Copy of USCG_Facility_Maintenance_RFI_Response_Matrix_ Updated111726.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- USCG_70ZH01_27MUSEUMSVCS01
- Issued by
- Not on record
About this file
This file is a Request for Information (RFI) response matrix template designed to collect corporate, technical, and commercial feedback from prospective industry partners for National Coast Guard Museum Facility Maintenance services in New London, Connecticut. The RFI response matrix is a standardized Excel workbook with multiple tabs requiring vendors to provide: corporate background information including UEI, CAGE code, business size (NAICS 561210 with $47.0M size standard), and socioeconomic status classifications; technical experience demonstrating relevant past performance on up to two contracts within the last five years, staffing and management approaches, and enterprise CMMS (Computerized Maintenance Management System) experience with IBM Maximo or USCG Shore Asset Management (SAM); detailed feedback on specific Performance Work Statement (PWS) sections using a five-column comment matrix; and acquisition considerations including recommended FTE staffing levels, trade and labor mix, subcontracting boundaries, rough order of magnitude (ROM) annual costs, and FFP (Firm-Fixed-Price) pricing risk assessments. Prospective vendors must submit the completed Excel workbook accompanied by a PDF capability statement (8–10 pages maximum) by December 1, 2026, at 2:00 PM EST to Leeann Washington (leeann.y.washington@uscg.mil) and Arianna Williams (Arianna.m.williams@uscg.mil).
The scope encompasses 24/7 comprehensive facility maintenance for an 84,000 square-foot, six-story museum building, including HVAC and environmental controls maintaining gallery tolerances of 68°F–72°F and 45%–55% relative humidity, electrical and plumbing systems, life safety compliance (NFPA 10 and NFPA 25), four elevator servicing and emergency response, hybrid custodial services using APPA Level 1 (public galleries) and APPA Level 4 (back-of-house) standards, grounds and hardscape maintenance, and 24/7 bare-pavement snow and ice control. The anticipated contract vehicle is Firm-Fixed-Price (FFP), with the government inviting feedback on labor sizing (FTE count), trade mix and prevailing wage implications, subcontracting versus self-performance recommendations for specialized elements (four elevators, NFPA 25, Integrated Pest Management), and cost drivers and commercial risk factors associated with the FFP structure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI- Museum Facility Services- 11132026.pdf | ||
| Copy of Copy of USCG_Facility_Maintenance_RFI_Response_Matrix_ Nov 2026.xlsx | XLSX spreadsheet | |
| BOSS_PWS_CLIN001_11.13.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions National Coast Guard Museum – Facility Maintenance : RFI Response Matrix Instructions
| 1. Purpose of this Matrix | This standardized response matrix is designed to collect corporate, technical, and commercial feedback from prospective industry partners for the National Coast Guard Museum - Facility Maintenance services in New London, CT. |
| 2. Completion Instructions | Prospective vendors should complete all blank fields across the following tabs: |
| • 'Corporate Background': Fill out company administrative, size standard, and contract vehicle information. | |
| • 'Technical Experience': Provide past performance summaries (up to 2 contracts in the last 5 years), management/staffing structures, and CMMS experience. | |
| • 'PWS Comments': Provide feedback, questions, or recommendations on specific Performance Work Statement sections using the 5-column template. | |
| • 'Acquisition Considerations': Submit high-level staffing, trade mix, ROM cost, and FFP risk recommendations. | |
| 3. Submission Guidelines | Please submit this completed Excel workbook along with your PDF Capability Statement (not to exceed 8-10 pages) via email. |
| • Submission Deadline: December 1 , 2026, by 2:00 PM EST | |
| • Submit To: Leeann Washington (leeann.y.washington@uscg.mil) and Arianna Williams (Arianna.m.williams@uscg.mil) | |
| • Subject Line: Response to RFI – National Coast Guard Museum Facility Maintenance |
Corporate Background
| National Coast Guard Museum – Facility Maintenance : Corporate Background | ||
| Information Field | Vendor Response | Government Notes / Guidance |
| Company Name | Insert legal company name | |
| Corporate Address | Insert primary business location | |
| Company Website | Insert corporate website URL | |
| Point of Contact (POC) Name & Title | Primary POC for this market research | |
| POC Phone Number | Direct voice/mobile contact number | |
| POC Email Address | Direct business email address | |
| Unique Entity Identifier (UEI) | Must be active on SAM.gov | |
| CAGE Code | Must match active registration | |
| Business Size under NAICS 561210 | Size Standard: $47.0M | |
| Socioeconomic Status (8a, SDVOSB, HUBZone, WOSB, etc.) | Indicate all applicable classifications | |
| Strategic Contract Vehicles (GSA MAS, OASIS+, etc.) | List available vehicles and SINs for direct ordering |
Technical Experience
| National Coast Guard Museum – Facility Maintenance : Technical Experience | |||
| PART A: RELEVANT EXPERIENCE (Up to Two Contracts in the Last 5 Years) | |||
| Project Sizing & Scope Metric | Contract / Project Reference 1 | Contract / Project Reference 2 | National Museum Compatibility Target |
| Client Agency / Organization | e.g., Federal, State, Museum, Civic, etc. | ||
| Contract Number & Pricing Type | Anticipating Firm-Fixed-Price (FFP) | ||
| Annual Contract Value ($) | Compare to Facility Maintenance requirements | ||
| Period of Performance (Dates) | Must be within the last five (5) years | ||
| Facility Size (sq. ft.) & Floors | Museum Target: 84k sq. ft., 6-story building | ||
| HVAC / Environmental Tolerances | Gallery tolerances: 68°F-72°F, 45%-55% RH | ||
| Custodial / Cleaning Standards | APPA Level 1 (Public Galleries) vs. APPA Level 4 | ||
| Full Scope of Facility Maintenance Services | HVAC, Electrical, Plumbing, Elevators, Snow, Pest | ||
| PART B: STAFFING, MANAGEMENT & CMMS EXPERIENCE | |||
| Technical Sizing Category | Vendor Capabilities / Narrative Summary | Key Personnel / Technical Requirements | Government Notes |
| Staffing & Management Approach | Key Personnel: Support Services Manager, Quality/Safety lead, licensed trade personnel | Assess hybrid custodial staffing (Day Porters vs. Night crew). | |
| Enterprise CMMS Experience | Identify experience with IBM Maximo or USCG Shore Asset Management (SAM) | Informs transition timing and GFI access. |
PWS Comments
| National Coast Guard Museum – Facility Maintenance : PWS Comment / Feedback Matrix | ||||
| No. | PWS Comment Type (Contract or Technical) | PWS Section No. | PWS Page No. | Feedback |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 |
Acquisition Considerations
| National Coast Guard Museum – Facility Maintenance : Acquisition Considerations | ||
| Acquisition & Sizing Metric | Vendor Recommendation / Feedback | Government Notes / Sizing Utility |
| Recommended Sizing (FTE Count) | Directly validates labor sizing for the Independent Government Cost Estimate (IGCE) | |
| Trade & Labor Mix (Trades needed) | Informs recommended union/prevailing wage classes and Service Contract Act (SCA) match | |
| Subcontracting Boundaries | Which specialty elements (4 Elevators, NFPA 25, IPM) should be subcontracted vs. self-performed? | |
| Rough Order of Magnitude (ROM) Annual Cost ($) | Aids in market capability sizing and budget validation | |
| Scope Risks & Cost Drivers | Identify which requirements (e.g., 24/7 bare-pavement snow deicers) represent volatile FFP pricing risk | |
| Contract Structure Feedback | Verify if any aspect of the anticipated FFP structure has commercial conflicts or creates unnecessary risk premiums |
File details come from the government source that posted it. Updated .