Copy of USCG_Facility_Maintenance_RFI_Response_Matrix_ Updated111726.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
National Coast Guard Museum- Facility Maintenance Services
Solicitation number
USCG_70ZH01_27MUSEUMSVCS01
Issued by
Not on record

About this file

This file is a Request for Information (RFI) response matrix template designed to collect corporate, technical, and commercial feedback from prospective industry partners for National Coast Guard Museum Facility Maintenance services in New London, Connecticut. The RFI response matrix is a standardized Excel workbook with multiple tabs requiring vendors to provide: corporate background information including UEI, CAGE code, business size (NAICS 561210 with $47.0M size standard), and socioeconomic status classifications; technical experience demonstrating relevant past performance on up to two contracts within the last five years, staffing and management approaches, and enterprise CMMS (Computerized Maintenance Management System) experience with IBM Maximo or USCG Shore Asset Management (SAM); detailed feedback on specific Performance Work Statement (PWS) sections using a five-column comment matrix; and acquisition considerations including recommended FTE staffing levels, trade and labor mix, subcontracting boundaries, rough order of magnitude (ROM) annual costs, and FFP (Firm-Fixed-Price) pricing risk assessments. Prospective vendors must submit the completed Excel workbook accompanied by a PDF capability statement (8–10 pages maximum) by December 1, 2026, at 2:00 PM EST to Leeann Washington (leeann.y.washington@uscg.mil) and Arianna Williams (Arianna.m.williams@uscg.mil).

The scope encompasses 24/7 comprehensive facility maintenance for an 84,000 square-foot, six-story museum building, including HVAC and environmental controls maintaining gallery tolerances of 68°F–72°F and 45%–55% relative humidity, electrical and plumbing systems, life safety compliance (NFPA 10 and NFPA 25), four elevator servicing and emergency response, hybrid custodial services using APPA Level 1 (public galleries) and APPA Level 4 (back-of-house) standards, grounds and hardscape maintenance, and 24/7 bare-pavement snow and ice control. The anticipated contract vehicle is Firm-Fixed-Price (FFP), with the government inviting feedback on labor sizing (FTE count), trade mix and prevailing wage implications, subcontracting versus self-performance recommendations for specialized elements (four elevators, NFPA 25, Integrated Pest Management), and cost drivers and commercial risk factors associated with the FFP structure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions National Coast Guard Museum – Facility Maintenance : RFI Response Matrix Instructions

1. Purpose of this MatrixThis standardized response matrix is designed to collect corporate, technical, and commercial feedback from prospective industry partners for the National Coast Guard Museum - Facility Maintenance services in New London, CT.
2. Completion InstructionsProspective vendors should complete all blank fields across the following tabs:
• 'Corporate Background': Fill out company administrative, size standard, and contract vehicle information.
• 'Technical Experience': Provide past performance summaries (up to 2 contracts in the last 5 years), management/staffing structures, and CMMS experience.
• 'PWS Comments': Provide feedback, questions, or recommendations on specific Performance Work Statement sections using the 5-column template.
• 'Acquisition Considerations': Submit high-level staffing, trade mix, ROM cost, and FFP risk recommendations.
3. Submission GuidelinesPlease submit this completed Excel workbook along with your PDF Capability Statement (not to exceed 8-10 pages) via email.
• Submission Deadline: December 1 , 2026, by 2:00 PM EST
• Submit To: Leeann Washington (leeann.y.washington@uscg.mil) and Arianna Williams (Arianna.m.williams@uscg.mil)
• Subject Line: Response to RFI – National Coast Guard Museum Facility Maintenance

Corporate Background

National Coast Guard Museum – Facility Maintenance : Corporate Background
Information FieldVendor ResponseGovernment Notes / Guidance
Company NameInsert legal company name
Corporate AddressInsert primary business location
Company WebsiteInsert corporate website URL
Point of Contact (POC) Name & TitlePrimary POC for this market research
POC Phone NumberDirect voice/mobile contact number
POC Email AddressDirect business email address
Unique Entity Identifier (UEI)Must be active on SAM.gov
CAGE CodeMust match active registration
Business Size under NAICS 561210Size Standard: $47.0M
Socioeconomic Status (8a, SDVOSB, HUBZone, WOSB, etc.)Indicate all applicable classifications
Strategic Contract Vehicles (GSA MAS, OASIS+, etc.)List available vehicles and SINs for direct ordering

Technical Experience

National Coast Guard Museum – Facility Maintenance : Technical Experience
PART A: RELEVANT EXPERIENCE (Up to Two Contracts in the Last 5 Years)
Project Sizing & Scope MetricContract / Project Reference 1Contract / Project Reference 2National Museum Compatibility Target
Client Agency / Organizatione.g., Federal, State, Museum, Civic, etc.
Contract Number & Pricing TypeAnticipating Firm-Fixed-Price (FFP)
Annual Contract Value ($)Compare to Facility Maintenance requirements
Period of Performance (Dates)Must be within the last five (5) years
Facility Size (sq. ft.) & FloorsMuseum Target: 84k sq. ft., 6-story building
HVAC / Environmental TolerancesGallery tolerances: 68°F-72°F, 45%-55% RH
Custodial / Cleaning StandardsAPPA Level 1 (Public Galleries) vs. APPA Level 4
Full Scope of Facility Maintenance ServicesHVAC, Electrical, Plumbing, Elevators, Snow, Pest
PART B: STAFFING, MANAGEMENT & CMMS EXPERIENCE
Technical Sizing CategoryVendor Capabilities / Narrative SummaryKey Personnel / Technical RequirementsGovernment Notes
Staffing & Management ApproachKey Personnel: Support Services Manager, Quality/Safety lead, licensed trade personnelAssess hybrid custodial staffing (Day Porters vs. Night crew).
Enterprise CMMS ExperienceIdentify experience with IBM Maximo or USCG Shore Asset Management (SAM)Informs transition timing and GFI access.

PWS Comments

National Coast Guard Museum – Facility Maintenance : PWS Comment / Feedback Matrix
No.PWS Comment Type (Contract or Technical)PWS Section No.PWS Page No.Feedback
1
2
3
4
5
6
7
8
9
10

Acquisition Considerations

National Coast Guard Museum – Facility Maintenance : Acquisition Considerations
Acquisition & Sizing MetricVendor Recommendation / FeedbackGovernment Notes / Sizing Utility
Recommended Sizing (FTE Count)Directly validates labor sizing for the Independent Government Cost Estimate (IGCE)
Trade & Labor Mix (Trades needed)Informs recommended union/prevailing wage classes and Service Contract Act (SCA) match
Subcontracting BoundariesWhich specialty elements (4 Elevators, NFPA 25, IPM) should be subcontracted vs. self-performed?
Rough Order of Magnitude (ROM) Annual Cost ($)Aids in market capability sizing and budget validation
Scope Risks & Cost DriversIdentify which requirements (e.g., 24/7 bare-pavement snow deicers) represent volatile FFP pricing risk
Contract Structure FeedbackVerify if any aspect of the anticipated FFP structure has commercial conflicts or creates unnecessary risk premiums

File details come from the government source that posted it. Updated .