Updated_First_Article_Requirements.pdf

PDF 161 KB Posted

Attached to
Spares Buy Aircraft Metallic Seal for the F100 Engine, NSN 2840-01-625-7347NZ
Solicitation number
FA812125Q0001
Issued by

About this file

This is a First Article Requirements form (AFMC IMT 260) dated November 26, 2024, specifying testing requirements for an Aircraft Metallic Seal (NSN 2840016257347NZ) for the F100 series turbine engine.

The document requires 3 first article units, with 2 parts being part of production quantity and 1 part in addition to production quantity. Testing will be conducted by the contractor, with all three first articles to be inspected according to LPF-QAR-003 specifications. One article will undergo destructive testing per paragraph 3.6 of LPF-QAR-003. The contractor must notify the ACO and PCO 30 days prior to testing, and submit a test report within 60 days of contract date. The government will provide approval/disapproval within 45 days of receiving the contractor's report. First article testing may be waived for Pratt & Whitney as the prime contractor or for contractors who have previously supplied this item to DoD within the past 36 months. Test deliverables should be submitted on ISO-10149 compliant CD-ROM in Adobe PDF format. The estimated cost of government testing/inspection evaluation is $2,500.

View the file

Other files

File Type Posted
Pricing_Matrix_FA812125Q0001.xlsx XLSX spreadsheet
CDRL 1 Report.pdf PDF
Data Item Description 97.pdf PDF
3316772_SMW_REPORT.pdf PDF
3979763_BIDSET_REPORT.pdf PDF
3770088_QAIRQMT_REPORT.pdf PDF
4041521_PKGRQMT_REPORT.pdf PDF
3307830_EDL_REPORT.pdf PDF
3770082_QUALRQMT.pdf PDF
Data Item Description.pdf PDF
4041523_TRNSPDATA_REPORT.pdf PDF
3316767_ITMDESC_REPORT.pdf PDF
FA812125Q0001.pdf PDF
LPF QAR.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

26 NOV 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

77445 / 4088962

4. NSN

2840016257347NZ

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM Lot

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

IDENTIFIED IN DRAWING, SUB-TIER DRAWINGS (IF AN ASSEMBLY), AND SPECIFICATIONS IDENTIFIED THEREIN.

B. The detailed technical requirements for First Article approval tests are contained in

BLOCK 12 OF THIS FORM AND LPF-QAR-003

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

PCO

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

AFLCMC/LZPED

FA Monitor DODAAC FA8111

3001 Staff Drive, Ste 1AF1 105A

TINKER AFB, OK 73145-3041

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

N/A

N/A calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 05 Dec 2024

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 0 calendar days from date contract.

(2) Notify 0 calendar days prior to shipment.

(3) Delivered to government at

N/A

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 0 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$2,500.0000

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

X Other Disposition:

See block 12 of this form

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 05 Dec 2024

12. REMARKS

Nguyen, Hanson VNAME: 12 NOV 2024DATE:

5. First Article Quantity is 3 parts:

2 parts will be part of production quantity 1 part will be in addition to production quantity Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:

a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3. Block 5 of LPF-QAR-003.

b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPFQAR-003.

NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Block 10. Disposition of First Articles:

Destructively tested first article assets will be condemned and disposed of at vendor's facility.

Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.

First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.

This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.

Block 3: Part Number: _4088962_ Block 9: additional information for part C&E:

C. 1) DD Form 1423 ELIN:

2) Deliver due _____ calendar days from date of contract E. 1) DD Form 1423 ELIN:

2) Due ______ calendar days from date of contract

Wilson, Jacob HNAME: 26 SEP 2023DATE:

Block 3: Part Number: 4088962 Block 9: additional information for part C&E:

C. 1) DD Form 1423 ELIN:

2) Deliver due _____ calendar days from date of contract

E. 1) DD Form 1423 ELIN:

2) Due ______ calendar days from date of contract

Block 5. First Article Quantity is 3 parts:

-2 parts will be part of production quantity -1 part will be in addition to production quantity

Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:

-a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.

-b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

-c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.

-NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Block 10. Disposition of First Articles:

-1 First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.

Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.

First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.

This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Wilson, Jacob H

AFLCMC / LPSBE

884-8773

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Wilson, Jacob H

AFLCMC / LPSBE

884-8773

AFMC IMT 260, 20230316, V-5,

Version 5Generated by PRPS using Jasper Reports on 05 Dec 2024

File details come from the government source that posted it. Updated .