e c s p r o p o s a l d o c x A

BID BOND

We, the undersigned, As Principal, hereinafter called the Principal, and

A corporation duly organized under the laws of the State of

As surety, hereinafter called the SURETY, are held and firmly bound unto:

The Owner: City of Utica in the sum of Dollars ($ ), For the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has submitted a bid for

NOW, THEREFORE, if the OWNER shall accept the bid of the Principal and the Principal shall enter into a contract with the OWNER in accordance with the terms of such bid, and give such bond or bonds as may be specified in the

CONTRACT DOCUMENTS with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such contract and give such bond or bonds, if the Principal shall pay to the OWNER the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the OWNER may in good faith contract with another party to perform the work covered by said bid, then the obligation of the Principal shall be null and void, otherwise to remain in full force and effect.

Signed and sealed this day of , 20

(Witness) (Principal) (Seal)

(Title)

(Witness) (Surety)

(Title)

END OF SECTION

CITY OF UTICA CONTRACT

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00500 / 1

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s c o n t r a c t d o c x A M

CONTRACT

ARTICLES OF AGREEMENT, Made and entered into this day of , 20__, by and between

City of Utica (A Michigan Municipal Corporation), 7550 Aurburn Road, Utica, MI 48317

Party of the first part, hereinafter called the Owner, and in the , County of and State of , Party of the second part, hereinafter called the Contractor, to wit:

Item 1) That all proposals, specifications, plans, bonds, etc., hereto attached or herein referred to, shall be and are made a part of this agreement and contract.

Item 2) That the Contractor, under penalty of bond attached, shall furnish all labor, materials, and appliances necessary, and do all the work as set forth in the proposal.

Water Service Line Material Verification Program

HRC Job No. 20240105 according to the specifications, plans, etc., which have been made a part of this contract in a manner, time, and place, all and singular, as herein set forth.

IN CONSIDERATION WHEREOF, said Party of the First Part, for it and its successors, promises and agrees to pay to said Party of the Second Part, the sum of:

Dollars ($ ) as provided in the attached proposal, all in the time and manner indicated in the specifications.

For the faithful performance of all and singular of the stipulations, terms and conditions of this Agreement, said parties respectfully bind themselves, their successors, heirs, executors, administrators and assigns.

CITY OF UTICA CONTRACT

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00500 / 2

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s c o n t r a c t d o c x A M

IN WITNESS WHEREOF, Said Parties have signed this Contract, in duplicate, on the date first above written.

WITNESS: CITY OF UTICA

(A Michigan Municipal Corporation) Party of the First Part

________________________________________ By:

WITNESS:

(A Michigan Corporation) Party of the Second Part

________________________________________ By:

CITY OF UTICA PERFORMANCE BOND

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00610 / 1

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s p e r f o r m a n c e b o n d d o c x A M

PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS, That we, the undersigned as Principal, and of as Sureties, are hereby held and firmly bound unto the “Owner”

City of Utica

7550 Aurburn Road

Utica, MI 48317 in the full and just sum of Dollars

( ) for the payment of which well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns.

Signed and sealed this day of 20___.

The condition of the above obligation is such that if said shall well and faithfully do and perform the things agreed by Owner to be done and performed by the annexed contract, according to the terms thereof, then this obligation shall be void; otherwise, the same shall remain in full force and effect.

CITY OF UTICA PERFORMANCE BOND

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00610 / 2

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s p e r f o r m a n c e b o n d d o c x A M

It is mutually understood and agreed that in cases where changes are required, either by order of the Engineer, or Owner, or by mutual agreement, such changes or changes shall not modify, discharge or release this bond.

(A Michigan Corporation)

(Seal)

(Seal) Principal

(Seal)

(Seal) Surety

Signed, Sealed and Delivered in the Presence of:

CITY OF UTICA LABOR AND MATERIAL BOND

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00620 / 1

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s l a b o r a n d m a t e r i a l b o n d d o c x A M

LABOR AND MATERIAL BOND

KNOW ALL MEN BY THESE PRESENTS, That we of hereinafter called the Principal, and hereinafter called the Surety, are held and firmly bound unto the City of Utica, 7550 Auburn Road, Utica, MI 48317 in the sum of

Dollars ($ ) to the payment whereof, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

Sealed with our seals and dated this day of

, A.D., 20__.

WHEREAS, The above named Principal has entered into a contract with the City of Utica, 7550 Auburn Road, Utica, MI 48317 dated the day of , A.D., 20___, wherein said Principal has covenanted and agreed as follows, to-wit:

To furnish all the labor and material

Water Service Line Material Verification Program

HRC Job No. 20240105

AND WHEREAS, This bond is given in compliance with and subject to the provisions of Act No. 213 of the Public Acts of Michigan, for the year 1963, and as may be amended by other Public Acts of Michigan.

CITY OF UTICA LABOR AND MATERIAL BOND

WATER SERVICE LINE MATERIAL VERIFICATION PROGRAM 00620 / 2

Hubbell, Roth & Clark, Inc.

Job 20240105 y d e s i g n p r o j e c t d o c s s p e c s l a b o r a n d m a t e r i a l b o n d d o c x A M

NOW, THEREFORE, The condition of this obligation is such that if payment shall be made by the Principal to any Subcontractor or by him or any Subcontractor as the same may become due and payable of all indebtedness which may arise from him to a Subcontractor or party performing labor or furnishing materials or supplies or any Subcontractor to any person, firm or corporation on account of any labor…