US Embassy Pretoria BAS Repair SOW.docx
DOCX document 144 KB Posted
- Solicitation number
- PR16122610
- Issued by
-
Department of State US Embassy Pretoria
About this file
This is a Statement of Work (SOW) for Building Automation System (BAS) replacement and upgrade services at the US Embassy Pretoria, South Africa, prepared by the Department of State's Bureau of Overseas Building Operations. The project involves replacing obsolete legacy BAS controllers (Trend IQ series, JACE3/TONN3 gateways, and TREND 963 front end) with a new platform based on Tridium Niagara N4 Supervisor software, Tridium JACE 9000 network managing controllers, and ISMA field controllers communicating via BACnet/IP protocol. The contractor must conduct a mandatory pre-work site survey, procure and deliver all equipment, decommission legacy hardware, install new infrastructure including three wall-mounted operator interface touchscreens (minimum 10 inches), and establish a dedicated BACnet/IP network with industrial Ethernet switching throughout the facility.
The scope encompasses full monitoring and control integration of three air handling units, three chilled water system chillers, three diesel-fired boilers, multiple extract fan systems, fuel pump monitoring, server room HVAC units, and cold room temperature monitoring, with specific requirements for fresh air override functions, free cooling sequences, and smoke extract automation. The contractor must provide comprehensive programming, standard point naming conventions, graphics creation for supervisory and touchscreen interfaces, field quality control with commissioning checklists, minimum eight hours of hands-on training for facility maintenance staff, and extensive deliverables including as-built drawings, control diagrams, sequences of operation, point lists, wiring diagrams, and product data. The period of performance is 90 calendar days from award, with all work completion required within this timeframe; personnel must have minimum five years of BAS experience and current manufacturer certifications from Tridium and ISMA; and deliverables must be submitted within 30 calendar days following on-site completion. The related Expression of Interest (PR16122610) indicates interested companies should submit credentials by 28 July 2026, with a compulsory site meeting scheduled for 31 July 2026 at the embassy, and payment terms are fixed-price EFT within 30 calendar days of delivery and invoice receipt.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Building Automation System Repairs Revision 0
| Post Location: | US Embassy Pretoria, South Africa |
| Organization: | The US Department of State, Bureau of Overseas Building Operations, OPS/FAC/PS BAS Support |
| Preparation Date: | May 26, 2026 |
| Prepared By: | Jonathan Nieuwoudt |
Table of Contents
| 1. | Acronyms and Abbreviations | 3 |
| 2. | Purpose | 4 |
| 3. | Period of Performance | 7 |
| 4. | Systems Impacted by the Scope of Work | 8 |
| 5. | Scope of Work | 16 |
| 6. | Contractor’s Responsibility | 48 |
| 7. | Attachments | 53 |
UNCLASSIFIED
| BAS Replacement Statement of Work | 26-May-26 |
| Version 1.14 | Page 2 of 8 |
UNCLASSIFIED
Acronyms and Abbreviations
UNCLASSIFIED
UNCLASSIFIED
The following are commonly used acronyms and abbreviations in this document.
| BAS Replacement Statement of Work | 26-May-26 |
| Version 1.14 | Page 4 of 23 |
UNCLASSIFIED
| BAS Replacement Statement of Work | 26-May-26 |
| Version 1.14 | Page 2 of 57 |
UNCLASSIFIED
1. A&E = Architectural and Engineering
2. AHU = Air Handling Unit
3. ASHRAE = American Society of Heating, Refrigerating and Air-Conditioning Engineers
4. BAS = Building Automation System
5. CAA = Cleared Access Area (Secure Area)
6. CFSM = OBO Construction, Facilities, and Security Management
7. CLIN = Contract Line Item
8. CMR = Chief of Mission Residence
9. CO = Contracting Officer
10. COR = Contracting Officer’s Representative
11. CRP = Consolidated Receiving Point
12. DBA = Defense Base Act
13. DOS = Department of State
14. DOT = Department of Transportation
15. DS = Diplomatic Security
16. eCC = Electronic Country Clearance
17. ES = Execution Schedule
18. FAC = Facilities or OBO/OPS Facilities
19. FCU = Fan Coil Unit
20. FM = Facility Manager
21. FMS = Facility Maintenance Staff
22. GSO = General Services Officer
23. GWA = General Work Area (Unsecured Area)
24. HAZMAT = Hazardous Material
25. HVAC = Heating, Ventilation, and Air Conditioning
26. IMO = Information Management Officer
27. IBC = International Building Code
28. LAA = Limited Access Area (Unsecure)
29. MSDS = Material Safety Data Sheet
30. MSGQ = Marine Security Guard Quarters
31. NEC = New Embassy Compound or National Electrical Code
32. NFPA = National Fire Protection Association
33. NCC = New Consulate Compound
34. OBO = Bureau of Overseas Building Operations
35. O&M = Operations and Maintenance
36. OSHA = Occupational Safety and Health Administration
37. OWS = Operator Workstation
38. PAA = Public Access Area (Unsecured Area)
39. PM = Preventative Maintenance
40. Post = Department of State Overseas Embassy, Consulate, or Mission
41. POWS = Portable Operator Workstation
42. PS = Program Support
43. RSO = Regional Security Officer
44. SBU = Sensitive but Unclassified
45. SGC = Security Classification Guide
46. SME = Subject Matter Expert
47. TDY = Temporary Duty (Work Travel OCONUS)
48. VAR = Visit Authorization Request
49. VAV = Variable Air Volume
Purpose
1.1. Post requires Building Automation System (BAS) replacement and upgrade services. The Contractor shall replace the legacy control system(s) at Post as described in this Statement of Work. The Contractor shall install the new Building Automation System(s) in a safe, reliable, and efficient manner. The Contractor shall also provide inventory, documentation, and reporting services to OBO, the Building Engineer, and Post Facility Maintenance Staff (FMS).
1.2. Post has identified that the existing BAS controller hardware, including Trend IQ series controllers, JACE3/TONN3 gateways, the TREND 963 front end, and all other legacy BAS controllers, is obsolete, end of life, and no longer supported by the manufacturer. The current system presents an urgent operational risk as Embassy engineering and technical staff cannot maintain or support the building without recurring emergency interventions. Multiple pieces of HVAC equipment are at risk of uncontrolled failure due to the unsupported nature of the existing platform.
1.3. The existing BAS is built around the Trend IQ220 controller platform, which coordinates heating, cooling, ventilation, and fuel systems throughout the facility. The BAS is designed to automatically regulate temperature, airflow, and ventilation while ensuring that mechanical components operate within optimal parameters, providing real time data monitoring and control for essential systems. This entire legacy platform shall be replaced under this project.
1.4. The objective of this repair work is to:
1.4.1. Restore reliable, maintainable digital control for all critical building systems so Embassy engineering and technical staff can operate and support the building without recurring emergency interventions. The BAS replacement work required shall include, but is not limited to:
1.4.1.1. The procurement and delivery to Post of all required replacement controller hardware, supervisory front-end software, networking equipment, operator interface hardware, and associated materials
1.4.1.2. The decommissioning and removal of all existing legacy BAS controllers and gateway hardware, including 2x Trend IQ241 and 1x Trend IQ210 (main panel), 1x Trend IQ241 (boiler room), 1x TONN3/JACE3 and 2x Trend IQ4E (chiller area), the existing Trend roof controller, and the TREND 963 operator workstation/front end
1.4.1.3. The installation, wiring, setup, and checkout of all new replacement controllers, I/O modules, supervisory software, operator interface touchscreens, and networking infrastructure
1.4.1.4. Full programming of all new controllers to replicate and improve upon existing sequences of operation for AHUs (including full fresh air/free cooling sequences, after hours free cooling mode, and full fresh air override capability), main plant pumps, boilers, chillers, extract fans, fuel pump monitoring, server room HVAC monitoring, and cold room monitoring
1.4.1.5. Implementation of a BACnet/IP network architecture connecting all new field controllers, operator interface touchscreens, and the supervisory front end
1.4.1.6. Implementation of a standard point naming and numbering convention across all new controllers and the supervisory platform
1.4.1.7. Trend and Alarm configuration for all monitored and controlled points
1.4.1.8. Graphics creation for all systems on the new supervisory front end and all operator interface touchscreens
1.4.1.9. As Built drawings, O&M Manual, annotated point lists, wiring/I/O diagrams, and network topology documentation
1.4.1.10. Hands on training and competency transfer for Embassy engineering staff
1.4.2. Result in all systems replaced under this agreement being in full, reliable operational condition when the work is completed, with no retained obsolete or end of life controller hardware.
1.5. Field devices that will remain in service for this project (no replacement unless found defective or non compatible during survey and commissioning) include pneumatic reheaters, valves, actuators, and sensors that remain mechanical/pneumatic. The Contractor shall assess compatibility of all existing field devices with the new controllers during the site survey and notify the Building Engineer of any devices requiring replacement prior to procurement.
1.6. The Building Engineer is responsible for all BAS and HVAC systems at Post and shall oversee the full engineering, installation, and commissioning of this project. The Building Engineer shall serve as the Contracting Officer's Representative (COR) for this contract. All references to the COR throughout this Statement of Work shall be understood to mean the Building Engineer unless otherwise stated. All coordination, approvals, confirmations, and notifications required by this Statement of Work shall be directed to the Building Engineer.
1.7. The Contractor shall provide all necessary managerial, administrative, and direct labor personnel as well as all transportation, tools, instrumentation, equipment, and supplies required to perform the BAS replacement services defined in this Statement of Work. The Contractor shall provide the services of qualified, trained, manufacturer certified BAS technicians to perform the required work.
1.8. All work shall be accomplished in a manner which conforms to the intent of all applicable IBC, ASHRAE, NFPA/NEC, U.S. EPA, and DOS policy, procedures, and directives; causes no damage to buildings or property; endangers none of the building occupants or workers during these tasks; and leaves the areas safe for occupancy.
1.9. Contracting Officer’s Representative (COR) and COR’s Subject Matter Expert (SME):
1.9.1. The Building Engineer shall serve as the COR for this contract and shall manage all project related activities and coordination. All project related activities and coordination shall be addressed through the Building Engineer.
1.9.2. The OBO/CFSM/FAC/PS BAS Support SME for this project shall be Burke Gower
1.9.3. If, while in the process of fulfilling the requirements of this Statement of Work, the Contractor is denied access to spaces, equipment, or systems covered by this Statement of Work or is in any other way hindered from fulfilling the requirements of this Statement of Work, the Contractor is required to contact the Building Engineer and/or the SME to report the problem and request assistance. To the extent possible, the Building Engineer and/or SME will attempt to provide assistance or offer alternative approaches to fulfilling the Statement of Work requirements.
1.9.4. The Building Engineer and SME do not have the authority to obligate or to change the terms/conditions associated with the Contract. If the Contractor receives direction from any source that changes contract requirements or exceeds the scope of the Contract, the Contractor shall immediately notify the Contracting Officer in writing with a detailed explanation of the change requested and an estimate of any additional costs.
Period of Performance
1.10. The period of performance shall be 90 calendar-days from the date of award.
1.10.1. All work on-site and off-site shall be completed within the period of performance.
1.10.2. The work shall be considered deficient if the Contractor fails to provide the services outlined in this scope within the period of performance.
1.10.3. Given the urgent nature of this replacement, the Contractor shall prioritize procurement and mobilization activities immediately upon award to minimize the period during which the facility operates on legacy hardware.
Systems Impacted by the Scope of Work
1.11. New BAS Platform
1.11.1. Supervisory Platform: Tridium Niagara Framework N4 (Supervisor), installed and configured on a Government furnished operator workstation PC. The Government will provide the operator workstation PC. The Contractor is responsible for the supply, installation, and licensing of all Niagara N4 Supervisor software and for the full configuration of the supervisory platform on the Government furnished PC.
1.11.2. Network Managing Controller: Tridium JACE 9000.
1.11.3. Field Controllers: ISMA controllers, freely programmable and BACnet/IP capable, with compatible I/O expansion modules as required. The Contractor shall determine the appropriate ISMA controller models and I/O expansion module configurations based on the site survey findings and the point count requirements of each controlled system.
1.11.4. Operator Interface Touchscreens: Wall mounted touchscreen displays shall be installed in the Building Engineer's office, AHU plantroom and in the chiller plant area. Each touchscreen shall be no smaller than 10 inches in display size and shall provide full graphical interface capability equivalent to the front end operator workstation PC, including full system display, setpoint adjustment, equipment override, and all control functions required by the Building Engineer and HVAC technicians. Full requirements are detailed in Section 4.3.
1.11.5. Network Protocol: BACnet/IP shall be used for all communications throughout the system, including supervisory to controller, controller to controller, controller to I/O module, and touchscreen to controller communications. All new controllers, I/O modules, touchscreens, and network components shall be BACnet/IP compliant. Where BACnet/IP cannot be used for a specific device or application, the Contractor shall obtain written engineering approval from the Building Engineer prior to proposing or implementing any alternative communication protocol.
1.11.6. A new dedicated BACnet/IP network, including all cabling and industrial Ethernet switching infrastructure, shall be installed as part of this project. All touchscreen devices shall be connected to this network.
1.12. The following building systems are currently integrated into or monitored by the existing BAS and shall be fully integrated into the new BAS platform under this project:
1.12.1. Air Handling Units (AHUs): Three AHUs serve as the primary components of the building's HVAC system. The new BAS shall provide full monitoring and control of all three AHUs, including:
1.12.1.1. Heating and cooling coil control
1.12.1.2. Supply fan start/stop and status monitoring
1.12.1.3. Return fan start/stop and status monitoring
1.12.1.4. Exhaust damper control and position monitoring
1.12.1.5. Fresh air damper control and position monitoring
1.12.1.6. Return air damper control and position monitoring
1.12.1.7. Full fresh air/free cooling sequences as detailed in Section 4.4.6
1.12.1.8. Full fresh air override mode as detailed in Section 4.4.5
1.12.1.9. Cooling control via return air temperature with settable maximum and minimum supply air temperature limits as detailed in Section 4.4.7
1.12.1.10. Supply and return air temperature monitoring
1.12.1.11. AHU fault detection and alarm generation
1.12.2. Chilled Water System: Three Trane chillers (installed 2015) supply chilled water for air conditioning and work in conjunction with the AHUs to cool distributed air. The chillers are network capable and were previously integrated into the BAS. This integration was lost due to the failure of the JACE 3 gateway and the third party chiller monitoring controller. The new BAS shall restore and improve upon this integration. The Contractor shall reconnect the chillers to the new BACnet/IP network, restore chiller data monitoring, and restore external pipe valve control and temperature sensor monitoring. An existing control enclosure in the chiller area shall be utilized for the installation of a new network switch to bring the chillers onto the BACnet/IP network, and a new ISMA controller shall be installed within or adjacent to this enclosure to manage the pipe systems not directly linked to the chiller units. This chiller area control system shall be designed for future expansion and improvements, with spare I/O capacity and network infrastructure provisions to accommodate additional integration and control requirements in future. The new BAS shall provide, at minimum:
1.12.2.1. Chiller on/off sequencing and lead/lag coordination across all three chillers
1.12.2.2. Chilled water supply and return temperature monitoring via restored and improved temperature sensor integration
1.12.2.3. External chilled water pipe valve control, restored and improved from the previous installation
1.12.2.4. Chilled water differential pressure monitoring where sensors are available or installed
1.12.2.5. Chilled water pump start/stop, lead/lag sequencing, run hours, and fault detection
1.12.2.6. Chilled water valve actuation for distribution to AHUs
1.12.2.7. Full chiller operating data integration including status, alarms, and setpoints exposed to the BAS supervisory layer via the restored network connection
1.12.2.8. Chiller status and fault alarm reporting to the supervisory front end and all touchscreen interfaces
1.12.3. Heating System, Diesel Fired Boilers: Three diesel fired boilers generate hot water for the HVAC system, circulated to heating coils within the AHUs and to pneumatic reheaters throughout the building. The new BAS shall provide:
1.12.3.1. Boiler firing logic and hot water production control
1.12.3.2. Circulating boiler pump management (start/stop, lead/lag sequencing, run hours, fault detection)
1.12.3.3. Boiler supply and return water temperature monitoring
1.12.3.4. Boiler pressure monitoring
1.12.3.5. Safety interlock enforcement
1.12.3.6. Fuel pump status monitoring relevant to boiler operation
1.12.3.7. Boiler fault and status alarm reporting to the supervisory front end and all touchscreen interfaces
1.12.4. Pneumatic Reheaters: Pneumatic reheaters are installed throughout the facility to provide localized zone temperature control. These units operate on pneumatic control and are not currently integrated into the BAS. They will remain in service as is for this project and will not be digitized or integrated into the new BAS under this scope.
1.12.5. Extract Fan (EF) Systems: The BAS oversees multiple extract fan systems which play a key role in removing excess heat, odors, and contaminants from specific areas of the facility. The new BAS shall provide full monitoring and control of the following extract fan systems:
1.12.5.1. Toilet Extract Fans, maintaining air circulation and preventing odors in restrooms
1.12.5.2. Kitchen Canopy Extract Fans, removing heat, smoke, and grease from cooking areas
1.12.5.3. Change Room Extract Fans, improving airflow and moisture control in locker rooms
1.12.5.4. Smoke Extract Fans, activating in case of fire or smoke buildup for rapid clearance. Smoke extract sequences shall be fully programmed and tested. A manual override control shall be provided on the BAS front end, on the Niagara N4 Supervisor, and on all touchscreen interfaces, allowing the facility team to independently activate the smoke extract fans for maintenance purposes without triggering the full smoke extract sequence. A separate independent override shall also be provided to activate the full fresh air supply fans linked to the smoke extract system, allowing the facility team to run the supply and extract fans independently during maintenance operations. Both overrides shall be clearly labeled and accessible from the front end and all touchscreen interfaces. In addition, the BAS shall be programmed to automatically run the smoke extract fans and their associated supply fans once per week after hours to verify functionality and prevent damage from extended periods of non operation. The weekly run schedule shall be configurable by the Building Engineer and shall be logged in the BAS event database.
1.12.5.5. MPR Extract Fans, regulating air quality and comfort in high occupancy spaces
1.12.6. Fuel Pump Monitoring: The BAS monitors fuel pump on/off status for the two generators and fire pump day tanks. The new BAS shall maintain this monitoring capability, with fuel pump status points visible at the supervisory front end and all touchscreen interfaces, and configured with appropriate alarms for abnormal status conditions.
1.12.7. Server Room HVAC Units: Two dedicated HVAC units serve the server rooms. The new BAS shall monitor these units to provide:
1.12.7.1. Temperature monitoring to prevent overheating
1.12.7.2. Humidity monitoring to minimize risks of static discharge or moisture damage
1.12.7.3. Continuous operation status monitoring and alerts to ensure cooling efficiency
1.12.7.4. Fault and alarm reporting to the supervisory front end and all touchscreen interfaces
1.12.8. Cold Room Monitoring: The facility's cold storage room is monitored by the BAS to ensure proper refrigeration. The new BAS shall:
1.12.8.1. Monitor internal cold room temperature continuously
1.12.8.2. Generate alarms when temperatures deviate from the required range
1.12.8.3. Provide trend logging of cold room temperatures for review by facility staff
1.12.9. Atrium Units: Two atrium units previously provided temperature control for large open areas of the facility and are currently non operational. No integration of the atrium units into the new BAS is required under this project. However, the network infrastructure and BAS architecture shall include provisions and spare capacity to accommodate the future connection and integration of replacement atrium units without requiring significant rework of the installed system.
1.13. Operator Interface Touchscreen Requirements
1.13.1. Three wall mounted operator interface touchscreens shall be supplied and installed as part of this project. One touchscreen shall be installed in the Building Engineer's office, one in the AHU plantroom on Lower Level and one touchscreen shall be installed in the chiller plant area at a location to be confirmed with the Building Engineer during the site survey.
1.13.2. Each touchscreen shall meet the following minimum hardware requirements:
1.13.2.1. Display size shall be no smaller than 10 inches measured diagonally
1.13.2.2. The display shall be a capacitive touchscreen with sufficient resolution for clear graphical display of system schematics, values, and controls
1.13.2.3. The touchscreen shall be suitable for wall mounting in its designated environment. The unit installed in the chiller plant area shall be rated for the environmental conditions present in that space, including temperature, humidity, and dust exposure.
1.13.2.4. The touchscreen shall be powered via the BACnet/IP network infrastructure or by a dedicated power supply as appropriate for the selected hardware
1.13.2.5. The touchscreen shall be connected to the BACnet/IP network and shall communicate directly with the JACE 9000 and/or ISMA field controllers
1.13.3. Each touchscreen shall provide full access to all BAS systems equivalent to the front end operator workstation PC. This is to ensure that all adjustments, testing, and overrides required by the Building Engineer or HVAC technicians can be performed quickly and easily from all touchscreen location without requiring access to the main operator workstation. Full access shall include, but is not limited to:
1.13.3.1. Full graphical display of all systems across the entire BAS, consistent with the graphics developed for the Niagara N4 Supervisor platform
1.13.3.2. Real time display of all system values, statuses, and alarms across all systems
1.13.3.3. Setpoint adjustment capability for all control variables accessible on the main operator workstation
1.13.3.4. Full equipment override capability for all equipment monitored and controlled by the BAS, allowing authorized users to manually start, stop, or override any equipment from the touchscreen interface
1.13.3.5. Full fresh air override control for all AHU systems, consistent with the requirements of Section 4.4.5
1.13.3.6. Independent smoke extract fan override and independent full fresh air supply fan override as described in Section 4.2.4.4
1.13.3.7. Display and acknowledgment of all active alarms and system notifications, including the full fresh air override notification described in Section 4.4.5
1.13.3.8. Access to trend data and reports for all configured trend points
1.13.3.9. User access control. The touchscreen shall require user authentication before allowing setpoint adjustments or equipment overrides. Read only display of system status shall be available without authentication.
1.13.4. Building Engineer's Office Touchscreen: The touchscreen installed in the Building Engineer's office shall provide complete access to all BAS graphics and controls, providing the Building Engineer with a full local interface for day to day system management, engineering adjustments, and oversight of all building systems without requiring access to the main operator workstation.
1.13.5. AHU plantroom and Chiller Plant Area Touchscreen: The touchscreen installed in the chiller plant area and AHU plantroom shall provide complete access to all BAS graphics and controls. This interface shall allow plant operators and HVAC technicians to perform all monitoring, setpoint adjustments, and equipment overrides directly from the plant area.
1.13.6. The Contractor shall confirm the exact mounting location, height, and orientation of each touchscreen with the Building Engineer during the site survey. All mounting hardware, conduit, cabling, and associated installation materials shall be supplied and installed by the Contractor.
1.13.7. The Contractor's proposal shall include the proposed touchscreen make, model, display size, environmental rating, and communication interface in the technical equipment list required under Section 4.1.3.
All extract fans shall have run commands, status feedback, fault alarms, interlocks, and smoke extract sequences programmed and operational in the new BAS.
Scope of Work
1.14. Parts and Materials
1.14.1. General
1.14.1.1. Licenses: All new software licenses shall be made out to the “The U.S. Department of State”. Licenses shall allow the Government to work directly with the BAS, software, and hardware manufacturers. It shall not be necessary after the project warranty period for DOS to work through installing Contractor to obtain new or modified licenses, parts, upgrades, and technical support from BAS manufacturer.
1.14.1.2. Admin Accounts: For any new software that is provided, the Contractor shall create an Administrator level User Account called “BAS Support” in the Operating System, the BAS software and the encryption software. The account shall be configured in such a manner that it cannot be deleted by an account that does not have Administrator rights. The Contractor will utilize a random password generator to create a password for this account and share this information with Post. The Contractor shall also create additional Administrator level User Accounts for Post, if requested to do so.
1.14.1.3. Parts Selection: All new controllers, I/O modules, touchscreens, and network components shall utilize BACnet/IP protocol. Field controllers shall be ISMA brand. The network managing controller shall be a Tridium JACE 9000. The diversity of part types and product numbers shall be kept to a minimum across the installation. Where BACnet/IP cannot be used for a specific device or application, the Contractor shall obtain written engineering approval from the Building Engineer prior to proposing or implementing any alternative communication protocol.
1.14.1.4. Substitution: Should the Contractor elect to use a part or material other than that specified by this Statement of Work, the Contractor shall submit a Material Substitution Request Form to the Building Engineer for review and approval prior to procurement. Substituted parts shall not impose additional costs or extend the Period of Performance. Submission of a material substitution request does not guarantee that the suggested material will be accepted.
1.14.1.5. Spares: The Contractor shall provide one (1) or ten percent (10%), whichever is greater, spares for all items with the exception of Operator Workstations, Laptops, and those parts specifically stated to not require spares by this Statement of Work.
1.14.2. The Contractor shall be responsible for conducting a full site survey to determine the complete design and quantity requirements for all equipment and materials needed to fulfill this scope of work. The Contractor shall procure, deliver to Post, install, and test all required material and parts. At minimum, the following categories of equipment shall be included in the Contractor's design and proposal:
1.14.2.1. Tridium Niagara N4 Supervisor software license(s) for installation on the Government furnished operator workstation PC
1.14.2.2. Tridium JACE 9000 network managing controller(s) with sufficient proxy point licensing to accommodate all field points across all systems described in Section 4.2
1.14.2.3. ISMA field controllers and compatible I/O expansion modules, in quantities and configurations as determined by the Contractor's site survey and design, sufficient to provide full monitoring and control of all systems listed in Section 4.2, including a dedicated ISMA controller for the chiller area pipe systems
1.14.2.4. Three wall mounted operator interface touchscreens, each no smaller than 10 inches in display size, meeting all requirements of Section 4.3, including all mounting hardware, cabling, and power supply equipment
1.14.2.5. BMS graphical user interface (GUI) development, including graphics, navigation, system database, historical database, alarm database, and reporting database for all systems listed in Section 3.2, developed for both the Niagara N4 Supervisor platform and the touchscreen interfaces
1.14.2.6. New industrial Ethernet network switches of sufficient port count and specification to support the full BACnet/IP network including all touchscreen devices and the chiller area network connection
1.14.2.7. New network cabling and reticulation infrastructure to support the BACnet/IP network throughout the facility, including cabling to all touchscreen locations and to the chiller area control enclosure. New dedicated network cabling shall be installed; existing cable routes shall be used where practicable.
1.14.2.8. Replacement field sensors and end devices as identified during the site survey as defective or incompatible with the new controller platform
1.14.2.9. New controller enclosures where required, including all internal electrical components, cable management, and wiring
1.14.2.10. All associated sundries, wiring materials, cable management, labels, and fixings required for a complete and professional installation
1.14.3. Proposal Technical Equipment List: The Contractor's proposal shall include a full technical equipment list detailing all equipment proposed for installation. This list shall include, at minimum, the manufacturer, model number, description, and technical specifications for every item of hardware and software proposed, including the proposed touchscreen make, model, display size, environmental rating, and communication interface. The technical equipment list shall also include the proposed point count per controller and a summary network architecture diagram showing the location of all controllers, touchscreens, and network components. Proposals that do not include a complete technical equipment list will not be considered.
1.15. Pre Work Site Survey
1.15.1. Prior to procurement of any materials, the Contractor shall conduct a detailed site survey of all existing BAS panels, controllers, field devices, wiring, and network infrastructure. The site survey is a mandatory requirement and shall be completed and documented before any procurement activity commences. The survey shall:
1.15.1.1. Confirm the exact I/O point count and wiring configuration for each existing controller being replaced, covering all systems listed in Section 3.2
1.15.1.2. Assess compatibility of all existing field devices (sensors, actuators, valves, damper actuators, status switches, etc.) with the new ISMA controller platform
1.15.1.3. Identify any field devices that are defective or incompatible and require replacement under this project
1.15.1.4. Assess the existing network infrastructure and identify all cabling routes, conduit availability, and any constraints affecting the new BACnet/IP network installation
1.15.1.5. Confirm and document the proposed mounting locations for all operator interface touchscreens, including the Building Engineer's office, AHU plantroom and the chiller plant area, in consultation with the Building Engineer
1.15.1.6. Assess and document the existing chiller network capability, the condition of the existing chiller area control enclosure, and the requirements for restoring and improving chiller integration, external pipe valve control, and temperature sensor monitoring. Confirm the suitability of the existing enclosure for installation of a new network switch and ISMA controller, and identify any additional infrastructure required.
1.15.1.7. Identify long lead spares and any obsolete field devices and provide a recommended critical spares list to the Building Engineer
1.15.1.8. Document existing sequences of operation for all systems to be replaced, including the full fresh air/free cooling sequences for the three AHUs
1.15.1.9. Produce a confirmed design, network architecture, and bill of materials for Building Engineer approval prior to procurement
1.16. Decommissioning
1.16.1. The Contractor shall decommission and remove the following existing legacy hardware:
1.16.1.1. Main panel: 2x Trend IQ241, 1x Trend IQ210
1.16.1.2. Boiler room: 1x Trend IQ241
1.16.1.3. Chiller area: 1x TONN3/JACE3 gateway, 2x Trend IQ4E
1.16.1.4. Roof panel: existing Trend roof controller
1.16.1.5. Front end/operator workstation: TREND 963 and associated hardware
1.16.1.6. Any additional legacy controllers, gateways, or network hardware identified during the site survey
1.16.2. Prior to decommissioning any existing controller, the Contractor shall:
1.16.2.1. Fully document the existing wiring, point assignments, and sequences of operation for that controller
1.16.2.2. Confirm that the replacement controller is ready for immediate installation to minimize system downtime
1.16.2.3. Coordinate the decommissioning sequence with the Building Engineer to ensure critical systems (boilers, chillers, server room HVAC) are not simultaneously taken offline
1.16.3. All decommissioned hardware shall be handled in accordance with Post security requirements. Disposal of removed equipment shall be coordinated with and approved by the Building Engineer prior to removal from site.
1.17. Installation
1.17.1. Network Infrastructure: The Contractor shall install a new, dedicated BACnet/IP network infrastructure throughout the facility, including:
1.17.1.1. New industrial Ethernet switches installed in appropriate locations to serve all controller panels and touchscreen devices, including a dedicated network switch installed in the existing chiller area control enclosure to connect the chillers and chiller area ISMA controller to the BACnet/IP network
1.17.1.2. New CAT5E or better network cabling run throughout the facility along existing cable routes where practicable, connecting all new ISMA field controllers, the JACE 9000, all three operator interface touchscreens, the chiller area control enclosure, and the operator workstation to the BACnet/IP network
1.17.1.3. All network components shall be properly labeled, documented, and included in the network topology map deliverable
1.17.2. Supervisory Platform: The Contractor shall:
1.17.2.1. Install and fully configure the Tridium Niagara N4 Supervisor software on the Government furnished operator workstation PC
1.17.2.2. Install and configure the Tridium JACE 9000 network managing controller, establishing BACnet/IP communications to all new ISMA field controllers and touchscreen devices
1.17.2.3. Configure the JACE 9000 with sufficient proxy point licensing to accommodate all field points across all systems
1.17.2.4. Develop and implement the full BMS graphical user interface on the Niagara N4 Supervisor platform, covering all systems listed in Section 3.2
1.17.2.5. Operator Interface Touchscreen Installation: The Contractor shall:
1.17.2.6. Supply and install one wall mounted touchscreen in the Building Engineer's office at the location confirmed during the site survey
1.17.2.7. Supply and install one wall mounted touchscreen in the chiller plant area and one wall mounted touchscreen in the AHU plantroom at the locations confirmed during the site survey
1.17.2.8. Provide and install all mounting hardware, brackets, conduit, cabling, and power supply equipment required for each touchscreen installation
1.17.2.9. Connect each touchscreen to the BACnet/IP network and configure communications to the JACE 9000 and/or ISMA field controllers
1.17.2.10. Configure the graphical interface on each touchscreen to provide full access to all BAS systems, consistent with the graphics developed for the Niagara N4 Supervisor, adapted as appropriate for the touchscreen display size
1.17.2.11. Configure user authentication on each touchscreen so that setpoint adjustments and equipment overrides require user login, while read only display of system status is available without authentication
1.17.2.12. Test all touchscreen functions including full system display, setpoint adjustment, equipment override, full fresh air override, smoke extract fan override, supply fan override, and alarm display and acknowledgment prior to handover
1.17.3. Chiller Area Controller Installation: The Contractor shall:
1.17.3.1. Install a new network switch within the existing chiller area control enclosure to connect the chillers and chiller area systems to the BACnet/IP network
1.17.3.2. Install a new ISMA controller within or adjacent to the existing chiller area control enclosure to manage the pipe systems not directly linked to the chiller units, including external pipe valve control and temperature sensor monitoring
1.17.3.3. Restore the network connection to all three Trane chillers, restoring full chiller data integration including status, alarms, and setpoints to the BAS supervisory layer
1.17.3.4. Restore and improve external chilled water pipe valve control and temperature sensor monitoring
1.17.3.5. Design and install the chiller area control system with spare I/O capacity and network infrastructure provisions to accommodate future expansion and additional integration requirements without requiring significant rework of the installed system
1.17.3.6. Complete all wiring, terminations, and labeling within the chiller area control enclosure in accordance with the wiring diagrams
1.17.4. Field Controller Installation: The Contractor shall:
1.17.4.1. Retro fit existing panel enclosures as applicable, decommissioning existing equipment and installing new ISMA controllers and I/O modules, completing all wiring and terminations
1.17.4.2. Install new controller enclosures in designated plant rooms where required, including all internal electrical components, cable management, and wiring
1.17.4.3. Replace any field sensors or end devices identified during the site survey as defective or incompatible with the new platform
1.17.4.4. Ensure all wiring is neatly dressed, labeled, and terminated in accordance with the wiring diagrams
1.17.5. Full Fresh Air Override: The Contractor shall implement a full fresh air override function for each AHU. This function shall operate as follows:
1.17.5.1. A clearly labeled override button or control shall be provided on each AHU graphic page on the Niagara N4 Supervisor and on all three operator interface touchscreens
1.17.5.2. When the full fresh air override is activated by an operator, the affected AHU shall immediately transition to full fresh air mode, opening the fresh air damper to 100%, opening the exhaust damper to 100%, driving the return air damper to fully closed, and commanding the extract fans associated with that AHU to full operation, regardless of the current automatic control mode or schedule
1.17.5.3. When the full fresh air override is active, the cooling coil valve and heating coil valve shall be commanded to their respective off or closed positions unless safety conditions require otherwise
1.17.5.4. When the full fresh air override is activated, a clearly visible notification shall appear on the BAS graphics alarm and notification area on the Niagara N4 Supervisor and on all three operator interface touchscreens. The notification shall clearly identify which AHU is in override mode and the time at which the override was activated.
1.17.5.5. The full fresh air override shall remain active until it is manually deactivated by an authorized operator. The system shall not automatically cancel the override based on time or schedule.
1.17.5.6. When the override is deactivated, the AHU shall return to normal automatic control and the override notification shall be cleared from the alarm and notification area.
1.17.5.7. All activations and deactivations of the full fresh air override shall be logged in the BAS alarm and event database with a timestamp and the user account that performed the action.
1.17.5.8. The full fresh air override function shall be accessible from the Building Engineer's office touchscreen, AHU plantroom and the chiller plant area touchscreen in addition to the main operator workstation.
1.17.6. Full Fresh Air / Free Cooling Sequence: The Contractor shall implement a full fresh air/free cooling sequence for each AHU. This sequence shall operate as follows:
1.17.6.1. During occupied hours, when outside air conditions (temperature and humidity) meet predefined parameters set by the Building Engineer, the system shall modulate toward full fresh air cooling, reducing or eliminating mechanical cooling demand while maintaining the minimum supply air temperature limit.
1.17.6.2. After hours, the system shall automatically operate in full fresh air/free cooling mode to cool the building down overnight. During after hours free cooling operation, the minimum supply air temperature limit shall be overridden to allow the system to take full advantage of cooler outside air conditions without restriction from the supply air temperature low limit. The fresh air damper shall open to 100%, the return air damper shall be driven to fully closed, the exhaust damper shall open to 100%, and mechanical cooling shall be disabled.
1.17.6.3. The after hours free cooling mode shall operate according to a configurable schedule set by the Building Engineer and shall automatically return the AHU to normal occupied control at the configured occupied start time.
1.17.6.4. All free cooling mode transitions shall be logged in the BAS event database with timestamps.
1.17.7. Cooling Control: The Contractor shall implement the following cooling control strategy for each AHU:
1.17.7.1. The primary cooling control variable shall be the return air temperature. The chilled water cooling coil valve shall be modulated to maintain the return air temperature at a user settable return air temperature setpoint.
1.17.7.2. In addition to return air temperature control, a settable maximum supply air temperature limit and a settable minimum supply air temperature limit shall be implemented for each AHU. These limits shall act as high and low supply air temperature constraints on the cooling control output during occupied hours. The minimum supply air temperature limit shall be overridden during after hours free cooling operation as described in Section 5.4.7.2.
1.17.7.3. If the supply air temperature rises above the settable maximum supply air temperature limit, the cooling control output shall be increased to bring the supply air temperature back within the acceptable range, regardless of the return air temperature control demand.
1.17.7.4. If the supply air temperature falls below the settable minimum supply air temperature limit during occupied hours, the cooling control output shall be reduced or the cooling coil valve shall be commanded toward closed to prevent over cooling of the supply air, regardless of the return air temperature control demand.
1.17.7.5. All cooling control setpoints, including the return air temperature setpoint, the maximum supply air temperature limit, and the minimum supply air temperature limit, shall be adjustable by authorized operators from the Niagara N4 Supervisor, the Building Engineer's office touchscreen, AHU plantroom and the chiller plant area touchscreen.
1.17.7.6. The current return air temperature, supply air temperature, cooling coil valve position, and all active cooling setpoints shall be displayed on the AHU graphic pages on the Niagara N4 Supervisor and on both operator interface touchscreens.
1.17.7.7. An alarm shall be generated if the supply air temperature exceeds the maximum supply air temperature limit or falls below the minimum supply air temperature limit during occupied hours for a configurable time period, indicating that the cooling system is unable to maintain the supply air temperature within the required range.
1.17.8. Programming Requirements: The Contractor shall program all new ISMA controllers and the Niagara N4 Supervisor to perform, at minimum, the following functions for each system:
1.17.8.1. Air Handling Units (3x AHUs):
1.17.8.1.1. Supply fan and return fan start/stop control, status monitoring, and fault detection
1.17.8.1.2. Heating coil control via modulating valve to maintain supply air temperature setpoint
1.17.8.1.3. Cooling coil control via return air temperature with maximum and minimum supply air temperature limits as described in Section 5.4.7
1.17.8.1.4. Fresh air damper modulating control to maintain minimum fresh air requirements per ASHRAE standards
1.17.8.1.5. Exhaust damper control, coordinated with fresh air damper and return air damper for proper building pressurization
1.17.8.1.6. Return air damper control, coordinated with fresh air and exhaust dampers
1.17.8.1.7. Full fresh air/free cooling sequence including after hours free cooling mode as described in Section 5.4.6
1.17.8.1.8. Full fresh air override mode as described in Section 5.4.5
1.17.8.1.9. Supply air temperature reset based on outside air temperature or zone demand
1.17.8.1.10. AHU scheduling with configurable start/stop schedules and optimized startup
1.17.8.1.11. Filter differential pressure monitoring and alarm
1.17.8.1.12. Freeze protection interlock
1.17.8.1.13. Fire/smoke interlock with smoke extract system
1.17.8.1.14. All AHU alarms surfaced to the supervisory front end and all touchscreen interfaces with appropriate alarm priorities
1.17.8.2. Chilled Water System (3x Trane Chillers):
1.17.8.2.1. Chiller on/off sequencing and lead/lag coordination across all three chillers via restored BACnet/IP network connection
1.17.8.2.2. Chilled water supply and return temperature monitoring via restored and improved temperature sensor integration
1.17.8.2.3. External chilled water pipe valve control, restored and improved from the previous installation
1.17.8.2.4. Chilled water differential pressure monitoring where sensors are available or installed
1.17.8.2.5. Chilled water pump start/stop, lead/lag sequencing, run hours, and fault detection
1.17.8.2.6. Chilled water valve actuation for distribution to AHUs
1.17.8.2.7. Full chiller operating data integration including status, alarms, and setpoints exposed to the BAS supervisory layer
1.17.8.2.8. Chiller status and fault alarm reporting to the supervisory front end and all touchscreen interfaces
1.17.8.2.9. Spare I/O capacity and network provisions maintained for future expansion
1.17.8.3. Heating System (3x Diesel Fired Boilers):
1.17.8.3.1. Boiler firing logic and hot water production control, including lead/lag sequencing across all three boilers
1.17.8.3.2. Circulating boiler pump management including start/stop, lead/lag sequencing, run hours, and fault detection
1.17.8.3.3. Hot water supply and return temperature monitoring
1.17.8.3.4. Boiler pressure monitoring
1.17.8.3.5. Outside air temperature reset of hot water supply temperature setpoint
1.17.8.3.6. Safety interlock enforcement including high temperature, high pressure, and low water cutoff
1.17.8.3.7. Fuel pump status monitoring for boiler fuel supply
1.17.8.3.8. Boiler fault and status alarm reporting to the supervisory front end and all touchscreen interfaces
1.17.8.4. Extract Fan (EF) Systems:
All extract fan systems shall have the following programmed and operational:
1.17.8.4.1. On/off run commands with status feedback confirmation
1.17.8.4.2. Fault detection and alarm generation for each fan
1.17.8.4.3. Scheduling where applicable (toilet, kitchen, change room, MPR fans)
1.17.8.4.4. Demand based control where applicable, such as conference room CO2 or occupancy based control if sensors are present
1.17.8.4.5. Smoke extract sequences. Smoke extract fans shall be programmed to activate automatically upon receipt of a fire/smoke signal and shall override normal scheduling. Smoke extract sequences shall be fully programmed, documented, and tested.
1.17.8.4.6. Independent manual override for smoke extract fans, accessible from the BAS front end and all touchscreen interfaces, allowing the facility team to activate the smoke extract fans independently for maintenance purposes without triggering the full smoke extract sequence
1.17.8.4.7. Independent manual override for the full fresh air supply fans linked to the smoke extract system, accessible from the BAS front end and all touchscreen interfaces, allowing the facility team to run the supply fans independently during maintenance operations
1.17.8.4.8. Automated weekly after hours run of smoke extract fans and associated supply fans to verify functionality and prevent damage from extended non operation. The weekly run schedule shall be configurable by the Building Engineer and all weekly run events shall be logged in the BAS event database.
1.17.8.4.9. Interlocks with AHU systems and fire alarm system where applicable and accessible
1.17.8.4.10. All extract fan alarms surfaced to the supervisory front end and all touchscreen interfaces with appropriate alarm priorities The following extract fan systems shall be individually addressed:
1.17.8.4.11. Toilet Extract Fans
1.17.8.4.12. Kitchen Canopy Extract Fans
1.17.8.4.13. Change Room Extract Fans
1.17.8.4.14. Smoke Extract Fans
1.17.8.4.15. MPR Extract Fans
1.17.8.5. Fuel Pump Monitoring:
1.17.8.5.1. Monitor on/off status of fuel pumps for the two generators and fire pump day tanks
1.17.8.5.2. Generate alarms for abnormal fuel pump status conditions, such as pump running unexpectedly or pump failed to start
1.17.8.5.3. Surface all fuel pump status points and alarms to the supervisory front end and all touchscreen interfaces
1.17.8.6. Server Room HVAC Units (2x Units):
1.17.8.6.1. Continuous temperature monitoring for each server room
1.17.8.6.2. Humidity monitoring for each server room
1.17.8.6.3. Unit run status monitoring and continuous operation alerts
1.17.8.6.4. High temperature and high humidity alarm generation with appropriate alarm priorities
1.17.8.6.5. Fault alarm reporting to the supervisory front end and all touchscreen interfaces
1.17.8.6.6. Trend logging of temperature and humidity for each server room
1.17.8.6.7. Cold Room Monitoring:
1.17.8.6.7.1. Continuous internal temperature monitoring
1.17.8.6.7.2. High and low temperature alarm generation.