LPF QAR.pdf
PDF 286 KB Posted
- Solicitation number
- FA812125Q0001
About this file
This is a Quality Assurance Requirements document (LPF-QAR-003) for First Article Test Plans and Reports related to F100 engine parts. The document outlines specific testing and inspection requirements for first article parts, including both destructive and non-destructive testing procedures.
The requirements specify that first articles must undergo 100% inspection with no sampling allowed, covering dimensional conformance, non-destructive inspection (FPI, ultrasonic, X-ray, visual), material properties testing, and compliance with specifications. Key requirements include serialization of all first articles, detailed dimensional inspection documentation, calibrated tooling traceable to NIST standards, and comprehensive NDI testing per Pratt & Whitney specifications. The document mandates specific submittal requirements for both First Article Test Plans (FATP) and First Article Test Reports (FATR) to the Contracting Officer, with all laboratory test results and sub-vendor testing included. All articles must be newly manufactured under the contract, with no previously manufactured items allowed without approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pricing_Matrix_FA812125Q0001.xlsx | XLSX spreadsheet | |
| CDRL 1 Report.pdf | ||
| Data Item Description 97.pdf | ||
| 3316772_SMW_REPORT.pdf | ||
| 3979763_BIDSET_REPORT.pdf | ||
| 3770088_QAIRQMT_REPORT.pdf | ||
| 4041521_PKGRQMT_REPORT.pdf | ||
| 3307830_EDL_REPORT.pdf | ||
| 3770082_QUALRQMT.pdf | ||
| Data Item Description.pdf | ||
| 4041523_TRNSPDATA_REPORT.pdf | ||
| 3316767_ITMDESC_REPORT.pdf | ||
| Updated_First_Article_Requirements.pdf | ||
| FA812125Q0001.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .