About this file

This is a Quality Assurance Requirements document (LPF-QAR-003) for First Article Test Plans and Reports related to F100 engine parts. The document outlines specific testing and inspection requirements for first article parts, including both destructive and non-destructive testing procedures.

The requirements specify that first articles must undergo 100% inspection with no sampling allowed, covering dimensional conformance, non-destructive inspection (FPI, ultrasonic, X-ray, visual), material properties testing, and compliance with specifications. Key requirements include serialization of all first articles, detailed dimensional inspection documentation, calibrated tooling traceable to NIST standards, and comprehensive NDI testing per Pratt & Whitney specifications. The document mandates specific submittal requirements for both First Article Test Plans (FATP) and First Article Test Reports (FATR) to the Contracting Officer, with all laboratory test results and sub-vendor testing included. All articles must be newly manufactured under the contract, with no previously manufactured items allowed without approval.

View the file

Other files

File Type Posted
Pricing_Matrix_FA812125Q0001.xlsx XLSX spreadsheet
CDRL 1 Report.pdf PDF
Data Item Description 97.pdf PDF
3316772_SMW_REPORT.pdf PDF
3979763_BIDSET_REPORT.pdf PDF
3770088_QAIRQMT_REPORT.pdf PDF
4041521_PKGRQMT_REPORT.pdf PDF
3307830_EDL_REPORT.pdf PDF
3770082_QUALRQMT.pdf PDF
Data Item Description.pdf PDF
4041523_TRNSPDATA_REPORT.pdf PDF
3316767_ITMDESC_REPORT.pdf PDF
Updated_First_Article_Requirements.pdf PDF
FA812125Q0001.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .